Questions-Answers #1 to FBO.pdf
PDF 227 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA8101-09-R-0021
About this file
The questions and answers included in this document comprise questions submitted by contractors from 20 July 2009 through 11 August 2009. The revised Statement of Work's will be uploaded NLT 17 August 2009.
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question/Answers #1 13 August 2009
The questions and answers below comprise all questions submitted by contractors from 20 JUL 09 through 11 AUG 09. If there is a question that isn‘t included in this document and was submitted, please contact A1C Kimberly DeLong at kimberly.delong@tinker.af.mil. Many of the answers caused changes in the related Statement of Work. Therefore, the revised Statement of Work‘s (to reflect ALL technical aspects below) will be uploaded to FedBizOps NLT 17 AUG 09.
RFI
# Subject Question/Answer
1 Design/Build
During the pre-proposal conference it was announced that 100% signed and sealed design documents are due August 28, 2009. Tinker MACC SOW explains a phased method of deliverables and review of design documents. Please clarify the SOW directive as it relates to the seed projects and future design build contracts.
Seed projects shall require a 100% signed and sealed design to be submitted by the RFP closing date. Future design-build projects shall be according to the MACC SOW and individual Task Order SOW that will identify the project as either a Fast Track DB or a
Conventional DB.
2 Design/Build
Tinker MACC SOW section B paragraph 1.1.2 outlines commissioning requirements as it pertains to LEED and Tinker MACC. During the pre-proposal conference commissioning was questioned to be applicable for all projects and was answered by clarifying that commissioning shall be utilized on a project specific basis and is not required for each and every seed project and future task order. Is this correct? Under what basis or direction shall each project require commissioning? Shall LEED's requirement as a prerequisite be followed?
That is correct. Commission requirements shall be identified in the Task Order SOW's. At this time, LEED is not a requirement.
SEED B-
WWYK070244
The existing office cubicle in the NW corner of area A is not addressed in the SOW or conceptual drawings. TRG is under the impression that this space was not accounted for during the planning of this seed project's scope of work and therefore shall not be in this contract and is to be removed by the user before construction begins. Is this correct?
That is correct. The cubicle in question will be removed by the Users prior to construction start.
4 Contracting
This project shall utilize two CLINS for funding. Shall demolition of HVAC and Plumbing be accounted within 522 or the HVAC/Plumbing fund code? Only one line is available on attachment 5 of the solicitation for pricing to be listed. Both prices shall be indicated separately, but shall both prices be written on this line? How shall pricing be properly listed?
An updated pricing sheet (ATCH 5) is incorporated into Amendment 0002 and has two lines for separate pricing.
SEED E-
WWYK070085
Please indicate the busway location via column line or bus number designation for the switch connection in this contract.
This information is shown on drawing E5.
mailto:kimberly.delong@tinker.af.mil
6 Contracting
The solicitation requests that all questions be submitted 10 days prior to the proposal due date. Is this correct?
7 Yes, this is correct.
SEED A-
WWYK07088
Handicapped Access: Item 1.4.1.1.3 says we are to modify the stairs and doorways to comply with Life Safety and egress requirements. Will it be required to upgrade the area and provide handicapped accessibility to this break room (e.g. elevator, lift, etc.)?
8 Life Safety design is required. ADA lift, elevator is not required.
WWYK07088
Stud Walls: Item 1.4.1.1.1 says to ―enclose the existing area with metal stud and drywall construction‖. Is it intended to demolish the existing stud walls and gypsum board on the existing walls? As a cost savings measure and in the event it is intended to demolish the existing stud walls and gypsum board. Could the existing stud walls and gypsum board be left in place and just apply on overlay of new gypsum board?
The intent is to convert the existing break room into a code compliant break room. The existing metal stud and exterior gyp board may remain in use. The walls shall be brought up to code compliance.
SEED A-
WWYK07088
New Doors/Frames/Hardware: Are new doors and frames to be installed at the two areas
(North and South) of egress?
The three (3) existing doors may remain but two (2) of the knob type handles shall be changed to lever type. The new doors and hardware shall be fire rated with lever type hardware. The existing south exit contains a metal door and cage. The Contractor shall demo this assembly.
SEED A-
WWYK07088
Doors/Frames/Hardware: As a cost savings measure can the existing doors, frames, and hardware remain and apply new paint?
Yes. The existing doors, frames and hardware may be reused. The hardware shall be lever type. All doors shall receive new paint.
SEED A-
WWYK07088
Design: Item 1.4.4.3 indicates that a schematic design has been provided. Can the
Government provide the schematic design?
Design shall be provided by the Contractor.
SEED A-
WWYK07088
Lighting: Item 1.4.4.4 indicates that all lighting and emergency lighting will be approved by submittal; however there is not an indication of the type or quality of the lighting to be submitted.
Due to the requirement for a 100% design with the bid, the Contractor shall provide lighting in accordance with the UFC requirements as noted in the Task Order SOW, paragraph 1.1.5.
SEED A-
WWYK07088
Ice Maker: Item 1.4.4.8 indicates that the electrical design needs to have adequate capacity for an ice maker. Since Ice makers vary greatly in capacity please indicate the desired size or capacity.
