01 33 00.00 37 Submittal Register.pdf
PDF 1 MB Posted
- Attached to
- PN 92594 SOF Operations Support Facility Federal contract opportunity
- Solicitation number
- W912PM
About this file
This request for proposal solicits construction and design services for an Operations Support Facility at Fort Bragg, North Carolina. Key requirements include construction of a 36,000 square foot facility to sensitive compartmented information standards, with spaces for command functions, life support, offices, training areas, medical facilities, an auditorium and more. Supporting site work includes utilities, parking, drives, drainage and landscaping. Comprehensive interior design and furnishings are required. Sustainability, energy efficiency, security systems, and accessibility standards must be met. The 540 calendar day period of performance concludes with a firm-fixed price contract awarded to the successful bidder.
View the file
Other files for this federal contract opportunity
Show all 50
PN 92594 SOF Operations Support Facility has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 105 PAGES
FORT BRAGG SOF
01 10 00.10 38 SD-01 Preconstruction Submittals
1.10List of Subcontractors
1.10Certificate of Insurance
1.7 GSubmittal Register
1.10 GPreliminary Submittal Register
1.7 GDeviations from Plans and
Specifications
1.7 GUpdated or Corrected Listings
1.10 GQuality Control Plan
1.13 GFinish Presentation Boards
1.16 GDetailed Qualifications of
Individual
1.16 GOriginal Cross Sections
1.16 GFinal As-Built Cross Sections
1.18.1 GRequest for Road Closure
1.23FAA Approvals
1.24Fort Bragg IGIS-Non-Disclosure
Agreement
1.25Environmental Training Log
SD-03 Product Data
1.7 GProgress Schedule
SD-07 Certificates
1.10Completion of Corps CQC
Course
1.10Letter Appointing Superintendent
1.8Manufacturer's Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 105 PAGES
01 10 00.10 38 1.9 Gtesting laboratory
1.9 Gtesting laboratory
1.9Proof of Compliance
01 11 00 SD-01 Preconstruction Submittals
1.4.2Utility Outage Requests
1.4.2Utility Connection Requests
1.5.1Excavation Permit
1.4.1Hot Work Permit
01 14 00 SD-01 Preconstruction Submittals
1.4.1.1 GContractor and Subcontractor
Contract Personnel List
1.5.1Security Briefing Packet
1.4.6 GWork Outside Regular Hours
Request
1.5.1.1CSO Appointment Letter
1.5.2 GApproved Consolidated Access
Roster
1.5.3Proof of Acceptance
01 20 00.00 20 SD-01 Preconstruction Submittals
1.3 GEarned Value Report
01 32 01.00 37 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00.00 37 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 105 PAGES
01 33 00.00 37 1.9 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 G SPreliminary High Performance
and Sustainable Building Checklist
1.4.1 G SSustainability Action Plan
1.5.3.1 G SPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.3.1 G SFinal High Performance and
Sustainable Building Checklist
1.5.3.1 G SFinal Sustainability eNotebook
1.5.3.1 G SAmended Final Sustainability
eNotebook
1.5.3.1 G SAmended Final High
Performance and Sustainable
Building Checklist
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 105 PAGES
01 35 26 1.7.2.3 GCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
3.2Energized Work Permit
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
01 45 35 SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
2.1Steel Truss Plant
2.1Certified Plant
2.1Certificate of Compliance
1.5 GSpecial Inspector
