10 44 16.pdf

PDF 14 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813726R0026
Issued by

About this file

This is a technical specification document for fire extinguisher systems at Tinker Air Force Base, Oklahoma, effective April 2019.

The specification requires the provision and installation of 10-pound enameled steel fire extinguishers with pressure gages as accessories. Equipment includes semi-recessed enameled steel cabinets dimensioned to accommodate the specified extinguishers, sized for either 6-inch or 4-inch walls as indicated in project documents, and wall-hook style fire extinguisher brackets. All installation work must comply with manufacturer recommendations. The specification references applicable standards from NFPA (standards 1, 10, 101, 241, 303, 385, 409, 418, 505, and 99), ASTM E814, UL standards (154, 299, 626, 2129, and 8), and federal regulations 29 CFR 1910.106 and 1910.157. Contractors must submit government-approved documentation including manufacturer's data, shop drawings for fire extinguishers, accessories, cabinets and wall brackets, product data, replacement parts lists, samples of cabinets and wall brackets, and manufacturer's warranty with inspection tags. Contractors are responsible for protecting materials during delivery and storage, providing samples for approval prior to installation, removing damaged work and replacing it at no cost to the Government, and cleaning all work surfaces and removing construction debris upon completion.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00260001 - CANCELLATION.pdf PDF
Solicitation Amendment FA813726R00260001 SF 30.pdf PDF
250063_ATT 10_Submittal Register.pdf PDF
250063_ATT 9_SOW.pdf PDF
250063_ATT 11_Drawings.pdf PDF
WWYK250063-04March2026.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
22 00 00.pdf PDF
28 31 76.pdf PDF
23 09 23.02.pdf PDF
07 14 00.pdf PDF
08 51 23.pdf PDF
07 21 16.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 33 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 78 23.pdf PDF
esvperf_singledual_2023_V2.pdf PDF
lrad331965pd_spec.pdf PDF
REACT VII SA-01.pdf PDF
TAFB B9001 VAV Schedule.pdf PDF
ARCH-COMBINED.pdf PDF
4500-MUG.pdf PDF
overall plan 04.15.2021.pdf PDF
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
26 05 73 POWER STUDIES.pdf PDF
26 20 00.pdf PDF
09 90 00.pdf PDF
23 09 13.pdf PDF
23 36 00.00 40.pdf PDF
08 71 00.pdf PDF
05 40 00.pdf PDF
10 14 00.10.pdf PDF
08 33 23.pdf PDF
08 11 13.pdf PDF
07 92 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
image.png PNG image
250063 React VII_Hardware schedule 25MAR26 JL.xlsx XLSX spreadsheet
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
ELECTRICAL PANEL SCHEDULE U18L.xlsx XLSX spreadsheet
esvEH_singledual_2023_V2.pdf PDF
lk406gn05t4_spec.pdf PDF
2_-_HE05-JINV-S11EE---GNT---L_001.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 10 44 16

FI RE EXTI NGUI SHERS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASTM I NTERNATI ONAL ( ASTM)

ASTM E814 ( 2013a) St andar d Test Met hod f or Fi r e Test s of Thr ough- Penet r at i on Fi r e St ops

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 1 ( 2015; ERTA 2015) Fi r e Code

NFPA 10 ( 2013) St andar d f or Por t abl e Fi r e Extinguishers

NFPA 101 ( 2015; ERTA 2015) Li f e Saf et y Code

NFPA 241 ( 2013; Er r at a 2015) St andar d f or Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Oper at i ons

NFPA 303 ( 2016) Fi r e Pr ot ect i on St andar ds f or Mar i nas and Boat yar ds

NFPA 385 ( 2012) St andar d f or Tank Vehi c l es f or Fl ammabl e and Combust i bl e Li qui ds

NFPA 409 ( 2016) St andar d on Ai r cr af t Hangar s

NFPA 418 ( 2016) St andar d f or Hel i por t s

NFPA 505 ( 2013) Fi r e Saf et y St andar d f or Power ed I ndust r i al Tr ucks I ncl udi ng Type Desi gnat i ons, Ar eas of Use, Conver si ons, Mai nt enance, and Oper at i ons

NFPA 99 ( 2015) Heal t h Car e Faci l i t i es Code

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

29 CFR 1910. 106 Fl ammabl e and Combust i bl e Li qui ds

29 CFR 1910. 157 ( 2003) Por t abl e Fi r e Ext i ngui sher s

UNDERWRI TERS LABORATORI ES ( UL)