Contractor shall provide a 20 amp receptacle for the ice maker.
SEED A-
WWYK07088
HVAC: Paragraph 1.4.2.1. The paragraph indicates to use B3001 air for conditioning. Is it safe to assume that the HVAC for the new space can tie-into the existing system for the
HVAC requirements? If so, can the Government identify the tie-in point?
Air shall be conditioned through a fan coil unit supplied by chilled water. Contractor shall refer to the B3001 utility asbuilts attached. Clarification – Contractor shall not tap into existing ductwork.
SEED A-
WWYK07088
HVAC Information: Paragraph 1.4.2.1. The paragraph indicates to use B3001 air for conditioning. Please provide the discharge temperature and humidity of the air that we are to obtain from the ―building 3001 air‖ so that the HVAC system can be correctly sized.
Air to be pulled into the fan coil unit shall be 78 degrees and 50% RH. Clarification –
Contractor shall not tap into existing ductwork.
SEED A-
WWYK07088
HVAC Filters: Paragraph 1.4.2.1. The paragraph indicates to ―provide filters.‖ It is assumed that this is to mean to provide filters on the air obtained from the B3001 air handling units.
Is this correct?
The Contractor shall design for a fan coil unit. Clarification – Contractor shall not tap into existing ductwork.
SEED A-
WWYK07088
HVAC Filters: Paragraph 1.4.2.1. The paragraph indicates to ―provide filters.‖ Please provide the static pressure available from the B3001 air handling unit so that the air system for this project can be properly designed.
The Contractor shall design for a fan coil unit. Clarification – Contractor shall not tap into existing ductwork.
SEED A-
WWYK07088
Filters: Paragraph 1.4.2.1. The paragraph indicates to ―provide filters.‖ Please define the type and level of filtration desired.
Two inch throw away Merv 8 Filters.
SEED A-
WWYK07088
Plumbing: Paragraph 1.4.2.2. The paragraph indicates to reuse the existing plumbing supply and waste. Please verify that the existing is completely suitable for the new application; that there are no low flow, blockages, code violations, etc . that would be encountered in making this connection.
The existing plumbing is suitable for reuse.
SEED A-
WWYK07088
Water Heater: Paragraph 1.4.2.3. The paragraph indicates to reuse the existing water heater and filter. Please verify that the existing water heater and filter are completely suitable for the new installation; that there are no existing problems, code violations, etc. that would be encountered in making this connection.
The existing water heater and filter are suitable for reuse.
SEED A-
WWYK07088
Fire Sprinklers: Statement of Work Section 1.4.3.1: In order to add sprinklers to an existing system, hydraulic calculations must be performed to verify the capability of the existing sprinkler system to supply the added demand of the new sprinklers. Are up-to-date, accurate, as-built sprinkler system drawings and calculations available to verify hydraulic capacity?
Utility asbuilts of B3001 are attached along with the location of existing fire devices.
SEED A-
WWYK07088
Fire Sprinklers: 1.4.1.1.3: UFC 1-200-01 and UFC 3-600-01 reference NFPA 101 for Life
Safety requirements as they relate to means of egress, not the International Building Code.
Is it the intent of this scope of work to provide means of egress facilities in accordance with the International Building Code or NFPA 101?
Contractor shall refer to Task Order SOW, paragraph 1.1.5.
WWYK07088
Fire Sprinklers: 1.4.5: In order to add and modify an existing fire alarm system, the current fire alarm system capacity needs to be known. Should it be assumed that the addition of any fire alarm devices and wiring will not overload the existing fire alarm system capacity?
Yes.
SEED A-
WWYK07088
Fire Sprinklers: 1.1.5: UFC 4-010-01 suggests mass notification systems during any renovation project. Should it be assumed that no mass notification systems will be provided as part of this scope of work?
Mass notification is not in the scope of this project.
SEED A-
WWYK07088
Exterior Finishes: Are there any requirements regarding new or restoration of finishes required outside the break room area?
The Contractor shall paint of the exterior walls - white. Refer to the SOW Revision 1, Para.
1.4.1.1.10.
WWYK07088 Wall/Corner Guards: Are Wall guards and corner guards required for the break room?
SEED A-
WWYK07088
Floor Preparation: The existing floor may be out of level and/or have waves and dips. Can the Government if any additional floor preparation will be required other than minor floor scraping (e.g. floor leveling, etc.)?
No other issues at this time for floor preparation.
SEED A-
WWYK07088
Existing Steps: In addition, to the handicapped accessibility referenced above in Item #7, there are currently steps entering the area from the South. It is intended to include for a ramp or install a landing for the egress area?
As part of the design process, the Contractor shall determine if the south steps need to be modified to meet life safety requirements.
SEED A-
WWYK07088
Hazardous Material Abatement: Can the Government advise if any hazardous abatement will be required other than heavy metals, including lead based paint, asbestos, PCB‘s or other types of materials?
The EM/BIO survey indicates that only horizontal surfaces that are to be disturbed will require the wet wiping process. The Government will provide the drums.
WWYK07088 Project Phasing: Will any phasing be required for this project?
Phasing is not required. Refer to the Task Order SOW paragraph 1.2.2.
