ELECTRICAL PANEL SCHEDULE U18L.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813726R0026
Issued by

About this file

This is an electrical panel schedule document that specifies the technical requirements and circuit configurations for two electrical distribution panels at a facility. Panel U18H is a 480-volt, 3-phase panel with a 200-amp main disconnect, 250-amp power rating, and 22K AIC capacity, mounted in a NEMA 1 surface enclosure. It serves primarily HVAC equipment including three VAV units (VAV-101, 102, 103, 104), an Energy Recovery Ventilator (ERV-V19), and a Transient Voltage Surge Suppressor (TVSS) rated at 75KVA connected to a 3-pole 30-amp breaker. The total connected load is 108.76 KVA with an estimated demand load of 87.0 KVA and demand line amps of 109.2. Panel U18L is a 208-volt, 3-phase panel with a 225-amp main disconnect and 10K AIC capacity, also surface-mounted in a NEMA 1 enclosure. This panel distributes power to lighting, receptacles, office equipment, an electric hot water heater, overhead doors, and supply fan SFV-19-01 across multiple rooms (101-105). The total connected load is 33.0 KVA with an estimated demand load of 26.4 KVA and demand line amps of 73.3. Both panels include specific equipment specifications: Panel U18H requires an Eaton #SP1-480D TVSS (Grainger #787R41) or equivalent, while Panel U18L requires a Mersen 201/120V, 50KAV TVSS. Both TVSS units must connect to 3-pole 30-amp breakers with short, straight leads and no sharp bends.

