Pre-Proposal Charts - Final.ppt

PPT presentation 400 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA8101-09-R-0021
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

Preproposal Conference Charts

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
FA8101-09-R-0021-0009.pdf PDF
rfi 167 and 163 update.pdf PDF
FA8101-09-R-0021-0007.doc DOC document
Question-Answers #5 to FBO.pdf PDF
FA8101-09-R-0021-0006.pdf PDF
2009 Base Facility Standard with 2007 ACP Included in Chap 13.pdf PDF
Electrical Base Stds 2007.pdf PDF
070094 Dwg M5 01 redline Rev 1.pdf PDF
BoilerPlateLanguage.pdf PDF
070094 Dwg A6 00 Rev 1.pdf PDF
070094 Spec 15400 - Rev 1.pdf PDF
FA8101-09-R-0021-0005.doc DOC document
fa8101-09-r-0021-0004.doc DOC document
070094 Spec 01110 - Rev 1.pdf PDF
070295 Spec 01 11 00 - Rev 1.pdf PDF
070085 Spec 01 11 00 - Rev 1.pdf PDF
070088 SOW - Rev 1.pdf PDF
070094 Dwgs - Rev 1.pdf PDF
950028 Asbuilt.pdf PDF
070244.zip ZIP file
Question-Answers #2 to FBO.pdf PDF
FA8101-09-R-0021-0003.pdf PDF
070244 SOW - Rev 1.pdf PDF
Questions-Answers #1 to FBO.pdf PDF
Amendment 0002.pdf PDF
070244 As-Builts 3.zip ZIP file
070244 As-Builts 2.zip ZIP file
MACC Presolicitation Bus Tour 7-16-09.pdf PDF
SEED PROJECT PRICING Revision 1 7AUG.pdf PDF
Ventilation Bldg 3001 Tinker.doc DOC document
Pre-Proposal Conference Minutes.pdf PDF
3001 UTILITIES.zip ZIP file
Asbuilts 950028 AHU_5-6-7.pdf PDF
03_070088 FP01-Layout1.pdf PDF
070085 AF66 Rev 1.pdf PDF
070244 FP02.pdf PDF
070295 AF66 Rev 1.pdf PDF
070094 AF66 Rev 1.pdf PDF
070244 AF66 Rev 1.pdf PDF
back shop foot print.xlsx XLSX spreadsheet
FA8101-09-R-0021-0001.pdf PDF
Attachment14C.zip ZIP file
Attachment 1 - Current Davis Bacon Wage.pdf PDF
Attachment 16.zip ZIP file
SEED PROJECT PRICING.docx DOCX document
Atch 4 - POC listing.doc DOC document
AF 66 SAMPLE.pdf PDF
Atch 7 - Client auth letter.docx DOCX document
Atch 6 - Consent letter.doc DOC document
Atch 10 - questionnaire cover letter.doc DOC document
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OKLAHOMA CITY

AIR LOGISTICS CENTER

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION SEE FAR 3.104

MULTIPLE AWARD CONSTRUCTION CONTRACTS (MACC)

PRE-PROPOSAL CONFERENCE

Richard Stewart

72 ABW/CEC

Cynthia Obermeyer

72 CONS/PKBA

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

SOURCE SELECTION INFORMATION SEE FAR 3.104

EVACUATION/SAFETY PLAN

Fire

Tornado

Defibrillator Location

SOURCE SELECTION INFORMATION SEE FAR 3.104

OVERVIEW

Opening Remarks

Solicitation Overview

Statement of Work Overview

Windshield Tour

Questions and Answers

SOURCE SELECTION INFORMATION SEE FAR 3.104

OPENING REMARKS

WELCOME!

Ms. Cathy Scheirman

Deputy Base Civil Engineer

SOURCE SELECTION INFORMATION SEE FAR 3.104

The MACC program represents a multiple award construction acquisition for design/build and construction activities at TAFB.
Work shall consist of multiple disciplines in general construction categories and may involve design services for execution of a broad range of maintenance, repair, alteration, and minor construction projects affecting real property in support of the Base Civil Engineer’s real property Sustainment, Restoration, and Maintenance (SRM) and Depot Maintenance Activity Group (DMAG) programs for facilities and infrastructure base-wide.

PROGRAM DESCRIPTION

SOURCE SELECTION INFORMATION SEE FAR 3.104

CONTRACT TYPE

Firm fixed price IDIQ contracts
Establish the contract basic terms and conditions
Establish a basic SOW requirement
5 Year Period of Performance:
One basic year and four one year options

Award up to six basic IDIQ contracts

SOURCE SELECTION INFORMATION SEE FAR 3.104

Program Ceiling: $100M
Total small business set aside
Must be recognized by SBA
All Joint Ventures and Teaming Arrangements must be approved by SBA
During the life of the MACC contracts, individual project requirements are executed by task order when work is identified and funds become available.

