PN92594_W912PM19R00210004.pdf

PDF 263 KB Posted

Attached to
PN 92594 SOF Operations Support Facility Federal contract opportunity
Solicitation number
W912PM
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

This Request for Proposal solicits construction and design services for an Operations Support Facility at Fort Bragg, North Carolina. The scope of work includes construction of an approximately 36,000 square foot facility built to sensitive compartmented information standards, to include a command suite, office and planning areas, training rooms, and support spaces. The project also includes associated site and utility work. The period of performance is 540 calendar days. The contract type is firm-fixed-price. Proposals are due by April 6, 2020 and will be evaluated based on corporate experience, past performance, key personnel, price, and small business participation plan. Technical factors are equal in importance to price. The successful offeror will construct the facility to requirements while meeting small business subcontracting goals.

View the file

Other files for this federal contract opportunity

Other files attached to PN 92594 SOF Operations Support Facility, newest first.
File Type Posted
PN92594_W912PM19R00210005.pdf PDF
FY20PN92594A-412.pdf PDF
FY20PN92594A-601.pdf PDF
FY20PN92594IF601.pdf PDF
FY20PN92594A-102.pdf PDF
FY20PN92594A-602.pdf PDF
PN92594_0003_Technical Summary of Changes.pdf PDF
PN92594_W912PM19R00210003.pdf PDF
08 33 23.pdf PDF
03 45 00.pdf PDF
FY20PN92594IN101.pdf PDF
FY20PN92594TA501.pdf PDF
03 30 00.00 10.pdf PDF
01 45 35.pdf PDF
PN92594_0002_Technical Summary of Changes.pdf PDF
FY20PN92594M-602.pdf PDF
PN92594_W912PM19R00210002.pdf PDF
FY20PN92594MP102.pdf PDF
FY20PN92594T101.pdf PDF
10 44 16.pdf PDF
FY20PN92594T102.pdf PDF
FY20PN92594M-501.pdf PDF
FY20PN92594M-503.pdf PDF
FY20PN92594IN601.pdf PDF
FY20PN92594A-101.pdf PDF
FY20PN92594A-410.pdf PDF
FY20PN92594T504.pdf PDF
PN 92594_RTA SPECS_VOL 01 (Amend0001).pdf PDF
PN92594_W912PM19R00210001.pdf PDF
PN 92594_RTA SPECS_VOL 05 (Amend0001).pdf PDF
Technical Summary of Changes to W912PM19R0021-0001_pn92594.pdf PDF
Site Visit Sign In Roster 92594 .pdf PDF
PN92594_RTA_PLANS_vol2of2 (1).pdf PDF
NAVFAC_USACE PPQ.pdf PDF
PN 92594_RTA SPECS_VOL 02 (1).pdf PDF
J&A W912PM19R0021 (PN92594) Chillers.pdf PDF
PN 92594_RTA SPECS_VOL 03 (1).pdf PDF
PN 92594_RTA SPECS_VOL 05 (1).pdf PDF
PN 92594_RTA SPECS_VOL 01 (1).pdf PDF
PN 92594_RTA SPECS_VOL 04 (1).pdf PDF
PN92594_RTA_PLANS_vol1of2 (1).pdf PDF
NAVFAC_USACE PPQ.pdf PDF
PN92594_RTA_PLANS_vol2of2 (1).pdf PDF
PN92594_RTA_PLANS_vol1of2 (1).pdf PDF
PN 92594_RTA SPECS_VOL 03 (1).pdf PDF
PN 92594_RTA SPECS_VOL 01 (1).pdf PDF
PN 92594_RTA SPECS_VOL 05 (1).pdf PDF
J&A W912PM19R0021 (PN92594) Chillers.pdf PDF
PN 92594_RTA SPECS_VOL 04 (1).pdf PDF
PN 92594_RTA SPECS_VOL 02 (1).pdf PDF
Show all 50

PN 92594 SOF Operations Support Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

A. Extend proposal due date to April 06, 2020.

B. All other solicitation terms and conditions remian unchanged.

//////////////////////////////////////////////////////////////////////////////LAST ITEM//////////////////////////////////////////////

1. CONTRACT ID CODE PAGE OF PAGES

1 23

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Mar-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM19R0021

X 9B. DATED (SEE ITEM 11)

10-Feb-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Mar-2020

CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: BOBBY LAW

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM19R0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 30-Mar-2020 02:00 PM to 06-Apr-2020 02:00 PM.

SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS

The following have been modified:

INSTRUCTIONS AND REQUIREMENTS

GENERAL PROPOSAL SUBMISSION INSTRUCTIONS & REQUIREMENTS

PN 92594

SOF Operations Support Facility, at Fort Bragg, Cumberland County, North Carolina

1. OVERVIEW.

1.1 This Request for Proposal (RFP) solicits construction and design of an Operations Support Facility, at Fort Bragg NC. The scope of work includes the construction of an approximately 36,000 SF Operations Support Facility built to sensitive compartmented information (SCI) standards. Project includes a command section with VTC conference room; life support area with gear storage room, covered loading dock, equipment room, training room, service area, and armory; private and open office areas; planning and training area; language training area with one-roof lab; security office; medical area with offices, exam room, and drug storage area;

operations center with private offices; auditorium; heritage/break room; male and female latrines with showers and lockers; janitor closets; electrical room; mechanical room; and communication server rooms. Project includes information systems, fire detection, alarm, and suppression systems, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Project includes information systems, mass notification system, cyber security, and fire protection, detection, and alarm systems. Provide elevator;

uninterruptable power source for critical areas; emergency standby power for the entire facility;

raised floor system; redundant chiller for the server room; intrusion detection system and closed circuit television installation; cypher locks; and sound attenuation around the command suite and command suite conference room. Supporting facilities include utility services and connection (electrical, water, sanitary sewer, and natural gas); security lighting; GOV parking; POV parking; service drives; walks, curbs and gutters; storm drainage to include outfall relocation;

information systems, to include fiber optic cable service and relocation of communications duck bank; lightning protection systems; landscaping; signage; and site improvements. Heating and air conditioning will be provided by self-contained system. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided. Antiterrorism/Force protection measures and sustainment mandates will be incorporated.

The period of performance shall not exceed 540 calendar days. Work location is Fort Bragg, North Carolina. The resultant contract will be Firm-Fixed Price (FFP).

1.2 The instructions and requirements contained herein establish uniform evaluation procedures for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Trade-Off Process (See Federal Acquisition Regulation 15.101-1). The proposal shall describe the capability of the offeror to perform the contract. Proposals should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract as set forth in these instructions and requirements.

1.3 Each offeror must submit both a Price Proposal and Technical Proposal, in addition to Past Performance Questionnaires. The Price Proposal, Technical Proposal, and Past Performance Questionnaires must be submitted as separate volumes/files. All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not cross-reference similar material in the Price Proposal, or vice versa.

The Price and the Technical Proposals in addition to the Past Performance Questionnaires must be received by the closing date and time set for receipt of proposals. No dollar amounts from the Price Proposal are to be included in the Technical proposal.

Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.

The technical data criteria specified for each factor identified herein, shall be submitted as part of the proposal.

The offeror is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the offeror shall be clear and concise in its proposal. The Government will not make assumptions concerning the offeror’s intent.

Failure to submit all the data required by the RFP and its Attachments, may be cause for determining a proposal incomplete and therefore may not be considered for award.

2. GENERAL INSTRUCTIONS.

In accordance with FAR Clause 52.215-1, Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to make award without discussions. Therefore, offerors should submit their best technical and price terms in their initial offer and not automatically assume that they will have an opportunity to participate in discussions or to submit a revised proposal. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interests of the Government.

In accordance with 15.306(c)(1) and FAR Clause 52.215-1(f)(4), Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

2.1 Contractor Team Arrangements. The Government will recognize the integrity and validity of contractor teaming arrangements, provided the arrangements are identified and company relationships are fully disclosed in the offer. As further described in paragraph 2.3, below, the Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code.

2.2 If applicable, the offeror shall submit evidence from the offeror’s SBA Servicing Agency that the offeror has notified and discussed the proposed joint venture for this project with the appropriate SBA personnel. For 8(a) set- aside procurements, all prospective Joint Ventures must comply with Title 13 Code of Federal Regulations (CFR) Part 124.513. For HUBZone set- aside procurements and awards to HUBZone SBCs through full and open competition after a price evaluation preference in favor of qualified HUBZone SBCs, a Joint Venture must comply with

13 CFR 126.616.

2.3 The Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code. However, IAW CFR 125.8(e), the Government will also evaluate past experience and past performance submitted by the individual firms that make up a joint venture.

2.4 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the offeror, whether an affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractor, WILL NOT be evaluated for any factor.

