This solicitation is for a firm fixed-price construction contract to rehabilitate turbine generator units at Old Hickory Power Plant in Hendersonville, Tennessee. The scope of work includes rewinding the generators and replacing the turbine runners for units 1, 2, and 3 to increase maximum output to 45 megawatts. Additional work involves upgrading or replacing various mechanical and electrical support systems. The estimated value of the contract is between $25 million and $100 million.
The project term is estimated at two years for model testing and design of the first unit, followed by eighteen months for installation per unit. Interested vendors must attend an organized site visit on May 5, 2022 and submit the required request form by the stated deadlines. Technical questions can be submitted through ProjNet until the question deadline. Responses are due in accordance with the solicitation schedule provided on ProjNet. The solicitation is issued by the U.S. Army Corps of Engineers Nashville District.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Primary Load Case 1: Hook Lift Load
Primary Load Case 2: Beam Self-Weight
Primary Load Case 3: Hook Lift Load
Primary Load Case 4: Combination of cases 1 thru 3
The statics check is shown below –
Static Check Results
As shown above there are insignificant differences in the statics check. This is due to rounding error in the program and is not a concern.
3.3 Eigenvalue Buckling Results
The results of the buckling analysis as well as the critical mode shape (mode shape 1) are shown below.
Note: The mode shapes have been scaled up significantly in order to be easily viewed. These shapes do not reflect actual deflections.
Critical Mode Shape 1 –
Top Plan View
Elevation View
Critical Location:
Beam side walls
Critical Location:
Beam side walls
Secondary Location:
Stiffeners
Secondary Location:
Top Flange
Iso – Downward Perspective of Top Flange
Iso – Downward Perspective of Bottom Flange (From inside of beam)The buckling factors are shown below for mode shapes 1 through 4.
Buckling Factor Results
As shown above the critical buckling factor is 27.7. Based on these results it is evident that buckling is not a concern and that the controlling limit state for the lifting beam is yielding.
Secondary Location:
Bottom flange rotation due to fixity of web to flange connection. Rotation direction matches web buckling direction.
Secondary Location: Top flange rotation due to fixity of web to flange connection.
Rotation direction matches web buckling direction.
4 FEA STRESS CHECKS
The allowable yield stress based on A7 steel per ASME BTH-1-2017 is calculated below –
Allowable Combined Normal and Shear stress based on ASME BTH-1-2017:
Screen print from BTH
As shown above the left side of the equation is the Von Mises stress (also known as the maximum distortion energy theory) and the right side of the equation is the allowable Von Mises stress which is calculated below -
N� = 2.00 For Design Category A Lifters
F�� = F�
N�
33ksi
2.0 = 16.5 ksi
The only areas in the FEA exceeding the allowable Von Mises stress of 16.5 ksi are shown below -
Area C: Iso – Downward perspective (From inside of beam)
Stress 1 –
I. R. =
19.9 ksi
16.5 ksi = 1.21
Note: Due to the nature of force transfer of plate elements in finite element models, the true bearing area of the trunnion support block bearing on the top flange of the lifting beam cannot be accurately reflected. Therefore, from the standpoint of reflecting bearing stress, the 19.9 ksi is deemed erroneous.
Refer to hand calculations for calculation of bearing stress.
Peak Stress 1 = 19.9 ksi Due to Bearing Stress
Peak Stress 2 = 17.6 ksi
Stress 2 –
The analytical model does not account for the hook guide plates welded to the bottom flange.
Therefore, the 17.6 ksi stress in this area is deemed acceptable. Hook guide plates shown below –
Although we are not counting on the plates, the welds are verified as follows:
bottom flange net area =is 1.25”x19” = 23.75 in2 based on 17.6 ksi, bottom flange load = 418 kips.
cover plate area = 2(0.75”)(7.5”) = 11.25 in2 combined area = 23.75 + 11.25 = 35 in2.
cover plates load = 418 kip (11.25/35) =134 kips.
cover plate weld length is 4(42”) = 168’ weld load =134 kip/168” = 0.8 kip/ in < 3.31 kip/in capacity of 5/16” fillet weld OK
¾” Hook Guide Plates
Area D: Iso – Downward perspective (From inside of beam)
Stress 1 - The 25.3 ksi is categorized as peak stress as it is located at the triangular stiffener tip which is a geometrical stress riser. This peak stress value is amplified as it is also located on numerical singularity created by a sharp edge connection between two perpendicular shell elements, which is in fact not representative of the exact geometry. However, BTH-1 Category A Design class 0 does not consider stress concentration as there is no fatigue assessment required under this category and design class. Indeed, this category and design class is defined by a low number of lift which is below the threshold to consider fatigue assessment. The design is verified based on average stresses only. The peak stress of 25.3 ksi is then not a concern as the utilization of the lifting device by nature will not induce fatigue phenomenon.
