This is a Special Provisions specification document for contractors working on Tinker Air Force Base (TAFB), issued in January 2022.

The document establishes mandatory requirements for all contractor activities on the base, with particular emphasis on airfield operations and safety. Contractors must coordinate all airfield activities with the Contracting Officer and Chief of Airfield Management prior to commencing work and must comply with TAFBI 13-204 (2021) Airfield Operations. All runways, taxiways, and aprons must remain open during projects unless otherwise directed, and construction vehicle and equipment heights are limited to 12 feet above surface. No equipment or personnel are permitted on aircraft movement areas or within 200 feet of runways without Tinker Control Tower authorization. For projects exceeding seven days, all contractor personnel operating equipment or vehicles within movement areas or on aircraft-parking ramps must complete flight line driver training and possess portable radios capable of communicating with Tinker Ground Control. The Chief of Airfield Management may authorize short-term exemptions from training requirements but will provide flight line orientation briefings. Contractor responsibilities also include dewatering excavated areas using sufficient pumps to remove rainwater as soon as practicable, following designated haul routes, and managing traffic control and barricades in accordance with Department of Transportation standards for automobile movement areas. Road closure restrictions apply: on two-lane roads only one lane may be blocked at a time, while four-lane roads must maintain at least two open lanes at all times and three during rush hours. All costs for traffic control and barricades are the contractor's responsibility at no additional cost to the Government. Waste materials removed become contractor property and must be disposed of off-base. The document permits winter recess negotiations between December 1 and March 1 as a no-cost modification extending delivery order completion dates accordingly.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00260001 - CANCELLATION.pdf PDF
Solicitation Amendment FA813726R00260001 SF 30.pdf PDF
250063_ATT 10_Submittal Register.pdf PDF
250063_ATT 9_SOW.pdf PDF
250063_ATT 11_Drawings.pdf PDF
WWYK250063-04March2026.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
22 00 00.pdf PDF
28 31 76.pdf PDF
23 09 23.02.pdf PDF
07 14 00.pdf PDF
08 51 23.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 33 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 78 23.pdf PDF
esvperf_singledual_2023_V2.pdf PDF
lrad331965pd_spec.pdf PDF
REACT VII SA-01.pdf PDF
TAFB B9001 VAV Schedule.pdf PDF
ARCH-COMBINED.pdf PDF
4500-MUG.pdf PDF
overall plan 04.15.2021.pdf PDF
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
26 05 73 POWER STUDIES.pdf PDF
26 20 00.pdf PDF
09 90 00.pdf PDF
23 09 13.pdf PDF
23 36 00.00 40.pdf PDF
08 71 00.pdf PDF
05 40 00.pdf PDF
10 14 00.10.pdf PDF
08 33 23.pdf PDF
08 11 13.pdf PDF
07 92 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
image.png PNG image
250063 React VII_Hardware schedule 25MAR26 JL.xlsx XLSX spreadsheet
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
ELECTRICAL PANEL SCHEDULE U18L.xlsx XLSX spreadsheet
esvEH_singledual_2023_V2.pdf PDF
lk406gn05t4_spec.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB Tinker General Requirements

SECTION 00 80 00

SPECIAL PROVISIONS FOR WORKING ON TINKER AFB

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. The most current edition of the listed publications at the time of contract/delivery order award shall be used.

TINKER AIR FORCE BASE (TAFB)

TAFBI 13-204 (2021) Airfield Operations

1.2 DEWATERING EXCAVATED AREA

It shall be the Contractor's responsibility to protect the construction area from damage due to rainwater. The Contractor shall provide and maintain at the job site sufficient pumps to remove rainwater from the excavated area as soon as practicable.

1.3 HAUL ROUTES

The haul routes to be used by the Contractor shall be as directed on the project drawings or by the Contracting Officer.

1.4 AIRFIELD OPERATIONS

All contractor activities on the airfield shall be pre-coordinated with the Contracting Officer in conjunction with the Chief, Airfield Management (CAM) prior to the Contractor proceeding on the airdrome. The provisions of TAFBI 13-204 and Section 00 80 05 SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE AIRFIELD shall be strictly adhered to.

All runways, taxiways and aprons shall remain open during this project, unless specified otherwise by the Contracting Officer. The height of construction vehicles and equipment shall be limited to 12 feet above the surface. Absolutely no equipment or personnel will be allowed on the aircraft movement area or within 200 feet of the runways without permission from the Tinker Control Tower.

All Contractor personnel who will be operating their equipment or vehicles within the movement area or on any aircraft-parking ramp shall receive flight line driver training and have portable radios capable of communicating with Tinker Ground Control for projects over seven days.

The CAM may authorize certain contractors and other personnel to drive on the airdrome for short specified periods without completing the flight line driving training. However, Airfield Management will brief contractors and project engineers (or other supervisors responsible for the work being accomplished) and will provide flight line orientation for contractor vehicle operators prior to allowing them to drive on the airdrome.

January 2022 Page 1 Section 00 80 00

Tinker AFB Tinker General Requirements

Prior to commencing work on this project, the Contractor shall coordinate with the Contracting Officer for any airfield authorization passes that may be required.

Taxiing and towed aircraft shall have the right-of-way at all times.

Close coordination will be maintained between the Contractor's on-site foreman and the Airfield Manager.

1.5 TRAFFIC CONTROL AND BARRICADES

1.5.1 Automobile Movement Areas

Construction areas affecting automobile movement areas shall be protected by an adequate number of barricades with working flashing lights, warning devices, construction signs, flagmen and personnel. The barricades and warning devices shall be in accordance with the "Manual on Uniform Traffic Control Devices for Streets and Highways" developed by the U.S. Department of Transportation as an approved national standard. All costs associated with providing the traffic control and barricades shall be considered incidentals and shall be borne by the Contractor at no additional cost to the Government.

1.5.2 Road Closures

On two lane roads, only one lane may be blocked at a time. On four lane roads, at least two lanes shall be kept open at all times and three at rush hour.

1.6 WASTE AREA

Unless otherwise specified in these specifications, all waste materials removed shall become property of the Contractor and shall be taken off base for disposal. Disposal site location shall be the responsibility of the Contractor.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 WINTER RECESS

A winter recess, between December 1 and March 1, can be negotiated per Delivery Order between the Contracting Officer and the Contractor. It shall be a no cost modification to the contract moving the Delivery Order completion date the amount of the recess time.

-- End of Section --

January 2022 Page 2 Section 00 80 00

File details come from the government source that posted it. Updated .