Successor entities shall clearly demonstrate in Volume I, Tab A of their proposal the official legal means performed to transform the former Predecessor Company to its current Successor, legal business entity. Examples of substantive documentation may include but is not limited to Articles of Incorporation, Joint Venture Agreements, Novation Agreements, and Merger Documentation.

"Successor" means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger).

Note: The term ''successor'' does not include new offices/ divisions of the same company or a company that only changes its name.

2.5 Offerors shall submit their proposal in accordance with Section 3. General Proposal Format, paragraph 3.4.

2.6 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

3. GENERAL PROPOSAL FORMAT.

3.1 Cover Page. Include the title of the solicitation, solicitation number, offeror name, and date of the submittal.

3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. If more than one Adobe PDF file is used for a volume, the complete table of contents shall be included in each. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

3.3 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not cross-reference similar material in the Price Proposal, or vice versa. No dollar amounts from the Price Proposal are to be included in the Technical proposal.

3.4 Each offeror must submit both a Price Proposal and a Technical Proposal via email to the Wilmington District Contracting Division at saw-ct-militaryproposals@usace.army.mil. Ensure the solicitation number is included in the subject line of the email. Note that attachments exceeding 15 MB may not be accepted by the email server. No hard paper copies will be accepted or evaluated. Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format and shall be on 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W912PM19R0021_COMPANY NAME_VOLUME I

W912PM19R0021_COMPANY NAME_VOLUME II

Offerors shall submit bid bonds (Standard Form 24) in both electronic and hard copy format.

Electronic copies of bid bonds shall be included in Volume 1: Offerors Certifications and Price under Tab G. Hard copies of bid bonds shall be submitted via USPS, UPS, FedEx or DHL. Hand carried bid bonds will not be accepted. Bid bond submissions shall be due by the proposal due date and time to the following address:

USACE-Wilmington Contracting Division Attn: Mr. John Hill 69 Darlington Avenue Wilmington, NC 28403

***Amendment 0004*** ***Amendment 0002*** Proposal due Date and Time:

Request For Proposal No: W912PM19R0021 Due Date of Proposal: 16 March, 2020 30 March 2020 06 April 2020 Time by which Proposals are due: 2:00 P.M. (Eastern Time) Title of Project: PN 92594 SOF Operations Support Facility, Fort Bragg, North Carolina ***Amendment 0002*** ***Amendment 0004***

The date and time of delivery will be established by the time of receipt by the email server (time stamped by the system), not by the date and time the offeror sent the proposal into their email account. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is sent minutes before the deadline but notification is not actually received in the recipients’ email inboxes until after the deadline, the submission will be considered late. The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.

3.5 The offeror is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the offeror shall be clear and concise in its proposal. The Government will not make assumptions concerning the offeror’s intent.

3.6 The technical data criteria specified for each factor identified herein and as described in these instructions shall be submitted as part of the proposal. Failure to submit all the data required by the RFP, and these instructions may be cause for determining a proposal incomplete and, therefore, not considered for award.

3.7 Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.

3.8 Tabs. Proposal shall be organized and tabbed as follows:

3.8.1 VOLUME I: OFFEROR’S CERTIFICATIONS AND PRICE (FACTORS 1 & 5)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted and one (1) original copy of the bid guarantee in both electronic and hardcopy shall be submitted.

TAB CONTENTS OF THE PRICE PROPOSAL

A The Proposal Cover Sheet

B Standard Form 1442

C Acknowledgement of Amendments (If Applicable)

D FACTOR 1: PRICE

E Section 00 45 00 – Representations and Certifications

F Teaming Arrangement (If Applicable)

G Bid Guarantee (Bid Bond)

H Financial Information and Bonding Capability

I Factor 5: Small Business Participation Plan

J Subcontracting Plan (FOR LARGE BUSINESSES ONLY)

TAB A – The proposal cover sheet is required by FAR 52.215-1(c)(2) and must be submitted by all offerors. The format for the proposal cover sheet is as follows:

PROPOSAL COVER SHEET

1. The solicitation number;

2. The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and

5. Name, title, and signature of person authorized to sign the proposal.

Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

Offerors should ensure telephone number; fax number, e-mail address, DUNS number and CAGE Code are all included. DUNS number will be used to access the Contractor Performance Assessment and Reporting System (CPARS) data. Offerors should also provide any other assigned number that identifies them in the CPARS database. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. The offeror should also submit their Tax ID number (TIN) or Employer ID number (EIN) on the proposal data sheet.