SD-11 Closeout Submittals
3.1.2 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 105 PAGES
01 50 00 SD-03 Product Data
1.4 GBackflow Preventers
SD-06 Test Reports
2.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
3.4.1 GClean Air Act (CAA) Permits
3.4.2 GOil or Dual-Fuel Boilers and
Furnaces Product Data
1.10 GSolid Waste Management Permit
1.5.2Regulatory Notifications
1.6 GEnvironmental Protection Plan
3.2.1.2 GStormwater Notice of Intent
1.6.9.1 GDirt and Dust Control Plan
1.5.5 GEmployee Training Records
1.5.4 GEnvironmental Manager
Qualifications
3.4.1Air Program Manager
3.4.1Air Permits
SD-06 Test Reports
3.2.1.3Inspection Reports
3.6.2.1 GSolid Waste Management Report
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 105 PAGES
01 57 19 1.5.5 GEmployee Training Records
1.5.5.1Certificate of Competency
1.5.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.2.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 GStormwater Notice of Termination
3.6.1 GWaste Determination
Documentation
3.6.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
1.5.5 GAssembled Employee Training
Records
1.10 GSolid Waste Management Permit
3.6.2.1 GSolid Waste Management Report
3.6.3.1 GHazardous Waste/Debris
Management
1.5.2 GRegulatory Notifications
3.6.2.1 GSales Documentation
3.6.2.1Contractor Certification
3.2.1.5As-Built Topographic Survey
01 58 00 SD-02 Shop Drawings
1.3.1 GSign Legend Orders
01 74 19.00 37 SD-11 Closeout Submittals
1.5Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 105 PAGES
01 78 00.00 37 SD-03 Product Data
1.3.1.2Project Execution Plan (PXP)
1.3.2As-Built Record of Equipment and Materials
1.7.1Warranty Management Plan
1.3.1As-Built BIM Model
1.7.5Warranty Tags
1.10Final Cleaning
1.4Spare Parts Data
SD-08 Manufacturer’s Instructions
1.5Preventative Maintenance
1.5Condition Monitoring (Predictive
Testing)
1.5Inspection
1.7.1Instructions
SD-10 Operation and Maintenance
Data
1.9 G ROOperation and Maintenance
Manuals
SD-11 Closeout Submittals
1.3.1Record Drawings
1.6 G ROCertification of EPA and USDA
Designated Items
1.11 G ROForm DD1354
1.11 G ROChecklist for Form DD1354
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 105 PAGES
01 78 23 SD-10 Operation and Maintenance
Data
1.3 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 78 24.00 10 SD-01 Preconstruction Submittals
1.4.1Facility Data Project Execution
Plan
SD-10 Operation and Maintenance
Data
3.1 GFacility Data Workbook, Construction Progress
3.1 GFacility Document Set, Construction Progress
SD-11 Closeout Submittals
3.2 GFacility Data Workbook, Construction Final
1.4.3 GFacility Document Set, Construction Final
3.2 GFacility Document Set, Construction Final
01 91 00.00 37 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 105 PAGES
01 91 00.00 37 3.3PVT forms
3.3PVT forms
CxA
3.8.1Control Drawings
3.11.2Control Drawings
3.8.1Equipment submittal
SD-06 Test Reports
3.8 G ROFilled out functional test
readiness forms
3.1.3 G ROCompleted PFT checklists
3.1.4.1 G ROCompleted startup checklists
3.3 G CxACompleted controls point to point
and PVT checkout
3.8.4Completed FPT forms
CxA
3.5Nonconformance and Approval in
PFT Checklists, Startup, Point to
Point and TAB
SD-07 Certificates
3.2Calibration documentation
CxA
3.2Calibration certification
SD-08 Manufacturer’s Instructions
1.10Startup and Checkout Plan
CxA
1.10Checkout Forms
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 105 PAGES
