WWYK070094 Revised Summary of Work
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RENOVATE RESTROOMS, B3001 WWYK070094
Tinker Air Force Base
Section 01110 Page 1 of 3
SECTION 01110
SUMMARY OF WORK
Revision 1 17 Aug 09
PART 1 SCOPE OF WORK
1.1 The work to be performed under the terms of the Contract consists of furnishing all labor, equipment, instruments, materials, transportation, and incidentals required to replace four groups of restrooms in Building 3001.
The restrooms are located at column Y89, Y103, R111, and G111. All work shall be accomplished in strict accordance with the contract drawings, specifications and code requirements. The work includes but is not limited to the following:
1.2 PROJECT PHASING
The Contractor shall submit a phasing plan to the Contracting Officer for approval prior to start of construction. The project shall be done in two separate phases. The first phase shall be the complete renovation of the restroom sets located at Y-89 and at G-111. The restroom renovations at these two locations (Y-89 and G-111) must be finalized and accepted by the Government for occupancy and use before renovation of the remaining restrooms sets at the Y-103 and R-111 locations can begin.
DEMOLITION
Demolish all items indicated on the drawings and in notes on drawings unless indicated otherwise in the specifications.
Demolition will be limited to removal of existing terazzo flooring, portions of existing concrete floor slab, masonry clay tile walls, light gage metal framed walls, all wall finishes (ceramic tile and gypsum board), ceilings, toilet fixtures including water closets, urinals, lavatories, wash basins, and mop sinks, all toilet accessories, HVAC ductwork, exhaust air ductwork, fire sprinkler piping, and all electrical power and lighting.
ENVIRONMENTAL
All abatement shall be done in accordance with Specifications Section 00720;
ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE.
Each restroom area will require heavy metal dust abatement. Remove asbestos piping insulation in crawlspace/chase wall as required. No lead based paints are indicated.
Civil Not Applicable
Architectural
Remove portion of existing concrete slab/terrazzo flooring Remove all interior walls, masonry and framed, as indicated on Plans Remove all toilet accessories Remove all toilet partitions Remove all ceiling tiles, grid, and accessories
Section 01110 Page 2 of 3
Structural Not Applicable
Mechanical Remove all lavatories and associated plumbing Remove all hand wash basins and associated plumbing Remove all mop sinks and associated plumbing Remove all urinals and associated plumbing Remove all toilets and associated plumbing Remove all supply air ductwork Remove all exhaust ductwork Remove all hot water heaters
Electrical Remove all lights and associated wiring Remove all switches, receptacles and associated wiring Remove all fire alarm devices and associated wiring Relocate Electrical panel at restroom G111.
Add new Electrical panel at G111 and R111.
CONSTRUCTION
Civil Not Applicable.
Architectural
Infill new concrete slab on grade Infill existing clay tile wall openings Install new 12x12 floor tile Install new light gage metal stud walls with 5/8” gypsum board sheathing Install new ceramic wall tile Install new hollow metal doors and frames Install new suspended ceiling grid and tiles Install new ceiling mounted stainless steel toilet partitions Install new wall mounted stainless steel urinal screens Install new wall mounted mirrors Install new toilet accessories
Structural Not Applicable
Mechanical Install new lavatories and associated plumbing Install new hand wash basins and associated plumbing Install new mop sinks and associated plumbing Install new urinals and associated plumbing Install new toilets and associated plumbing Install new hot water heaters Install new exhaust ductwork Test and Balance new exhaust system Modify existing fire sprinkler system to fit new floor plan Y89 Restroom will require a new sprinkler system with piping to be tied into the fire riser near column Y89.
Test and certify fire sprinkler system
Section 01110 Page 3 of 3
Electrical Install new lights and associated wiring Install new switches, receptacles and associated wiring Install new fire alarm strobe fixtures and connect to existing fire alarm system Test and certify fire alarm system
LOCATION
The project is located within Building 3001 at column markers Y-89, Y-103, R- 111, & G-111. The work related to this contract is limited to restroom and the immediate area. The Contractor shall identify all “pass through” utilities found during demolition and keep in operation. The Contractor shall submit access routes for construction hauling to the Contracting Officer for approval.
GOVERNMENT FURNISHED PROPERTY
No government furnished property is included in this project.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-End of section-