This request for proposal solicits construction and design services for an Operations Support Facility at Fort Bragg, North Carolina. Key requirements include construction of a 36,000 square foot facility to sensitive compartmented information standards, with spaces for command functions, life support, offices, training areas, medical facilities, an auditorium and more. Supporting site work includes utilities, parking, drives, drainage and landscaping. Comprehensive interior design and furnishings are required. Sustainability, energy efficiency, security systems, and accessibility standards must be met. The 540 calendar day period of performance concludes with a firm-fixed price contract awarded to the successful bidder.

View the file

Other files for this federal contract opportunity

Other files attached to PN 92594 SOF Operations Support Facility, newest first.
File Type Posted
PN92594_W912PM19R00210005.pdf PDF
FY20PN92594IF601.pdf PDF
FY20PN92594A-102.pdf PDF
FY20PN92594A-602.pdf PDF
FY20PN92594A-412.pdf PDF
FY20PN92594A-601.pdf PDF
PN92594_0003_Technical Summary of Changes.pdf PDF
PN92594_W912PM19R00210003.pdf PDF
03 30 00.00 10.pdf PDF
01 45 35.pdf PDF
PN92594_0002_Technical Summary of Changes.pdf PDF
FY20PN92594M-602.pdf PDF
PN92594_W912PM19R00210002.pdf PDF
FY20PN92594MP102.pdf PDF
FY20PN92594T101.pdf PDF
10 44 16.pdf PDF
FY20PN92594T102.pdf PDF
FY20PN92594M-501.pdf PDF
FY20PN92594M-503.pdf PDF
08 33 23.pdf PDF
03 45 00.pdf PDF
FY20PN92594IN101.pdf PDF
FY20PN92594TA501.pdf PDF
FY20PN92594IN601.pdf PDF
FY20PN92594A-101.pdf PDF
FY20PN92594A-410.pdf PDF
FY20PN92594T504.pdf PDF
PN 92594_RTA SPECS_VOL 01 (Amend0001).pdf PDF
PN92594_W912PM19R00210001.pdf PDF
PN 92594_RTA SPECS_VOL 05 (Amend0001).pdf PDF
Technical Summary of Changes to W912PM19R0021-0001_pn92594.pdf PDF
Site Visit Sign In Roster 92594 .pdf PDF
PN92594_RTA_PLANS_vol2of2 (1).pdf PDF
NAVFAC_USACE PPQ.pdf PDF
PN 92594_RTA SPECS_VOL 02 (1).pdf PDF
J&A W912PM19R0021 (PN92594) Chillers.pdf PDF
PN 92594_RTA SPECS_VOL 03 (1).pdf PDF
PN 92594_RTA SPECS_VOL 05 (1).pdf PDF
PN 92594_RTA SPECS_VOL 01 (1).pdf PDF
PN 92594_RTA SPECS_VOL 04 (1).pdf PDF
PN92594_RTA_PLANS_vol1of2 (1).pdf PDF
NAVFAC_USACE PPQ.pdf PDF
PN 92594_RTA SPECS_VOL 01 (1).pdf PDF
PN 92594_RTA SPECS_VOL 05 (1).pdf PDF
J&A W912PM19R0021 (PN92594) Chillers.pdf PDF
PN 92594_RTA SPECS_VOL 04 (1).pdf PDF
PN92594_RTA_PLANS_vol2of2 (1).pdf PDF
PN92594_RTA_PLANS_vol1of2 (1).pdf PDF
PN 92594_RTA SPECS_VOL 03 (1).pdf PDF
PN 92594_RTA SPECS_VOL 02 (1).pdf PDF
Show all 50

PN 92594 SOF Operations Support Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 105 PAGES

