This Request for Proposal solicits construction and design services for an Operations Support Facility at Fort Bragg, North Carolina. The scope of work includes construction of a 36,000 square foot facility to sensitive compartmented information standards. The facility will include office, training, medical, operations, and support spaces. It will have information systems, fire protection, and emergency power systems. Supporting site work includes utilities, parking, walks, drainage, lighting, and landscaping. Comprehensive interior design services are required. The period of performance is 540 calendar days. The agency is the Department of the Army Corps of Engineers Engineering District Wilmington. The contract type will be firm-fixed-price.
View the file
Other files for this federal contract opportunity
Show all 50
PN 92594 SOF Operations Support Facility has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. W912PM19R0021 Project Number PN 92594
Amendment 0003
TECHNICAL SUMMARY OF CHANGES
A. SPECIFICATIONS:
(1.) PROJECT TABLE OF CONTENTS
Replace Project Table of Contents in its entirety for
VOLUMES 1-4.
(2.) SECTION 01 33 00.00 37- SUBMITTAL REGISTER
Delete existing Page 1-105 in their entirety and replace with revised enclosed pages 1-106.
(3.) 12 50 00.13 10- FURNITURE AND FURNITURE INSTALLATION
Insert new Spec section in its entirety pager 1-12
(4.) VOLUME 05- FURNITURE, FIXTURES & EQUIPMENT (FF&E)
Delete existing Page 1-75 in their entirety and replace with revised enclosed pages 1-79.
B. DRAWINGS:
(1.) Delete Sheets A-101, A-102, A-402, A-412, A-531, A-601, A- 602, and IF601 in drawing set 1 of 2 in their entirety and replace with revised enclosed Sheets in accordance with Amendment 0003.
Encls As stated
SPECIAL OPERATIONS FACILITY PN 92594
FORT BRAGG, NORTH CAROLINA
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LIST OF DRAWINGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 37 PROJECT SCHEDULE
01 33 00.00 37 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19.00 37 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00.00 37 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 FACILITY DATA REQUIREMENTS
01 91 00.00 37 COMMISSIONING
DI VI SI ON 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
03 45 00 PRECAST ARCHITECTURAL CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
PROJECT TABLE OF CONTENTS Page 1
06 61 16 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 11 13 BITUMINOUS DAMPPROOFING
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 42 13 METAL WALL PANELS
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 23 OVERHEAD COILING DOORS
08 34 59 VAULT DOORS AND DAY GATES
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 51 23 STEEL WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.13 STANDARD RESINOUS FLOORING
09 68 00 CARPETING
09 69 13 RIGID GRID ACCESS FLOORING
09 72 00 WALLCOVERINGS
09 84 20 ACOUSTICAL WALL PANELS
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.20 INTERIOR SIGNAGE
10 14 53 TRAFFIC SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 56 13 STEEL SHELVING
DI VI SI ON 11 - EQUI PMENT
11 70 00 GENERAL REQUIREMENTS FOR MEDICAL AND DENTAL EQUIPMENT
PROJECT TABLE OF CONTENTS Page 2
DI VI SI ON 12 - FURNI SHI NGS
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 07 19.00 40 PLUMBING PIPING INSULATION
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, WATER PIPING SYSTEMS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
23 82 00.00 20 TERMINAL HEATING UNITS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.01 CYBER SECURITY FOR FIRE AND LIFE SAFETY SYSTEMS
25 05 11.02 CYBER SECURITY FOR BACNET DIRECT DIGITAL CONTROL SYSTEMS
FOR HVAC
25 05 11.03 CYBER SECURITY FOR POWER SYSTEMS AND METERING
25 05 11.04 CYBER SECURITY FOR LIGHTING SYSTEMS
25 05 11.05 CYBER SECURITY FOR HYDRAULIC PASSENGER ELEVATORS