View the file

Other files

File Type Posted
250063_ATT01_SOW_Amend_01.pdf PDF
Site Visit Sign In Sheet.jpg JPG image
Solicitation - FA813726R0026.pdf PDF
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
26 05 73 POWER STUDIES.pdf PDF
26 20 00.pdf PDF
09 90 00.pdf PDF
23 09 13.pdf PDF
23 36 00.00 40.pdf PDF
08 71 00.pdf PDF
05 40 00.pdf PDF
10 14 00.10.pdf PDF
08 33 23.pdf PDF
08 11 13.pdf PDF
07 92 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
image.png PNG image
250063 React VII_Hardware schedule 25MAR26 JL.xlsx XLSX spreadsheet
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
esvEH_singledual_2023_V2.pdf PDF
lk406gn05t4_spec.pdf PDF
2_-_HE05-JINV-S11EE---GNT---L_001.pdf PDF
ERV Schedule_TAFB B9001_O-212477.xlsx XLSX spreadsheet
4500-CIVIL.pdf PDF
250063_ATT 4_ODS.pdf PDF
WWYK250063-04March2026 1.docx DOCX document
250063_ATT 3_RMDF.pdf PDF
23 00 00.pdf PDF
23 07 00.pdf PDF
23 31 13.00 40.pdf PDF
23 08 00.pdf PDF
03 01 00.pdf PDF
23 64 26.pdf PDF
10 14 00.20.pdf PDF
23 05 48.00 40.pdf PDF
07 84 00.pdf PDF
23 03 00.pdf PDF
01 50 00.pdf PDF
00 80 00.pdf PDF
01 42 00.pdf PDF
UMRL.pdf PDF
PILE SCHEDULE.xlsx XLSX spreadsheet
HELICAL PILES NOTES.docx DOCX document
z400i.pdf_safe.pdf PDF
ELECTRICAL COMBINED.pdf PDF
220042 As Built Drawings.pdf PDF
250063_ATT 10_Submittal Register.pdf PDF
250063_ATT 9_SOW.pdf PDF
250063_ATT 11_Drawings.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PANEL U18H SCHECULE
VOLTS (L-l) 480PHASE 3WIRE 4S/N BUSS 100%EG BUS 100%MOUNT SURFACEENCLOSURE NEMA 1
DISCONNECT Main BreakerDISCONNECT AMPS 200POWER AMPS 250PANEL AIC 22K MINUM
COMMENTS SQ D NF OR EQUAL WITH MAIN BREAKER
Load /Phase (VA)
Circuit No.Trip AmpNo. PolesLoad TypeLoad ServedABCLoad ServedLoad TypeNo. PolesTrip AmpCircuit No.
1151MVAV - 101< 3741Air Handling Unit (AHU-1)M3202
6860>
3151MVAV - 102<7324
732>
5151MVAV - 103<31606
732>
7151MVAV - 104<3160SPAREF1208
>
9201FSPARE<<SPAREF12010
>>
11201ERV-V19<4000SPAREF12012
F>
13201ERV-V19<4000SPAREF12014
F>
15201ERV-V19<4000SPAREF12016
F>
17201SPARE<SPAREF12018
F>
191<F120
F>
211<F122
F>
231<F124
F>
251<F126
F>
271<F128
F>
291<F130
F>
311<F132
F>
331<F134
F>
351F136
F
37303OTVSS< 075KVAT312538
37500>
39040
37500>
41< 042
37500>
TOTAL419563340333403
TOTAL CONNECTED LOAD 108.76 KVA
ESTIMATED DEMAND LOAD 87.0 KVADEMAND LINE AMPS 109.2 AMPS
INSTALL TVSS EATON #SP1-480D (GRAINGER #787R41) OR EQUAL 480V, 50KA CONNECT TO 3P30A BREAKER IN PANEL AND KEEP LEADS AS SHORT AND STRAIGHT AS POSSIBLE WITH NO SHARP BENDS ALLOWED.
PANEL U18L SCHEDULE
VOLTS (L-l) 208PHASE 3WIRE 4S/N BUSS 100%EG BUS 100%MOUNT SURFACEENCLOSURE NEMA 1
DISCONNECT Main BreakerDISCONNECT AMPS 225POWER AMPS 225PANEL AIC 10K MINUM
COMMENTS SQ DNQ PANEL
Load /Phase (VA)
Circuit No.Trip AmpNo. PolesLoad TypeLoad ServedABCLoad ServedLoad TypeNo. PolesTrip AmpCircuit No.
1201LROOM LIGHTS 101 & 102<536ROOM 101 SW OFFICER1202
540>
3201LROOM LIGHTS 104<380ROOM 101 SW OFFICER1204
360>
5201LROOM LIGHTS 103<766ROOM 101 SW OFFICER1206
360>
7201RROOM 102 PRINTER AND RECPT<720ROOM 104 NORTH RECPTR1208
1080>
9201FROOM 102 EASTCOUNTERTOP<1500ROOM 104 L6-30 RECPTR23010
2400>
11201RROOM 102 CENTER COUNTERTOP<150012
2400>
13201RROOM 102 WEST COUNTERTOP<1920ROOM 104 RECPTR12014
540>
15201RROOM 102 OFFICE FURNITURE FEED<720ROOM 104 RECPTR12016
720>
17201RROOM 102 OFFICE FURNITURE FEED<720ROOM 104 RECPTR12018
540>
19201RROOM 103 WEST RECPT<540ROOM 102 NE RECPTR12020
1080>
21201RROOM 103 N CENTER CORD REEL<540ROOM 103 S CENTER CORD REELR12022
540>
23201RROOM 103 NE CENTER CORD REEL<540ROOM 103 SE CENTER CORD REELR12024
>
25201OSPARE<ELECTRIC HOT WATER HEATERO25026
7280>
27201OROOM 103 OVERHEAD DOOR<75028
7280>
29201MAHU-1 CONTROL PANEL<1200SPARES12030
732>
31201SSPARE<SUPPLY FAN SFV-19-01S12032
>
33201OROOM 105

OVERHEAD

DOOR100SPARES12034
>
35100SPARES12036
>
37151ODOORBELL<500SPARE2038
>
3920SPARE<SPARE2040
>
4120SPARE<SPARE2042
>
43<44
>
45<46
>
47<48
>
49303OTVSS< 050
>
51052
>
53< 054
>
TOTAL147361577014106
TOTAL CONNECTED LOAD 33.0 KVA
ESTIMATED DEMAND LOAD 26.4 KVADEMAND LINE AMPS 73.3 AMPS
INSTALL TVSS MERSEN FOR 201/120V, 50KAV, CONNECT TO 3P, 30A BREAKER IN PANEL AND KEEP LEADS AS SHORT AND STRAIGHT AS POSSIBLE WITH NOT SHARP BENDS.

File details come from the government source that posted it. Updated .