UL 154 ( 2005; Repr i nt May 2014) Car bon- Di oxi de Fi r e Ext i ngui sher s

Apr i l 2019 Page 1 SECTI ON 10 44 16

UL 2129 ( 2017) UL St andar d f or Saf et y Hal ocar bon Cl ean Agent Fi r e Ext i ngui sher s

UL 299 ( 2012) Dr y Chemi cal Fi r e Ext i ngui sher s

UL 626 ( 2005; Repr i nt Mar 2012) 2- 1/ 2 Gal l on St or ed- Pr essur e, Wat er - Type Fi r e Extinguishers

UL 8 ( 2016) UL St andar d f or Saf et y Wat er Based Agent Fi r e Ext i ngui sher s

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Manuf act ur er ' s Dat a; G

SD- 02 Shop Dr awi ngs

Fi r e Ext i ngui sher s; G

Accessor i es; G

Cabi net s; G

Wal l Br acket s; G

SD- 03 Pr oduct Dat a

Fi r e Ext i ngui sher s; G

Accessor i es; G

Cabi net s; G

Wal l Br acket s; G

Repl acement Par t s Li st ; G

SD- 04 Sampl es

Fi r e Ext i ngui sher ; G

Cabi net ; G

Wal l Br acket s; G

Accessor i es; G

SD- 07 Cer t i f i cat es

Apr i l 2019 Page 2 SECTI ON 10 44 16

Fi r e Ext i ngui sher s; G

Manuf act ur er ' s War r ant y wi t h I nspect i on Tag; G

1. 3 DELI VERY, STORAGE, AND HANDLI NG

Pr ot ect mat er i al s f r om weat her , soi l , and damage dur i ng del i ver y, st or age, and const r uct i on.

Del i ver mat er i al s i n t hei r or i gi nal packages, cont ai ner s, or bundl es bear i ng t he br and name and t he name and t ype of t he mat er i al .

1. 3. 1 Samples

Pr ovi de t he f ol l owi ng sampl es: one f ul l - s i zed sampl e of each t ype of cabi net bei ng i nst al l ed; t hr ee sampl es of wal l br acket s and accessor i es of each t ype bei ng used.

Use appr oved sampl es f or i nst al l at i on, wi t h pr oper i dent i f i cat i on and storage.

PART 2 PRODUCTS

Submi t f abr i cat i on dr awi ngs consi st i ng of f abr i cat i on and assembl y det ai l s per f or med i n t he f act or y and pr oduct dat a f or t he f ol l owi ng i t ems:

Accessor i es, cabi net s, Wal l Br acket s.

2. 1 SYSTEM DESCRI PTI ON

2. 1. 1 Material

Pr ovi de enamel ed st eel ext i ngui sher shel l .

2. 1. 2 Size

10 pounds ext i ngui sher s.

2. 1. 3 Accessories

Pr essur e gage

2. 2 EQUIPMENT

2. 2. 1 Cabinets

2. 2. 1. 1 Material

Pr ovi de enamel ed st eel cabi net s.

2. 2. 1. 2 Type

Pr ovi de semi - r ecessed cabi net f or a 6- i nch or 4- i nch wal l as i ndi cat ed.

2. 2. 1. 3 Size

Di mensi on cabi net s t o accommodat e t he speci f i ed f i r e ext i ngui sher s.

Apr i l 2019 Page 3 SECTI ON 10 44 16

2. 2. 2 Wal l Br acket s

Pr ovi de wal l - hook f i r e ext i ngui sher wal l br acket s.

Pr ovi de wal l br acket and accessor i es as appr oved.

PART 3 EXECUTI ON

3. 1 INSTALLATION

Compl y wi t h t he manuf act ur er ' s r ecommendat i ons f or al l i nst al l at i ons.

3. 2 PROTECTION

3. 2. 1 Repairing

Remove and r epl ace damaged and unaccept abl e por t i ons of compl et ed wor k wi t h new wor k at no addi t i onal cost t o t he Gover nment .

Submi t r epl acement par t s l i s t i ndi cat i ng speci f i ed i t ems r epl acement par t , r epl acement cost , and name, addr ess and cont act f or r epl acement par t s distributor.

3. 2. 2 Cleaning

Cl ean al l sur f aces of t he wor k, and adj acent sur f aces whi ch ar e soi l ed as a r esul t of t he wor k. Remove f r om t he si t e al l const r uct i on equi pment , t ool s, sur pl us mat er i al s and r ubbi sh r esul t i ng f r om t he wor k.

- - End of Sect i on - -

Apr i l 2019 Page 4 SECTI ON 10 44 16

File details come from the government source that posted it. Updated .