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND
INTEGRATION
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
PROJECT TABLE OF CONTENTS Page 3
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH
AUXILIARIES
26 32 33.00 10 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM ABOVE 15 KVA
CAPACITY
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR RED COMMUNICATION
SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 41 13 FRONT PROJECTION SCREENS
27 51 19 SOUND MASKING SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 92 23 SODDING
DI VI SI ON 33 - UTI LI TI ES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 106 PAGES
FORT BRAGG SOF
01 10 00.10 38 SD-01 Preconstruction Submittals
1.10List of Subcontractors
1.10Certificate of Insurance
1.7 GSubmittal Register
1.10 GPreliminary Submittal Register
1.7 GDeviations from Plans and
Specifications
1.7 GUpdated or Corrected Listings
1.10 GQuality Control Plan
1.13 GFinish Presentation Boards
1.16 GDetailed Qualifications of
Individual
1.16 GOriginal Cross Sections
1.16 GFinal As-Built Cross Sections
1.18.1 GRequest for Road Closure
1.23FAA Approvals
1.24Fort Bragg IGIS-Non-Disclosure
Agreement
1.25Environmental Training Log
SD-03 Product Data
1.7 GProgress Schedule
SD-07 Certificates
1.10Completion of Corps CQC
Course
1.10Letter Appointing Superintendent
1.8Manufacturer's Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 106 PAGES
01 10 00.10 38 1.9 Gtesting laboratory
1.9 Gtesting laboratory
1.9Proof of Compliance
01 11 00 SD-01 Preconstruction Submittals
1.4.2Utility Outage Requests
1.4.2Utility Connection Requests
1.5.1Excavation Permit
1.4.1Hot Work Permit
01 14 00 SD-01 Preconstruction Submittals
1.4.1.1 GContractor and Subcontractor
Contract Personnel List
1.5.1Security Briefing Packet
1.4.6 GWork Outside Regular Hours
Request
1.5.1.1CSO Appointment Letter
1.5.2 GApproved Consolidated Access
Roster
1.5.3Proof of Acceptance
01 20 00.00 20 SD-01 Preconstruction Submittals
1.3 GEarned Value Report
01 32 01.00 37 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00.00 37 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 106 PAGES
01 33 00.00 37 1.9 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 G SPreliminary High Performance
and Sustainable Building Checklist
1.4.1 G SSustainability Action Plan
1.5.3.1 G SPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.3.1 G SFinal High Performance and
Sustainable Building Checklist
1.5.3.1 G SFinal Sustainability eNotebook
1.5.3.1 G SAmended Final Sustainability
eNotebook
1.5.3.1 G SAmended Final High
Performance and Sustainable
Building Checklist
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 106 PAGES
01 35 26 1.7.2.3 GCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
3.2Energized Work Permit
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
01 45 35 SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
2.1Steel Truss Plant
2.1Certified Plant
2.1Certificate of Compliance
1.5 GSpecial Inspector
SD-11 Closeout Submittals
3.1.2 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 106 PAGES
01 50 00 SD-03 Product Data
1.4 GBackflow Preventers
SD-06 Test Reports
2.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
3.4.1 GClean Air Act (CAA) Permits
3.4.2 GOil or Dual-Fuel Boilers and
Furnaces Product Data
1.10 GSolid Waste Management Permit
1.5.2Regulatory Notifications
1.6 GEnvironmental Protection Plan
3.2.1.2 GStormwater Notice of Intent
1.6.9.1 GDirt and Dust Control Plan
1.5.5 GEmployee Training Records
1.5.4 GEnvironmental Manager
Qualifications
3.4.1Air Program Manager
3.4.1Air Permits
SD-06 Test Reports
3.2.1.3Inspection Reports
3.6.2.1 GSolid Waste Management Report
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 106 PAGES
01 57 19 1.5.5 GEmployee Training Records
1.5.5.1Certificate of Competency