TAB B - Standard Form 1442, completed and signed by authorized individual(s) of the offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

TAB C - If applicable - All amendments must be acknowledged by all offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102.

TAB D – Factor 1 - Price. Proposed price schedule is to be completed in its entirety by all offerors to include the Subtotals and Totals section as found in Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule.

TAB E - Section 00 45 00 – Representations and Certifications. Offerors shall include any narratives as it pertains to the requirement at 2.2 to document any teaming arrangement the offeror has or will enter into.

TAB F - Teaming Agreement, if applicable. See paragraph 2.1 and 2.2 note to 8(a)—SBA must approve a joint venture agreement prior to the award of an 8(a) contract on behalf of the joint venture.

TAB G - Offerors shall provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid Guarantee in both Hard copy and electronically in Tab G. Hard copies of Bid Guarantees (submitted via UPS, FedEx, USPS, etc.) shall be addressed to the Contract Officer at:

USACE – Wilmington District Attention: John Hill 69 Darlington Ave Wilmington NC 28403

For the purposes of this Request for Proposal, please note that in accordance with

(IAW) FAR 28.001:

“Bond means a written instrument executed by a bidder or contractor (the “principal”), and a second party (the “surety” or “sureties”) (except as provided in 28.204), to assure fulfillment of the principal’s obligations to a third party (the “obligee” or “Government”), identified in the bond. If the principal’s obligations are not met, the bond assures payment, to the extent stipulated, of any loss sustained by the obligee.”

Bonds shall therefore be executed in the name of the legal entity, whether a joint venture, partnership or the Prime Contractor of an informal teaming arrangement, with whom the government would enter into a contract for a successful offeror. The entity named on the bond must be able to acquire bonding capacity on its own merits, and not as the result of indemnification from a subcontractor or third party.

TAB H - Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.

TAB I - Factor 5- Small Business Participation Plan. Further Description and information of TAB I, Factor 5 can be found in the subsequent paragraph 7 of this section, entitled the

GENERAL PROPOSAL SUBMISSION INSTRUCTIONS & REQUIREMENTS

TAB J - Subcontracting Plan – FOR LARGE BUSINESS OFFERORS ONLY.

Subcontracting Plan shall be prepared in accordance with FAR 52.219-9, and SBA’s Electronic Subcontracting Reporting System (eSRS) located at http://esrs.gov. Instructions for completion of requisite forms, as well as guidance on coordinating and preparing for all compliance reviews by Federal agencies can be found at this website. Offerors are to ensure subcontractors agree to submit to ESRS.

3.8.2 VOLUME II: TECHNICAL PROPOSAL (FACTORS 2-4)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted.

TAB CONTENTS OF THE TECHNICAL PROPOSAL

A Factor 2: Past Experience

B Factor 3: Past Performance

C Factor 4: Key Personnel

Page Limitations: The following page limitations are established for each factor described above:

Factor 2: Past Experience, Construction – Limited to 20 pages (maximum of 5 forms) Factor 3: Past Performance – Limited to no fewer than three (3) and no more than five (5) projects. Individual project Past Performance Assessment Questionnaires shall not exceed four (4) pages; Government evaluators will review and evaluate only the information contained on the first four (4) pages.

Factor 4: Key Personnel – Limited to five (5) pages per individual resume

NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.

Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.

Offerors are cautioned that “parroting” of the Technical requirements or the Scope of Work with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.

4. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB A—FACTOR 2 – PAST EXPERIENCE

4.1 SUBMISSION/MINIMUM REQUIREMENTS:

4.1.1 The offeror shall demonstrate recent, relevant experience as the prime contractor on projects using Attachment 2 at the end of this section. Offerors may identify state and local government and private contracts that are similar to the Government’s requirements. If the offeror is a joint venture, or any other formal or informal teaming arrangement, only projects completed by the proposed prime entity may be submitted for evaluation. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer.

4.1.2 Projects must be deemed relevant to be considered for this procurement. Relevant projects are those projects which meet all of the minimum criteria specified in paragraph 4.1.2.1. The Government will not consider multiple projects such as individual task orders combined to meet the criteria referenced in 4.1.2.1 below. Projects which do not meet all of the minimum criteria specified shall be deemed not relevant and shall not be considered further. Relevant projects which meet some or all of the additional criteria specified in paragraph 4.1.2.2 may be given more weight by the Government in determining the appropriate rating.