SEED A-
WWYK07088
Furniture/Equipment Relocation: Can you advise if there are any requirements for the moving, storing, or relocating of Government equipment, materials, shelving, furniture, supplies, or personal property in the performance of this contract?
Storage is not required. Refer to the Task Order SOW paragraph 1.2.1.2.
WWYK07088 Signage: Is there any provisions in this project for project signage?
Signage is not included in this project.
SEED A-
WWYK07088
Data Communications: Is there any work performance required for the installation of data/com, including conduit and outlet boxes?
No.
SEED A-
WWYK07088
Temporary Systems: Can you advise if temporary electrical, water, or heating and cooling will be required for this project or adjacent building occupants?
The hot water tank provides service to the restrooms below.
SEED A-
WWYK07088
Shop Drawings: If required, will standard shop drawings as normally provided by that particular vender or subcontractor be acceptable?
SEED A-
WWYK07088
Existing Building Systems: Can you advise if any upgrading of any existing building assemblies for code compliance, including—but not limited to—electrical systems, mechanical systems, fire sprinkler systems, and other life-safety systems is required outside of the project boundaries.
Upgrades of existing systems are limited to the project area only.
SEED A-
WWYK07088
Existing Building Systems: Can you advise if any upgrading of existing building assemblies for building code compliance, including-but not limited to-fire rated assemblies for walls, and ceiling, ADA compliance, and physical dimensions related to building egress, is required outside the work area.
Upgrades for code compliance are limited to the project area only.
SEED A-
WWYK07088
Existing Walls: In the event that there are existing walls and/or finishes that are not plumb and true, which could result in variances in the new interior finishes will this an acceptable existing condition? Note: If corrective action is required this could result in removal/demolition and re-installation/re-construction in order to correct the deficiencies.
Contract calls for new finishes. Reference Task Order SOW paragraph 1.4.1.
SEED A-
WWYK07088
Standard Material Selection: Is any custom interior or exterior colors included for this project? If not it is intended to use the manufacturers standard color selections.
No.
WWYK07088 Color Boards: Will color boards or material samples be required for this project?
Color boards are not required but material submittals are required. Reference Task Order
SOW paragraph 1.4.1 and AF66 material submittal requirements.
SEED A-
WWYK07088
Staging Area: This project will require a staging area and location for a dumpster, due to the type of construction and size of the materials involved in this project. Can you advise as to where a staging area and dumpster can be located?
The staging area that will possibly be used is the area on the 2nd floor south of the project location. This area is currently vacant. A dumpster shall be placed outside of building 3001 in an approved dumpster location. Reference Spec Section 00700.
WWYK07088 Training: Is there any training required for this project?
O&M and FOD Training are required. Reference AF66 submittal requirements.
WWYK07088
Fire Sprinkler: Will the Government require the adjustment of the existing fire sprinkler so that the heads are centered in the ceiling tile?
Existing sprinkler heads are above the project area. New Sprinkler Heads and lines shall be required and included in the design effort.
SEED A-
WWYK07088
Government Retained Property: Please confirm that the Government does not wish to retain any of the demolition items or equipment?
That is correct.
SEED A-
WWYK07088
Matching Interior Finishes: Does the Government concur that the contractor will attempt to match as close as reasonably possible the interior finishes (e.g. paint, cove base, ceiling tile
& grid, etc.), but cannot warrant the exact match of existing finishes. There may be slight variations in color, material, or texture from the existing finishes?
Contractor shall submit proposed material and any deviations to the furnished color selections for Government approval.
SEED A-
WWYK07088
Certification of Operational Integrity: Will testing of existing M-E-P and fire sprinkler systems and equipment for proper operation; such as 1) the tracing and identification of existing electrical circuits and verification of electrical panel information, 2) load testing of the existing electrical systems, 3) the testing and certification of the existing fire alarm system, and 4) the testing and calibration of the existing HVAC systems, and environmental controls be performed by the Government prior to construction and jointly with contractor?
If not are we to include cost for these types of services?
1& 3 - The Government will assist the Contractor with items 1 & 3. 2 - At this time, the existing power requirements are adequate. 4 - There currently is no existing HVAC system.
SEED A-
WWYK07088
Site Investigation: Since it is not practical for the Government to provide compensation prior to the award of the contract for a thorough and exhaustive site investigations to determine the full extent of the existing conditions and scope, which could include partial demolition activities, testing and evaluation of existing equipment and systems, studies and/or complete engineering analyses. Therefore, will it be acceptable to provide reasonable simple visual inspection in an attempt to determine the existing conditions? Note: By performing visual inspections not all aspects of the existing site conditions can be determined.
No issues at this time, all existing utilities are adequate for the existing conditions. Design shall be required for all modifications and additions to the systems. Contractor shall refer to the attached B3001 asbuilts. The Break room currently powers 3 refrigerators and 5 microwaves.
SEED B-
WWYK070244
Within the SOW, paragraph 1.4.2.7 directs the floor transition to be replaced. Shall the new transition design meet ADA?
Yes. The transition shall meet ADA requirements.
SEED B-
WWYK070244
The SOW of this Area A does not address modifications to the existing suspended ceiling.