1.5.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.2.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 GStormwater Notice of Termination
3.6.1 GWaste Determination
Documentation
3.6.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
1.5.5 GAssembled Employee Training
Records
1.10 GSolid Waste Management Permit
3.6.2.1 GSolid Waste Management Report
3.6.3.1 GHazardous Waste/Debris
Management
1.5.2 GRegulatory Notifications
3.6.2.1 GSales Documentation
3.6.2.1Contractor Certification
3.2.1.5As-Built Topographic Survey
01 58 00 SD-02 Shop Drawings
1.3.1 GSign Legend Orders
01 74 19.00 37 SD-11 Closeout Submittals
1.5Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 106 PAGES
01 78 00.00 37 SD-03 Product Data
1.3.1.2Project Execution Plan (PXP)
1.3.2As-Built Record of Equipment and Materials
1.7.1Warranty Management Plan
1.3.1As-Built BIM Model
1.7.5Warranty Tags
1.10Final Cleaning
1.4Spare Parts Data
SD-08 Manufacturer’s Instructions
1.5Preventative Maintenance
1.5Condition Monitoring (Predictive
Testing)
1.5Inspection
1.7.1Instructions
SD-10 Operation and Maintenance
Data
1.9 G ROOperation and Maintenance
Manuals
SD-11 Closeout Submittals
1.3.1Record Drawings
1.6 G ROCertification of EPA and USDA
Designated Items
1.11 G ROForm DD1354
1.11 G ROChecklist for Form DD1354
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 106 PAGES
01 78 23 SD-10 Operation and Maintenance
Data
1.3 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 78 24.00 10 SD-01 Preconstruction Submittals
1.4.1Facility Data Project Execution
Plan
SD-10 Operation and Maintenance
Data
3.1 GFacility Data Workbook, Construction Progress
3.1 GFacility Document Set, Construction Progress
SD-11 Closeout Submittals
3.2 GFacility Data Workbook, Construction Final
1.4.3 GFacility Document Set, Construction Final
3.2 GFacility Document Set, Construction Final
01 91 00.00 37 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 106 PAGES
01 91 00.00 37 3.3PVT forms
3.3PVT forms
CxA
3.8.1Control Drawings
3.11.2Control Drawings
3.8.1Equipment submittal
SD-06 Test Reports
3.8 G ROFilled out functional test
readiness forms
3.1.3 G ROCompleted PFT checklists
3.1.4.1 G ROCompleted startup checklists
3.3 G CxACompleted controls point to point
and PVT checkout
3.8.4Completed FPT forms
CxA
3.5Nonconformance and Approval in
PFT Checklists, Startup, Point to
Point and TAB
SD-07 Certificates
3.2Calibration documentation
CxA
3.2Calibration certification
SD-08 Manufacturer’s Instructions
1.10Startup and Checkout Plan
CxA
1.10Checkout Forms
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 106 PAGES
01 91 00.00 37 1.10Test Procedures
SD-10 Operation and Maintenance
Data
3.11.1 G ROTraining Plan
3.11.3Training Documentation
CxA
3.11.4Training Verification
SD-11 Closeout Submittals
1.11.1 G ROFinal Cx Report
1.11.2 GCurrent Facility Requirements
and O&M Plan
3.9.1Deficiency Report and Resolution
Record
3.9.4Deficiency Report and Resolution
Record
CxA
03 11 13.00 10 SD-02 Shop Drawings
2.2.1Formwork
3.1.1Formwork
2.2.1Form Removal Schedule
SD-03 Product Data
2.2Form Materials
Part 2 SRecycled Content Products
SD-04 Samples
1.3Sample Panels
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 106 PAGES
03 11 13.00 10 2.1Calculations
SD-06 Test Reports
3.2Inspection
03 15 00.00 10 SD-02 Shop Drawings
2.4Waterstops
SD-03 Product Data
2.2Preformed Expansion Joint Filler
2.3Sealant
2.4Waterstops
SD-07 Certificates
2.2Preformed Expansion Joint Filler
2.3Sealant
2.4Waterstops
03 20 00.00 10 SD-02 Shop Drawings
3.1 GReinforcement
SD-03 Product Data
2.3 GReinforcing Steel
Part 2 SRecycled Content Products
SD-06 Test Reports
2.7 GTests, Inspections, and
Verifications
SD-07 Certificates
2.3Reinforcing Steel
1.3.1Qualified Welders
03 30 00.00 10 SD-01 Preconstruction Submittals