FORT BRAGG SOF

01 10 00.10 38 SD-01 Preconstruction Submittals

1.10List of Subcontractors

1.10Certificate of Insurance

1.7 GSubmittal Register

1.10 GPreliminary Submittal Register

1.7 GDeviations from Plans and

Specifications

1.7 GUpdated or Corrected Listings

1.10 GQuality Control Plan

1.13 GFinish Presentation Boards

1.16 GDetailed Qualifications of

Individual

1.16 GOriginal Cross Sections

1.16 GFinal As-Built Cross Sections

1.18.1 GRequest for Road Closure

1.23FAA Approvals

1.24Fort Bragg IGIS-Non-Disclosure

Agreement

1.25Environmental Training Log

SD-03 Product Data

1.7 GProgress Schedule

SD-07 Certificates

1.10Completion of Corps CQC

Course

1.10Letter Appointing Superintendent

1.8Manufacturer's Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 105 PAGES

01 10 00.10 38 1.9 Gtesting laboratory

1.9 Gtesting laboratory

1.9Proof of Compliance

01 11 00 SD-01 Preconstruction Submittals

1.4.2Utility Outage Requests

1.4.2Utility Connection Requests

1.5.1Excavation Permit

1.4.1Hot Work Permit

01 14 00 SD-01 Preconstruction Submittals

1.4.1.1 GContractor and Subcontractor

Contract Personnel List

1.5.1Security Briefing Packet

1.4.6 GWork Outside Regular Hours

Request

1.5.1.1CSO Appointment Letter

1.5.2 GApproved Consolidated Access

Roster

1.5.3Proof of Acceptance

01 20 00.00 20 SD-01 Preconstruction Submittals

1.3 GEarned Value Report

01 32 01.00 37 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00.00 37 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 105 PAGES

01 33 00.00 37 1.9 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 G SPreliminary High Performance

and Sustainable Building Checklist

1.4.1 G SSustainability Action Plan

1.5.3.1 G SPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

1.5.3.1 G SFinal High Performance and

Sustainable Building Checklist

1.5.3.1 G SFinal Sustainability eNotebook

1.5.3.1 G SAmended Final Sustainability

eNotebook

1.5.3.1 G SAmended Final High

Performance and Sustainable

Building Checklist

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 105 PAGES

01 35 26 1.7.2.3 GCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

3.2Energized Work Permit

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

01 45 35 SD-06 Test Reports

3.1.2Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

2.1Steel Truss Plant

2.1Certified Plant

2.1Certificate of Compliance

1.5 GSpecial Inspector

SD-11 Closeout Submittals

3.1.2 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 105 PAGES

01 50 00 SD-03 Product Data

1.4 GBackflow Preventers

SD-06 Test Reports

2.5Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.5.1Preconstruction Survey

3.4.1 GClean Air Act (CAA) Permits

3.4.2 GOil or Dual-Fuel Boilers and

Furnaces Product Data

1.10 GSolid Waste Management Permit

1.5.2Regulatory Notifications

1.6 GEnvironmental Protection Plan

3.2.1.2 GStormwater Notice of Intent

1.6.9.1 GDirt and Dust Control Plan

1.5.5 GEmployee Training Records

1.5.4 GEnvironmental Manager

Qualifications

3.4.1Air Program Manager

3.4.1Air Permits

SD-06 Test Reports

3.2.1.3Inspection Reports

3.6.2.1 GSolid Waste Management Report

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 105 PAGES

01 57 19 1.5.5 GEmployee Training Records

1.5.5.1Certificate of Competency

1.5.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

3.2.1.4 GStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 GStormwater Notice of Termination

3.6.1 GWaste Determination

Documentation

3.6.3.6 GDisposal Documentation for

Hazardous and Regulated Waste

1.5.5 GAssembled Employee Training

Records

1.10 GSolid Waste Management Permit

3.6.2.1 GSolid Waste Management Report

3.6.3.1 GHazardous Waste/Debris

Management

1.5.2 GRegulatory Notifications

3.6.2.1 GSales Documentation

3.6.2.1Contractor Certification

3.2.1.5As-Built Topographic Survey

01 58 00 SD-02 Shop Drawings

1.3.1 GSign Legend Orders

01 74 19.00 37 SD-11 Closeout Submittals

1.5Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 105 PAGES

01 78 00.00 37 SD-03 Product Data

1.3.1.2Project Execution Plan (PXP)

1.3.2As-Built Record of Equipment and Materials

1.7.1Warranty Management Plan

1.3.1As-Built BIM Model

1.7.5Warranty Tags

1.10Final Cleaning

1.4Spare Parts Data

SD-08 Manufacturer’s Instructions

1.5Preventative Maintenance

1.5Condition Monitoring (Predictive

Testing)