During the site visit on July 17th TSS mentioned that the ceiling shall remain. The height of the existing ceiling conflicts with the height of the new overhead door. The ceiling may be reconfigured near the OH door but without complete removal the ceiling height will limit the potential of this opening into the space. TRG suggests the entire ceiling to be demolished including above ceiling mechanical and electrical items not in use. The structure would receive the similar finish to that of the newly painted walls. Please provide clarification to the use of this space and / or accept this condition as noted and acceptable.
The existing ceiling has missing acoustical tiles to be replaced if the grid shall remain.
Should the same ceiling and tiles be used per the finish schedule intended for Area B?
Existing ceiling and tiles shall remain. Missing tiles shall be replaced with similar to existing tiles. The new overhead door shall be installed on the hangar side.
SEED B-
WWYK070244
Past projects within B2122 have revealed heavy metal dust. Is it correct that a survey was conducted within Area A space with no positive results of environmentally hazardous materials?
A BIO/EM survey was conducted and there are no requirements for heavy metal dust removal.
SEED B-
WWYK070244
(A&B)
Section 1.4.1.6 indicates to remove existing notification devices and pull stations, but
Section 1.4.1.7 indicates to verify the condition of the existing fire alarm system. Is the intent of this scope of work to verify and modify the existing fire alarm system to bring it into code compliance? Or, is the intent of the scope of work to remove the entire existing fire alarm system and provide new, code compliant systems in Area A and Area B?
Contractor shall refer to WWYK070244 As-Builts, at this time, the existing fire alarm system is in working condition. Requirement is for the Contractor to modify the existing system to bring it up to code compliance for the project areas only.
SEED B-
WWYK070244
(A&B) Please identify ―ALU‖ and ―BT2‖ in section 1.4.1.8.
ALU stands for Analog Loop Unite and BT2 stands for Base Transmitter with 2 being the device generation. Refer to SOW Revision 1, Paragraph 1.4.1.8.
SEED B-
WWYK070244
(A)
Item 1.4.2.4 calls for a new 16‘x14‘ rollup door. The existing ceiling height is 8 feet. Do you want to change the door size to 16‘x8‘ high? If not, is there room for raising the height of the ceiling to a minimum of 14 feet? If that is done all walls will have to be finished to
14‘ also.
Yes. Door size shall be changed to 16‘ x 8‘ high to coordinate with the existing ceiling height. Refer to SOW Revision 1, Paragraph 1.4.3.3.
WWYK070244
(A)
Another question related to the new roll up door, on which side of the door will the hood be located? If located inside Area ‗A‘, will it project above the ceiling or will the new ceiling be raised above the height of the hood?
The new OH door hood shall be located on the hangar side so it will not interfere with the existing ceiling.
(A) What type of overhead door, is it coiling, insulated and electric operated?
New OH doors shall be coiling and electric operated.
SEED B-
WWYK070244
(A)
The existing West wall is concrete block. In that wall there is an existing 6070 opening and a 3070 opening. Both have been filled / patched with existing studs and sheetrock on both sides. Sheet A02 indicates we are to ―remove the existing wall assembly. Sheet A03 then indicates we are to install ―new gypsum wall board and metal stud assembly‖ back into the same opening. Why? Is this the intent or did they intend that we should fill in the openings with concrete block matching the existing wall? If so do they want the new block toothed into the existing wall or just to the existing opening dimensions?
Existing patch work was done self help. The intent is to replace with a new gypsum wall board and metal stud assembly.
SEED B-
WWYK070244
(A)
There is some damage to the existing gypsum walls. When the damage is repaired it may not exactly match the existing texture. Is that going to be a problem? What should be done?
The intent is to have uniform repairs throughout the project area. The existing texture is minimal. All new work shall match as close as possible.
SEED B-
WWYK070244
(A)
How are the pneumatic drops being supplied? Is there an existing compressor to be tied into? What pressure is required?
Contractor shall refer to the 070244 asbuilts. Design of this component shall be part of the design requirements. Pressure required is 90 psi. Refer to drawing M01 for location of new pneumatic drops.
SEED B-
WWYK070244
(A)
We are required to verify the design of the existing fire system. How are we to verify if the system works if we cannot have further site visits? How detailed can the design be if the actual locations of the sprinklers cannot be verified?
Contractor shall refer to WWYK070244 As-Builts, at this time, the existing fire system is in working condition. Requirement is for the Contractor to modify the existing system to bring it up to code compliance for the project area only. See new drawing 070244 FP02 for location of existing fire devices.
SEED B-
WWYK070244
(A)
Item 1.2.5.1 please indicate pertinent information for referenced electrical drops (location, voltage, amperage, receptacle configuration and height).
User‘s power requirements are located on the attached spreadsheet. Tab 1 shows Zone 1, Tab 2 shows Zone 2, Tab 3 shows Zone 3, and Tab 4 shows them all. Power requirements are shown for Zone 1. Power requirements for Zones 2 & 3 will be 110 volts per work table.
SEED B-
WWYK070244
(A)
Item 1.2.5.1 user equipment. Please indicate the user equipment location and electrical requirements.
User‘s power requirements are located on the attached spreadsheet. Tab 1 shows Zone 1, Tab 2 shows Zone 2, Tab 3 shows Zone 3, and Tab 4 shows them all. Power requirements are shown for Zone 1. Power requirements for Zones 2 & 3 will be 110 volts per work table.