4.1.2.1 Minimum Criteria. The offeror shall demonstrate the experience as a prime contractor on projects of similar size, scope, and complexity of projects:

Projects shall involve vertical construction or renovation or combination of both types of work of at least 21,500 square feet of gross space.

Projects submitted by the offeror shall have a new construction and/or renovation value of no less than $17,500,000.00

A minimum of two (2) projects submitted shall include construction of a Sensitive Compartment Information Facility (SCIF) area within the building.

4.1.2.2 Additional Criteria. The Government may afford additional consideration for proposal containing the following:

Projects may include construction of a facility within high security-controlled area. A high security control area is defined as an area requiring armed security guard escort at all times, perimeter intrusion detection or access control measures (into the actual project site), and contractor personnel require identification badges and are subject to random searches of vehicles, equipment and personnel (by users special security).

Projects may include construction of a facility within an area that requires advanced site access coordination for all contractor personnel.

Projects may include new construction of 35,750 square feet of gross space or greater.

Proposals may include where the Sensitive Compartment Information Facility (SCIF) construction was performed at ICD 705 Standards.

Projects may include construction of a Sensitive Compartment Information Facility

(SCIF) where the entire facility is a SCIF.

Projects may include construction of consolidated administrative offices, operational and planning areas.

4.1.3 The offeror shall complete a minimum of three (3), but no more than five (5), “Experience Information” forms, (See Attachment 2), in response to this factor. All projects submitted must be at least 50% complete within the last six (6) years preceding the date of the solicitation.

4.1.4 Offerors shall utilize Experience Information Form in Attachment 2. This sheet is MANDATORY and SHALL be used to submit project information. For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded;

however, total length for each project data sheet shall not exceed FOUR (4) pages.

4.1.5 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Offerors that are part of the DoD Mentor Protégé program may only submit two

(2) recent and relevant project completed by the Mentor. Offerors are still limited to a total of five (5) projects. Experience of proposed subcontractors to be utilized on this project will not be considered.

4.2 EVALUATION CRITERIA:

4.2.1 The Government will evaluate the extent of recent, relevant experience of the prime contractor as identified in paragraph 4.1.2. Projects that were awarded on an individual task/delivery order basis will not be aggregated for purposes of meeting minimum or additional criteria. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience.

4.2.2 To be considered eligible for award, the Government will verify that each offeror has submitted a minimum of three (3) projects which meet the minimum criteria of paragraph 4.1.2.

4.2.3 The Government intends to give greater consideration to proposals that demonstrate experience with the additional criteria listed in paragraph 4.1.2.2 when assigning evaluation standards in accordance with paragraphs 8.1 through 8.4. The offeror’s Past Experience will be evaluated based on the Government’s assessment of each submitted project’s similarity (in terms of size, scope and complexity) to the work described in this RFP.

4.2.4 The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Contractor Performance Assessment Reporting System (CPARS), other DOD or Government appraisal systems or by contacting owners or references.

The Government may check any or all cited references, or available uncited references, to verify supplied information.

4.2.5 If the offeror is determined to have insufficient recent, relevant experience in accordance with the submission requirements of this RFP, the offeror will be considered ineligible for award.

5. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB B — FACTOR 3 - PAST PERFORMANCE.

5.1 SUBMISSION/MINIMUM REQUIREMENTS:

5.1.1 Past performance refers to the quality of recent, relevant project experience from the owner’s perspective. The offeror shall complete and provide a NAVFAC/USACE Past Performance Questionnaire (PPQ), see Attachment 3, on no fewer than three (3) and no more than five (5) projects. Projects submitted under this factor must first be deemed recent and relevant in accordance with the minimum criteria specified in paragraph 4.1.2.1 and additional criteria in paragraph 4.1.2.2 before being evaluated for quality in accordance with the criteria specified in paragraph 5.2 and the evaluation standards set forth in paragraphs 8.2 and 8.3. It is at the offerors discretion if they would like NAVFAC/USACE PPQs completed by their previous clients to be completed and returned to them to be included in their submission or submitted electronically to the attention of both the Contract Specialist, Robert Law at robert.n.law@usace.army.mil and the Contracting Officer, John Hill at john.t.hill@usace.army.mil.

5.1.2 Recent. In order for projects to be considered recent they must be of similar size, scope, and complexity that must have been completed (fully designed and at least 50% construction progress completed) within six (6) years preceding the date of the solicitation.

