Sources_Sought_ICD705_Osan_PDB_OTA_27Oct26_V1.pdf

Intelligence Community Directive Oct 27, 2026 PDF 228 KB Posted

Attached to
ICD-705 Controlled Spaces Modernization and Sustainment Program - (Progressive Design-build (PDB) Other Transaction Agreement (OTA)
Solicitation number
W912UM27S0TA1
Issued by

About this file

This is a Sources Sought Announcement and Industry Day Notice for market research purposes only, issued by the U.S. Army Corps of Engineers, Far East District (USACE FED) under Sources Sought Number W912UM27S0TA1. The Government is conducting market research to evaluate a Progressive Design-Build (PDB) delivery method executed through an Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a for the ICD-705 Controlled Spaces Modernization and Sustainment Program at Osan Air Base, Republic of Korea. This is not a solicitation, Request for Qualifications, or commitment to award; responses will not be reimbursed and do not affect future eligibility. The Government seeks candid industry input on benefits, limitations, risks, and commercial terms of a PDB OTA compared with traditional design-bid-build or design-build approaches.

The program encompasses approximately $60–100 million in modernization and sustainment work across two existing facilities: Building A requires replacement of the M49 Collective Protection System with a new M98 CPS, HVAC modernization, and conversion of approximately 2,610 square feet to meet ICD-705 requirements; Building B requires conversion of approximately 3,700 square feet to ICD-705 standards and sustainment work on approximately 50,000 square feet, including roof repairs, office improvements, fire protection and alarm system repairs, and HVAC infrastructure replacement. Construction funding is anticipated for obligation in FY27. The Government is evaluating a two-phase approach: Phase 1 (Design and Preconstruction) involving collaborative requirement refinement and design development; Phase 2 (Construction) potentially including a Guaranteed Maximum Price (GMP). Interested firms must submit a completed Industry Questionnaire and a Capability Statement (not exceeding 12 pages) no later than 2:00 p.m. Korea Standard Time on Tuesday, 17 November 2026, to Eugene A. Gibbs (Eugene.A.Gibbs@usace.army.mil) or Mike M. Miyagi (Michael.M.Miyagi@usace.army.mil). A Virtual Industry Day will be scheduled with registration details posted on SAM.gov. Firms should include company registration information (CAGE code and/or UEI), business size status under NAICS Code 236220, and two completed projects of similar nature and complexity. The Government specifically seeks recommendations on commercial practices, agreement terms, project phasing, risk sharing, open-book pricing approaches, and governance structures.

View the file

Other versions and copies of ICD 705

File Revision Posted Attached to
ICD 705 Tech Specs Ver 1.5.1_26 Jul 2022PDF.pdf Version 1.5.1, Jul 26, 2022 Access Control System
ICD 705 v1.5.1 Tech_Specs_for_Construction_and_Management_of_SCIFs_v1.5.1_ July 26, 2021.pdf Jul 1, 2026 IDS/ACS System
ICD 705 v1.5.1 Tech_Specs_for_Construction_and_Management_of_SCIFs_v1.5.1_ July 26, 2021.pdf Jul 1, 2026 Request for Information - IDS/ACS System
(CUI) ICD 705 v1.5.1 Tech_Specs_for_Construction_and_Management_of_SCIFs_v1.5.1_ July 26, 2021.pdf Jul 1, 2026 Request for Information - IDS/ACS System
RFI_N40080RFI24RP00048_Souces Sought ICD 705 Space NSA Washington 01.24.2024.pdf Jan 24, 2024 REQUEST FOR INTEREST (RFI) N40080RFI24RP00048 - SOURCES SOUGHT ONLY
Attachment 5 - ICD-705-Technical-Specifications 1.4 Sep 2017.pdf Sep 4, 2017 MA MERS SCIF Door Replacement at the FEMA, MERS, VSAB, Bldg. B
USEB262315 - 5h. - ICD 705 Tech Specs.pdf Revision not stated USEB262315 - B302 ISRG Ops HVAC Increase
ICD 705 Manual.pdf Revision not stated Combo - FY26 Wargamming Secure (Vault) Door
ICD 705 Technical Specifications v1.5.1.pdf Revision not stated Maintenance SCIF Alarm Systems Recompete
ICD 705 Technical Specifications v1.5.1.pdf Revision not stated SCIF MAINTENANCE FOR MSC
CDRL-009_Ph2-ICD705ComplianceReport.pdf Revision not stated FA248624RB004- Mobile SAPF Trailer
Attachment 1a - ICD 705.pdf Revision not stated 3TES SCIF Door Installation
ICD 705.pdf Revision not stated 3TES SCIF Door Installation
ATTACH07_ICD705_Construction and Management_SCIF.PDF Revision not stated Robins AFB Mechanical/Electrical II IDIQ
ICD 705 Chapter 9 Acoustic Mitigation.pdf Revision not stated A032005 - RFI Acoustic Mitigation
ICD_705_SCIFs.pdf Revision not stated HNJ Lundy Conference Room A/V Upgrade
AppD6. ICD 705.pdf Revision not stated Install Beacon Lighting
Bidders Library Security - ICD 705.pdf Revision not stated TEC II Services RFP
Attachment 3 ICD 705 Door Criteria - Addl salient characteristics.pdf Revision not stated Specialized Acoustic Doors
Attachment 9_ICD_705_SCIFs.pdf Revision not stated Vindicator Intrusion Detection System Installation
Show all 20

