WWYK250063-04March2026 1.docx
DOCX document 425 KB Posted
- Solicitation number
- FA813726R0026
About this file
This is a technical specification sheet for overhead door electrical work related to a fire-rated wall upgrade project at Tinker Air Force Base, Oklahoma. The document (Sheet E-104) details electrical specifications for two overhead doors (103A and 105A) that require power and control stations during the installation of fire-rated wall assemblies. Door 103A requires 115 VAC single-phase power with a 24V, 3-button control station (open, close, stop) mounted in a NEMA 1 flush interior configuration, while Door 105A requires 230 VAC single-phase power with the same control station specifications. The control stations must be coordinated with the construction of the rated wall assemblies, and electrical components must maintain a 35% design overhead for the project.
The contractor is responsible for removing, preserving, and reinstalling all existing electrical components located on or within walls designated for fire-rated upgrades, including power and lighting panels, junction boxes, conduits, wiring devices, fire alarm devices, and low-voltage cabling/outlets. All work must be coordinated with the general contractor, with affected systems safely de-energized and locked out prior to removal. Upon completion, all systems must be re-energized and tested for full functionality in compliance with the current National Electrical Code (NEC) and applicable life safety standards. This specification sheet is part of the broader WWYK250063 project for installing the REACT VII Facility in Building B9001, with the project issued on October 7, 2025, and designed by the Tinker AFB Civil Engineer Directorate.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
E WALL TO BE UPGRADED TO A FIRE RATED WALL - ELECTRICAL WORK BOTH SIDES.
ELECTRICAL SCOPE FOR FIRE-RATED WALL UPGRADES
E
35% DESIGNOVERHEAD DOOR - ELECTRICAL SPECIFICATIONS
DOOR NO.
POWER
CONTROL STATION
CONTROL STATION MOUNTING
NOTES
103A
115 VAC - SINGLE PHASE
24V, 3 BUTTON, OPEN, CLOSE, STOP (STD)
NEMA 1 FLUSH INTERIOR
1. COORDINATE CONTROL STATION INSTALLATION WITH CONSTRUCTION OF RATED WALL ASSEMBLIES 105A
230 VAC - SINGLE PHASE
24V, 3 BUTTON, OPEN, CLOSE, STOP (STD)
NEMA 1 FLUSH INTERIOR
1. COORDINATE CONTROL STATION INSTALLATION WITH CONSTRUCTION OF RATED WALL ASSEMBLIES
W
D
C V V
OFFICE 2102
LOADING DOCK
M PBAISLE
UL18-27
105A
PB
U18L-33, 35
V
103ADATE
1. CONTRACTOR SHALL REMOVE, PRESERVE, AND RE-INSTALL ALL E;ISTING ELECTRICAL COMPONENTS LOCATED ON OR WITHIN WALLS DESIGNATED FOR UPGRADE TO A FIRE-RATED ASSEMBLY. COORDINATE ALL WORK WITH THE GENERAL CONTRACTOR.
DWWYK250063 INSTALL REACT VII FACILITY
B9001, V19
TINKER AIR FORCE BASE, OKLAHOMA
2. AFFECTED COMPONENTS INCLUDE BUT ARE NOT LIMITED TO: POWER/LIGHTING PANELS, -UNCTION BO;ES, CONDUITS, WIRING DEVICES, FIRE ALARM DEVICES, AND LOW-VOLTAGE CABLING/OUTLETS.PROJECT INFORMATION
3. PRIOR TO REMOVAL, SAFELY DE-ENERGIZE AND LOTO ALL AFFECTED SYSTEMS.
4. UPON COMPLETION OF RE-INSTALLATION, RE-ENERGIZE AND TEST ALL SYSTEMS TO ENSURE FULL FUNCTIONALITY.
. ALL WORK SHALL COMPLY WITH THE CURRENT NEC AND ALL C
RELEVANT LIFE SAFETY STANDARDS.DESCRIPTION
MATERIAL TESTING ROOM-1103
REVISIONS MARK
ISSUE DATE:7 OCT 25 DESIGN GROUP:TEPA-CSAG DESIGNED BY:D PERRY DRAWN BY:T KISER CHECKED BY:C HIXON DESIGN FILE LOCATION:
Engr\Design\2020s\2025\20250063\0_Support\0_3_Drawings\Model
B BMANAGEMENT INFORMATION
OFFICE 1101
U U
MATERIAL TESTING ROOM-2
U
PROJECT LOCATION
OVERHEAD DOOR ELECTRICAL SPECIFICATIONS
A ASHEET TITLE
E-104
OVERHEAD DOOR ELECTRICAL SPECIFICATIONS
SCALE: 1/8" = 1'-0"E-104
SHEET
OF
B9001 KEY PLAN
SHEET NUMBER
1 2 3 4 5 image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image1.png image2.png
File details come from the government source that posted it. Updated .