5.1.3 Other Sources. The Government may contact sources other than those provided by the offeror for information with respect to past performance. These other sources may include but are not limited to: Contractor Performance Assessment Reporting System (CPARS), Federal Awardee Performance Integrity Information System (FAPIIS), other Government sources, and interviews with organizations or individuals familiar with the offeror’s performance.

5.1.4 The offeror shall provide clear and adequate information in response to the past performance elements identified on Attachment 3. Though not required, ideally project past performance information submitted under this factor would be on the same projects submitted for consideration under Factor 3. Individual project NAVFAC/USACE PPQs shall not exceed four (4) pages. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. The Government will call and confirm information provided by the offeror on the NAVFAC/USACE PPQ with the points of contact, to the extent necessary to conduct a meaningful evaluation. The Government reserves the right to interview other individuals if the point of contact is not available.

5.1.5 The Government may contact sources other than those provided by the offeror for information with respect to past performance. These other sources may include but are not limited to: Contractor Performance Assessment Reporting System (CPARS), other Government sources, and interviews with organizations or individuals familiar with the offeror’s performance.

5.1.6 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Offerors that are part of the DoD Mentor Protégé program may only submit two

(2) recent and relevant project completed by the Mentor. Offerors are still limited to a total of five (5) projects. Experience of proposed subcontractors to be utilized on this project will not be considered.

5.1.7 The past performance of individuals will not be considered under this factor.

5.2 EVALUATION CRITERIA:

5.2.1 The Government will consider past performance of the prime construction contractor. If a firm has multiple functions or divisions, the Government will only evaluate the past performance of the unit or division submitting the offer. Where the Government views an offeror’s role, or that of its team members, if any, as not significant or as not clearly defined, the Government reserves the right to view this lack of involvement, or clarity, as a risk which may impact an offeror’s rating for this factor despite the quality of recent, relevant past performance information.

The Government will evaluate the offeror's past performance using the sources available to it including but not limited to: the example projects identified by the offeror and submitted on the NAVFAC/USACE PPQs and any additional information received from references, CPARS or other sources. Offerors may be provided an opportunity to address any negative past performance information about which the offeror has not previously had an opportunity to respond if such information is determined to present an impact on the rating to be assessed.

5.2.2 To be considered eligible for award, the Government will verify that each offeror has submitted a minimum of three (3) projects which meet the minimum criteria of paragraph 4.1.2.1.

5.2.3 The Government intends to give greater consideration to proposals that demonstrate recent and relevant Past Performance with the additional criteria listed in paragraph 4.1.2.2 when assigning evaluation standards in accordance with paragraphs 8.1 through 8.4. The offeror’s Past Experience will be evaluated based on the Government’s assessment of each submitted project’s similarity (in terms of size, scope and complexity) to the work described in this RFP. The Government will consider the recency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. The Government places higher value on projects for which successful performance can be validated by means other than the offeror’s self-assessment such as through independent telephone interviews with points of contact identified in the proposal, CPARS or other agency performance databases, offeror furnished references or personal knowledge. The Government places a higher value on projects which provided particularly difficult or unique challenges and the innovative methods the offeror used to resolve problems successfully.

5.2.4 The Government will evaluate recent, relevant past performance (as set forth in paragraph 8.2) based on the elements listed below to assign a confidence rating in accordance with paragraph 8.3:

(1) Quality of Construction. The Government will evaluate all information available with respect to the quality of the actual construction undertaken and the offeror’s ability to maintain quality control and accuracy of quality control documentation.

(2) Schedule. The Government will evaluate all information available with respect to the completion of projects within the scheduled completion times.

(3) Cost Control. The Government will evaluate all information available with respect to the offeror’s ability to efficiently utilize resources and demonstrate cost responsibility.

(4) Management. The Government will evaluate all information available with respect to the offeror’s ability to manage resources and key personnel.

(5) Utilization of Small Business. The Government will evaluate all information available with respect to the offeror’s ability to meet small business subcontracting plan goals.

(6) Regulatory Compliance. The Government will evaluate all information available with respect the offeror’s ability to enforce laws and regulations, correct deficiencies when non-compliant, and communicate laws and regulations to subcontractors.

(7) Safety. The Government will evaluate all information available with respect to the contractor’s safety program or efforts.

5.2.5 General. The Government will evaluate all general information and comments provided by previous clients with respect to the contractor’s efforts.

