FA8101-09-R-0021-0005.doc
DOC document 47 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA8101-09-R-0021
About this file
Solicitation Amendment 0005
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following changes are hereby incorporated in solicitation FA8101-09-R-0021:
FIRST:
The closing date for acceptance of offers is hereby extended:
FROM: 12:00 PM on 10 SEP 09
TO: 12:00 PM on 14 SEP 09
SECOND: Section J-List of Documents, Exhibits and Other Attachments, ahs been amended to include new and revised attachments, listed in bold font:
ATTACHMENTS
DOCUMENT TYPE
DESCRIPTION
PAGES
DATE
Attachment 1
Current Davis Bacon Wage
(for Reference Only) per DBWD
Attachment 2
Statement of Work and
Technical Specifications
30 Apr 09
Attachment 3
AF Form 66
Attachment 4
POC Listing
Attachment 5 Seed Project Pricing- Rev 1
7 Aug 09
Attachment 6
Consent Authorization Letter
Attachment 7
Client Authorization Letter
Attachment 8
Subcontractor/Teaming Partner
Consent Form for Release of Past
Performance Information from
Prime Contractor
Attachment 9
Past Performance Questionnaire
Attachment 10
Performance Questionnaire Letter
Attachment 11
Past Performance Information Sheet 2
Attachment 12
Seed Project A: Design/Build
WWYK070088 Repair Break Area Col 2O93 B/3001
Statement of Work- Rev 1
7 AUG 09
Drawings
17 JUN 09
Drawing (FP01)
17JUN 09
As-Builts (070088)
4 AUG 09
AF Form 66- Rev 1
Wage Determination
26 JUN 09
OK080034
Ventilation Building 3001
Attachment 13
Seed Project B: Design/Build
WWYK070244 – Repair/Renovate First Floor B/2122
Statement of Work- Rev 1
Section 09612
30 MAR 09
Drawings (FP01 & FP02)
14 JUL 08
As-Builts (070244)
20 JUL 09
As-Builts (950028)
Back Shop Footprint
4 AUG 09
AF Form 66- Rev 1
26 JUN 09
Attachment 14
Seed Project C: Construction Only
WWYK070295- Replace Emergency Lighting B/3001
Statement of Work
31 DEC 08
Section 01 11 00
29 DEC 08
6 FEB 09
Attachment 15
Seed Project D: Construction Only
WWYK060367- Renovate Madppc Space B/3703
24 MAR 09
AUG 09
19 FEB 09
Rev 1- A501, F101, F102
19 AUG 09
Attachment 16
Seed Project E: Construction Only
WWYK070085- Replace Lighting in Backshop Metal Halide Lighting B/3001
31 DEC 08
29 DEC 08
Attachment 17
Seed Project F: Construction Only
WWYK070094- Repair/Renovate Restrooms PH3 B/3001
14 JAN 08
17 AUG 09
Section 15400
28 AUG 09
14 JAN 08
Rev 1- D1.00, A1.00, A6.00 (27 AUG 09), A7.00, M1.01, M1.02, M2.00, M3.00, M4.00, M5.00, M5.01 (27 AUG 09), E1.00, E2.00, E3.00, E4.00
19 AUG 09
Rev 2- M3.00
27 AUG 09
KTR Route B3001
Attachment 18 Base Standards for Building/Utility 17
JAN 07
Electrical Distribution Systems/Tele-Data
Communications
Attachment 19
Affirmative Procurement Plan
23 SEP 03
Attachment 20
Tinker Air Force Base
Facility Standard
FOURTH: Section L- Instructions, Conditions and Notices to Bidders, paragraph C. 11. is hereby modified to allow for electronic copies of proposals in Adobe Acrobat format:
11. Electronic Copies
The content and page size of electronic copies must be identical to the hard copies. When discrepancies exist between the written offers and those provided in electronic format, the written offer will take precedence in all cases. For electronic copies, indicate on each CD-ROM the volume number and title. Use separate files to permit rapid location of all portions, including subfactor required plans, exhibits, appendices and attachments, if any. The electronic copies of the proposal shall be submitted in a format readable by Microsoft (MS) Word 2003®, MS Excel 2003®, MS-Project 2003®, MS-Power Point 2003®, Microsoft Office XP®, or Adobe Acrobat, as applicable.
*** FOR COMPUTER PURPOSES ONLY***
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 10-Sep-2009 12:00 PM to 14-Sep-2009 12:00 PM.
The Issued By organization has changed from
72 CONS/PKBA
SHARLA FLOWERS/405-739-3930
7858 5TH ST STE 1
TINKER AFB OK 73145-9125
to
72 CONS/PKBA
KIMBERLY DELONG/405-739-3930
7858 5TH ST STE 1
TINKER AFB OK 73145-9125
(End of Summary of Changes)
File details come from the government source that posted it. Updated .