1.5Inspection

1.7.1Instructions

SD-10 Operation and Maintenance

Data

1.9 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals

1.3.1Record Drawings

1.6 G ROCertification of EPA and USDA

Designated Items

1.11 G ROForm DD1354

1.11 G ROChecklist for Form DD1354

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 105 PAGES

01 78 23 SD-10 Operation and Maintenance

Data

1.3 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

01 78 24.00 10 SD-01 Preconstruction Submittals

1.4.1Facility Data Project Execution

Plan

SD-10 Operation and Maintenance

Data

3.1 GFacility Data Workbook, Construction Progress

3.1 GFacility Document Set, Construction Progress

SD-11 Closeout Submittals

3.2 GFacility Data Workbook, Construction Final

1.4.3 GFacility Document Set, Construction Final

3.2 GFacility Document Set, Construction Final

01 91 00.00 37 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 105 PAGES

01 91 00.00 37 3.3PVT forms

3.3PVT forms

CxA

3.8.1Control Drawings

3.11.2Control Drawings

3.8.1Equipment submittal

SD-06 Test Reports

3.8 G ROFilled out functional test

readiness forms

3.1.3 G ROCompleted PFT checklists

3.1.4.1 G ROCompleted startup checklists

3.3 G CxACompleted controls point to point

and PVT checkout

3.8.4Completed FPT forms

CxA

3.5Nonconformance and Approval in

PFT Checklists, Startup, Point to

Point and TAB

SD-07 Certificates

3.2Calibration documentation

CxA

3.2Calibration certification

SD-08 Manufacturer’s Instructions

1.10Startup and Checkout Plan

CxA

1.10Checkout Forms

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 105 PAGES

01 91 00.00 37 1.10Test Procedures

SD-10 Operation and Maintenance

Data

3.11.1 G ROTraining Plan

3.11.3Training Documentation

CxA

3.11.4Training Verification

SD-11 Closeout Submittals

1.11.1 G ROFinal Cx Report

1.11.2 GCurrent Facility Requirements

and O&M Plan

3.9.1Deficiency Report and Resolution

Record

3.9.4Deficiency Report and Resolution

Record

CxA

03 11 13.00 10 SD-02 Shop Drawings

2.2.1Formwork

3.1.1Formwork

2.2.1Form Removal Schedule

SD-03 Product Data

2.2Form Materials

Part 2 SRecycled Content Products

SD-04 Samples

1.3Sample Panels

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 105 PAGES

03 11 13.00 10 2.1Calculations

SD-06 Test Reports

3.2Inspection

03 15 00.00 10 SD-02 Shop Drawings

2.4Waterstops

SD-03 Product Data

2.2Preformed Expansion Joint Filler

2.3Sealant

2.4Waterstops

SD-07 Certificates

2.2Preformed Expansion Joint Filler

2.3Sealant

2.4Waterstops

03 20 00.00 10 SD-02 Shop Drawings

3.1 GReinforcement

SD-03 Product Data

2.3 GReinforcing Steel

Part 2 SRecycled Content Products

SD-06 Test Reports

2.7 GTests, Inspections, and

Verifications

SD-07 Certificates

2.3Reinforcing Steel

1.3.1Qualified Welders

03 30 00.00 10 SD-01 Preconstruction Submittals

1.4.2 GQuality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 105 PAGES

03 30 00.00 10 1.4.1 GLaboratory Accreditation

3.7.5.6 GSampling Plan

SD-03 Product Data

Part 2 SRecycled Content Products

2.2Cementitious Materials

2.9Vapor Retarder

2.1.5Floor Finish

2.4Chemical Admixtures

SD-04 Samples

2.4.5Surface Retarder

SD-05 Design Data

2.1.1 GMixture Proportions

SD-06 Test Reports

2.1.1 GMixture Proportions

3.7 GTesting and Inspection for CQC

2.2.3Fly Ash

2.2.6Ground Granulated Blast-Furnace

(GGBF) Slag

2.3Aggregates

3.7.5.1Air Content

3.7.5.3Slump

3.7.5.6Compressive Strength

2.5Water

SD-07 Certificates

1.4Contractor Quality Control personnel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 105 PAGES

