WWYK250063-04March2026 1.docx

DOCX document 425 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813726R0026
Issued by

About this file

This is a technical specification sheet for overhead door electrical work related to a fire-rated wall upgrade project at Tinker Air Force Base, Oklahoma. The document (Sheet E-104) details electrical specifications for two overhead doors (103A and 105A) that require power and control stations during the installation of fire-rated wall assemblies. Door 103A requires 115 VAC single-phase power with a 24V, 3-button control station (open, close, stop) mounted in a NEMA 1 flush interior configuration, while Door 105A requires 230 VAC single-phase power with the same control station specifications. The control stations must be coordinated with the construction of the rated wall assemblies, and electrical components must maintain a 35% design overhead for the project.

The contractor is responsible for removing, preserving, and reinstalling all existing electrical components located on or within walls designated for fire-rated upgrades, including power and lighting panels, junction boxes, conduits, wiring devices, fire alarm devices, and low-voltage cabling/outlets. All work must be coordinated with the general contractor, with affected systems safely de-energized and locked out prior to removal. Upon completion, all systems must be re-energized and tested for full functionality in compliance with the current National Electrical Code (NEC) and applicable life safety standards. This specification sheet is part of the broader WWYK250063 project for installing the REACT VII Facility in Building B9001, with the project issued on October 7, 2025, and designed by the Tinker AFB Civil Engineer Directorate.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00260001 - CANCELLATION.pdf PDF
250063_Pre-Bid RFI_Responses Round 2 COR.pdf PDF
Solicitation Amendment FA813726R00260001 SF 30.pdf PDF
250063_ATT02_Drawings_Amend_01.pdf PDF
250063_ATT01_SOW_Amend_01.pdf PDF
250063_Prebid RFI Responses.pdf PDF
Site Visit Sign in Sheet - WWYK250063.jpg JPG image
Site Visit Sign In Sheet.jpg JPG image
Solicitation - FA813726R0026.pdf PDF
4500-CIVIL.pdf PDF
esvEH_singledual_2023_V2.pdf PDF
01 32 16.00 20.pdf PDF
03 01 00.pdf PDF
10 44 16.pdf PDF
TAFB B9001 VAV Schedule.pdf PDF
23 00 00.pdf PDF
23 05 48.00 40.pdf PDF
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
00 71 00.pdf PDF
08 51 23.pdf PDF
23 09 23.02.pdf PDF
00 80 00.pdf PDF
00 70 00.pdf PDF
Solicitation - FA813726R0026.pdf PDF
2026 TAFB Mechanical Standard_signed.pdf PDF
Mechanical Schedules.xls XLS spreadsheet
SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx XLSX spreadsheet
08 81 00.pdf PDF
10 22 13.pdf PDF
08 71 00.pdf PDF
250063 React VII_Hardware schedule 25MAR26 JL.xlsx XLSX spreadsheet
2_-_HE05-JINV-S11EE---GNT---L_001.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
23 05 15.pdf PDF
26 51 00 INTERIOR LIGHTING.pdf PDF
00 80 05.pdf PDF
overall plan 04.15.2021.pdf PDF
01 33 00.pdf PDF
01 78 23.pdf PDF
ARCH-COMBINED.pdf PDF
01 78 00.pdf PDF
05 40 00.pdf PDF
ELECTRICAL PANEL SCHEDULE U18L.xlsx XLSX spreadsheet
07 21 16.pdf PDF
lrad331965pd_spec.pdf PDF
07 14 00.pdf PDF
28 31 76.pdf PDF
2020 TAFB Facility Standard.pdf PDF
250063_ATT 9_SOW.pdf PDF
REACT VII SA-01.pdf PDF
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

E WALL TO BE UPGRADED TO A FIRE RATED WALL - ELECTRICAL WORK BOTH SIDES.

ELECTRICAL SCOPE FOR FIRE-RATED WALL UPGRADES

E

35% DESIGNOVERHEAD DOOR - ELECTRICAL SPECIFICATIONS

DOOR NO.

POWER

CONTROL STATION

CONTROL STATION MOUNTING

NOTES

103A

115 VAC - SINGLE PHASE

24V, 3 BUTTON, OPEN, CLOSE, STOP (STD)

NEMA 1 FLUSH INTERIOR

1. COORDINATE CONTROL STATION INSTALLATION WITH CONSTRUCTION OF RATED WALL ASSEMBLIES 105A

230 VAC - SINGLE PHASE

24V, 3 BUTTON, OPEN, CLOSE, STOP (STD)

NEMA 1 FLUSH INTERIOR

1. COORDINATE CONTROL STATION INSTALLATION WITH CONSTRUCTION OF RATED WALL ASSEMBLIES

W

D

C V V

OFFICE 2102

LOADING DOCK

M PBAISLE

UL18-27

105A

PB

U18L-33, 35

V

103ADATE

1. CONTRACTOR SHALL REMOVE, PRESERVE, AND RE-INSTALL ALL E;ISTING ELECTRICAL COMPONENTS LOCATED ON OR WITHIN WALLS DESIGNATED FOR UPGRADE TO A FIRE-RATED ASSEMBLY. COORDINATE ALL WORK WITH THE GENERAL CONTRACTOR.

DWWYK250063 INSTALL REACT VII FACILITY

B9001, V19

TINKER AIR FORCE BASE, OKLAHOMA

2. AFFECTED COMPONENTS INCLUDE BUT ARE NOT LIMITED TO: POWER/LIGHTING PANELS, -UNCTION BO;ES, CONDUITS, WIRING DEVICES, FIRE ALARM DEVICES, AND LOW-VOLTAGE CABLING/OUTLETS.PROJECT INFORMATION

3. PRIOR TO REMOVAL, SAFELY DE-ENERGIZE AND LOTO ALL AFFECTED SYSTEMS.

4. UPON COMPLETION OF RE-INSTALLATION, RE-ENERGIZE AND TEST ALL SYSTEMS TO ENSURE FULL FUNCTIONALITY.

. ALL WORK SHALL COMPLY WITH THE CURRENT NEC AND ALL C

RELEVANT LIFE SAFETY STANDARDS.DESCRIPTION

MATERIAL TESTING ROOM-1103

REVISIONS MARK

ISSUE DATE:7 OCT 25 DESIGN GROUP:TEPA-CSAG DESIGNED BY:D PERRY DRAWN BY:T KISER CHECKED BY:C HIXON DESIGN FILE LOCATION:

Engr\Design\2020s\2025\20250063\0_Support\0_3_Drawings\Model

B BMANAGEMENT INFORMATION

OFFICE 1101

U U

MATERIAL TESTING ROOM-2

U

PROJECT LOCATION

OVERHEAD DOOR ELECTRICAL SPECIFICATIONS

A ASHEET TITLE

E-104

OVERHEAD DOOR ELECTRICAL SPECIFICATIONS

SCALE: 1/8" = 1'-0"E-104

SHEET

OF

B9001 KEY PLAN

SHEET NUMBER

1 2 3 4 5 image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image1.png image2.png