SEED B-
WWYK070244
(A)
Reference MACC statement of work – WWYK070244, paragraph 1.4.3.1. The paragraph indicates to refurbish the existing mechanical systems. Please provide a detailed status of the condition of the existing system.
The intent in Area A is to go from existing A/C to Heating/Comfort Ventilation. The conversion is part of the Contractor‘s design effort. The Contractor shall refer to the attached asbuilt drawings from Project WWYK950028 and to the asbuilts to aid in the design.
SEED B-
WWYK070244
(A)
Reference MACC statement of work – WWYK070244, paragraph 1.4.3.1. The paragraph indicates to refurbish the existing mechanical systems. Please provide the manufacturers model and serial number of the unit so the cost and availability of spare parts can be
The Government‘s intent in Area A is to go from existing A/C to Heating/Comfort
Ventilation. The conversion is part of the Contractor‘s design effort. The Contractor shall refer to the attached asbuilt drawings from Project WWYK950028 and to the asbuilts provided on 7/20/09 to aid in the design.
SEED B-
WWYK070244
(A)
Reference MACC statement of work – WWYK070244, paragraph 1.4.3.2. The paragraph indicates to ―secure‖ the chilled water supply. Please define exactly what is meant by
―secure.‖ refer to the attached asbuilt drawings from Project WWYK950028 and to the
WWYK070244 As-Builts to aid in the design.
SEED B-
WWYK070244
(A)
Reference MACC statement of work – WWYK070244, paragraph 1.4.3.2. The paragraph indicates to ―reconfigure the existing unit.‖ Please provide the complete design data and manufacturers model and serial number of the existing unit so that it can be determined that the existing unit can in fact be ―reconfigured‖ to a heating and ventilating unit and perform correctly.
refer to the attached asbuilt drawings from Project WWYK950028 and to the
WWYK070244 As-Builts to aid in the design.
SEED B-
WWYK070244
(A)
Reference MACC statement of work – WWYK070244, paragraph 1.4.3.2. The paragraph indicates to ―reconfigure the existing unit.‖ Please provide a list of all heat producing equipment that will be used in the space such that the quantity of ventilation air can be refer to the attached asbuilt drawings from Project WWYK950028 and to the
WWYK070244 As-Builts to aid in the design.
WWYK070244
(A)
Reference MACC statement of work – WWYK070244, paragraph 1.4.4.1. The paragraph indicates to remove and relocate an existing eyewash station. Please verify that the existing eye wash station is in complete working order.
The existing eyewash station is in complete working order.
SEED B-
WWYK070244
(A)
Is occupancy hazard classification changing per NFPA 13? The existing sprinkler spacing may not provide adequate coverage depending on how this space will be used post-renovation.
This determination shall be part of the design effort. The space is changing from office to storage of sheet metal.
SEED B-
(B) Who is removing the user furniture?
The User shall have the furniture removed prior to construction start.
SEED B-
WWYK070244
(B)
Currently there are no existing AC window units, contrary to what is stated in the scope of work. There is an existing ductwork system above the existing ceiling. Is the existing ductwork system in Area ‗B‖ to be removed and replaced back to its source? What kind of unit is supplying the AC for this area? Does it remain or is it to be replaced?
Please disregard references to AC window units. Existing duck work shall be reused in new design. Existing AHU shall remain. The Contractor shall refer to the WWYK070244 As-
Builts.
SEED B-
WWYK070244
(B)
We are required to verify the condition of the existing fire alarm system(s). How are we to verify if the system works if we cannot have further access to the site?
Contractor shall refer to WWYK070244 As-Builts, at this time, the existing fire alarm system is in working condition. Requirement is for the Contractor to modify the existing system to bring it up to code compliance for the project area only.
SEED B-
WWYK070244
(B)
To cap off all water and especially drain lines in the wall it will be necessary to demo the floor at the water closet Sweep and plug the line. Will it be required to demo the vent piping or just cap it where needed?
Contractor shall cap off all water lines below grade. Do not demo to wall. Verify from
WWYK070244 As-Builts that no additional lines are tied into existing vent piping.
SEED B-
WWYK070244
(B)
Item 1.4.9.2 please indicate pertinent information for referenced electrical drops (location, voltage, amperage, receptacle configuration and height).
Each office shall follow the requirements in the Tinker Base Standard for Building/Utility
Electrical Distribution Systems.
SEED B-
WWYK070244
(B)
Item 1.4.9.2 user equipment. Please indicate the user equipment location and electrical requirements.
The Contractor shall match the existing office layout and insure compliance with the Tinker
Base Standard for Building/Utility Electrical Distribution Systems. Contractor shall match existing office layout. The area currently a restroom shall be converted to open office.
Contractor shall provide 120V duplex receptacles at about the same spacing as the rest of the office. Refer to SOW Revision 1, paragraph 1.4.9.3.
SEED B-
WWYK070244
(B)
Reference MACC statement of work – WWYK070244, paragraph 1.4.7.1. The paragraph indicates to remove existing window A/C units. On the walk through there were no window units. Please clarify.
Disregard reference to existing window A/C units.