Who attaches ICD 705

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sources Sought No. W912UM27S0TA1 | USACE Far East District

Page 1 of 3 | Request for Information Only – Not a Solicitation nor Request for Qualifications (RFQ) nor Proposal

SOURCES SOUGHT ANNOUNCEMENT

AND INDUSTRY DAY NOTICE

PROGRESSIVE DESIGN-BUILD (PDB)

OTHER TRANSACTION AGREEMENT (OTA)

ICD-705 Controlled Spaces Modernization and Sustainment Program Osan Air Base, Republic of Korea

U.S. Army Corps of Engineers – Far East District Sources Sought Number: W912UM27S0TA1

DISCLAIMER: This Sources Sought is issued solely for market research/intelligence and acquisition planning. It is not a solicitation, Request for Qualifications, or commitment to issue a solicitation or award any agreement or contract. No Statements of Qualifications or proposals are requested. Participation is voluntary; the Government will not reimburse response costs and will not accept unsolicited proposals. Responses will inform acquisition strategy, industry capability assessment, and project delivery options. Responding does not affect eligibility for any future solicitation.

THE OPPORTUNITY

The U.S. Army Corps of Engineers, Far East District (USACE FED) invites industry partners to help shape the acquisition strategy for a high-priority modernization and sustainment program involving ICD- 705 controlled spaces at Osan Air Base, Republic of Korea. The Government is evaluating an innovative Progressive Design-Build (PDB) delivery method executed through an Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a.

This approach enables early contractor involvement, collaborative design development, open-book pricing, and flexible risk allocation—advantages particularly valuable for complex, security-sensitive work performed in an active overseas operational environment with unique host-nation and ICD-705 constraints. The Government has not made a final acquisition strategy determination and seeks candid industry input on the benefits, limitations, risks, and commercial terms of a PDB OTA compared with traditional design-bid-build or design-build approaches.

WHY PROGRESSIVE DESIGN-BUILD / OTA?

ICD-705 controlled spaces, collective protection systems, and HVAC modernization on an active air base present technical, security, operational, and logistical complexities that benefit from early industry engagement. A PDB OTA structure may allow:

• Joint refinement of requirements and design while the facility remains operational;

• Early identification and mitigation of long-lead items, host-nation interfaces, and ICD-705 accreditation risks;

• Transparent, open-book cost development leading to a more reliable construction baseline (including potential GMP);

• Flexible commercial terms and governance tailored to the unique constraints of overseas military construction in the Republic of Korea.

The Government is particularly interested in industry’s practical experience with these methods on similar secure or operationally constrained projects, as well as any recommended alternatives that would better achieve mission, schedule, and cost objectives.

PROJECT SCOPE

Page 2 of 3 | Request for Information Only – Not a Solicitation nor Request for Qualifications (RFQ) nor Proposal

The program encompasses modernization and sustainment work in two existing facilities at Osan Air Base:

Building A – Collective Protection, HVAC & ICD-705 Modernization

• Replace the existing M49 Collective Protection System (CPS) filter system with a new M98 CPS, including associated blast doors, seals, relief valves, electronic control systems, and other appurtenances, fully coordinated with applicable ICD-705 requirements.

• Replace or modernize principal components of the existing HVAC system to support ICD-705 environmental and security standards.

• Convert approximately 2,610 square feet of existing space to meet applicable ICD-705 requirements.

Building B – ICD-705 Conversion & Facility Sustainment

• Convert approximately 3,700 square feet of existing space to meet applicable ICD-705 requirements.

• Perform sustainment work on approximately 50,000 square feet, including roof repairs and existing office space improvements.

• Repair and/or replace components of the existing fire protection and fire alarm systems; air-handling units (AHUs), air-cooled condensing units (ACCUs), and associated HVAC infrastructure; bathroom fixtures and plumbing; plus associated incidental work required to complete the planned improvements.

Estimated program magnitude: $60–100 million. Construction funding for both facilities is anticipated for obligation in FY27, subject to availability of funds and applicable approvals. This Sources Sought is the Government’s primary tool to assess industry interest, capability, and preferred commercial practices before finalizing the acquisition approach.