03 30 00.00 10 3.2.1Ready-Mix Plant

03 35 00.00 10 SD-03 Product Data

Part 2 SRecycled Content Products

03 39 00.00 10 SD-03 Product Data

2.1Curing Materials

SD-06 Test Reports

3.2Testing and Inspection for CQC

SD-08 Manufacturer’s Instructions

2.1Curing Compound

03 45 00 SD-01 Preconstruction Submittals

1.11.5Pre-Installation Meeting

SD-02 Shop Drawings

1.11.1 GPrecast Drawings

SD-03 Product Data

2.3 GCast-In Embedded Items And

Connectors

2.3.2 GConnection Devices

2.2.6Admixtures

2.5Gasket

2.6Bearing Pads

Part 2 SRecycled Content Products

SD-04 Samples

1.11.2 GConcrete Wall Panel Surface

Finish

1.11.4 GMock-up

1.11.2 GFull Size Sample Wall Panel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 105 PAGES

03 45 00 SD-05 Design Data

1.5.4 GDesign Calculations

2.1.1 GContractor-Furnished Mix Design

2.4.9 GRepair of Surface Defects

1.5.5 GThermal Calculations

SD-06 Test Reports

1.10.2 GStrength Tests

1.10.2Slump

1.10.2Air Content

1.10.1Test for Concrete Materials

2.2.7Water

3.6.4Testing Precast Units for Strength

SD-07 Certificates

1.4Manufacturer's Qualifications

1.8.1Fabricator Quality Certifications

1.9Erector Certification

SD-08 Manufacturer’s Instructions

3.3 GInstallation

3.8 GCleaning

SD-11 Closeout Submittals

1.11.3 GBatch Ticket Information

2.2.1 SRecycled Content for Fly Ash and

Pozzolan

2.2.1 SRecycled Content for Ground Iron

Blast-Furnace Slag

2.2.1 SRecycled Content for Silica Fume

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 105 PAGES

04 20 00 SD-02 Shop Drawings

3.3.3.1 GCut CMU

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2.2.1 GCement

2.4.1.1 GCementitious Materials

Part 2 SRecycled Content Products

Part 2 SRegional Products

SD-04 Samples

1.3.1.1 GMock-Up Panel

2.2.2.2 GConcrete Masonry Units (CMU)

2.4.1.3 GAdmixtures for Masonry Mortar

2.6.2 GAnchors, Ties, and Bar

Positioners

2.6.3 GJoint Reinforcement

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

2.2.2.3Fire-Rated Concrete Masonry

Units

3.2.4 GBracing Calculations

SD-06 Test Reports

2.2.2.3Fire-Rated Concrete Masonry

Units

3.6.1.1Prism Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 105 PAGES

04 20 00 SD-07 Certificates

1.3.2Special Masonry Inspector

Qualifications

2.2.2.2Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.2.2 SRecycled Content

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 105 PAGES

05 12 00 2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.3Tension Control Bolts

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

2.2.3 SRecycled Content for Steel Pipe

SD-05 Design Data

1.4.3 GDesign Calculations for Steel

Connections

1.4.2 GShoring and Temporary Bracing

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3AISC Structural Steel Fabricator

Quality Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 105 PAGES

05 12 00 1.3AISC Structural Steel Erector

Quality Certification

1.4.4.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.1.4Galvanizing Repair Paint

2.2.17Mechanical Fasteners

2.1.4Touch-Up Paint

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

2.1 SRecycled Content of Steel

Products

SD-04 Samples

2.1.1Metal Roof Deck Units

2.2.4Flexible Closure Strips

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 105 PAGES

05 30 00 1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Wind Storm Resistance