1.4.2 GQuality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 106 PAGES
03 30 00.00 10 1.4.1 GLaboratory Accreditation
3.7.5.6 GSampling Plan
SD-03 Product Data
Part 2 SRecycled Content Products
2.2Cementitious Materials
2.9Vapor Retarder
2.1.5Floor Finish
2.4Chemical Admixtures
SD-04 Samples
2.4.5Surface Retarder
SD-05 Design Data
2.1.1 GMixture Proportions
SD-06 Test Reports
2.1.1 GMixture Proportions
3.7 GTesting and Inspection for CQC
2.2.3Fly Ash
2.2.6Ground Granulated Blast-Furnace
(GGBF) Slag
2.3Aggregates
3.7.5.1Air Content
3.7.5.3Slump
3.7.5.6Compressive Strength
2.5Water
SD-07 Certificates
1.4Contractor Quality Control personnel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 106 PAGES
03 30 00.00 10 3.2.1Ready-Mix Plant
03 35 00.00 10 SD-03 Product Data
Part 2 SRecycled Content Products
03 39 00.00 10 SD-03 Product Data
2.1Curing Materials
SD-06 Test Reports
3.2Testing and Inspection for CQC
SD-08 Manufacturer’s Instructions
2.1Curing Compound
03 45 00 SD-01 Preconstruction Submittals
1.11.5Pre-Installation Meeting
SD-02 Shop Drawings
1.11.1 GPrecast Drawings
SD-03 Product Data
2.3 GCast-In Embedded Items And
Connectors
2.3.2 GConnection Devices
2.2.6Admixtures
2.5Gasket
2.6Bearing Pads
Part 2 SRecycled Content Products
SD-04 Samples
1.11.2 GConcrete Wall Panel Surface
Finish
1.11.4 GMock-up
1.11.2 GFull Size Sample Wall Panel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 106 PAGES
03 45 00 SD-05 Design Data
1.5.4 GDesign Calculations
2.1.1 GContractor-Furnished Mix Design
2.4.9 GRepair of Surface Defects
1.5.5 GThermal Calculations
SD-06 Test Reports
1.10.2 GStrength Tests
1.10.2Slump
1.10.2Air Content
1.10.1Test for Concrete Materials
2.2.7Water
3.6.4Testing Precast Units for Strength
SD-07 Certificates
1.4Manufacturer's Qualifications
1.8.1Fabricator Quality Certifications
1.9Erector Certification
SD-08 Manufacturer’s Instructions
3.3 GInstallation
3.8 GCleaning
SD-11 Closeout Submittals
1.11.3 GBatch Ticket Information
2.2.1 SRecycled Content for Fly Ash and
Pozzolan
2.2.1 SRecycled Content for Ground Iron
Blast-Furnace Slag
2.2.1 SRecycled Content for Silica Fume
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 106 PAGES
04 20 00 SD-02 Shop Drawings
3.3.3.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2.2.1 GCement
2.4.1.1 GCementitious Materials
Part 2 SRecycled Content Products
Part 2 SRegional Products
SD-04 Samples
1.3.1.1 GMock-Up Panel
2.2.2.2 GConcrete Masonry Units (CMU)
2.4.1.3 GAdmixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
2.2.2.3Fire-Rated Concrete Masonry
Units
3.2.4 GBracing Calculations
SD-06 Test Reports
2.2.2.3Fire-Rated Concrete Masonry
Units
3.6.1.1Prism Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 106 PAGES
04 20 00 SD-07 Certificates
1.3.2Special Masonry Inspector
Qualifications
2.2.2.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.2.2 SRecycled Content
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 106 PAGES
05 12 00 2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.3Tension Control Bolts
2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
2.2.3 SRecycled Content for Steel Pipe
SD-05 Design Data
1.4.3 GDesign Calculations for Steel
Connections
1.4.2 GShoring and Temporary Bracing
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports
3.7.2.1Direct Tension Indicator Washer
Inspection Reports
3.7.3.1Bolt Testing Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.3AISC Structural Steel Fabricator
Quality Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 106 PAGES
05 12 00 1.3AISC Structural Steel Erector
Quality Certification
1.4.4.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.7.1.1Certified Welding Inspector
3.7.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.4Galvanizing Repair Paint
2.2.17Mechanical Fasteners
2.1.4Touch-Up Paint
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