ACQUISITION APPROACH UNDER EVALUATION

Industry feedback will help refine potential agreement structure, project phasing, pricing approach, governance, risk allocation, and other commercial terms.

Potential Phase 1 – Design and Preconstruction The Government and selected contractor would collaborate to refine project requirements, develop the design, conduct constructability reviews, identify long-lead equipment, evaluate phasing and operational constraints, obtain subcontractor input, develop cost estimates, and mitigate technical and execution risks.

Feedback is requested on the design maturity, site investigations, pricing information, and agreement terms needed to establish a reliable construction cost and schedule baseline.

Potential Phase 2 – Construction Following design development and resolution of key technical and commercial risks, the contractor may be asked to propose a construction price, potentially including a Guaranteed Maximum Price (GMP) if appropriate to the final structure. Any transition to construction would be subject to the terms of the resulting agreement, Government acceptance, availability of funds, and required approvals. The Government seeks practical recommendations for off-ramp provisions, design deliverables, compensation, and transition arrangements should the parties be unable to reach agreement on construction pricing or other required terms.

Alternative acquisition strategies that industry believes would better support the program’s security, technical, schedule, cost, and operational requirements are welcome and encouraged.

INDUSTRY DAY

Page 3 of 3 | Request for Information Only – Not a Solicitation nor Request for Qualifications (RFQ) nor Proposal

A Virtual Industry Day is to be determined. The SAM.gov posting will be updated with registration instructions and meeting information when available. Interested firms are strongly encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive timely updates, including Industry Day details.

INFORMATION REQUESTED FROM INDUSTRY

Your candid, detailed feedback is critical to shaping a successful acquisition. The Government’s primary mechanism for obtaining market research is the Industry Questionnaire, which addresses capability and capacity, relevant experience, Progressive Design-Build experience, open-book pricing, technical capabilities (ICD-705, CPS, secure facilities), real estate and construction considerations in the Republic of Korea, schedule, security, risk, governance, and recommended commercial practices.

1. Complete the Industry Questionnaire: Access Questionnaire Here

2. Submit a Capability Statement (not to exceed 12 pages). Do not duplicate information already provided in the questionnaire. Include:

• Company name and address, CAGE code and/or Unique Entity Identifier (UEI) from your SAM.gov registration. Clearly identify if you are a foreign firm, partner, or subsidiary located outside the United States.

• Business size status and any applicable socioeconomic categories under NAICS Code 236220 – Commercial and Institutional Building Construction (small business size standard: $45 million).

• Two completed projects of similar nature and complexity (examples: ICD-705 controlled spaces, collective protection system installation or modernization, secure facility conversion, complex HVAC/CPS upgrades in operational military facilities, or comparable high-security construction). For each project state whether you were Prime, Subcontractor, or partnering Architect-Engineer firm, and provide: start and end dates of construction, project cost, complexity of the work, and any significant challenges (e.g., coordination with multiple partners/agencies, operational constraints, climate, terrain, or host-nation requirements).

The Government especially values recommendations on commercial practices, agreement terms, project phasing, risk sharing, open-book pricing approaches, governance structures, and other considerations that could improve successful execution of this project under 10 U.S.C. § 2808a.

HOW TO RESPOND

Interested firms should complete the Industry Questionnaire and submit any supplemental Capability Statement via email no later than 2:00 p.m. Korea Standard Time (KST), Tuesday, 17 November 2026.

Primary Point of Contact(s):

Eugene A. Gibbs | Eugene.A.Gibbs@usace.army.mil Mike M. Miyagi | Michael.M.Miyagi@usace.army.mil

Email subject line: W912UM27S0TA1 / [Your Company Name] Response

Add your firm to the Interested Vendors List on SAM.gov associated with this announcement to ensure you receive all future updates, including Industry Day registration details.

https://forms.osi.apps.mil/Pages/ResponsePage.aspx?id=unZN_HzxUEy5p48xY9J1gkOXdBFTSSpJlGbZL6EFB8NUN1FSQ0pXMEE3TU05UzlUQ09QNjNMSjNTTyQlQCN0PWcu

THE OPPORTUNITY
WHY PROGRESSIVE DESIGN-BUILD / OTA?
PROJECT SCOPE
Building A – Collective Protection, HVAC & ICD-705 Modernization
Building B – ICD-705 Conversion & Facility Sustainment
ACQUISITION APPROACH UNDER EVALUATION
Potential Phase 1 – Design and Preconstruction
Potential Phase 2 – Construction
INDUSTRY DAY
INFORMATION REQUESTED FROM INDUSTRY
HOW TO RESPOND