SEED B-
WWYK070244
(B)
Reference MACC statement of work – WWYK070244, paragraph 1.4.7.1. The paragraph indicates to remove existing window A/C units. The statement of work does not include any other HVAC work. It is assumed that the existing systems are adequate and no HVAC work is required. Is this correct?
SEED B-
WWYK070244
(B)
Reference MACC statement of work – WWYK070244, paragraph 1.4.8.1. The paragraph indicates to remove the existing plumbing fixtures and to cap the waste and supplies in the chase wall. Drawing A05 indicates that the chase walls will no longer exist in the new configuration. It is assumed that the waste lines are to be capped below the finished floor and the supply lines are to be capped above the ceiling. Is this correct?
SEED B-
WWYK070244
(B)
Reference MACC statement of work – WWYK070244, paragraph 1.4.8.1. The paragraph indicates to remove the existing plumbing fixtures and to cap the waste and supplies in the chase wall. Drawing A05 indicates that the chase walls will no longer exist in the new configuration. Please verify that removing and capping any of these plumbing supply, waste, or vent lines will not affect other pluming in the area.
Since these restrooms are being demolished, there is no further need of the existing plumbing fixtures, etc. Contractor shall refer to WWYK070244 As-Builts.
SEED C-
WWYK070295
Reference Summary Of Work, Section 01 11 00, Page 2, 1.2.6.1 Bullet 3, Ballast and bulb disposal. SOW states that Government will provide drums for lamp and ballast disposal.
Will Government also take receipt of removed lamps and ballasts and dispose of them or will Contractor be responsible for disposal and documentation of disposal?
The Government will provide drums. Refer to Spec Section 00 72 00, Paragraph 1.7 and
Attachment 4, Parts B & C.
SEED C-
WWYK070295
Reference Summary Of Work, Section 01 11 00, Page 3, paragraph 1.4.1.1.1. – Inspect and modify as required floor base at X31 electrical platform to allow for installation of UPS system. Has it been determined that the X31 platform is capable of sustaining the existing electrical equipment along with the additional weight of the UPS system and accompanying batteries? Should contractor include cost for a structural analysis of the elevated platform?
The weight of the existing electrical equipment was included in the Structural Platform
Analysis (see attached).
SEED C-
WWYK070295
Reference Summary of Work, Section 01 11 00, Page 4, paragraphs 1.5.1 States all electrical requirements shall be verified and designed by a licensed professional engineer in the state of Oklahoma. The design shall consider the following…………1.) This project is
100% designed with plans and specifications. Please clarify the requirements of a licensed engineer will not be required and are there any design requirements for this project?
No further Design or Engineering is required. The Engineer of Record is Derek Gates of
D.W. Gates Engineering. Requirement deleted. Refer to SOW Revision 1, paragraph 1.4.1.
SEED C-
WWYK070295
Reference Summary of Work, Section 01 11 00 1.2.3 States Non-Standard hours has been identified. Will the Government identify what shifts are currently working and which shift the contractor can be expected to work?
The project covers a large area with different Users. All work shall be accomplished during
3rd shift (11 PM – 7 AM). During portions of the work, the Contractor may request to work another shift but it will need to be coordinated and approved with the Users of this area.
SEED D-
WWYK060367
Please confirm that there are no asbestos, Lead paint or Heavy Metal Dust Removal for this project?
Confirmed.
SEED D-
WWYK060367
Please verify ceiling height in room 102 & 103, sheet A-101 says 7‘-8‖, sheet F-101 says
7‘-10‖.
The correct ceiling height is 7‘-8‖.
SEED D-
WWYK060367 Please verify if the new wood doors are to be painted or stained? If stained what color?
All new wood doors called out in this scope of work shall be replaced with hollow metal doors. All doors and frames shall be painted SW6531 Indigo
WWYK060367 Does the inside of the big overhead door in the Shop Area (Rm 101) paint?
Yes. Paint color shall be the same color as the doors - SW6531 Indigo.
WWYK060367 There is a 4‘ wall on the north side of door #103, does this wall stay or is it to be removed?
The Contractor shall demo the wall when demoing lighting that is connected to the wall.
SEED D-
WWYK060367
Are the existing floor joints in the Shop Area (Rm 101) to be filled and caulked before the floor is sealed?
WWYK060367 Does the handrail going up the stairs repaint?
Yes. Reference Note #2 on Sheet I-601 on drawings.
WWYK060367 Does the guard rail at the end of the mezzanine repaint?
Yes. Reference Note #2 on Sheet I-601 on drawings.
SEED D-
WWYK060367
Detail 5 on sheet A-501 shows the new door frame #103 to be installed in a masonry wall.
The existing door frame is installed a in drywall partition. Therefore, does the new frame go back into the drywall partition or is the area around the door frame to have masonry installed. Please advise?
The existing double wood doors are installed in a drywall construction. Contractor shall replace the drywall with new and paint wall facing shop area #103 per finish schedule.
Paint other side SW6531 Indigo. Detail 5/A-101 is incorrect, should be drywall.
SEED D-
WWYK060367
Do the new doors require door signage per section 10 14 02, no door signage schedule shown, please advise?
No signage required.
SEED D-
WWYK060367A
Please confirm that there are no asbestos, Lead paint or Heavy Metal Dust Removal for this project?
