10 44 16.pdf

PDF 12 KB Posted

Attached to
PN 92594 SOF Operations Support Facility Federal contract opportunity
Solicitation number
W912PM
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

This document provides details for a federal construction contract opportunity with the Army Corps of Engineers. The solicitation seeks construction and design services for a 36,000 square foot Special Operations Facility at Fort Bragg, North Carolina, to sensitive compartmented information standards. The scope of work includes construction of office, training, medical, and operations areas along with supporting facilities such as parking, utilities, and site work. Sustainability measures, security systems, and emergency power are required. The period of performance is 540 calendar days. The contract type is firm-fixed-price.

View the file

Other files for this federal contract opportunity

Other files attached to PN 92594 SOF Operations Support Facility, newest first.
File Type Posted
PN92594_W912PM19R00210005.pdf PDF
FY20PN92594IF601.pdf PDF
FY20PN92594A-102.pdf PDF
FY20PN92594A-602.pdf PDF
FY20PN92594A-412.pdf PDF
FY20PN92594A-601.pdf PDF
PN92594_0003_Technical Summary of Changes.pdf PDF
PN92594_W912PM19R00210003.pdf PDF
03 30 00.00 10.pdf PDF
01 45 35.pdf PDF
PN92594_0002_Technical Summary of Changes.pdf PDF
FY20PN92594M-602.pdf PDF
PN92594_W912PM19R00210002.pdf PDF
FY20PN92594MP102.pdf PDF
FY20PN92594T101.pdf PDF
FY20PN92594T102.pdf PDF
FY20PN92594M-501.pdf PDF
FY20PN92594M-503.pdf PDF
08 33 23.pdf PDF
03 45 00.pdf PDF
FY20PN92594IN101.pdf PDF
FY20PN92594TA501.pdf PDF
FY20PN92594IN601.pdf PDF
FY20PN92594A-101.pdf PDF
FY20PN92594A-410.pdf PDF
FY20PN92594T504.pdf PDF
01 33 00.00 37 Submittal Register.pdf PDF
PN 92594_RTA SPECS_VOL 01 (Amend0001).pdf PDF
PN92594_W912PM19R00210001.pdf PDF
PN 92594_RTA SPECS_VOL 05 (Amend0001).pdf PDF
Technical Summary of Changes to W912PM19R0021-0001_pn92594.pdf PDF
Site Visit Sign In Roster 92594 .pdf PDF
PN92594_RTA_PLANS_vol2of2 (1).pdf PDF
NAVFAC_USACE PPQ.pdf PDF
PN 92594_RTA SPECS_VOL 02 (1).pdf PDF
J&A W912PM19R0021 (PN92594) Chillers.pdf PDF
PN 92594_RTA SPECS_VOL 03 (1).pdf PDF
PN 92594_RTA SPECS_VOL 05 (1).pdf PDF
PN 92594_RTA SPECS_VOL 01 (1).pdf PDF
PN 92594_RTA SPECS_VOL 04 (1).pdf PDF
PN92594_RTA_PLANS_vol1of2 (1).pdf PDF
NAVFAC_USACE PPQ.pdf PDF
PN 92594_RTA SPECS_VOL 01 (1).pdf PDF
PN 92594_RTA SPECS_VOL 05 (1).pdf PDF
J&A W912PM19R0021 (PN92594) Chillers.pdf PDF
PN 92594_RTA SPECS_VOL 04 (1).pdf PDF
PN92594_RTA_PLANS_vol2of2 (1).pdf PDF
PN92594_RTA_PLANS_vol1of2 (1).pdf PDF
PN 92594_RTA SPECS_VOL 03 (1).pdf PDF
PN 92594_RTA SPECS_VOL 02 (1).pdf PDF
Show all 50

PN 92594 SOF Operations Support Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL OPERATIONS FACILITY PN 92594

FORT BRAGG, NORTH CAROLINA

SECTION TABLE OF CONTENTS

DIVISION 10 - SPECIALTIES

SECTION 10 44 16

FIRE EXTINGUISHERS

11/19

PART 1 GENERAL

1.1 SUBMITTALS

1.2 DELIVERY, STORAGE, AND HANDLING

1.2.1 Samples

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

2.1.1 Material

2.1.2 Size

2.1.3 Accessories

2.2 EQUIPMENT

2.2.1 Cabinets

2.2.1.1 Material

2.2.1.2 Type

2.2.1.3 Size

PART 3 EXECUTION

3.1 INSTALLATION

3.2 PROTECTION

3.2.1 Repairing

3.2.2 Cleaning

-- End of Section Table of Contents --

SECTION 10 44 16 Page 1

SECTION 10 44 16

FIRE EXTINGUISHERS

11/19

****Amendment 0002**** Entire Section has been added

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only.

Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Manufacturer's Data; G

SD-02 Shop Drawings

Fire Extinguishers;

Accessories; G

Cabinets; G

SD-03 Product Data

Fire Extinguishers;

Accessories;

Cabinets;

Wall Brackets; G

Replacement Parts List; G

SD-04 Samples

Fire Extinguisher; G

Cabinet; G

Accessories; G

SD-07 Certificates

Fire Extinguishers Certifications; G

Manufacturer's Warranty with Inspection Tag; G

SECTION 10 44 16 Page 2

1.2 DELIVERY, STORAGE, AND HANDLING

Protect materials from weather, soil, and damage during delivery, storage, and construction.

Deliver materials in their original packages, containers, or bundles bearing the brand name and the name and type of the material.

1.2.1 Samples

Provide the following equipment samples: one full-sized sample of each type of cabinet being installed; three samples of wall brackets and accessories of each type being used.

Use approved samples for installation, with proper identification and storage.

PART 2 PRODUCTS

Submit fabrication drawings consisting of fabrication and assembly details performed in the factory and product data for the following items:

Accessories, cabinets, Wall Brackets.

2.1 SYSTEM DESCRIPTION

2.1.1 Material

Provide enameled steel extinguisher shell.

2.1.2 Size

10 pounds extinguishers.

2.1.3 Accessories

Forged brass valve

Fusible plug

Safety release

Pressure gage

2.2 EQUIPMENT

2.2.1 Cabinets

2.2.1.1 Material

Provide stainless steel cabinets sized for 10 pound fire extinguisher.

Cabinet door to have vertical acrylic vision panel, partial width of door. Provide vertical diecut lettering to read "FIRE EXTINGUISHER" in black color to metal section of the cabinet door..

2.2.1.2 Type

Provide semi-recessed cabinet for a 4 inch wall with trim projection from

SECTION 10 44 16 Page 3 wall not to exceed 2 inches.

2.2.1.3 Size

Dimension cabinets to accommodate the specified fire extinguishers.

PART 3 EXECUTION

3.1 INSTALLATION

Comply with the manufacturer's recommendations for all installations.

Mount bottom of cabinet 36 inches AFF, unless noted otherwise.

Comply with the manufacturer's recommendations for all installations.

3.2 PROTECTION

3.2.1 Repairing

Remove and replace damaged and unacceptable portions of completed work with new work at no additional cost to the Government.

Submit replacement parts list indicating specified items replacement part, replacement cost, and name, address and contact for replacement parts distributor.

3.2.2 Cleaning

Clean all surfaces of the work, and adjacent surfaces which are soiled as a result of the work. Remove from the site all construction equipment, tools, surplus materials and rubbish resulting from the work.

-- End of Section --

SECTION 10 44 16 Page 4

File details come from the government source that posted it. Updated .