The band of stress crossing the entire plate circled above of roughly 15.85 ksi. The plate is adequate as is. See hand calculations in Appendix A for further discussion.
Peak Stress 2 = 21.3 ksi Due to Bearing Stress
Peak Stress 1 = 25.3 ksi
Note: Due to the nature of force transfer of plate elements in finite element models, the true bearing area of the trunnion pin bearing on the trunnion support block cannot be accurately reflected.
Therefore, from the standpoint of reflecting bearing stress, the 21.3 ksi shown on page 47 does accurately reflect the design bearing stress. See hand calculations for this bearing stress.
Stress 2
I. R. =
21.3 ksi
16.5 ksi = 1.29
FEA CONCLUSION
The FEA results presented above are adequate for determination that the Lifting
Beam complies with the requirements of BTH-1
APPENDIX A
OLD HICKORY
ROTOR LIFTING BEAM
TRADITIONAL HAND CHECK CALCULATION
BASIC BEAM STRESS, SHEAR & STIFFENERS
CHECK
Design criteria per ASME BTH-1 " Under the Hook Lifting Devices"
& Supplemented as required by AISC
OLD HICKORY TURBINE LIFTING BEAM CALCULATION / BASIC BEAM STRESS & SHEAR CHECK
Design criteria per ASME BTH-1 " Under the Hook Lifting Devices"
& Supplemented as required by AISC
Design Category = A Loading is predictable BTH- 1 Section 2-2.1
Service Class = 0 < than 20,000 cycles BTH-1 Sect 2-3 & Table 2-3-1
Loads: Design Hook Load 572 kips BTH-1 Section 3-1.2
Dead load 16 kips Given the hook is at the center and comprises the bulk of the load assume it
Total load P= 588 kips is at the center
End Reaction = max shear = V 294 kips
Section 2 Maximum Span L = 12.25 ft
Section 2 Max Moment = PL/4 = 1801 ft-kips At Beam centerline
Section 1 L= 4.88 ft At transition of sloping flange
Section 1 M=VL= 1435 ft-kips
Section 1 Nd = 2 BTH-1 Section 3-1.3.1
Steel Grade = ASTM A7
Fy = 33 ksi
Ft= 60 ksi
44.5"
42"
21"
30"
1-1/4" Pl
3/4" Pl
10.5" cutout
Section 1 at Transition Section 2 at center
Section 1 & 2
Neutral Axis is at centerline due to symmetry
The pair of 3/4" x 7.5" plates at the bottom flange of Section 2 will not be considered effective for strengthening the cross section
SECTION 1 SECTION 2
I=2(1.25)^3(30)/12 + 2((42)^3(0.75)/12 + (2) 1.25(30)(21.625)^2 44344 in^4 32068 in^4
S=I/22.25 = Section Modulus 1993 in^3 1441 in^3
Aw = area of web = 2 x 42 x0.75 = 63 in^2 63 in^2 fb = bending stress = m/S 8.64 ksi 14.99 ksi fb corrected for sloping flange( Note 2) = 1.031xfb = 8.91 ksi fv = shear stress = V/Aw = 4.67 ksi 4.67 ksi
Additional V for sloping flange = fb x 3/12 x 30 in x 1.25 in = 80.99 kip
Adjusted shear stress for sloping flange =fw + 80.99/Aw = 5.95 ksi
Von mises combined stress =(fb2 + 3fv2)0.5 = 13.62 ksi 17.03 ksi
Allowable combined stress per BTH-1 E3-37 = Fy/Nd = 16.5 ksi 16.5 ksi
Interaction Ratio (See Chapter H in AISC)= 0.83 1.03
Note 1: Section 2 Inertia = Sect 1 Inertia - 2(1.25)(10.5)(21.625)^2
Note 2: Reference "Local effects of beam cranks and long notches" by Richaed Henderson
Lp will be calculated only at section 2 with holes in the flange no doubt will control
J = Ix + Iy
Iy = 2((1.25)(30)^3)/12 + (42)(0.75)((10)^2 -1.25(10.5)^3/12) 11804.41
J = Ix + Iy 43873
Zx=AcYc + AtyT 1711.5
A= 111.75 ry: (Iy/A)^0.5 10.27776
Mp=Zfy 56479.5
Lp= 0.13ryE(JA)^0.5/Mp 126.5868 ft
Fb=1.1Fy/Nd = 18.15 ksi > 14.99 computed above
Check Fiange to Web Welds
丁he maximum value ofVQ/I with constant shea「 w川occur at the sha=ow end ofthe beam, The ine巾a wi!l be conservativeiy calculated ignoring軸e thicker 3,5’一plate
1訓・75 (讐十2・1・25・16・(14)2)=14808・625
Q:=16・1.25・14=280
V・♀=5.559 kips/in