No abatement required.
WWYK060367A Is the electric power for the HVAC as shown on sheet E-105 part of the project?
SEED E-
WWYK070085
Reference Summary of Work, Section 01 11 00, Page 2, Environmental/Bio-Environmental
– Paragraph 1.3.7.1; There is no reference for the Government to provide drums for lamp and ballast disposal. Will the Government provide drums for removed lamps and ballasts?
If so, will the Government also take receipt and dispose of them? Or, will Contractor be responsible for disposal and documentation of disposal?
The Government will provide drums. Refer to Spec Section 00 72 00, Paragraph 1.7 and
Attachment 4, Parts B & C for details.
SEED E-
WWYK070085
Reference Summary of Work, Section 01 11 00, Page 2, Environmental/Bio-Environmental
– Paragraph 1.3.7.1 – Wiping of heavy metal dust on all horizontal surfaces……wet wiping of lights and conduits to be demolished…. Will heavy metal dust abatement need to be performed on mezzanine carriage bottom horizontal surfaces and existing lights and conduit to be removed attached to the mezzanine carriage bottom?
Horizontal surfaces below the mezzanine carriage will need to be wet wiped. Fixtures identified to be demoed may be bagged and placed in the drums in lieu of wet wiping.
SEED E-
WWYK070085
Reference Summary of Work, Section 01 11 00, Page 3, 1.5.1 Electrical; paragraph. 1.5.1.1.
–modify platform as required accommodate panels and UPS. Government furnished drawings do not reference or call out for an UPS system on any platforms, only the elevated electrical room at Column O81. Are there additional locations or platforms to install an
UPS system other than on the elevated electrical room at Column O81?
No. Clarification, the elevated electrical room is located at column O83.
SEED E-
WWYK070085
Reference Summary of Work, Section 01 11 00, Page 3, 1.5 Electrical; paragraph. 1.5.1.2 –
Install new UPS system……….on elevated electrical room. Has the Government determined that the O83 elevated electrical room is capable of sustaining the existing electrical equipment along with the additional weight of the UPS system and accompanying batteries? Should contractor include cost for a structural analysis of the elevated electrical room structural support system?
No additional analysis is required. The Engineer of Record has determined that the existing structure will support additional loading of the UPS and associated equipment.
SEED E-
WWYK070085
Reference Summary of Work, Section 01 11 00, Page 3, paragraph 1.5 States all electrical requirements shall be verified and designed by a licensed professional engineer in the state of Oklahoma for the requirement provided by the vertical lift fabric door manufacturer. The design shall consider the following: a) there is no other reference to a vertical lift fabric door, please clarify the requirement. b) this project is 100% designed with plans and specifications. Will the Government clarify that the requirements of a licensed engineer and design will not be required for this project?
The paragraph stating ―All electrical requirements shall be verified and designed by a licensed professional engineer….by the vertical lift fabric door manufacturer‖ is incorrect and should not be included in the scope of this project. No further Design or Engineering is required. The Engineer of Record is Derek Gates of D.W. Gates Engineering. Requirement has been deleted. Refer to SOW Revision 1, paragraph 1.5.1.
SEED E-
WWYK070085
Reference Summary of Work, Section 01 11 00 1.2.3 States Non-Standard hours has been identified. Will the Government identify what shifts are currently working and which shift the contractor can be expected to work?
All work shall be accomplished during 3 rd shift (11 PM – 7 AM). During portions of the work, the Contractor may request to work another shift but it will need to be coordinated and approved with the User.
SEED E-
WWYK070085
Reference Summary of Work, Section 01 11 00, Page 3, paragraph 1.5 States to connect to the elevated 480 bus located in the area. Will the Government identify which 480V bus the contractor will be required to connect to?
Refer to note on drawing E5, which states ―BUS BAR (PV6AS-V6N) NOTE: FEED TO
UPS @ LOAD CENTER O-83‖.
SEED F-
WWYK070094
In specification section 13930 part 1.2 General Requirements it states, ―Wet pipe sprinkler system shall be provided in areas indicated on the drawings.‖ Currently the 100% drawings do not show an existing sprinkler system or a design to supply a new sprinkler system. Do these restrooms have a sprinkler system present and if not is one required?
All restrooms except for Y89 have an existing sprinkler system that will need to be modified for the new floor plan configurations. Y89 will require a new system with piping to be tied into the fire riser near column Y89. New sprinkler heads shall be recessed, quick action type.
SEED F-
WWYK070094
During previous projects done in B3001 on Tinker AFB it was stated that a majority of the soils under B3001 are to be treated as contaminated. Are we to treat the underlying soils as contaminated and thus requiring contaminated soil remediation?
Since building 3001 is an EPA-regulated facility, the soil is classified as a CERCLA waste
(CERCLA is an env. law term). Most soil from B3001 digs turn out to be non-hazardous.
For bidding purposes, the soil is non-hazardous. Once digging begins, Base Environmental will have the soil tested for contamination. If the soil turns out to be contaminated, then a modification to the contract will be required for remediation. If the soil turns out to be non-hazardous, then the soil may be placed back into the ground after the plumbing lines have been run. Excess non-hazardous soil shall be hauled off to Eask Oak landfill.