1.3.1Manufacturer's Certificates

2.2.12Stud Manufacture's Certification

2.2.12Stud Manufacture's Test Reports

05 40 00 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists

2.1 SRecycled Content of Steel

Products

SD-05 Design Data

1.6.2 GMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.1.1Welds

05 50 13 SD-02 Shop Drawings

2.4Floor Gratings

2.4 GRoof Walkways

2.5Bollards/Pipe Guards

2.6 GAngles and Plates

SD-03 Product Data

2.4Floor Gratings

2.1 SRecycled Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 105 PAGES

05 50 13 2.1 GCertificates of Compliance

05 51 00 SD-02 Shop Drawings

2.1Iron and Steel Hardware

2.1Steel Shapes, Plates, Bars, and

Strips

2.2.1 GMetal Stair System

SD-03 Product Data

2.4.1 GStructural-Steel Plates, Shapes, and Bars

2.4.2 GStructural-Steel Tubing

2.4.5 GHot-Rolled Carbon Steel Sheets

and Strips

2.4.4 GCold-Finished Steel Bars

2.4.3 GHot-Rolled Carbon Steel Bars

2.4.6 GCold-Rolled Carbon Steel Sheets

2.4.7 GGalvanized Carbon Steel Sheets

2.4.8 GCold-Drawn Steel Tubing

2.4.9 GGray Iron Castings

2.4.10 GMalleable Iron Castings

2.3.3Masonry Anchorage Devices

2.2.4Protective Coating

2.2.2Steel Pan Stairs

2.3.1 GSteel Stairs

Part 2 SRecycled Content Products

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 105 PAGES

05 51 00 2.1 GDesign Calculations for Steel Pan

Stair System

SD-07 Certificates

1.3.1 GWelding Procedures

1.3.1 GWelder Qualification

SD-08 Manufacturer’s Instructions

2.2.4Protective Coating

2.3.3Masonry Anchorage Devices

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

Part 2 SRecycled Content Products

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1Masonry Anchorage Devices

2.1.2Protective Coating

2.2.3Steel Railings and Handrails

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 105 PAGES

05 52 00 1.2.1Anchorage and Fastening

Systems

Part 2 SRecycled Content Products

SD-07 Certificates

1.4.1Welding Procedures

1.4.2Welder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 10 00 SD-02 Shop Drawings

2.2.1Nailing strips and Nailers

SD-03 Product Data

1.8Fire-retardant Treatment

2.3Oriented Strand Board

2.4.2Adhesives

SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

1.9.1Certificates of Grade

2.1.1 SCertified Sustainably Harvested

Virgin Lumber

2.2.1 SCertified Sustainably Harvested

Framing Lumber

2.3.1.1 SCertified Sustainably Harvested

Plywood Wall Sheathing

2.3.2.1 SCertified Sustainably Harvested

Plywood for Other Uses

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 105 PAGES

06 10 00 1.7Preservative Treatment

2.4.2 SIndoor Air Quality for Aerosol

Adhesives

2.4.2 SIndoor Air Quality for Non-aerosol

Adhesives

06 20 00 SD-02 Shop Drawings

1.3Detail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.1Wood Products

Engineered

1.4Treated Wood Products

2.5Hardware and Accessories

SD-04 Samples

1.5Samples

SD-07 Certificates

1.7.1.1Certificates of Grade

2.1.3 SCertified Sustainably Harvested

Wood for Trim and Frames

2.1.4 SCertified Sustainably Harvested

Softwood Plywood

2.1.5 SCertified Sustainably Harvested

Hardwood Plywood

2.1.5 SIndoor Air Quality for Hardwood

Plywood

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 105 PAGES

06 20 00 2.1.6 SIndoor Air Quality for MDF and

Particleboard

2.6.1.2 SIndoor Air Quality for Non-aerosol

Adhesives

2.6.1.2 SIndoor Air Quality for Aerosol

Adhesives

06 41 16.00 10 SD-02 Shop Drawings

1.5.2Shop Drawings

2.9Shop Drawings

3.1Installation

SD-03 Product Data

2.1Wood Materials

2.9.8.3Finish Schedule

SD-04 Samples

2.3 GPlastic Laminates;

2.6Cabinet Hardware

SD-07 Certificates

1.5Quality Assurance

3.1Laminate Clad Casework

SD-11 Closeout Submittals

1.3LEED Documentation

06 61 16 SD-02 Shop Drawings

1.5.2 GDetail Drawings

1.5.2 GMock-ups

3.1Installation

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 105 PAGES

06 61 16 2.1Solid Polymer Material

1.5.1Qualifications

2.3Fabrications

2.2.4 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 GMaterial

SD-06 Test Reports

2.1Solid Polymer Material

SD-07 Certificates

2.3Fabrications

1.5.1Qualifications

2.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

3.2Clean-up

07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-05 Design Data

3.2 GEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 105 PAGES

07 05 23 1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 GPressure Test Procedures

3.5.8 GAir Leakage Test Report

3.6.5 GDiagnostic Test Report

07 11 13 SD-07 Certificates

1.3Materials

07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.1.2 SRecycled Content for Insulation