01 91 00.00 37 1.10Test Procedures
SD-10 Operation and Maintenance
Data
3.11.1 G ROTraining Plan
3.11.3Training Documentation
CxA
3.11.4Training Verification
SD-11 Closeout Submittals
1.11.1 G ROFinal Cx Report
1.11.2 GCurrent Facility Requirements
and O&M Plan
3.9.1Deficiency Report and Resolution
Record
3.9.4Deficiency Report and Resolution
Record
CxA
03 11 13.00 10 SD-02 Shop Drawings
2.2.1Formwork
3.1.1Formwork
2.2.1Form Removal Schedule
SD-03 Product Data
2.2Form Materials
Part 2 SRecycled Content Products
SD-04 Samples
1.3Sample Panels
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 105 PAGES
03 11 13.00 10 2.1Calculations
SD-06 Test Reports
3.2Inspection
03 15 00.00 10 SD-02 Shop Drawings
2.4Waterstops
SD-03 Product Data
2.2Preformed Expansion Joint Filler
2.3Sealant
2.4Waterstops
SD-07 Certificates
2.2Preformed Expansion Joint Filler
2.3Sealant
2.4Waterstops
03 20 00.00 10 SD-02 Shop Drawings
3.1 GReinforcement
SD-03 Product Data
2.3 GReinforcing Steel
Part 2 SRecycled Content Products
SD-06 Test Reports
2.7 GTests, Inspections, and
Verifications
SD-07 Certificates
2.3Reinforcing Steel
1.3.1Qualified Welders
03 30 00.00 10 SD-01 Preconstruction Submittals
1.4.2 GQuality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 105 PAGES
03 30 00.00 10 1.4.1 GLaboratory Accreditation
3.7.5.6 GSampling Plan
SD-03 Product Data
Part 2 SRecycled Content Products
2.2Cementitious Materials
2.9Vapor Retarder
2.1.5Floor Finish
2.4Chemical Admixtures
SD-04 Samples
2.4.5Surface Retarder
SD-05 Design Data
2.1.1 GMixture Proportions
SD-06 Test Reports
2.1.1 GMixture Proportions
3.7 GTesting and Inspection for CQC
2.2.3Fly Ash
2.2.6Ground Granulated Blast-Furnace
(GGBF) Slag
2.3Aggregates
3.7.5.1Air Content
3.7.5.3Slump
3.7.5.6Compressive Strength
2.5Water
SD-07 Certificates
1.4Contractor Quality Control personnel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 105 PAGES
03 30 00.00 10 3.2.1Ready-Mix Plant
03 35 00.00 10 SD-03 Product Data
Part 2 SRecycled Content Products
03 39 00.00 10 SD-03 Product Data
2.1Curing Materials
SD-06 Test Reports
3.2Testing and Inspection for CQC
SD-08 Manufacturer’s Instructions
2.1Curing Compound
03 45 00 SD-01 Preconstruction Submittals
1.11.5Pre-Installation Meeting
SD-02 Shop Drawings
1.11.1 GPrecast Drawings
SD-03 Product Data
2.3 GCast-In Embedded Items And
Connectors
2.3.2 GConnection Devices
2.2.6Admixtures
2.5Gasket
2.6Bearing Pads
Part 2 SRecycled Content Products
SD-04 Samples
1.11.2 GConcrete Wall Panel Surface
Finish
1.11.4 GMock-up
1.11.2 GFull Size Sample Wall Panel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 105 PAGES
03 45 00 SD-05 Design Data
1.5.4 GDesign Calculations
2.1.1 GContractor-Furnished Mix Design
2.4.9 GRepair of Surface Defects
1.5.5 GThermal Calculations
SD-06 Test Reports
1.10.2 GStrength Tests
1.10.2Slump
1.10.2Air Content
1.10.1Test for Concrete Materials
2.2.7Water
3.6.4Testing Precast Units for Strength
SD-07 Certificates
1.4Manufacturer's Qualifications
1.8.1Fabricator Quality Certifications
1.9Erector Certification
SD-08 Manufacturer’s Instructions
3.3 GInstallation
3.8 GCleaning
SD-11 Closeout Submittals
1.11.3 GBatch Ticket Information
2.2.1 SRecycled Content for Fly Ash and
Pozzolan
2.2.1 SRecycled Content for Ground Iron
Blast-Furnace Slag
2.2.1 SRecycled Content for Silica Fume
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 105 PAGES
04 20 00 SD-02 Shop Drawings
3.3.3.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2.2.1 GCement