CONTRACT OBJECTIVES

SOURCE SELECTION INFORMATION SEE FAR 3.104

Solicitation FA8101-09-R-0021
Issued 29 Jun 09
Offers are due by 1200 hours, 28 Aug 09
Offerors shall review solicitation and statement of work for all required submissions
Failure to submit all required information may render proposal invalid
Offerors must bid all six seed projects
Two design build projects – take to 100% complete
Four construction only projects
Requires work plan and pricing
Exceptions to Terms and Conditions
Reference Section L, paragraph H

SOLICITATION OVERVIEW

SOURCE SELECTION INFORMATION SEE FAR 3.104

Special Provisions – Section H of solicitation
Task Order Procedures
Teaming Arrangements
Bid Notes - read all bid notes at beginning of solicitation
Bond requirements
Excluded Offers
Multiple Task Order Expectations

SOLICITATION REQUIREMENTS

SOURCE SELECTION INFORMATION SEE FAR 3.104

Acquisition Procedures
AFFARS Part 5315.3, Source Selection
IG5315.101-1, Performance Price Tradeoff (PPT)
IG5336.9201-ch4, Multiple Award Construction Contracts (MACC) & Task Order (TO) Negotiations
Performance Price Tradeoff Source Selection
If tradeoffs are used, they will only be made between past performance and price among those offerors who have been determined technically acceptable.
Ardent focus on past performance illustrating quality and professional workmanship to meet the Statement of Work requirements

REGULATIONS

SOURCE SELECTION INFORMATION SEE FAR 3.104

Volume I: Technical Proposal – Five (5) complete copies and one (1) electronic copy
Volume limited to fifty (50) pages. Design of the seed projects does not count toward the fifty (50) pages.
Volume II: Past Performance/Experience Information – Five (5) complete copies and one (1) electronic copy
Volume limited to fifty (50) pages.
Volume III: Cost/Price – Two (2) complete copies and one (1) electronic copy
No Page Limit

SOLICITATION REQUIREMENTS

SOURCE SELECTION INFORMATION SEE FAR 3.104

Volume I: Technical Proposal
Tab A – Executive Summary
Tab B – Technical
Subfactor 1 – Program Management Ability
Subfactor 2 – Design
Subfactor 3 – Project Execution and Technical Capability
Subfactor 4 – Business Plans

TECHNICAL PROPOSAL REQUIREMENTS

SOURCE SELECTION INFORMATION SEE FAR 3.104

Volume II - Past Performance
Tab A – Past Performance Information (reference Attachment 11)
Tab B – Consent Letters (reference Attachment 6)
Tab C – Client Authorization Letters (reference Attachment 7)
Tab D – Subcontractor/Teaming Partner Consent Form for Releaseof Past
Performance Information to the Prime (reference Attachment 8)
Tab E - Organizational Structure Change History

PAST PERFORMANCE PROPOSAL REQUIREMENTS

SOURCE SELECTION INFORMATION SEE FAR 3.104

Volume III – Cost/Price
Tab A – Company/Division Address, Identifying code, and Applicable Designation
Tab B – Authorized Offeror Personnel
Tab C - SF 1442
Tab D – Amendments
Tab E – Bonding
Tab F – Subcontracting, Teaming Partnerships and/or Joint Venture Arrangements
Tab G - Teaming Arrangement(s) and/or Letter(s) of Intent
Tab H - Exceptions to the Terms and Conditions
Tab I – Pricing for seed projects (reference Attachment 5)

COST/PRICE PROPOSAL REQUIREMENTS

SOURCE SELECTION INFORMATION SEE FAR 3.104

Evaluation based on submission as received

Performance Price Tradeoff (PPT) source selection procedures, with technical proposals, to make an integrated assessment for a best value award decision.
Reserves the right to award without discussions
Reserves the right to conduct discussions if later determined by the Contracting Officer as necessary
Reserve the right to issue Evaluation Notices (ENs) as determined by the Contracting Officer as necessary

EVALUATION OF OFFERORS

SOURCE SELECTION INFORMATION SEE FAR 3.104

Minimum guarantee - $75k
First select the awardees for the two design build projects, Seed Projects A and B.
The design build seed projects awardees will be selected based on best design approach representing the best value for the government
The selection of the awardees for the construction only seed projects based on best value to the government
Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments, including contract terms and conditions
Proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.

SEED PROJECT AWARDS

SITE VISIT RULES

SOURCE SELECTION INFORMATION SEE FAR 3.104

Site visit begins at 0900, Friday 17 Jul 09
Will proceed from one directly to the other
All questions must be submitted in writing no later than 27 Jul 09
DO NOT disturb the using activity with questions regarding any seed project
Only that information issued via the solicitation process is binding

SITE VISIT FOR SEED PROJECTS

SOURCE SELECTION INFORMATION SEE FAR 3.104

General Requirements
Introduction

Work shall consist of multiple disciplines in general construction categories and may involve design services for execution of a broad range of maintenance, repair, alteration, and minor construction.