Materials

2.2Accessories

SD-07 Certificates

2.1.4 SIndoor Air Quality for Insulation

Materials

2.2.1 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.1.1Insulation

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

SD-03 Product Data

2.1 GInsulation

1.4 GCover Board

2.3 GFasteners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 105 PAGES

07 22 00 2.1.2 SRecycled Content For Insulation

SD-07 Certificates

1.6 GInstaller Qualifications

2.1.3 SIndoor Air Quality For Insulation

SD-08 Manufacturer’s Instructions

2.3 GFasteners

2.1 GInsulation

07 27 10.00 10 SD-02 Shop Drawings

1.9 GAir Barrier System Design

Drawings

SD-06 Test Reports

1.8 G DODesign Review Report

3.1.2 G ROTesting and Inspection

SD-07 Certificates

1.7 G ROAir Barrier Inspector

07 27 26 SD-01 Preconstruction Submittals

1.9.1Qualifications of Manufacturer

1.9.2Qualifications of Installer

SD-02 Shop Drawings

1.4 GFluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.4 GFluid-Applied Membrane Air

Barrier

2.2 GPrimers, Adhesives, and Mastics

2.5 GReinforcement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 105 PAGES

07 27 26 1.4.2Safety Data Sheets

SD-06 Test Reports

1.6Capillary Moisture Test

1.4.3Field Peel Adhesion Test

1.4.3Flame Propagation of Wall

Assemblies

1.4.3Flame Spread and Smoke

Developed Index Ratings

3.4.1Site Inspections

SD-07 Certificates

1.4Fluid-Applied Membrane Air

Barrier

1.9.1Qualifications of Manufacturer

1.9.2Qualifications of Installer

SD-08 Manufacturer’s Instructions

1.4Fluid-Applied Membrane Air

Barrier

2.2Primers, Adhesives, and Mastics

07 42 13 SD-01 Preconstruction Submittals

1.5.3Qualification of Manufacturer

1.5.4Qualification of Installation

Contractor

1.8 GWarranty

SD-02 Shop Drawings

1.5.1.1Installation Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 105 PAGES

07 42 13 2.2Recycled Content;

2.3.1 GWall Panels

2.3.2Factory Color Finish

1.5.5Closure Materials

2.6.3.4Pressure Sensitive Tape

2.6.3.1Sealants and Caulking

1.5.5Accessories

2.6Accessories

SD-04 Samples

2.3.1 GWall Panels

1.5.3.1 GFasteners

2.6.2Metal Closure Strips

SD-05 Design Data

1.5.1.2 GWind load design analysis

SD-06 Test Reports

1.3.2Wind Load Tests

2.3.2.6Coating

2.3.2.6Chalking

SD-07 Certificates

1.5.3.1Coil Stock

1.5.3.1Fasteners

SD-08 Manufacturer’s Instructions

3.3Installation

SD-09 Manufacturer’s Field

Reports

3.8.1Manufacturer's Field Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 105 PAGES

07 42 13 SD-11 Closeout Submittals

1.8Warranty

1.5.6 GMaintenance Instructions

1.8.120 year 'No Dollar Limit' warranty for labor and material

07 52 00 SD-02 Shop Drawings

1.4.6Roof plan

SD-03 Product Data

2.2 GModified Bitumen Sheets

2.1.1 SHeat Island Reduction

2.5Primer

2.6Modified Bitumen Roof Cement

2.9Pre-Manufactured Accessories

2.8Fasteners And Plates

1.9Warranty

SD-05 Design Data

1.4.5 GWind Uplift Calculations;

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

1.4.3Qualification of Engineer of

Record

1.4.5Wind Uplift Resistance

1.4.4Fire Resistance

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 105 PAGES

07 52 00 3.3.4Modified Bitumen Membrane

Application

3.3.5Flashing

3.2.2.3Torches

2.5Primer

2.8.1Fasteners

1.6Cold Weather Installation

SD-11 Closeout Submittals

1.9 GWarranty;

3.8Information Card

3.7Instructions To Government

Personnel

1.9 GSubmit 20 year 'No-Dollar-Limit'

warranty for labor and materials;

07 60 00 SD-02 Shop Drawings

2.2.1Exposed Sheet Metal

3.1.12Gutters

3.1.13Downspouts

2.2.1Gravel Stops and Fasciae

3.1.15Splash Pans

3.1.14Flashing for Roof Drains

3.1.9Base Flashing

3.1.10Counterflashing

3.1.17Flashing at Roof Penetrations and Equipment Supports

3.1.18Copings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 105 PAGES

07 60 00 2.1 SRecycled Content

SD-04 Samples

1.4.2 GFinish Samples;

SD-08 Manufacturer’s Instructions

1.4.3Instructions for Installation

3.5Quality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3Cleaning and Maintenance

07 84 00 SD-02 Shop Drawings

2.1Firestopping System

SD-03 Product Data

2.2Firestopping Materials

SD-06 Test Reports

3.3Inspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1Installer Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

2.2Primers

2.3Bond Breakers

2.4Backstops

3.1Field Adhesion

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 105 PAGES

07 92 00 2.1.1 SIndoor Air Quality For Interior

Sealants

2.1.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.1.4 SIndoor Air Quality For Interior