2.1 SRecycled Content of Steel
Products
SD-04 Samples
2.1.1Metal Roof Deck Units
2.2.4Flexible Closure Strips
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 106 PAGES
05 30 00 1.3.3Welder Qualifications
1.3.3Welding Procedures
1.3.4.1Wind Storm Resistance
1.3.1Manufacturer's Certificates
2.2.12Stud Manufacture's Certification
2.2.12Stud Manufacture's Test Reports
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1 SRecycled Content of Steel
Products
SD-05 Design Data
1.6.2 GMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.1.1Welds
05 50 13 SD-02 Shop Drawings
2.4Floor Gratings
2.4 GRoof Walkways
2.5Bollards/Pipe Guards
2.6 GAngles and Plates
SD-03 Product Data
2.4Floor Gratings
2.1 SRecycled Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 106 PAGES
05 50 13 2.1 GCertificates of Compliance
05 51 00 SD-02 Shop Drawings
2.1Iron and Steel Hardware
2.1Steel Shapes, Plates, Bars, and
Strips
2.2.1 GMetal Stair System
SD-03 Product Data
2.4.1 GStructural-Steel Plates, Shapes, and Bars
2.4.2 GStructural-Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GCold-Drawn Steel Tubing
2.4.9 GGray Iron Castings
2.4.10 GMalleable Iron Castings
2.3.3Masonry Anchorage Devices
2.2.4Protective Coating
2.2.2Steel Pan Stairs
2.3.1 GSteel Stairs
Part 2 SRecycled Content Products
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 106 PAGES
05 51 00 2.1 GDesign Calculations for Steel Pan
Stair System
SD-07 Certificates
1.3.1 GWelding Procedures
1.3.1 GWelder Qualification
SD-08 Manufacturer’s Instructions
2.2.4Protective Coating
2.3.3Masonry Anchorage Devices
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
Part 2 SRecycled Content Products
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.2.1Masonry Anchorage Devices
2.1.2Protective Coating
2.2.3Steel Railings and Handrails
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 106 PAGES
05 52 00 1.2.1Anchorage and Fastening
Systems
Part 2 SRecycled Content Products
SD-07 Certificates
1.4.1Welding Procedures
1.4.2Welder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-02 Shop Drawings
2.2.1Nailing strips and Nailers
SD-03 Product Data
1.8Fire-retardant Treatment
2.3Oriented Strand Board
2.4.2Adhesives
SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
1.9.1Certificates of Grade
2.1.1 SCertified Sustainably Harvested
Virgin Lumber
2.2.1 SCertified Sustainably Harvested
Framing Lumber
2.3.1.1 SCertified Sustainably Harvested
Plywood Wall Sheathing
2.3.2.1 SCertified Sustainably Harvested
Plywood for Other Uses
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 106 PAGES
06 10 00 1.7Preservative Treatment
2.4.2 SIndoor Air Quality for Aerosol
Adhesives
2.4.2 SIndoor Air Quality for Non-aerosol
Adhesives
06 20 00 SD-02 Shop Drawings
1.3Detail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.1Wood Products
Engineered
1.4Treated Wood Products
2.5Hardware and Accessories
SD-04 Samples
1.5Samples
SD-07 Certificates
1.7.1.1Certificates of Grade
2.1.3 SCertified Sustainably Harvested
Wood for Trim and Frames
2.1.4 SCertified Sustainably Harvested
Softwood Plywood
2.1.5 SCertified Sustainably Harvested
Hardwood Plywood
2.1.5 SIndoor Air Quality for Hardwood
Plywood
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 106 PAGES
06 20 00 2.1.6 SIndoor Air Quality for MDF and
Particleboard
2.6.1.2 SIndoor Air Quality for Non-aerosol
Adhesives
2.6.1.2 SIndoor Air Quality for Aerosol
Adhesives
06 41 16.00 10 SD-02 Shop Drawings
1.5.2Shop Drawings
2.9Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
2.9.8.3Finish Schedule
SD-04 Samples
2.3 GPlastic Laminates;
2.6Cabinet Hardware
SD-07 Certificates
1.5Quality Assurance
3.1Laminate Clad Casework
SD-11 Closeout Submittals
1.3LEED Documentation
06 61 16 SD-02 Shop Drawings
1.5.2 GDetail Drawings
1.5.2 GMock-ups
3.1Installation
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 106 PAGES
