WWYK070094 Revised Summary of Work

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
FA8101-09-R-0021-0009.pdf PDF
rfi 167 and 163 update.pdf PDF
RFI Response 161-166.doc DOC document
SOW070244 SOW Rev 3.pdf PDF
FA8101-09-R-0021-0007.doc DOC document
Question-Answers #5 to FBO.pdf PDF
FA8101-09-R-0021-0006.pdf PDF
2009 Base Facility Standard with 2007 ACP Included in Chap 13.pdf PDF
Electrical Base Stds 2007.pdf PDF
070094 Dwg M5 01 redline Rev 1.pdf PDF
BoilerPlateLanguage.pdf PDF
070094 Dwg A6 00 Rev 1.pdf PDF
070094 Spec 15400 - Rev 1.pdf PDF
FA8101-09-R-0021-0005.doc DOC document
070094 Dwg M3 00 redline Rev 2.pdf PDF
MACC Curtain Wall Model-1.pdf PDF
fa8101-09-r-0021-0004.doc DOC document
070295 Spec 01 11 00 - Rev 1.pdf PDF
070085 Spec 01 11 00 - Rev 1.pdf PDF
070088 SOW - Rev 1.pdf PDF
070094 Dwgs - Rev 1.pdf PDF
950028 Asbuilt.pdf PDF
070244.zip ZIP file
Question-Answers #2 to FBO.pdf PDF
FA8101-09-R-0021-0003.pdf PDF
Questions-Answers #1 to FBO.pdf PDF
Amendment 0002.pdf PDF
070244 As-Builts 3.zip ZIP file
070244 As-Builts 2.zip ZIP file
MACC Presolicitation Bus Tour 7-16-09.pdf PDF
SEED PROJECT PRICING Revision 1 7AUG.pdf PDF
Ventilation Bldg 3001 Tinker.doc DOC document
Pre-Proposal Conference Minutes.pdf PDF
3001 UTILITIES.zip ZIP file
03_070088 FP01-Layout1.pdf PDF
070085 AF66 Rev 1.pdf PDF
070244 FP02.pdf PDF
070244 Spec 09612.pdf PDF
FA8101-09-R-0021-0001.pdf PDF
Attachment14C.zip ZIP file
Attachment 1 - Current Davis Bacon Wage.pdf PDF
Attachment 17.zip ZIP file
Attachment 16.zip ZIP file
Attachment 12.zip ZIP file
SEED PROJECT PRICING.docx DOCX document
Atch 4 - POC listing.doc DOC document
AF 66 SAMPLE.pdf PDF
Atch 7 - Client auth letter.docx DOCX document
Atch 6 - Consent letter.doc DOC document
Atch 10 - questionnaire cover letter.doc DOC document
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RENOVATE RESTROOMS, B3001 WWYK070094

Tinker Air Force Base

Section 01110 Page 1 of 3

SECTION 01110

SUMMARY OF WORK

Revision 1 17 Aug 09

PART 1 SCOPE OF WORK

1.1 The work to be performed under the terms of the Contract consists of furnishing all labor, equipment, instruments, materials, transportation, and incidentals required to replace four groups of restrooms in Building 3001.

The restrooms are located at column Y89, Y103, R111, and G111. All work shall be accomplished in strict accordance with the contract drawings, specifications and code requirements. The work includes but is not limited to the following:

1.2 PROJECT PHASING

The Contractor shall submit a phasing plan to the Contracting Officer for approval prior to start of construction. The project shall be done in two separate phases. The first phase shall be the complete renovation of the restroom sets located at Y-89 and at G-111. The restroom renovations at these two locations (Y-89 and G-111) must be finalized and accepted by the Government for occupancy and use before renovation of the remaining restrooms sets at the Y-103 and R-111 locations can begin.

DEMOLITION

Demolish all items indicated on the drawings and in notes on drawings unless indicated otherwise in the specifications.

Demolition will be limited to removal of existing terazzo flooring, portions of existing concrete floor slab, masonry clay tile walls, light gage metal framed walls, all wall finishes (ceramic tile and gypsum board), ceilings, toilet fixtures including water closets, urinals, lavatories, wash basins, and mop sinks, all toilet accessories, HVAC ductwork, exhaust air ductwork, fire sprinkler piping, and all electrical power and lighting.

ENVIRONMENTAL

All abatement shall be done in accordance with Specifications Section 00720;

ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE.

Each restroom area will require heavy metal dust abatement. Remove asbestos piping insulation in crawlspace/chase wall as required. No lead based paints are indicated.

Civil Not Applicable

Architectural

Remove portion of existing concrete slab/terrazzo flooring Remove all interior walls, masonry and framed, as indicated on Plans Remove all toilet accessories Remove all toilet partitions Remove all ceiling tiles, grid, and accessories

Section 01110 Page 2 of 3

Structural Not Applicable

Mechanical Remove all lavatories and associated plumbing Remove all hand wash basins and associated plumbing Remove all mop sinks and associated plumbing Remove all urinals and associated plumbing Remove all toilets and associated plumbing Remove all supply air ductwork Remove all exhaust ductwork Remove all hot water heaters

Electrical Remove all lights and associated wiring Remove all switches, receptacles and associated wiring Remove all fire alarm devices and associated wiring Relocate Electrical panel at restroom G111.

Add new Electrical panel at G111 and R111.

CONSTRUCTION

Civil Not Applicable.

Architectural

Infill new concrete slab on grade Infill existing clay tile wall openings Install new 12x12 floor tile Install new light gage metal stud walls with 5/8” gypsum board sheathing Install new ceramic wall tile Install new hollow metal doors and frames Install new suspended ceiling grid and tiles Install new ceiling mounted stainless steel toilet partitions Install new wall mounted stainless steel urinal screens Install new wall mounted mirrors Install new toilet accessories

Structural Not Applicable

Mechanical Install new lavatories and associated plumbing Install new hand wash basins and associated plumbing Install new mop sinks and associated plumbing Install new urinals and associated plumbing Install new toilets and associated plumbing Install new hot water heaters Install new exhaust ductwork Test and Balance new exhaust system Modify existing fire sprinkler system to fit new floor plan Y89 Restroom will require a new sprinkler system with piping to be tied into the fire riser near column Y89.

Test and certify fire sprinkler system

Section 01110 Page 3 of 3

Electrical Install new lights and associated wiring Install new switches, receptacles and associated wiring Install new fire alarm strobe fixtures and connect to existing fire alarm system Test and certify fire alarm system

LOCATION

The project is located within Building 3001 at column markers Y-89, Y-103, R- 111, & G-111. The work related to this contract is limited to restroom and the immediate area. The Contractor shall identify all “pass through” utilities found during demolition and keep in operation. The Contractor shall submit access routes for construction hauling to the Contracting Officer for approval.

GOVERNMENT FURNISHED PROPERTY

No government furnished property is included in this project.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-End of section-

File details come from the government source that posted it. Updated .