SEED F-
WWYK070094
Is the General Contractor required to supply a routing plan of where to enter the building and which hallways to travel to move materials to and from the site (logistics plan) or will this be provided by the Government?
Refer to the B3001 route plan.
SEED F-
WWYK070094 What is the thickness of the floor slab and does it contain grade beams?
The floor slab is 6-9‖ thick. The Contractor shall assume an 8‖ thick slab. Grade Beams are not present in these locations.
SEED F-
WWYK070094
What should be done with the existing finishes in the corridors on the outside of the restrooms being renovated? The restrooms show new entry doors which would cause finishes to need repaired in the corridors. The plans do not specify what finishes are currently in the corridors and what finishes will be required to repair the corridors.
Any repairs made to the exterior are to match existing which is painted brick.
108 Design/Build
It is understood from the pre-proposal conference that full size 100% design documents, signed by the engineers and architects of record, are required for the two design-build seed projects as part of the response to the proposal. Given the limited information provided in the RFP and at the site visit and the liability taken when signing and sealing drawings, could
100% 'not for construction', non-signed and sealed plans be submitted in lieu of signed and sealed plans with the intent to field verify existing conditions prior to signature and seal once awarded?
Yes. 100% non signed and sealed drawings may be submitted in lieu of sealed.
109 Design/Build
Are there specific drafting standards required regarding Revit or 3D modeling software?
Can we assume that BIM is not required on the two design-build seed project? What about later projects in the MACC – will BIM be required?
Revit, 3D modeling or BIM are not required.
110 Design/Build
Will the Gov‘t require electronic CAD files of all projects designed in this MACC and if so, what software and version will be required?
The Government is currently using AutoCAD 2009 and will be moving to 2010.
111 Design/Build
Can the electronic CAD files of the two design-build seed projects be provided? These are necessary to create the 100% documents.
CAD files of the drawings which were in the design package were provided with the solicitation package.
112 Design/Build
Can all as-builts of the existing facilities where the two design build projects are located please be provided in order to verify existing conditions?
All of the asbuilts for building 2122 which included CAD and TIFF files were provided on
7/20/09. Asbuilts for building 3001 are attached.
113 Design/Build
The RFP requires the design-builder to verify the functionality of the existing fire alarm systems. This could not be done at the site visit. Are we to assume that the existing fire alarm systems are in proper, functioning order?
114 Design/Build
The RFP requires the verification of the number of A/V fire devices, sprinklers, and pull stations. This could not be accurately done at the site visit. Can as-builts showing the location of all fire devices be provided (for the two design-build seed projects)?
Attached are the locations for fire devices for 070244. Design Build project 070088 will need all new fire devices.
115 Design/Build
In the absence of pressure and flow data on the existing fire protection system supply, are we to assume that the existing fire protection system has adequate capacity to support the reconfigured sprinkler layout?
116 Design/Build
Section L, on page 56 of 78, Paragraph #11 states that ―The electronic copies of the proposal shall be submitted in a format readable by Microsoft (MS) Word 2003®, MS
Excel 2003®, MS-Project 2003®, and MS-Power Point 2003®, or Microsoft Office XP®, as applicable.‖ Are we allowed to use Adobe PDF? This will enable us to turn our proposal into a single document and bookmark the different areas that will be tabbed in our original proposal.
117 Design/Build
In Volume 1 – Technical, on page 59 of 78, Sub-factor 3, we are referred to using the SOW in attachment 2 to complete the design and price for seed projects A&B. It is still unclear what is actually required to be submitted for this proposal. SOW Attachment 2 seems to ask for 100% signed and sealed design documents. Please clarify the exact documents that will be required and evaluated.
100% plans, specifications and design analysis are required to be signed and sealed. The
Contractor shall use the 42 division UFGS specifications in conjunction with the Tinker
Specifications provided in Section F of the MACC Contract Statement of Work. Please see the Attachment 2 Contract Statement of Work Section A paragraph 1.1.1 Full Design Build the first sentence covers this.
118 Contracting
In Volume 2 – Past Performance, beginning on page 60 of 78, it states that contractors shall submit past performance information on any major subcontractor with which there is an arrangement to perform more than 25% of the work for the resultant contract effort. Does this include the design team? If so, attachment 9, 10 and 11 seem to be written from the construction only side for contractors and sub-contractors not the design firms. Please advice.
There is no distinction between the trade of subcontractors.
119 Design/Build
At the pre-proposal conference, it was heard that the government is expecting both 100% signed and sealed plans for the proposal submittal as well as 100% specifications? Is that indeed the case – 100% specs are required? I cannot find in the RFP where it requests specifications. We are assuming that Tinker requires UFGS – does Tinker prefer 42 division UFGS or 16 division UFGS?
100% plans, specifications and design analysis are required to be signed and sealed. The
Contractor shall use the 42 division UFGS specifications in conjunction with the Tinker
Specifications provided in Section F of the MACC Contract Statement of Work. Please see the Attachment 2 Contract Statement of Work Section A paragraph 1.1.1 Full Design Build the first sentence covers this.
SEED B-
(A) What is thickness of the new epoxy floor coating?
See attached spec Epoxy Flooring.