06 61 16 2.1Solid Polymer Material
1.5.1Qualifications
2.3Fabrications
2.2.4 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 GMaterial
SD-06 Test Reports
2.1Solid Polymer Material
SD-07 Certificates
2.3Fabrications
1.5.1Qualifications
2.1 SIndoor Air Quality for solid
surface fabrication products
SD-10 Operation and Maintenance
Data
3.2Clean-up
07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
2.2 GThermal Imaging Camera
SD-05 Design Data
3.2 GEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 106 PAGES
07 05 23 1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 GPressure Test Procedures
3.5.8 GAir Leakage Test Report
3.6.5 GDiagnostic Test Report
07 11 13 SD-07 Certificates
1.3Materials
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.1.2 SRecycled Content for Insulation
Materials
2.2Accessories
SD-07 Certificates
2.1.4 SIndoor Air Quality for Insulation
Materials
2.2.1 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.1.1Insulation
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
SD-03 Product Data
2.1 GInsulation
1.4 GCover Board
2.3 GFasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 106 PAGES
07 22 00 2.1.2 SRecycled Content For Insulation
SD-07 Certificates
1.6 GInstaller Qualifications
2.1.3 SIndoor Air Quality For Insulation
SD-08 Manufacturer’s Instructions
2.3 GFasteners
2.1 GInsulation
07 27 10.00 10 SD-02 Shop Drawings
1.9 GAir Barrier System Design
Drawings
SD-06 Test Reports
1.8 G DODesign Review Report
3.1.2 G ROTesting and Inspection
SD-07 Certificates
1.7 G ROAir Barrier Inspector
07 27 26 SD-01 Preconstruction Submittals
1.9.1Qualifications of Manufacturer
1.9.2Qualifications of Installer
SD-02 Shop Drawings
1.4 GFluid-Applied Membrane Air
Barrier
SD-03 Product Data
1.4 GFluid-Applied Membrane Air
Barrier
2.2 GPrimers, Adhesives, and Mastics
2.5 GReinforcement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 106 PAGES
07 27 26 1.4.2Safety Data Sheets
SD-06 Test Reports
1.6Capillary Moisture Test
1.4.3Field Peel Adhesion Test
1.4.3Flame Propagation of Wall
Assemblies
1.4.3Flame Spread and Smoke
Developed Index Ratings
3.4.1Site Inspections
SD-07 Certificates
1.4Fluid-Applied Membrane Air
Barrier
1.9.1Qualifications of Manufacturer
1.9.2Qualifications of Installer
SD-08 Manufacturer’s Instructions
1.4Fluid-Applied Membrane Air
Barrier
2.2Primers, Adhesives, and Mastics
07 42 13 SD-01 Preconstruction Submittals
1.5.3Qualification of Manufacturer
1.5.4Qualification of Installation
Contractor
1.8 GWarranty
SD-02 Shop Drawings
1.5.1.1Installation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 106 PAGES
07 42 13 2.2Recycled Content;
2.3.1 GWall Panels
2.3.2Factory Color Finish
1.5.5Closure Materials
2.6.3.4Pressure Sensitive Tape
2.6.3.1Sealants and Caulking
1.5.5Accessories
2.6Accessories
SD-04 Samples
2.3.1 GWall Panels
1.5.3.1 GFasteners
2.6.2Metal Closure Strips
SD-05 Design Data
1.5.1.2 GWind load design analysis
SD-06 Test Reports
1.3.2Wind Load Tests
2.3.2.6Coating
2.3.2.6Chalking
SD-07 Certificates
1.5.3.1Coil Stock
1.5.3.1Fasteners
SD-08 Manufacturer’s Instructions
3.3Installation
SD-09 Manufacturer’s Field
Reports
3.8.1Manufacturer's Field Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 106 PAGES
07 42 13 SD-11 Closeout Submittals
1.8Warranty
1.5.6 GMaintenance Instructions
1.8.120 year 'No Dollar Limit' warranty for labor and material
07 52 00 SD-02 Shop Drawings
1.4.6Roof plan
SD-03 Product Data
2.2 GModified Bitumen Sheets
2.1.1 SHeat Island Reduction
2.5Primer
2.6Modified Bitumen Roof Cement
2.9Pre-Manufactured Accessories
2.8Fasteners And Plates
1.9Warranty
SD-05 Design Data
1.4.5 GWind Uplift Calculations;
SD-07 Certificates
1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
1.4.3Qualification of Engineer of
Record
1.4.5Wind Uplift Resistance
1.4.4Fire Resistance