Acoustical Sealants

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.1 SRecycled Content for Steel Door

Product

2.5 GFrames

2.5 GFrames

2.5 SRecycled Content for Steel Frame

Product

2.3Accessories

SD-03 Product Data

2.1 GDoors

2.5 GFrames

2.3Accessories

08 14 00 SD-02 Shop Drawings

2.1 GDoors

SD-03 Product Data

2.1 GDoors

2.1.1.1 SRecycled Content for Door Cores

2.2Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 105 PAGES

08 14 00 2.3.7Water-resistant Sealer

1.5Warranty

2.1.2 GSound Transmission Class

Rating

2.1.3 GFire Resistance Rating

SD-04 Samples

2.1Doors

2.3.6.2 GDoor Finish Colors;

SD-06 Test Reports

2.4Cycle-Slam

2.4Hinge Loading Resistance

SD-07 Certificates

1.3.1Certificates of Grade

2.1.1 SCertified Sustainably Harvested

Flush Wood Doors

2.1.1.1 SIndoor Air Quality for

Particleboard and Agrifiber Door

Cores

SD-11 Closeout Submittals

1.5Warranty

08 31 00 SD-02 Shop Drawings

1.3 GAccess Doors And Panels

SD-03 Product Data

1.3 GAccess Doors And Panels

1.3.2Hardware

2.2.8Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 105 PAGES

08 31 00 2.1 SRecycled Content

SD-04 Samples

2.5 GFinishes;

08 33 23 SD-02 Shop Drawings

2.2.1Overhead Coiling Doors

2.2.3Counterbalancing Mechanism

2.2.4Manual Door Operators

2.2.5Electric Door Operators

2.2.1.4Bottom Bars

2.1.1.1Guides

Mounting Brackets

Overhead Drum

2.2.2.3Hood

2.1.1.1Installation Drawings

SD-03 Product Data

2.2.1Overhead Coiling Doors

2.2.2Hardware

2.2.3Counterbalancing Mechanism

2.2.4Manual Door Operators

2.2.5Electric Door Operators

2.2.6Fire-Rated Door Assembly

SD-05 Design Data

2.2.1Overhead Coiling Doors

2.2.2Hardware

2.2.3Counterbalancing Mechanism

2.2.4Manual Door Operators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 105 PAGES

