This is a technical specification sheet for overhead door electrical work related to a fire-rated wall upgrade project at Tinker Air Force Base, Oklahoma. The document (Sheet E-104) details electrical specifications for two overhead doors (103A and 105A) that require power and control stations during the installation of fire-rated wall assemblies. Door 103A requires 115 VAC single-phase power with a 24V, 3-button control station (open, close, stop) mounted in a NEMA 1 flush interior configuration, while Door 105A requires 230 VAC single-phase power with the same control station specifications. The control stations must be coordinated with the construction of the rated wall assemblies, and electrical components must maintain a 35% design overhead for the project.

The contractor is responsible for removing, preserving, and reinstalling all existing electrical components located on or within walls designated for fire-rated upgrades, including power and lighting panels, junction boxes, conduits, wiring devices, fire alarm devices, and low-voltage cabling/outlets. All work must be coordinated with the general contractor, with affected systems safely de-energized and locked out prior to removal. Upon completion, all systems must be re-energized and tested for full functionality in compliance with the current National Electrical Code (NEC) and applicable life safety standards. This specification sheet is part of the broader WWYK250063 project for installing the REACT VII Facility in Building B9001, with the project issued on October 7, 2025, and designed by the Tinker AFB Civil Engineer Directorate.

View the file

Other files

File Type Posted
250063_Pre-Bid RFI_Responses Round 2 COR.pdf PDF
250063_ATT02_Drawings_Amend_01.pdf PDF
250063_Prebid RFI Responses.pdf PDF
Site Visit Sign in Sheet - WWYK250063.jpg JPG image
Solicitation - FA813726R0026.pdf PDF
Site Visit Meet Up Location.png PNG image
2026 TAFB Mechanical Standard_signed.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
SOW Att 01_Appointment of Security Representative Template 496.docx DOCX document
SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx XLSX spreadsheet
23 05 15.pdf PDF
21 13 13.pdf PDF
09 67 23.15.pdf PDF
26 51 00 INTERIOR LIGHTING.pdf PDF
08 81 00.pdf PDF
06 41 16.00 10.pdf PDF
10 22 13.pdf PDF
23 05 93.pdf PDF
05 05 23.16.pdf PDF
00 70 00.pdf PDF
01 45 00.00 10.pdf PDF
00 80 05.pdf PDF
afi48-104.pdf PDF
image (1).png PNG image
Mechanical Schedules.xls XLS spreadsheet
Door_Window_Schedule.xlsx XLSX spreadsheet
Room finish schedule.xlsx XLSX spreadsheet
DESV_Submittal.pdf PDF
z415-bz1.pdf PDF
HE05IN_Dimension_Drawing.pdf PDF
4500-S.pdf PDF
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
26 05 73 POWER STUDIES.pdf PDF
26 20 00.pdf PDF
09 90 00.pdf PDF
23 09 13.pdf PDF
23 36 00.00 40.pdf PDF
08 71 00.pdf PDF
05 40 00.pdf PDF
10 14 00.10.pdf PDF
08 33 23.pdf PDF
08 11 13.pdf PDF
07 92 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
image.png PNG image
250063 React VII_Hardware schedule 25MAR26 JL.xlsx XLSX spreadsheet
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
ELECTRICAL PANEL SCHEDULE U18L.xlsx XLSX spreadsheet
esvEH_singledual_2023_V2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

E WALL TO BE UPGRADED TO A FIRE RATED WALL - ELECTRICAL WORK BOTH SIDES.

ELECTRICAL SCOPE FOR FIRE-RATED WALL UPGRADES

E

35% DESIGNOVERHEAD DOOR - ELECTRICAL SPECIFICATIONS

DOOR NO.

POWER

CONTROL STATION

CONTROL STATION MOUNTING

NOTES

103A

115 VAC - SINGLE PHASE

24V, 3 BUTTON, OPEN, CLOSE, STOP (STD)

NEMA 1 FLUSH INTERIOR

1. COORDINATE CONTROL STATION INSTALLATION WITH CONSTRUCTION OF RATED WALL ASSEMBLIES 105A

230 VAC - SINGLE PHASE

24V, 3 BUTTON, OPEN, CLOSE, STOP (STD)

NEMA 1 FLUSH INTERIOR

1. COORDINATE CONTROL STATION INSTALLATION WITH CONSTRUCTION OF RATED WALL ASSEMBLIES

W

D

C V V

OFFICE 2102

LOADING DOCK

M PBAISLE

UL18-27

105A

PB

U18L-33, 35

V

103ADATE

1. CONTRACTOR SHALL REMOVE, PRESERVE, AND RE-INSTALL ALL E;ISTING ELECTRICAL COMPONENTS LOCATED ON OR WITHIN WALLS DESIGNATED FOR UPGRADE TO A FIRE-RATED ASSEMBLY. COORDINATE ALL WORK WITH THE GENERAL CONTRACTOR.

DWWYK250063 INSTALL REACT VII FACILITY

B9001, V19

TINKER AIR FORCE BASE, OKLAHOMA

2. AFFECTED COMPONENTS INCLUDE BUT ARE NOT LIMITED TO: POWER/LIGHTING PANELS, -UNCTION BO;ES, CONDUITS, WIRING DEVICES, FIRE ALARM DEVICES, AND LOW-VOLTAGE CABLING/OUTLETS.PROJECT INFORMATION

3. PRIOR TO REMOVAL, SAFELY DE-ENERGIZE AND LOTO ALL AFFECTED SYSTEMS.

4. UPON COMPLETION OF RE-INSTALLATION, RE-ENERGIZE AND TEST ALL SYSTEMS TO ENSURE FULL FUNCTIONALITY.

. ALL WORK SHALL COMPLY WITH THE CURRENT NEC AND ALL C

RELEVANT LIFE SAFETY STANDARDS.DESCRIPTION

MATERIAL TESTING ROOM-1103

REVISIONS MARK

ISSUE DATE:7 OCT 25 DESIGN GROUP:TEPA-CSAG DESIGNED BY:D PERRY DRAWN BY:T KISER CHECKED BY:C HIXON DESIGN FILE LOCATION:

Engr\Design\2020s\2025\20250063\0_Support\0_3_Drawings\Model

B BMANAGEMENT INFORMATION

OFFICE 1101

U U

MATERIAL TESTING ROOM-2

U

PROJECT LOCATION

OVERHEAD DOOR ELECTRICAL SPECIFICATIONS

A ASHEET TITLE

E-104

OVERHEAD DOOR ELECTRICAL SPECIFICATIONS

SCALE: 1/8" = 1'-0"E-104

SHEET

OF

B9001 KEY PLAN

SHEET NUMBER

1 2 3 4 5 image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image1.png image2.png

File details come from the government source that posted it. Updated .