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 106 PAGES
07 52 00 3.3.4Modified Bitumen Membrane
Application
3.3.5Flashing
3.2.2.3Torches
2.5Primer
2.8.1Fasteners
1.6Cold Weather Installation
SD-11 Closeout Submittals
1.9 GWarranty;
3.8Information Card
3.7Instructions To Government
Personnel
1.9 GSubmit 20 year 'No-Dollar-Limit'
warranty for labor and materials;
07 60 00 SD-02 Shop Drawings
2.2.1Exposed Sheet Metal
3.1.12Gutters
3.1.13Downspouts
2.2.1Gravel Stops and Fasciae
3.1.15Splash Pans
3.1.14Flashing for Roof Drains
3.1.9Base Flashing
3.1.10Counterflashing
3.1.17Flashing at Roof Penetrations and Equipment Supports
3.1.18Copings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 106 PAGES
07 60 00 2.1 SRecycled Content
SD-04 Samples
1.4.2 GFinish Samples;
SD-08 Manufacturer’s Instructions
1.4.3Instructions for Installation
3.5Quality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3Cleaning and Maintenance
07 84 00 SD-02 Shop Drawings
2.1Firestopping System
SD-03 Product Data
2.2Firestopping Materials
SD-06 Test Reports
3.3Inspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1Installer Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2Primers
2.3Bond Breakers
2.4Backstops
3.1Field Adhesion
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 106 PAGES
07 92 00 2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.1 SRecycled Content for Steel Door
Product
2.5 GFrames
2.5 GFrames
2.5 SRecycled Content for Steel Frame
Product
2.3Accessories
SD-03 Product Data
2.1 GDoors
2.5 GFrames
2.3Accessories
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
2.1.1.1 SRecycled Content for Door Cores
2.2Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 106 PAGES
08 14 00 2.3.7Water-resistant Sealer
1.5Warranty
2.1.2 GSound Transmission Class
Rating
2.1.3 GFire Resistance Rating
SD-04 Samples
2.1Doors
2.3.6.2 GDoor Finish Colors;
SD-06 Test Reports
2.4Cycle-Slam
2.4Hinge Loading Resistance
SD-07 Certificates
1.3.1Certificates of Grade
2.1.1 SCertified Sustainably Harvested
Flush Wood Doors
2.1.1.1 SIndoor Air Quality for
Particleboard and Agrifiber Door
Cores
SD-11 Closeout Submittals
1.5Warranty
08 31 00 SD-02 Shop Drawings
1.3 GAccess Doors And Panels
SD-03 Product Data
1.3 GAccess Doors And Panels
1.3.2Hardware
2.2.8Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 106 PAGES
08 31 00 2.1 SRecycled Content
SD-04 Samples
2.5 GFinishes;
08 33 23 SD-02 Shop Drawings
2.2.1Overhead Coiling Doors
2.2.3Counterbalancing Mechanism
2.2.4Manual Door Operators
2.2.5Electric Door Operators
2.2.1.4Bottom Bars
2.1.1.1Guides
Mounting Brackets
Overhead Drum
2.2.2.3Hood
2.1.1.1Installation Drawings
SD-03 Product Data
2.2.1Overhead Coiling Doors
2.2.2Hardware
2.2.3Counterbalancing Mechanism
2.2.4Manual Door Operators
2.2.5Electric Door Operators
2.2.6Fire-Rated Door Assembly
SD-05 Design Data
2.2.1Overhead Coiling Doors
2.2.2Hardware
2.2.3Counterbalancing Mechanism
2.2.4Manual Door Operators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 106 PAGES
08 33 23 2.2.5Electric Door Operators
1.3Fire-Rated Door
SD-10 Operation and Maintenance
Data
3.3.2Operation and Maintenance
Manuals
3.3.2Materials
3.3.2Devices
3.3.2Procedures
3.3.2Manufacturer's Brochures
3.3.2Parts Lists
SD-11 Closeout Submittals
3.3.1Warranty
08 34 59 SD-02 Shop Drawings
2.1 GVault Door Unit
2.3 GDay Gate
SD-03 Product Data
2.2Vault Door and Frame
SD-07 Certificates
2.2Vault Door and Frame
SD-08 Manufacturer’s Instructions
3.1Installation
SD-11 Closeout Submittals
1.2LEED Documentation
08 34 73 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 106 PAGES
08 34 73 2.1 GHollow Metal Sound Retardant
Doors
2.1 GWood Sound Retardant Doors
2.1 GDoor Frames
SD-03 Product Data
2.1 GHollow Metal Sound Retardant
Doors
2.1 GWood Sound Retardant Doors
2.1 GDoor Frames
2.1 GDoor Hardware
2.1Intumescent…