5.3 In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance. In this case, the offeror’s past performance is unknown and assigned a performance confidence rating of “neutral.” Although the Government may not rate an offeror that lacks recent, relevant past performance favorably or unfavorably with regard to past performance, the Government may determine, that a “Substantial Confidence” or “Satisfactory Confidence” past performance rating is worth more than a “Neutral Confidence” past performance rating.

5.4 Offerors are cautioned that the submission of each NAVFAC/USACE PPQ shall not exceed four (4) pages and that Government evaluators will review and evaluate only the information contained on the first four (4) pages. Note: Offerors shall remove the instructions for the PPQ prior to submission to reduce the total to four (4) pages. Should the offerors client submit directly to the government, the government will remove the instructions prior to evaluation.

6. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB C —FACTOR 4 – KEY PERSONNEL.

6.1 SUBMISSION/MINIMUM REQUIREMENTS:

6.1.1 Each offeror shall provide resumes for the following Key Personnel proposed for this contract. Resumes shall not exceed five (5) pages per person. The proposed position of each person shall be clearly stated at the beginning of the resume.

Note: When determinng the duration of a particular individual for a position, the resume must be clear on a project by project basis, how long the individual performed on said project. The aggregation of that time will be used to establish the total length of experience that individual has, whether with the offeror, other firms, or on projects of similar size, scope and complexity.

Quality Control Manager

The Quality Control Manager (QCM) is required to be a graduate engineer, graduate architect, or a graduate of construction management with a minimum of 7 years construction experience on construction similar to this Contract OR possess 10 year’s construction experience as a CQC on construction similar to this Contract. Construction similar to this contract is defined previously in paragraph 4.1.2.

For further information refer to:

3.4.2 CQC SYSTEM MANAGER

SECTION 01 45 00.00 10 QUALITY CONTROL

Project Superintendent

The Project Superintendent shall have a minimum of 7 years of experience as a Project Superintendent on projects of similar size, scope, and complexity.

Refer to:

3.1 GENERAL REQUIREMENTS

SECTION 01 45 00.00 10 QUALITY CONTROL

6.1.2 A sample suggested resume format is included with this RFP (Attachment 4). If offerors elect not to use the suggested resume format, all information identified on the sample format is still required for each resume submitted under this Factor. Proposals that fail to include resumes or that fail to include all required information on these resumes may be rejected as unacceptable.

6.1.3 The Key Personnel identified must be used on the project. No deviations will be permitted unless they meet the same qualifications and experience of those individuals proposed and are expressly approved by the Contracting Officer in advance. An offeror’s use of different personnel than those proposed without approval from the Contracting Officer will be grounds for a Termination for Default.

6.2 EVALUATION CRITERIA:

6.2.1 The Government will evaluate each offeror’s proposed Key Personnel submitted in response to Paragraph 6.1 assigning each a rating in accordance with paragraph 8.2.

6.2.2 The offeror must demonstrate in all resumes that the key personnel proposed have or exceed the minimum requirements of specialized and relevant experience as identified in paragraph 6.1.1 and in the specifications in the following roles: Quality Control Manager, Project Superintendent.

6.2.3 The Government places higher value on Key Personnel who have:

Ten (10) years or more experience in assigned positions working on projects of similar size, scope, and complexity to the work described in this RFP (exception: if the CQC qualifies for the minimum criteria by having 10 years’ experience, it will not be given additional consideration here).

A degree or advanced degree in a field of study applicable to the assigned position (e.g.

construction management, engineering, architecture, or related fields).

Five (5) years or more of experience in their assigned position while an employee of the prime contractor.

Professional accreditations, licenses, or certifications applicable to the assigned position.

7. TAB I – VOLUME I: FACTOR 5- SMALL BUSINESS PARTICIPATION PLAN.

This factor requires all offerors to submit a proposed Small Business Participation Plan utilizing the template provided as Attachment 5 of this solicitation. The Small Business Participation Plan will be evaluated on the level of proposed participation of U.S. small businesses in the performance of acquisition (as small business prime offerors or 1st tier small business subcontractors) relative to the objectives and goals established herein. This is NOT a sub-contracting plan. Evaluation of this factor is based on the percentage of total contract value and not total subcontracted dollars. For large business offerors, the goals set forth in the Small Business Participation Plan shall mirror the goals set forth in VOLUME I: Offerors Certifications and Price Tab J - Subcontracting Plan – FOR LARGE BUSINESS OFFERORS

ONLY.