2.4.1.1 GCementitious Materials
Part 2 SRecycled Content Products
Part 2 SRegional Products
SD-04 Samples
1.3.1.1 GMock-Up Panel
2.2.2.2 GConcrete Masonry Units (CMU)
2.4.1.3 GAdmixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
2.2.2.3Fire-Rated Concrete Masonry
Units
3.2.4 GBracing Calculations
SD-06 Test Reports
2.2.2.3Fire-Rated Concrete Masonry
Units
3.6.1.1Prism Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 105 PAGES
04 20 00 SD-07 Certificates
1.3.2Special Masonry Inspector
Qualifications
2.2.2.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.2.2 SRecycled Content
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 105 PAGES
05 12 00 2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.3Tension Control Bolts
2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
2.2.3 SRecycled Content for Steel Pipe
SD-05 Design Data
1.4.3 GDesign Calculations for Steel
Connections
1.4.2 GShoring and Temporary Bracing
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports
3.7.2.1Direct Tension Indicator Washer
Inspection Reports
3.7.3.1Bolt Testing Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.3AISC Structural Steel Fabricator
Quality Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 105 PAGES
05 12 00 1.3AISC Structural Steel Erector
Quality Certification
1.4.4.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.7.1.1Certified Welding Inspector
3.7.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.4Galvanizing Repair Paint
2.2.17Mechanical Fasteners
2.1.4Touch-Up Paint
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
2.1 SRecycled Content of Steel
Products
SD-04 Samples
2.1.1Metal Roof Deck Units
2.2.4Flexible Closure Strips
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 105 PAGES
05 30 00 1.3.3Welder Qualifications
1.3.3Welding Procedures
1.3.4.1Wind Storm Resistance
1.3.1Manufacturer's Certificates
2.2.12Stud Manufacture's Certification
2.2.12Stud Manufacture's Test Reports
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1 SRecycled Content of Steel
Products
SD-05 Design Data
1.6.2 GMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.1.1Welds
05 50 13 SD-02 Shop Drawings
2.4Floor Gratings
2.4 GRoof Walkways
2.5Bollards/Pipe Guards
2.6 GAngles and Plates
SD-03 Product Data
2.4Floor Gratings
2.1 SRecycled Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 105 PAGES
05 50 13 2.1 GCertificates of Compliance
05 51 00 SD-02 Shop Drawings
2.1Iron and Steel Hardware
2.1Steel Shapes, Plates, Bars, and
Strips
2.2.1 GMetal Stair System
SD-03 Product Data
2.4.1 GStructural-Steel Plates, Shapes, and Bars
2.4.2 GStructural-Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GCold-Drawn Steel Tubing
2.4.9 GGray Iron Castings
2.4.10 GMalleable Iron Castings
2.3.3Masonry Anchorage Devices
2.2.4Protective Coating
2.2.2Steel Pan Stairs
2.3.1 GSteel Stairs
Part 2 SRecycled Content Products
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 105 PAGES
05 51 00 2.1 GDesign Calculations for Steel Pan
Stair System
SD-07 Certificates
1.3.1 GWelding Procedures
1.3.1 GWelder Qualification
SD-08 Manufacturer’s Instructions
2.2.4Protective Coating
2.3.3Masonry Anchorage Devices
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
Part 2 SRecycled Content Products
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.2.1Masonry Anchorage Devices
2.1.2Protective Coating
2.2.3Steel Railings and Handrails
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 105 PAGES
05 52 00 1.2.1Anchorage and Fastening
Systems
Part 2 SRecycled Content Products
SD-07 Certificates
1.4.1Welding Procedures
1.4.2Welder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-02 Shop Drawings
2.2.1Nailing strips and Nailers
SD-03 Product Data
1.8Fire-retardant Treatment
2.3Oriented Strand Board
2.4.2Adhesives
SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
1.9.1Certificates of Grade
2.1.1 SCertified Sustainably Harvested
Virgin Lumber
2.2.1 SCertified Sustainably Harvested
Framing Lumber
2.3.1.1 SCertified Sustainably Harvested
Plywood Wall Sheathing
2.3.2.1 SCertified Sustainably Harvested
Plywood for Other Uses
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 105 PAGES
06 10 00 1.7Preservative Treatment
2.4.2 SIndoor Air Quality for Aerosol
Adhesives
2.4.2 SIndoor Air Quality for Non-aerosol
Adhesives
06 20 00 SD-02 Shop Drawings
1.3Detail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.1Wood Products
Engineered
1.4Treated Wood Products
2.5Hardware and Accessories
SD-04 Samples
1.5Samples
SD-07 Certificates
1.7.1.1Certificates of Grade
2.1.3 SCertified Sustainably Harvested
Wood for Trim and Frames
2.1.4 SCertified Sustainably Harvested
Softwood Plywood
2.1.5 SCertified Sustainably Harvested
Hardwood Plywood
2.1.5 SIndoor Air Quality for Hardwood
Plywood
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 105 PAGES
06 20 00 2.1.6 SIndoor Air Quality for MDF and
Particleboard
2.6.1.2 SIndoor Air Quality for Non-aerosol
Adhesives
2.6.1.2 SIndoor Air Quality for Aerosol
Adhesives
06 41 16.00 10 SD-02 Shop Drawings
1.5.2Shop Drawings
2.9Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
2.9.8.3Finish Schedule
SD-04 Samples
2.3 GPlastic Laminates;
2.6Cabinet Hardware
SD-07 Certificates
1.5Quality Assurance
3.1Laminate Clad Casework
SD-11 Closeout Submittals
1.3LEED Documentation
06 61 16 SD-02 Shop Drawings
1.5.2 GDetail Drawings
1.5.2 GMock-ups
3.1Installation
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 105 PAGES
06 61 16 2.1Solid Polymer Material
1.5.1Qualifications
2.3Fabrications
2.2.4 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 GMaterial
SD-06 Test Reports
2.1Solid Polymer Material
SD-07 Certificates
2.3Fabrications
1.5.1Qualifications
2.1 SIndoor Air Quality for solid
surface fabrication products
SD-10 Operation and Maintenance
Data
3.2Clean-up
07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
2.2 GThermal Imaging Camera
SD-05 Design Data
3.2 GEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 105 PAGES
07 05 23 1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 GPressure Test Procedures
3.5.8 GAir Leakage Test Report
3.6.5 GDiagnostic Test Report
07 11 13 SD-07 Certificates
1.3Materials
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.1.2 SRecycled Content for Insulation
Materials
2.2Accessories
SD-07 Certificates
2.1.4 SIndoor Air Quality for Insulation
Materials
2.2.1 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.1.1Insulation
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
SD-03 Product Data
2.1 GInsulation
1.4 GCover Board
2.3 GFasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 105 PAGES
07 22 00 2.1.2 SRecycled Content For Insulation
SD-07 Certificates
1.6 GInstaller Qualifications
2.1.3 SIndoor Air Quality For Insulation
SD-08 Manufacturer’s Instructions
2.3 GFasteners
2.1 GInsulation
07 27 10.00 10 SD-02 Shop Drawings
1.9 GAir Barrier System Design
Drawings
SD-06 Test Reports
1.8 G DODesign Review Report
3.1.2 G ROTesting and Inspection
SD-07 Certificates
1.7 G ROAir Barrier Inspector
07 27 26 SD-01 Preconstruction Submittals
1.9.1Qualifications of Manufacturer
1.9.2Qualifications of Installer
SD-02 Shop Drawings
1.4 GFluid-Applied Membrane Air
Barrier
SD-03 Product Data
1.4 GFluid-Applied Membrane Air
Barrier
2.2 GPrimers, Adhesives, and Mastics
2.5 GReinforcement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 105 PAGES
07 27 26 1.4.2Safety Data Sheets
SD-06 Test Reports
1.6Capillary Moisture Test
1.4.3Field Peel Adhesion Test
1.4.3Flame Propagation of Wall
Assemblies
1.4.3Flame Spread and Smoke
Developed Index Ratings
3.4.1Site Inspections
SD-07 Certificates
1.4Fluid-Applied Membrane Air
Barrier
1.9.1Qualifications of Manufacturer
1.9.2Qualifications of Installer
SD-08 Manufacturer’s Instructions
1.4Fluid-Applied Membrane Air
Barrier
2.2Primers, Adhesives, and Mastics
07 42 13 SD-01 Preconstruction Submittals
1.5.3Qualification of Manufacturer
1.5.4Qualification of Installation
Contractor
1.8 GWarranty
SD-02 Shop Drawings
1.5.1.1Installation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 105 PAGES
07 42 13 2.2Recycled Content;
2.3.1 GWall Panels
2.3.2Factory Color Finish
1.5.5Closure Materials
2.6.3.4Pressure Sensitive Tape
2.6.3.1Sealants and Caulking
1.5.5Accessories
2.6Accessories
SD-04 Samples
2.3.1 GWall Panels
1.5.3.1 GFasteners
2.6.2Metal Closure Strips
SD-05 Design Data
1.5.1.2 GWind load design analysis
SD-06 Test Reports
1.3.2Wind Load Tests
2.3.2.6Coating
2.3.2.6Chalking
SD-07 Certificates
1.5.3.1Coil Stock
1.5.3.1Fasteners
SD-08 Manufacturer’s Instructions
3.3Installation
SD-09 Manufacturer’s Field
Reports
3.8.1Manufacturer's Field Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 105 PAGES
07 42 13 SD-11 Closeout Submittals
1.8Warranty
1.5.6 GMaintenance Instructions
1.8.120 year 'No Dollar Limit' warranty for labor and material
07 52 00 SD-02 Shop Drawings
1.4.6Roof plan
SD-03 Product Data
2.2 GModified Bitumen Sheets
2.1.1 SHeat Island Reduction
2.5Primer
2.6Modified Bitumen Roof Cement
2.9Pre-Manufactured Accessories
2.8Fasteners And Plates
1.9Warranty
SD-05 Design Data
1.4.5 GWind Uplift Calculations;
SD-07 Certificates
1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
1.4.3Qualification of Engineer of
Record
1.4.5Wind Uplift Resistance
1.4.4Fire Resistance
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 105 PAGES
07 52 00 3.3.4Modified Bitumen Membrane
Application
3.3.5Flashing
3.2.2.3Torches
2.5Primer
2.8.1Fasteners
1.6Cold Weather Installation
SD-11 Closeout Submittals
1.9 GWarranty;
3.8Information Card
3.7Instructions To Government
Personnel
1.9 GSubmit 20 year 'No-Dollar-Limit'
warranty for labor and materials;
07 60 00 SD-02 Shop Drawings
2.2.1Exposed Sheet Metal
3.1.12Gutters
3.1.13Downspouts
2.2.1Gravel Stops and Fasciae
3.1.15Splash Pans
3.1.14Flashing for Roof Drains
3.1.9Base Flashing
3.1.10Counterflashing
3.1.17Flashing at Roof Penetrations and Equipment Supports
3.1.18Copings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 105 PAGES
07 60 00 2.1 SRecycled Content
SD-04 Samples
1.4.2 GFinish Samples;
SD-08 Manufacturer’s Instructions
1.4.3Instructions for Installation
3.5Quality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3Cleaning and Maintenance
07 84 00 SD-02 Shop Drawings
2.1Firestopping System
SD-03 Product Data
2.2Firestopping Materials
SD-06 Test Reports
3.3Inspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1Installer Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2Primers
2.3Bond Breakers
2.4Backstops
3.1Field Adhesion
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 105 PAGES
07 92 00 2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.1 SRecycled Content for Steel Door
Product
2.5 GFrames
2.5 GFrames
2.5 SRecycled Content for Steel Frame
Product
2.3Accessories
SD-03 Product Data
2.1 GDoors
2.5 GFrames
2.3Accessories
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
2.1.1.1 SRecycled Content for Door Cores
2.2Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 105 PAGES
08 14 00 2.3.7Water-resistant Sealer
1.5Warranty
2.1.2 GSound Transmission Class
Rating
2.1.3 GFire Resistance Rating
SD-04 Samples
2.1Doors
2.3.6.2 GDoor Finish Colors;
SD-06 Test Reports
2.4Cycle-Slam
2.4Hinge Loading Resistance
SD-07 Certificates
1.3.1Certificates of Grade
2.1.1 SCertified Sustainably Harvested
Flush Wood Doors
2.1.1.1 SIndoor Air Quality for
Particleboard and Agrifiber Door
Cores
SD-11 Closeout Submittals
1.5Warranty
08 31 00 SD-02 Shop Drawings
1.3 GAccess Doors And Panels
SD-03 Product Data
1.3 GAccess Doors And Panels
1.3.2Hardware
2.2.8Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 105 PAGES
08 31 00 2.1 SRecycled Content
SD-04 Samples
2.5 GFinishes;
08 33 23 SD-02 Shop Drawings
2.2.1Overhead Coiling Doors
2.2.3Counterbalancing Mechanism
2.2.4Manual Door Operators
2.2.5Electric Door Operators
2.2.1.4Bottom Bars
2.1.1.1Guides
Mounting Brackets
Overhead Drum
2.2.2.3Hood
2.1.1.1Installation Drawings
SD-03 Product Data
2.2.1Overhead Coiling Doors
2.2.2Hardware
2.2.3Counterbalancing Mechanism
2.2.4Manual Door Operators
2.2.5Electric Door Operators
2.2.6Fire-Rated Door Assembly
SD-05 Design Data
2.2.1Overhead Coiling Doors
2.2.2Hardware
2.2.3Counterbalancing Mechanism
2.2.4Manual Door Operators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 105 PAGES
08 33 23 2.2.5Electric Door Operators
1.3Fire-Rated Door
SD-10 Operation and Maintenance
Data
3.3.2Operation and Maintenance
Manuals
3.3.2Materials
3.3.2Devices
3.3.2Procedures
3.3.2Manufacturer's Brochures
3.3.2Parts Lists
SD-11 Closeout Submittals
3.3.1Warranty
08 34 59 SD-02 Shop Drawings
2.1 GVault Door Unit
2.3 GDay Gate
SD-03 Product Data
2.2Vault Door and Frame
SD-07 Certificates
2.2Vault Door and Frame
SD-08 Manufacturer’s Instructions
3.1Installation
SD-11 Closeout Submittals
1.2LEED Documentation
08 34 73 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 105 PAGES
08 34 73 2.1 GHollow Metal Sound Retardant
Doors
2.1 GWood Sound Retardant Doors
2.1 GDoor Frames
SD-03 Product Data
2.1 GHollow Metal Sound Retardant
Doors
2.1 GWood Sound Retardant Doors
2.1 GDoor Frames
2.1 GDoor Hardware
2.1Intumescent Seals and Gasketing
2.1Thresholds
2.1Astragals
SD-06 Test Reports
2.4.4Wind Loading Tests
2.4.4Water Leakage Tests
2.4.4 GAcoustical Tests
2.4.4Air Infiltration Tests
2.4.4Positive Pressure Tests
SD-07 Certificates
2.1Hollow Metal Sound Retardant
Doors
2.1Wood Sound Retardant Doors
2.1Door Frames
2.1Door Hardware
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 105 PAGES
08 34 73 1.3.1.2Intumescent Seals,Gasketing and
Door Bottoms
2.1Thresholds
2.1Astragals
08 51 23 SD-02 Shop Drawings
2.2Windows
SD-03 Product Data
2.1.1Steel Framing Materials
2.1.1 SRecycled Content for Steel
Framing Materials
SD-04 Samples
2.2Windows
SD-06 Test Reports
2.1.1Acoustical Tests
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.7 GKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 105 PAGES
08 71 00 SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
2.3Glazing
2.2.2Glazing Accessories
SD-04 Samples
2.3 GGlazing;
2.2.1.1Sealant
SD-08 Manufacturer’s Instructions
2.2Setting and Sealing Materials
3.2Glass Setting
08 91 00 SD-02 Shop Drawings
1.4 GWall louvers;
1.5 GWall louvers;
SD-03 Product Data
2.2Metal Wall Louvers
SD-04 Samples
1.4 GWall louvers;
1.5 GWall louvers;
09 22 00 SD-02 Shop Drawings
2.1Metal Support Systems
SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 105 PAGES
09 29 00 2.1.6Cementitious Backer Units
2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.2Water-Resistant Gypsum Backing
Board
2.1.4Glass Mat Covered or Reinforced
Gypsum Sheathing
2.1.4.1Glass Mat Covered or Reinforced
Gypsum Sheathing Sealant
2.1.5Abuse Resistant Gypsum Board
2.1.11Accessories
2.1.1Gypsum Board
2.1.1 SRecycled Content for Gypsum
Board
2.1.7 SVOC Content of Joint Compound
SD-07 Certificates
2.1Asbestos Free Materials
2.1.1 SIndoor Air Quality for Gypsum
Board
2.1.9 SIndoor Air Quality for Non-aerosol
Adhesives
2.1.9 SIndoor Air Quality for Aerosol
Adhesives
09 30 10 SD-02 Shop Drawings
3.2Detail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 105 PAGES
09 30 10 2.1.1 GPorcelain Tile
2.1.1 SRecycled Content for Porcelain
Tile
2.2Mortar, Grout, and Adhesive
SD-04 Samples
2.1 GTile
2.1.2Accessories
2.2.2 GGrout
SD-07 Certificates
2.2 SIndoor Air Quality for Adhesives
2.2.3 SIndoor Air Quality for Sealants
SD-08 Manufacturer’s Instructions
3.4Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2Installation
09 51 00 SD-02 Shop Drawings
2.1Approved Detail Drawings
SD-03 Product Data
2.2 GAcoustical Units
2.2.3 GMetal Acoustic Baffles
2.2.4 GWood Panel Ceiling System
2.2.2.1 SRecycled Content for Type XII
Ceiling Tiles
2.3 SRecycled Content for Suspension
Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 105 PAGES
09 51 00 SD-04 Samples
2.2 GAcoustical Units
2.2.3 GMetal Acoustic Baffles
2.2.4 GWood Panel Ceiling System
SD-06 Test Reports
2.1.1 GFire Resistive Ceilings
2.1.2Ceiling Attenuation Class and
Test
SD-07 Certificates
2.2.2.1 SIndoor Air Quality for Type XII
Ceiling Tiles
2.9 SIndoor Air Quality for Sealants
09 65 00 SD-02 Shop Drawings
2.9Resilient Flooring and
Accessories
SD-03 Product Data
2.9 GResilient Flooring and
Accessories
2.5Adhesives
SD-04 Samples
2.9 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3Moisture, Alkalinity and Bond
Tests
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 105 PAGES
09 65 00 SIndoor Air Quality for Luxury Vinyl
Tile
2.2 SIndoor Air Quality for Wall Base
2.5 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.2Surface Preparation
3.1Installation
SD-10 Operation and Maintenance
Data
2.9Resilient Flooring and
Accessories
09 67 23.13 SD-02 Shop Drawings
2.1Installation Drawings
SD-03 Product Data
GEpoxy Flooring Systems
SD-04 Samples
1.4.2 GHardboard Mounted Epoxy
Flooring
3.1.4 GFloor Topping;
SD-07 Certificates
1.4.1Listing of Product Installations
1.4Referenced Standards
Certificates
SD-11 Closeout Submittals
1.5Warranty
09 68 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 105 PAGES
09 68 00 3.4Installation Drawings
SD-03 Product Data
2.1 GCarpet
2.1.1 SRecycled Content for Carpeting
2.4Moldings
2.3 SIndoor Air Quality for Aerosol
Adhesives
2.3 SIndoor Air…