Each individual Task Order (TO) Statement of Work (SOW) under this contract will define specific requirements / levels of effort.

STATEMENT OF WORK OVERVIEW

SOURCE SELECTION INFORMATION SEE FAR 3.104

General Requirements (cont.)
Levels of Effort
Full Design-Build

Conventional: Contractor executes design before construction begins Fast-Track: Contractor executes design and construction simultaneously (phased per SOW) Minimal Design-Build

Projects will relatively simple in scope; generally would not required the services of an R.A. or P.E.

Contractor not required to provide fully executed design documents. Contractor will produce set of working documents which convey work to be accomplished.

STATEMENT OF WORK OVERVIEW

SOURCE SELECTION INFORMATION SEE FAR 3.104

General Requirements (cont.)
Levels of Effort
Construction Only

Contractor will be provided completed design and will be required to provide construction services only

Definitions
Design Effort

15% (Conceptual) Design 35% (Preliminary) Design 65% (Intermediate) Design 95% (Pre-Final) Design 100% (Final) Design

STATEMENT OF WORK OVERVIEW

SOURCE SELECTION INFORMATION SEE FAR 3.104

General Requirements (cont.)
Codes, Regulations, Standards, and Technical Specifications

Provided list is not all inclusive; additional specific codes, regulation or standards may be specified in individual TOs Latest edition of codes, standards and regulations in effect at time of task order award will be followed Specifications produced by the contractor shall utilize Unified Facility Guide Specifications Government Furnished Office Space @ Storage Areas

Contractors will not be provided with permanent on-base office or storage/staging areas Staging areas for individual task orders will be assigned on a case-by-case basis

STATEMENT OF WORK OVERVIEW

SOURCE SELECTION INFORMATION SEE FAR 3.104

General Project Requirements
General Design Requirements
Review Conferences and Meetings

Design review conferences (each scheduled design submittals; may be revised by individual TO SOW) Architectural and Engineering Review Panel Contractor will provide confirmation notices for all meeting/conferences Design Drawings and Specifications

Note that the section entitled Specifications generally lays out the government’s expectation providing supporting data for design

STATEMENT OF WORK OVERVIEW

SOURCE SELECTION INFORMATION SEE FAR 3.104

Miscellaneous Project Requirements
Submittal Procedures

Government will provide submittal requirements for design phase of design-build projects; contractor will be responsible for developing submittal requirements for the construction phase Government will provide submittal requirements for construction only projects Construction Fencing

Provided for all projects involving exterior work and for exterior staging areas.

Additional fencing requirements (or reduction of requirements) will be addressed individual TO SOWs

STATEMENT OF WORK OVERVIEW

SOURCE SELECTION INFORMATION SEE FAR 3.104

Miscellaneous Project Requirements (cont)
Site Safety Guidelines

Contractors shall adhere to applicable safety manuals, standards, and federal regulations In addition, note that TAFB participates in the OSHA Voluntary Protection Program (VPP). All construction sites will be posted with contact information so ANY base personnel can report what they believe to be unsafe work practices.

Excavation Around Existing Utilities

STATEMENT OF WORK OVERVIEW

SOURCE SELECTION INFORMATION SEE FAR 3.104

Miscellaneous Project Requirements (cont)
Notifications

Outages: 21 days Airfield Waiver: 30 days Crane (>100 ft): 45 days Utility Marking: 10 days Final: 7 days Scheduling of Work

Note the information above as schedules are developed Periods of performance and schedules are considered on an individual TO basis. Contractor shall schedules for individual TOs to occur concurrently without extending performance period due to insufficient resources.

STATEMENT OF WORK OVERVIEW

SOURCE SELECTION INFORMATION SEE FAR 3.104

General Project Completion Requirements
O&M Manuals and Training
Redlines/As-Builts
DD Form 1354

Above documents (as a minimum) are required to be submitted before a final inspection is performed Final Inspection

Scheduled 7 days in advance; expectation that site is ready for turnover to government at time of inspection CO reserves the right to turn down or suspend final inspection if it is evident the contractor is not ready

STATEMENT OF WORK OVERVIEW

SOURCE SELECTION INFORMATION SEE FAR 3.104

General Project Completion Requirements (cont)
Warranties

Each task order will have a one (1) year materials and workmanship warranty in addition to any other manufacturer warranties required.

STATEMENT OF WORK OVERVIEW

SOURCE SELECTION INFORMATION SEE FAR 3.104

SOURCE SELECTION INFORMATION SEE FAR 3.104

File details come from the government source that posted it. Updated .