7.1 SUBMISSION REQUIREMENTS:

7.1.1 Planned Small Business Utilization: All offerors are required to provide a Small Business Participation Plan utilizing the template entitled Attachment 5 “Proposed Small Business Participation Plan” and a supporting narrative discussion of no more than 5 pages total addressing their corporate approach and methodology for acquiring, soliciting and using small and small disadvantaged businesses in the performance of this contract. All narratives should address the offeror's commitment to providing subcontracting opportunities, as well as evidence of planned and/or continued outreach efforts to encourage and use small and small disadvantaged businesses. Narratives should demonstrate the historical execution of small business participation on no fewer than three (3) and no more than five (5) projects. Offeror’s proposal must meet the minimum mandatory Total Small Business Participation goal (20%) through collective small business participation from any type of small business or sub-category small business, whether small business prime or 1st tier small business subcontractor. The subcategory small business goals are NOT mandatory.

7.1.2 The overall extent to which each small business subcategory will be utilized shall be provided. This should include a general description of the type of work, product or service anticipated to be supplied via a small business concern along with the estimated percentage of each subcontracted portion in relation to the overall project. Identification of the names of specific subcontractors is not required for the small business utilization evaluation; however, successful offerors will ultimately be required to name subcontractors as a part of their subcontracting plan submission (Example: Demolition Work- 10% of total work effort- SDVOSB identified).

7.2 EVALUATION CRITERIA:

7.2.1 Small Business Participation Plans will be evaluated on the basis of:

The extent to which such Small Business firms are specifically identified in proposals;

The extent of commitment to use such Small Business firms;

Identification of the complexity and variety of the work small firms are to perform;

The extent of participation of small business prime offerors and 1st tier small business subcontractors in terms of the percentage of the value of the total acquisition and the extent to which the proposal meets or exceed the small business participation goals for this acquisition.

The work to be performed directly by a small business prime will be evaluated as small business participation. The small business participation goals for this acquisition are:

The Total Small Business (any type of small business) goal is 20% of the total contract value for this acquisition. The Sub-category Small Business goals are:

3.0% of total contract value to Small Disadvantaged Business (SDB) 3.0% of total contract value to HUBZONE 3.0% of total contract value to Women Owned (WOSB) 2.0% of total contract value to Service-Disabled Veteran Owned (SDVOSB) 2.0% of total contract value to Veteran Owned (VOSB)

0.0% of total contract value to Historically Black Colleges and Universities and Minority Institutions (HBCU/MI)

(Note, for example, that a participation plan that reflects 1% of the total contract value for WOSB would also count towards the overall Small Business Goal; and percentages for SDVOSB also count towards VOSB).

7.2.2 The Government will evaluate narratives provided by applying the adjectival descriptions of paragraph 8.4 of this solicitation. Those narratives with greater detail and specificity will be given greater credit than general statements and commitments provided said details clearly demonstrate offeror’s historical achievement of proposed goals.

7.2.3 If the Government does not obtain information on past performance from the offeror and cannot establish a past performance record for the offeror’s small business utilization through other sources that aspect of this factor will be rated neither favorably nor unfavorably.

7.2.4 The Government will only consider the prime construction contractor participation plan. If a firm has multiple functions or divisions, the Government will only evaluate the past performance of the unit or division submitting the offer. The offeror is required to demonstrate its planned level of commitment to small business usage if awarded a contract from this solicitation and demonstrate its previous commitment to small business usage in the past performance of recent and relevant projects. Work performed by the offeror that is a small business shall be considered small business participation.

7.2.5 The Government will consider recent, relevant projects that are successfully completed, or substantially completed (fully designed and at least 50% construction progress completed) within six (6) years preceding the date of the solicitation. To be deemed relevant, projects must comply with minimum criteria in paragraph 4.1.2.1. The Government will consider the degree to which the project is recent and relevant, the source of project information, context of the data, and general trends in contractor performance. The Government places higher value on projects for which successful performance can be validated by means other than the offeror’s self-assessment such as through independent interviews with points of contact identified in the proposal, CPARS or other agency performance databases, offeror furnished references or personal knowledge. The Government places a higher value on projects which provided particularly difficult or unique challenges and the innovative methods the offeror used to resolve problems successfully.

7.2.6 Offerors are cautioned that the submission of each Proposed Small Business Participation Plan shall not exceed eight (8) pages in length. This page limit shall include three (3) pages for the submission of the template provided in this RFP, entitled Attachment 5 “Proposed Small Business Participation Plan” and five (5) pages for the supporting narrative…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .