FY20PN92594MP102.pdf

PDF 346 KB Posted

Attached to
PN 92594 SOF Operations Support Facility Federal contract opportunity
Solicitation number
W912PM
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

This document contains a Request for Proposal (RFP) soliciting construction and design services for an Operations Support Facility at Fort Bragg, North Carolina. The scope of work includes construction of an approximately 36,000 square foot facility to sensitive compartmented information standards. It requires command, life support, office, training, medical, and operations areas. Ancillary requirements include information systems, mass notification, cybersecurity, fire protection, elevator, backup power, raised floor, redundant chiller, security systems, furnishings, and site improvements. Sustainability and energy measures must be incorporated. The period of performance is 540 calendar days. The resultant contract will be firm-fixed price awarded by the Department of the Army Corps of Engineers Engineering District Wilmington.

View the file

Other files for this federal contract opportunity

Other files attached to PN 92594 SOF Operations Support Facility, newest first.
File Type Posted
PN92594_W912PM19R00210005.pdf PDF
PN92594_0005_Technical Summary of Changes.pdf PDF
PN 92594_RTA SPECS_VOL 01.pdf PDF
FY20PN92594A-602.pdf PDF
FY20PN92594A-412.pdf PDF
FY20PN92594A-601.pdf PDF
FY20PN92594A101.pdf PDF
FY20PN92594A-531.pdf PDF
FY20PN92594A-402.pdf PDF
PN92594_W912PM19R00210004.pdf PDF
PN92594_0003_Technical Summary of Changes.pdf PDF
PN92594_W912PM19R00210003.pdf PDF
FY20PN92594T101.pdf PDF
10 44 16.pdf PDF
FY20PN92594T102.pdf PDF
FY20PN92594M-501.pdf PDF
FY20PN92594M-503.pdf PDF
08 33 23.pdf PDF
03 45 00.pdf PDF
FY20PN92594IN101.pdf PDF
FY20PN92594TA501.pdf PDF
FY20PN92594IN601.pdf PDF
FY20PN92594A-101.pdf PDF
FY20PN92594A-410.pdf PDF
FY20PN92594T504.pdf PDF
01 33 00.00 37 Submittal Register.pdf PDF
60584960 Table of Contents.pdf PDF
FY20PN92594CG101.pdf PDF
FY20PN92594IN102.pdf PDF
FY20PN92594S-001.pdf PDF
FY20PN92594L-101.pdf PDF
PN 92594_RTA SPECS_VOL 05 (Amend0001).pdf PDF
Technical Summary of Changes to W912PM19R0021-0001_pn92594.pdf PDF
Site Visit Sign In Roster 92594 .pdf PDF
J&A W912PM19R0021 (PN92594) Chillers.pdf PDF
PN 92594_RTA SPECS_VOL 03 (1).pdf PDF
PN 92594_RTA SPECS_VOL 05 (1).pdf PDF
PN 92594_RTA SPECS_VOL 01 (1).pdf PDF
PN 92594_RTA SPECS_VOL 04 (1).pdf PDF
PN92594_RTA_PLANS_vol1of2 (1).pdf PDF
PN92594_RTA_PLANS_vol2of2 (1).pdf PDF
NAVFAC_USACE PPQ.pdf PDF
PN 92594_RTA SPECS_VOL 04 (1).pdf PDF
PN92594_RTA_PLANS_vol2of2 (1).pdf PDF
PN92594_RTA_PLANS_vol1of2 (1).pdf PDF
PN 92594_RTA SPECS_VOL 03 (1).pdf PDF
PN 92594_RTA SPECS_VOL 02 (1).pdf PDF
PN 92594_RTA SPECS_VOL 01 (1).pdf PDF
PN 92594_RTA SPECS_VOL 05 (1).pdf PDF
J&A W912PM19R0021 (PN92594) Chillers.pdf PDF
Show all 50

PN 92594 SOF Operations Support Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STAIR 1

PRINT/COPY

ELEC

COMM

WOMEN

BREAK ROOM

STAIR 2

OFFICE

OFFICE

OFFICE

TRAINING

OPEN OFFICE

OPEN OFFICE

MEN

VEST

2300A

JANITOR

TRAINING

OFFICE

COMM

OFFICE

OFFICE

STORAGE

OFFICE

OFFICE

OPEN OFFICE

PRINT/COPY

VEST

2300B

OPEN OFFICE

OPEN OFFICE

TRAINING

OPEN OFFICE

TRAINING

OFFICE

OFFICE

STOR

VEST

250A

HFEDA

C G I

B

M-302

TU-23

TU-24

TU-20

TU-21

TU-22

TU-25

TU-15

TU-14

TU-16

TU-17

TU-18

TU-13

TU-12

TU-11

TU-10

TU-08

TU-06

TU-19

TU-07

TU-09

TU-03

TU-51

TU-05TU-04

TU-01

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

1" HWR

1" HWS3/4" HWR

3/4" HWS

1 1/2" HWR

1 1/2" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

1" HWR

1" HWS

1" HWS

1" HWR

1" HWR

1" HWS

OPEN OFFICE

TU-52

TU-02

T

T

T T T

T

T

T T

T T

T T

T T

T

T

T

T

T

T

T

T

T T

SS-04a

SS-04b

SS-05a

SS-05b

SS-05c

6" CHWS

6" CHWR

2" HWS

2" HWR

1" HWS

1" HWR

C H

W R

C H

W S

M-301

M-302

M-302

M-303

SS-08b

SS-08a

1" D 1" D

1" D

3/4" D

3/4" D

TU-18

TU-17

TU-16

TU-15

TU-14

TU-13

TU-12

TU-11

TU-07

TU-10 TU-08 TU-06

TU-01

TU-25

TU-21

TU-22

TU-20

TU-23

TU-24

TU-19

TU-09

TU-52

TU-51

TU-02

T

TU-03

T

TU-04

T

TU-05

3/4" HWR

3/4" HWS

RL

RS

RL

RS

RL

RS

1" D

R S

R S

R L

R L

RL

RS

RL

RS

RL

RS

SS-08

T

SS-05

3/4" D

RS

RL

RS

RL

RL

RS

RL

RS 1" D

ELEVATOR

CORRIDOR

M-301

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

23.021

23.02123.021

23.021

23.011

23.013 23.014

23.015

23.016

23.017 23.018

23.019

23.020

SS-04c

1" D

1" D

3/4" D

RL

RS

RL

RS

RL

RS

23.02123.021

23.021

23.021

3/4" HWR

3/4" HWS

RS

RL

23.021

23.021

23.021

23.021

23.021

23.02123.021

23.021

23.021

23.021

1" HWR

1" HWS

DP

C

C

23.012

23.04423.044

23.058

T

SS-04

8' 4' 0 8' 16'

1/8"=1'-0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

C A

T E

G O

R Y

C O

D E

1 2 3 4 5

A

GRAPHIC SCALES

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A S

O F

O P

E R

A T

IO

N

S F

A C

IL

IT

Y F

Y

P

N

W

IL

M

IN

G T

O N

D

IS

T

R

IC

T W

IL

M

IN

G

T O

N N

O R

T H

C A

R O

L

IN

A

A E

C O

M S

E R

V

IC

E S

IN

C

S

J E

F F

E R

S O

N S

T S

T E

R O

A N

O K

E V

A

/2

/1

7 8 9 10

B

C

D

E

F

G

T M

J

UNCLASSIFIED//FOR OFFICIAL USE ONLY

UNCLASSIFIED//FOR OFFICIAL USE ONLY

-W P

M R

MP102

S E

C O

N D

F L O

O R

P

IP

IN

G

P L A

N

D P

A

T B

M

C L W

F Y

P

N M

P .d w g

READY TO ADVERTISE

1/8" = 1'-0"

SECOND FLOOR PIPING PLAN

⎔ SHEET KEYNOTES:

23.011 6" CHWS UP FROM FIRST FLOOR THROUGH

SECURE BOUNDARY AT UTILITY CHASE

WALL. PROVIDE DIELECTRIC BREAK AT

PENETRATION.

23.012 6" CHWR DOWN TO FIRST FLOOR THROUGH

SECURE BOUNDARY AT UTILITY CHASE

WALL. PROVIDE DIELECTRIC BREAK AT

PENETRATION.

23.013 2 1/2" HWS UP FROM FIRST FLOOR THROUGH

SECURE BOUNDARY AT UTILITY CHASE

WALL. PROVIDE DIELECTRIC BREAK AT

PENETRATION.

23.014 2 1/2" HWR DOWN TO FIRST FLOOR THROUGH

SECURE BOUNDARY AT UTILITY CHASE

WALL. PROVIDE DIELECTRIC BREAK AT

PENETRATION.

23.015 6" CHWS UP TO AHU-01 THROUGH SECURE

BOUNDARY AT UTILITY CHASE WALL.

PROVIDE DIELECTRIC BREAK AT

PENETRATION.

23.016 6" CHWR DOWN FROM AHU-01 THROUGH

SECURE BOUNDARY AT UTILITY CHASE

WALL. PROVIDE DIELECTRIC BREAK AT

PENETRATION.

23.017 1 1/2" HWS UP TO AHU-01 THROUGH SECURE

BOUNDARY AT UTILITY CHASE WALL.

PROVIDE DIELECTRIC BREAK AT

PENETRATION.

23.018 1 1/2" HWR DOWN FROM AHU-01 THROUGH

SECURE BOUNDARY AT UTILITY CHASE

WALL. PROVIDE DIELECTRIC BREAK AT

PENETRATION.

23.019 1" HWS THROUGH SECURE BOUNDARY AT

SWA WALL. PROVIDE DIELECTRIC BREAK AT

PENETRATION.

23.020 1" HWR THROUGH SECURE BOUNDARY AT

SWA WALL. PROVIDE DIELECTRIC BREAK AT

PENETRATION.

23.021 GROUND REFRIGERANT PIPING

PENETRATIONS THROUGH ROOF WITH NO. 4

WIRE TO THE BUILDING GROUND. GROUND

REFRIGERANT LINE WITHIN 6" OF SECURE

BOUNDARY.

23.044 3/4" HWS&R BRANCH UP TO UH-03.

23.058 TERMINATE CONDENSATE DRAIN 1" ABV

FLOOD LEVEL OF SINK.

GENERAL NOTES THIS SHEET (PIPING)

A. REFER TO SHEET M-001 FOR MECHANICAL LEGEND AND

GENERAL NOTES.

B. CONTRACTOR SHALL ENSURE THE BOTTOM OF THE VAV

BOXES ARE A MINIMUM OF 6” ABOVE CEILING GRID IN ORDER

TO PROVIDE THE REQUIRED SERVICE CLEARANCE, AND

MAINTAIN SERVICE CLEARANCE ON CONTROL SIDE OF VAV

BOX, AS INDICATED.

C. ALL PIPING RUNOUTS TO HYDRONIC EQUIPMENT SHALL BE ¾”

UNLESS OTHERWISE INDICATED.

D. ROUTE CONDENSATE PIPING FROM DUCTLESS SPLIT SYSTEMS

TO NEAREST FLOOR DRAINS.

E. SIZE ALL REFRIGERANT PIPING PER MANUFACTURER’S

RECOMMENDATIONS.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

R

E V

IS

E

D

IN

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

M A

R

Sheets
M-501 - MECHANICAL DETAILS
M-503 - MECHANICAL DETAILS
M-602 - MECHANICAL SCHEDULES
MP102 - SECOND FLOOR PIPING PLAN

File details come from the government source that posted it. Updated .