08 33 23 2.2.5Electric Door Operators

1.3Fire-Rated Door

SD-10 Operation and Maintenance

Data

3.3.2Operation and Maintenance

Manuals

3.3.2Materials

3.3.2Devices

3.3.2Procedures

3.3.2Manufacturer's Brochures

3.3.2Parts Lists

SD-11 Closeout Submittals

3.3.1Warranty

08 34 59 SD-02 Shop Drawings

2.1 GVault Door Unit

2.3 GDay Gate

SD-03 Product Data

2.2Vault Door and Frame

SD-07 Certificates

2.2Vault Door and Frame

SD-08 Manufacturer’s Instructions

3.1Installation

SD-11 Closeout Submittals

1.2LEED Documentation

08 34 73 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 105 PAGES

08 34 73 2.1 GHollow Metal Sound Retardant

Doors

2.1 GWood Sound Retardant Doors

2.1 GDoor Frames

SD-03 Product Data

2.1 GHollow Metal Sound Retardant

Doors

2.1 GWood Sound Retardant Doors

2.1 GDoor Frames

2.1 GDoor Hardware

2.1Intumescent Seals and Gasketing

2.1Thresholds

2.1Astragals

SD-06 Test Reports

2.4.4Wind Loading Tests

2.4.4Water Leakage Tests

2.4.4 GAcoustical Tests

2.4.4Air Infiltration Tests

2.4.4Positive Pressure Tests

SD-07 Certificates

2.1Hollow Metal Sound Retardant

Doors

2.1Wood Sound Retardant Doors

2.1Door Frames

2.1Door Hardware

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 105 PAGES

08 34 73 1.3.1.2Intumescent Seals,Gasketing and

Door Bottoms

2.1Thresholds

2.1Astragals

08 51 23 SD-02 Shop Drawings

2.2Windows

SD-03 Product Data

2.1.1Steel Framing Materials

2.1.1 SRecycled Content for Steel

Framing Materials

SD-04 Samples

2.2Windows

SD-06 Test Reports

2.1.1Acoustical Tests

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.7 GKeying System

SD-03 Product Data

2.3 GHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 105 PAGES

08 71 00 SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

2.3Glazing

2.2.2Glazing Accessories

SD-04 Samples

2.3 GGlazing;

2.2.1.1Sealant

SD-08 Manufacturer’s Instructions

2.2Setting and Sealing Materials

3.2Glass Setting

08 91 00 SD-02 Shop Drawings

1.4 GWall louvers;

1.5 GWall louvers;

SD-03 Product Data

2.2Metal Wall Louvers

SD-04 Samples

1.4 GWall louvers;

1.5 GWall louvers;

09 22 00 SD-02 Shop Drawings

2.1Metal Support Systems

SD-03 Product Data

2.1Metal Support Systems

2.1 SRecycled Content for Metal

Support Systems

09 29 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 105 PAGES

09 29 00 2.1.6Cementitious Backer Units

2.1.3Glass Mat Water-Resistant

Gypsum Tile Backing Board

2.1.2Water-Resistant Gypsum Backing

Board

2.1.4Glass Mat Covered or Reinforced

Gypsum Sheathing

2.1.4.1Glass Mat Covered or Reinforced

Gypsum Sheathing Sealant

2.1.5Abuse Resistant Gypsum Board

2.1.11Accessories

2.1.1Gypsum Board

2.1.1 SRecycled Content for Gypsum

Board

2.1.7 SVOC Content of Joint Compound

SD-07 Certificates

2.1Asbestos Free Materials

2.1.1 SIndoor Air Quality for Gypsum

Board

2.1.9 SIndoor Air Quality for Non-aerosol

Adhesives

2.1.9 SIndoor Air Quality for Aerosol

Adhesives

09 30 10 SD-02 Shop Drawings

3.2Detail Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 105 PAGES

09 30 10 2.1.1 GPorcelain Tile

2.1.1 SRecycled Content for Porcelain

Tile

2.2Mortar, Grout, and Adhesive

SD-04 Samples

2.1 GTile

2.1.2Accessories

2.2.2 GGrout

SD-07 Certificates

2.2 SIndoor Air Quality for Adhesives

2.2.3 SIndoor Air Quality for Sealants

SD-08 Manufacturer’s Instructions

3.4Maintenance Instructions

SD-10 Operation and Maintenance

Data

3.2Installation

09 51 00 SD-02 Shop Drawings

2.1Approved Detail Drawings

SD-03 Product Data

2.2 GAcoustical Units

2.2.3 GMetal Acoustic Baffles

2.2.4 GWood Panel Ceiling System

2.2.2.1 SRecycled Content for Type XII

Ceiling Tiles

2.3 SRecycled Content for Suspension

Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 105 PAGES

09 51 00 SD-04 Samples

2.2 GAcoustical Units

2.2.3 GMetal Acoustic Baffles

2.2.4 GWood Panel Ceiling System

SD-06 Test Reports

2.1.1 GFire Resistive Ceilings

2.1.2Ceiling Attenuation Class and

Test

SD-07 Certificates

2.2.2.1 SIndoor Air Quality for Type XII

Ceiling Tiles

2.9 SIndoor Air Quality for Sealants

09 65 00 SD-02 Shop Drawings

2.9Resilient Flooring and

Accessories

SD-03 Product Data

2.9 GResilient Flooring and

Accessories

2.5Adhesives

SD-04 Samples

2.9 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3Moisture, Alkalinity and Bond

Tests

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 105 PAGES

09 65 00 SIndoor Air Quality for Luxury Vinyl

Tile

2.2 SIndoor Air Quality for Wall Base

2.5 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2Surface Preparation

3.1Installation

SD-10 Operation and Maintenance

Data

2.9Resilient Flooring and

Accessories

09 67 23.13 SD-02 Shop Drawings

2.1Installation Drawings

SD-03 Product Data

GEpoxy Flooring Systems

SD-04 Samples

1.4.2 GHardboard Mounted Epoxy

Flooring

3.1.4 GFloor Topping;

SD-07 Certificates

1.4.1Listing of Product Installations

1.4Referenced Standards

Certificates

SD-11 Closeout Submittals

1.5Warranty

09 68 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 105 PAGES

09 68 00 3.4Installation Drawings

SD-03 Product Data

2.1 GCarpet

2.1.1 SRecycled Content for Carpeting

2.4Moldings

2.3 SIndoor Air Quality for Aerosol

Adhesives

2.3 SIndoor Air…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .