This is an equipment list template for the SMS Builder project (Project #WWYK) at Building 9001. The spreadsheet serves as a standardized inventory tracking document designed to catalog all equipment associated with the facility installation, including fields for equipment identification, specifications, and operational details. The template includes columns for tracking project status (Draft, Interim, Final), action type (New, Replace, Demo), equipment classification by specification section, and in-service dates.

The equipment list captures comprehensive technical specifications for each item, including manufacturer and model information, serial numbers, capacity ratings with units of measure, physical location (floor and room/column assignments), and motor specifications (horsepower, voltage, and phase). Additional columns accommodate unit cost, warranty period, and other relevant information necessary for facility management and maintenance tracking. This template is directly associated with the Air Force solicitation FA813726R0026 for the REACT VII Facility installation at Building 9001, a project restricted to SBA Certified Women Owned Small Businesses (WOSB). The equipment list would serve as supporting documentation to define the scope of equipment to be installed as part of this facility construction contract.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00260001 - CANCELLATION.pdf PDF
250063_Pre-Bid RFI_Responses Round 2 COR.pdf PDF
Solicitation Amendment FA813726R00260001 SF 30.pdf PDF
250063_ATT02_Drawings_Amend_01.pdf PDF
250063_ATT01_SOW_Amend_01.pdf PDF
250063_Prebid RFI Responses.pdf PDF
Site Visit Sign in Sheet - WWYK250063.jpg JPG image
Site Visit Sign In Sheet.jpg JPG image
Solicitation - FA813726R0026.pdf PDF
4500-CIVIL.pdf PDF
esvEH_singledual_2023_V2.pdf PDF
01 32 16.00 20.pdf PDF
03 01 00.pdf PDF
10 44 16.pdf PDF
TAFB B9001 VAV Schedule.pdf PDF
23 00 00.pdf PDF
23 05 48.00 40.pdf PDF
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
00 71 00.pdf PDF
08 51 23.pdf PDF
23 09 23.02.pdf PDF
00 80 00.pdf PDF
00 70 00.pdf PDF
Solicitation - FA813726R0026.pdf PDF
2026 TAFB Mechanical Standard_signed.pdf PDF
Mechanical Schedules.xls XLS spreadsheet
08 81 00.pdf PDF
10 22 13.pdf PDF
08 71 00.pdf PDF
250063 React VII_Hardware schedule 25MAR26 JL.xlsx XLSX spreadsheet
2_-_HE05-JINV-S11EE---GNT---L_001.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
23 05 15.pdf PDF
26 51 00 INTERIOR LIGHTING.pdf PDF
00 80 05.pdf PDF
overall plan 04.15.2021.pdf PDF
01 33 00.pdf PDF
01 78 23.pdf PDF
ARCH-COMBINED.pdf PDF
01 78 00.pdf PDF
05 40 00.pdf PDF
ELECTRICAL PANEL SCHEDULE U18L.xlsx XLSX spreadsheet
07 21 16.pdf PDF
lrad331965pd_spec.pdf PDF
07 14 00.pdf PDF
28 31 76.pdf PDF
2020 TAFB Facility Standard.pdf PDF
250063_ATT 9_SOW.pdf PDF
REACT VII SA-01.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PROJECT #: WWYKTITLE:BUILDING #
CONTRACT #WORKSHEET STATUS (DRAFT, INTERIM, FINAL)
ACTION (NEW, REPLACE, DEMO)SPEC SECTIONPLACED IN SERVICE DATEEQUIPMENT TYPEUID/UNIT TAGMANUFACTURERMODEL #SERIAL #CAPACITYCAPACITY UOMLOCATIONFLOOR #ROOM/ COLUMNMOTOR CAPACITYUNIT COSTWARRANTY PERIODOTHER INFO
HPVOLTSPhASE

&"-,Bold"&16SMS BUILDER EQUIPMENT LIST

V0_08/17/23

File details come from the government source that posted it. Updated .