Ndニ2 E棚:=60・鳥8i
乱=0.6」生二15繭 oo.31 :=0.707・0.3125・れF㍉3.314埜- るれ
2朝.31=6.628生 る性
>与.与与9 0K
BTH-1 EQ 3-与5
Capacfty of 5/16刷et
CaPaCity for two sides
PIN PリI丁ES
n∂〆遡 重
Pin Plates
Check the end lift point. The pinhole will be analyzed per BTH-1 Section 3-3.3. The diameter of the smaller holes surrounding the pin hole will conservatively be deducted from width and height dimensions
Hole diameter
Pin diameter
Diameter of keeper plate bolt holes
PIN PLATE EVALUATION
pin plate thickness
Pin plate width
Center of hole to edge of plate
BTH-1 EQ 3-47
Effective actual width edge of pinhole to edge of plate actual effective width controls
BTH - 1 EQ 3-45
Tension Capacity of one plate
Tension Capacity of two plates is much larger than V=294 kip OK Pb = single plane fracture strength beyond a single pinhole calculated below
Pb is also obviously good with two plates
BTH-1 EQ 3-52
Distance from center of pinhole to edge of plate
BTH-1 EQ 3-50 Double plane shear strength for two plates
Pinhole Bearing Stress
BTH-1 EQ 3-53 Allowable pin hole bearing stress
Actual pin bearing stress OK
Pin Bending & Shear
Pin Shear
Shear Area
Allowable Shear Stress
BTH-1 EQ 3-28
Actual Shear Stress OK
Clear distance between pin plates
Minimum pin bearing width on pin plate
Hook Width
Assume that pin bears on full width of hook
ASME BTH-1 EQ 3-6
Allowable bending stress
Bending moment lever arm
Pin bending moment
Pin section modulus
OK ASTM A237 49T
Pin Plate Load Transfer Into Web & Stiffeners
The pin plates are welded vertically to the stiffeners for 19 inches and horizontally to the web above only for 15 inches
Welds are 5/16" E60 with 3.31 kip/in capacity
< 3.31 OK
The Stiffener is 5" wide x 3/4" thick. However because the girder flanges only project out 2.5" from the web, Only 2.5" of the stiffener can be counted on. That is not a concern as the stiffener load will gradually transfer into the girder web. The stiffener is also welded to the web with a continuous 5/16" fillet thus assuring the load transfer will take place.
The web will now be further evaluated per AISC Chapter G
Transverse distance between stiffeners at the beam ends
Web thickness
Web depth at beam end.
See Elevation view on drawing sheet 1 of 2
AISC G2-3
>294 OK
AISC Section G2.2 transverse Stiffeners is now checked is >h/tw = 38.67 thus stiffeners although provided were not required
AISC J10.5 Compression buckling Web was intended to apply to a compression load on top of the flange. That is not the case here but the principal is still valid and so EQ J10-8 will be checked. However the value of h used will be that from the top of the pin plate to the top flange conservatively 9"
>147 OK
Hook Analysis
The hook is a forging per ASTM A237 49T Class B. It was originally rated for 275 tons.
The yield strength is 50 ksi and the tensile strength is 80 ksi. Crane hooks, nuts, trunnions, tapered roller bearings and support blocks are designed to safety factors that do not readily correspond with BTH-1. Columbus Mckinnon a world leading producer of crane hooks and associated parts (which are generally forgings) usies two general classes of steels. This is carbon steel which is comparable to ASTM A572 Grade 50 and for which a safety factor of 5 is required applied to the 80 ksi tensile strength resulting in a 16 ksi allowable stress. Second is called super alloy steel which is comparable to AISI 4340 steel.
Without heat treatment would have a 108ksi tensile (higher if normalized for example) to which a safety factor of 4.5 would be applied resulting in an allowable of 24 ksi.
Looking specifically at the hook section we see that the specific measurements required for calculation of the section modulus are not well defined. However, the 9" diameter shank with a 63 in2 cross section in direct tension is well defined. Loaded with the original design load of 275 tons produces a stress of only 8.73 ksi.
The photo shows the hook. Pictured to the left is the lifting bell used to lift the rotor.
The bell pins to the hook for lifting. Some of the key dimensions for design are sketched above the photo. The design allowable, 16 ksi stated above will be used for both trnsion and bending. This is in leu of BTH-1 and somewhat more conservative. 60% of the tension (9.6 ksi) will be used for allowable shear
Conservative approximation of the effective cross section thru the throat
Plastic Section Modulus
Eccentricity of load from center of throat to face of shaft
Moment on hook
<16 ksi OK bending stress
<9.6 ksi OK Shear stress approximate distance from center of pinhole to bottom of hook shear area
<9.6 ksi OK Pin hole shear is OK
一一一一一一〇○○一一二一・一一一「 ‾
園
The hook is ok and now we will check tension on the threaded shaft at the top
Threads/inch
Net tensile area AISC Table 7-18
< 16 ksi OK Hook shaft is OK
Thread diameter
Shaft threaded length
Theoretical number of threads
Actual number of threads to use
Circumferential length of one thread
Thread pitch thread height at root AISC Table 7-18
Shear area of one thread
Shearr capacity / thread
Theoretical number of threads required
Actual number of threads assumed required
< nt = 22 provided Thread is OK
Nut
The nut material designation was not stated on the original drawing. However, just as the trunnion and the hook, it to is a large forging and it would seem likely that it is at least as strong as the others were. A second reason is that it is common practice of nut manufacturers to make the nut of material at least as strong as the bolt or shaft. The following review assumes without apology that the nut mateial is the same as the shaft.
The thread on the nut matches the thread on the shaft. The diameter of the thread on the nut is larger than the thread on the shaft. Finally the length of the nut at 7 inches exceeds the shaft thread length. Thus the strength provided by the nut threads exceeds the strength for the shaft
Per ANSI B18 2.1 and as shown in "Fastener Standards" Table C-21 Minimum height for the nut is 0.625xshaft diameter + 0.188 inch. this is obviously less than than the 7" fabricated height of the nut Minimum width across the flats is 1.5Xshaft diameter = 9x1.5 = 13.5 inches which is less than the 15" fabricated diameter of the nutnut
Nut Thread
Detail Part 3 Drwg MKB 83- 200 F TB Sheet 2 of 2 Also for thread diameter
Ratio of trad root to pitch Fastener Std 6th Editition A-28
Thread cross section area
Thread Shear Stress
Thread Yield Stress
Allowable thread shear stress
In Conclusion there is little reason for concern regarding the nut material
Conical Roller Bearing
Roller bearing skf 29344 has a rating of 1416 kip. However the bearing is known to have seized prohibiting rotation of the hook. The source of the problem is believed to be that the nut above has only one grease fitting. It is believed that grease needs to be injected circumferentially around the bushing. Two more grease fittings are recommended at 120 degree intervals around the nut
Trunnion Block
The central section of the trunnion supporting the roller bearing is rigid and bears no checking. Checking will be limited to bending, shear and bearing of the 8.25" diameter pin. Conservatively assume the pin bears uniformly across the trunnion support block and so the reaction is at the center of the trunnion support block. The trunnion material is unknown and conservatively will be assumed A7
BTH-1 EQ 3-28
< 9.53 ksi OK
< 18.16 OK
< Fp = 20.63 OK
Trunnion Support Block
Since the bearing stress on the pin above is ok it follows that the trunnion bearing support block is also OK
Description & Analysis of Load Carrying Mechanism at/near Center of beam
The trunnion support bearing block sits directly on top of the beam flange. There is one block located directly above each of the two webs on each side of the beam. Each block is 6" wide, 7" deep and is 19" long butting up against the pair of 6" x 3/4" vertical stiffener plate sitting perpindicular to the beam axis at each end of the bearing blocks.
We can assume that the bearing blocks are intended to take on only direct vertical bearing loads. Indeed, a major lift as this generator rotor is performed with precaution to avoid unnecessary and undesirable lateral load on the lifting device and crane.
However presumably only to be sure any lateral movement of the trunnion blocks was prohibited, the bearing blocks were welded all aound to the beam flange as well as all around to the vertical stiffener at each end and the welds used were fillets varying from 1/2" - 5/8". The FEA completely demonstrated that the effect of this extreme connectivity was to cause the bearing blocks to act integrally with the top flange participating in carrying bending compression.
The unexpected support condition describe above goes further in that there is a pair of triangular stiffener plates attached to the vertical 6" x 3/4" stiffeners and extending on to the top flange transition point. Although not really needed these plates are the highest stressed area of the beam developing 25 ksi stresses at each end of the stiffener. The highly stressed point closest to the beam end is a "hotspot" and not of concern. The other highly stressed point is likely due to vertical direct bearing stresses ans thus not as critical as they might have been.
Regardless the overall stress state on the stiffener is real and averages around 15 ksi compression across the heighth of the stiffener. The weld along the base of the stiffener is adequate to transmit the net compression and obviously has been doing so whether desireable or not.
For the 3/4" X 12" long stiffener See AISC J4.4 r = 0.28t = 0.28(0.75) =0.21
> 15ksi OK Triangular stiffener will not fail
Note that at a shallower cross section (perhaps 2.5" high) that the stress is constant at 17.4 ksi or 3% overstress at which failure would not seem likely
< 3.31 kip/in weld capacity OK
Analysis of Vertical Stiffener Plate @ Beam Flange Transition
Vertical tension load on stiffener plate due to Flange slope Previously calculated
Width of stiffener between webs
Stiffener thickness
Stiffener depth
< 16.5 OK
Stiffener weld length
< 3.31 OK
Analysis of Stiffeners Beneath Trunnion Support Blocks
Stiffeners lie directly beneath center of suppot blocks (center of beam) and also at each end of the support blocks beneath the vertical stiffener plates crossing the top of the flange. Best judgement is that these support points (3 on each side of the beam) will share equally in the total load to the beam or approximately 100 kips each
Center Stiffener
Inside stiffener is 3.75" wide x 12" deep X 1.25" thick. The outside stiffener is 4.5" wide x 1.25" thick x 42" deep. There is a 3/4" web in between the stiffeners and thus a total width of 9".
For the 1.25" X 12" long stiffener See AISC J4.4 r = 0.28t = 0.28(1.25) =0.35 KL/r = (1)(12)/(0.35) = 42 > 25 Chapter E applies
> 8.89ksi OK stiffener will not fail
< 3.31 kip/in weld capacity OK
Note: Assumed that stiffener width was same on each side. The other stiffener is slightly wider and would have slightly more load. However the avaialble weld length is 42 inches and so plenty of weld capacity
None of the provisions of AISC Section J10 apply
Stiffeners at ends of Trunnion Bearing Blocks
Stiffener is inside of webs and is 18" wide x 6" deep X 1.25" thick. The trunnion support pad only projects 3" Over the stiffener. assume the stiffener will carry half of the load and flange bending will carry the other half. The actual loaded length on the stiffener can be assumed as 3" + 1.25 = 4.25"'
< 18.15 ksi OK Also because the stiffener is only 6" deep, L/r will not reduce capacity
<3.94 Weld load OK
Determine flange bending capacity of other side of web
AISC EQ J10-1
> 50 OK
Since all of the vertical load has conservatively been assumed to be concentrated between the six stiffener points, there has been no direct check on the webs capability for resisting the compressive forces. Since the 4 concentrations at the ends of the trunnion bearing blocks have only a 6" deep stiffener on one side only, A check of web crippling at those points would be the most conservative look with the 6" deep stiffener ignored. Refer to AISC Section J10.3, Web Crippling
Conservative assumption of bearing length
J10-4
>100 kips Web is OK
APPENDIX B
OLD HICKORY
ROTOR LIFTING BEAM
NDE INDICATIONS
DISPOSITION
DISPOSITION OF NDE INDICATIONS
Indication
No.
Location Description Approximate
Stress (ksi)
Repair
1 Center Stiffener intersection with bottom flange
Crack in weld between bottom flange and vertical stiffener
Ft = 15
Fv = 5
Note 1
2 Near stiffener plate on opposite of pinhole for indication no. 4
Horizontal crack in web Fc = 4 ksi Note 2
3 Adjacent to stiffener nearest beam end
Horizontal crack in web Negligible Note 1
4 Adjacent to stiffener for pinhole at beam end
Horizontal crack in web Fc = 4 ksi Note 2
5 Stiffener Adjacent to pinhole near beam end
Crack in weld between stiffener & flange
Negligible Note 1
6 Center Stiffener intersection with bottom flange
Crack in weld between bottom flange and vertical stiffener
Ft = 15
Fv = 5
Note 1
7 Center Stiffener intersection with top flange
Vertical crack in weld between web and stiffener
Fw = 4 ksi Note 1
8 Center Stiffener intersection with top flange
Vertical crack in weld between web and stiffener
Fw = 4 ksi Note 1
9 ¾” vertical stiffener weld to top flange
Longitudinal weld crack Fc=10 ksi Note 1
10 Triangular Stiffener at center of beam
Crack in weld across tip pf plate
Fc = 8 ksi Note 1
11 Full depth stiffener plate adjacent to center of beam
Horizontal crack in stiffener base material
Ft=7ksi Note 3
12 Stiffener adjacent to center weld to web
Longitudinal crack in weld Fv = 15 ksi Note 1
13 Stiff to web at beam center Longitudinal crack in weld Fv = 6 ksi Note 1
14 ¾” cover plate on bottom flange plate
Longitudinal weld crack NA Note 1
15 Top of 3.5” pin plate to ¾” web plate inside of web
Longitudinal weld crack Fc=7ksi Note 1
16 ¾” cover plate on bottom flange plate
Longitudinal weld crack NA Note 1
17 Triangular stiffener on top flange connection to vertical stiffener on top flange
Longitudinal crack in Weld at top of the two plates
Fc=3ksi Note 1
18 ¾” cover plate on bottom flange plate
Longitudinal weld crack NA Note 1
19 ¾” vertical stiffener weld to top flange
Longitudinal weld crack Fc=10ksi Note 1
2 Trunnion support block weld to top flange
Longitudinal weld crack Fc=11ksi Note 1
21 Vertical stiffener on top of top flg weld to flg plate
Longitudinal weld crack Fc=10ksi Note 1
Note 1: Repair per ACME Weld Repair Procedure SM-3-CS
Note 2: Excavate crack thru thickness of web and weld back with full penetration weld B-U4
Note 3: This horizontal crack is loaded in compression and so may be repaired per Note 1
D I-
2- N
-T -0
F
R -E
N R ev .B
N° H1039500 MEI 83-200 F DC-03
DOCUMENT TECHNIQUE
TECHNICAL DOCUMENT
Titre / Title LIFTING DEVICE INSPECTION REPORT
Édition / Issue July 2018 Rév. / Rev. - Date 2018.02.22 Par / By S.Gingras
A 2018.03.01 S.Gingras
B 2018.06.04 L.Thibault
C 2018.06.26 L.Thibault
D 2018.07.31 L.Thibault
E 2018.09.05 L.Thibault
Contrat / Contract N°: W912P5-17-C-0002 CLIENT : U.S. Army Corps of Engineers
Réf. / Ref. N° : SECTION 01 10 10 para 1.18.5, item 34
Projet / Project : 1584- OLD HICKORY TURBINE-GENERATOR UNIT 4 REHABILITATION
Préparé ou révisé par / Prepared or revised by
Lynda Thibault
Revu et approuvé par / Reviewed and approved by
Sebastien Gingras, P.Eng
Secteur responsable / Responsible Department Design Engineering
DISTRIBUTION (CODE)
Copie non contrôlée / Uncontrolled copy Client, M, N, O, S x Copie contrôlée / Controlled copy
-D
2- N
-T -0
F
R -E
N R
N° : H1039500 MEI 83-200 F DC-03
Cont. N° : 158400 Rev. : E
DOCUMENT TECHNIQUE Date : 2018.09.05
Titre / Title : LIFTING DEVICE INSPECTION REPORT
1.0 INSPECTION RESULTS AND RECOMMENDATIONS
Generator Lifting Beam Bearing Inspection See ACME’s recommendation in Appendix A.
NDT inspection See NDT inspection results in Appendix B. Alston recommends repairing the defects before the load test.
Alstom proposes to excavate the weld defects and weld back to the weld original size. Defects in base metal will be smoothed first and welded back only if required. Weld repair around high precision holes will need to be managed to avoid excessive deformation.
Repair All weld defects detected on rotor lifting beam and other lifting devices were repaired as per repair procedure presented in Submittal 01 10 10 item 37. NDT inspection was done following repairs. See report in Appendix C. It should be noted that new bearing was installed including greasing point added. All tooling are ready for load test.
Load Test See NDT inspection report following load test in Appendix D.
Some indications were found on the rotor lifting device base metal. See sketch for location and pictures for indications. Tom Bucy who is the engineer who performed the repair procedure, finite element analysis and analytical calculation went at the supplier to look at the defects. Those indications seem to be cosmetic only.
It is hardly understanding how this kind of defect could have been produced by the load test and so we assume that those marks where there from the beginning. Also, the indications in base metal found before repair has been corrected by polishing only. We believe those defects are superficial as the others were. The lifting beam succeed the load test at 125% and is so certified as per the OSHA. We recommend keeping the beam as-is. A beam modification would require performing a load test again.
Weld indications has been found on the intermediate shaft and turbine guide bearing lifting device. See sketch for location and pictures for indications. This device will not be used during the outage as we plan to use other mains to perform the lifting of the intermediate shaft and turbine guide bearing. This founding will then not impact site activities. Alstom however recommends performing weld repair on the lifting device if USACE wants to use the device in the future. Load test can or cannot be performed after repair as your discretion.
Indications have been detected on the rotor yoke studs number 1, 3 and 5. The indications are at the extremity near the threads but not in the threads. Indications are longitudinal which is less a concern when loading the studs in tension. We do not believe the load test created those defects as the orientation would be perpendicular to the studs instead of longitudinal. The studs succeed the load test at 125% and is so certified as per the OSHA. We recommend keeping the studs as‐is. A stud modification would require performing a load test again.
-D
2- N
-T -0
F
R -E
N R
Rev. : E
DOCUMENT TECHNIQUE Date : 2018.09.05
All tooling have now been load tested to 125% of certified load. They can now be used on site at the exception of the intermediate and turbine guide bearing lifting device (one lifting device for both components) as mentioned above.
APPENDIX A: GENERATOR LIFTING BEAM BEARING INSPECTION
APPENDIX B: AS-FOUND (PRE-REPAIR) NDT INSPECTION RESULTS
APPENDIX C: AS-REPAIRED (BEFORE LOAD TEST) NDT INSPECTION RESULTS
APPENDIX D: INSPECTION REPORT AFTER LOAD TEST
APPENDIX E: LOAD TEST CERTIFICATES
APPENDIX F: NDT PROCEDURES
APPENDIX G: NDT QUALIFICATIONS- ADDITIONAL
Note: Additional certification added for inspector James Steward, not included in submittal Qualifications of NDT under submittal 05 05 33.20 item 2. See designation letter for visual acuity - Inspector no longer working for Ivey Cooper.
Rev. E
Rev. : A
DOCUMENT TECHNIQUE Date : 2018.03.01
TECHNICAL DOCUMENT Page : ANNEXE A
ANNEXE A
Generator Lifting Beam Bearing Inspection
212523552 Rectangle
212523552 Texte tapé à la machine E
212523552 Texte tapé à la machine
212523552 Texte tapé à la machine
212523552 Rectangle
212523552 Texte tapé à la machine 2018.09.05
212523552 Texte tapé à la machine
212523552 Texte tapé à la machine
212523552 Texte tapé à la machine
212523552 Rectangle
212523552 Texte tapé à la machine
212523552 Texte tapé à la machine
4301 Rossville Boulevard, Chattanooga, Tennessee 37407
Phone (423) 867-1001; Fax (423) 867-3305
Date: 03/1/2018
From: Tyler Eller / ACME Industrial Piping
To: General Electric
Attention: Sebastien Gingras
Project: Old Hickory Lifting Device Bearing Inspection
Bearing Inspection
The bearing that was supplied with the lifting beam is a SKF 29344.
Which is a Spherical Roller thrust Bearing with 14.173” OD, 8.661”ID, and a static load capacity of 1,416,296 LB.
Upon disassembly of the bearing it was noted that there was only grease on one side of the bearing, the side away from the grease fitting was dry.
Use of the bearing in this condition has caused some damage to both the rollers as well as the races. With the lack of grease as a protective coating, there is some corrosion and pitting on both the rollers as well as the lower race. This lack of grease also reduced the lubrication of the rollers and has caused some scoring and flat spots on both the lower race as well as the rollers. It is impossible to do further inspection without permission needed to disassemble and clean the bearing. Below are some photos of the damage.
With this information, as well as information gathered from the manufacturer, SKF, we believe this bearing to be irreparable and needs to be replaced. Replacing the bearing is less costly than shipping the bearing to Birmingham for a more thorough cleaning and inspection, then cost of repairs after. The price for shipment and inspection only, is already half of the cost of a new bearing. This does not take into consideration the repair costs or the schedule delays. Bearing Inspection will delay the schedule 3-4 days, a new bearing will delay the schedule 1 day.
With the information provided as well as the photos we recommend replacing the bearing.
Respectfully Submitted, Tyler Eller BSME
Tyler Eller Project Engineer
Rev. : A
DOCUMENT TECHNIQUE Date : 2018.03.01
TECHNICAL DOCUMENT Page : ANNEXE B
ANNEXE B
NDT inspection results
212523552 Rectangle
212523552 Texte tapé à la machine E
212523552 Texte tapé à la machine
212523552 Texte tapé à la machine 2018.09.05
212523552 Texte tapé à la machine
212523552 Texte tapé à la machine
212523552 Texte tapé à la machine
212523552 Texte tapé à la machine
212523552 Rectangle
212523552 Texte tapé à la machine
212523552 Texte tapé à la machine
212523552 Rectangle
212523552 Texte tapé à la machine As-Found (Pre-Repair) NDT Inspection Results
212523552 Texte tapé à la machine
212523552 Texte tapé à la machine
212523552 Texte tapé à la machine
212523552 Texte tapé à la machine rev E
212523552 Texte tapé à la machine
Ivey Cooper
SERVICES, LLC
Magnetic Particle Inspection Report Report Number:_____1_____
Page_1__ of _6__
11135 Dayton Pike Soddy-Daisy, TN 37379 Phone: (423) 493-0097 Fax: (423) 435-9620 Form 6/30/13
Rev: Acceptance Standard:
Length:
Amps:
Cal Date: 2/12/2018 Model: n/a Serial: n/a n/aSpacing: 10 Lb S/N 7986
180016
Technique Light Meter
40 (4x10) Lb S/NHead Shot
Coil Current/Equipment
Alternating Current Direct Current Direct Current Rectified n/a Model B100 4474 / 2875
Yoke Lift Test
X
Calibrations (Daily) X n/a
Material/Lighting and Inspection Information Section As welded
Date:
ASME Section VIII, division 1, appendix 6
X
Surface Conditions:
Diameter:n/a n/a n/aCoating:
Material Type:
Drawing Number:
Customer: ACME Industrial piping,Inc. 2/12/2018Customer Job #: n/a
ICS WO#:
Black White Pre-Intensity (Foot-Candles): Post-Intensity (Foot-Candles):
Post-Intensity (µW/cm²):Portable Fixed
19858Certification #:
Weld Identification or Part Number
W el de r I
.D
A cc ep t
A lig ne d
R ej ec t
C ra ck
La p
L.
O
.F
Po ro si ty
Remarks n/aDia:
U nd er cu t
Li ne ar
Central Condutor
Cal Date: n/a Cal Due:
Se am
Sl ag
Type of Discontinuity
D ia m et er
R ou nd ed n/a Verification on record n/a
X X X X
X Indication number 3 Indication number 5 Indication number 7
A side indications Indication number 1
Accept= / Reject= X No Apparent Defects= NAD
Base metal indication
Le ng th
Indications 1,3,5,and 7 are located on the side designated as, A side. See picture below.
ICS Technician (Print) ICS Technician (Sign) Level Customer Reviewer
X X X
Sketch/Drawing/Location of Discontinuity Images Attached: X Yes
Kevin E Collier
No
Certification Number Authorized Inspector n/a
II
Dry Wet Visible Fluorescent
X Prods
# Of Turns:
Job Location: Chattanooga. TN
Lighting Equipment Lighting Type Section
Structure: Lifting Beam
Inspection Procedure:
Yoke
QOP 9-MT-1
Thickness:
Pre-Intensity (µW/cm²):
Particle Type X n/a
X
Carbon Steel
Magnetic Particle Inspection Report Report Number:_____1_____
Page_2__ of _6__
11135 Dayton Pike Soddy-Daisy, TN 37379 Phone: (423) 493-0097 Fax: (423) 435-9620 Form 6/30/13
Rev: Acceptance Standard:
Length:
Amps:
n/a
Certification Number Authorized Inspector
(Sign) Level Customer ReviewerICS Technician (Print) ICS Technician
No
Kevin E Collier II
Sketch/Drawing/Location of Discontinuity Images Attached: X Yes
Indications 2,4,6,and 8 are located on, side B. See picture below, for location of indications, (reference only) Indication number 8 X X Indication number 6 X X Indication number 4 X X Base metal indication Indication number 2 X X Base metal indication
B side indications
Po ro si ty
Se am
Sl ag
Cal Due:
Weld Identification or Part Number
W el de r I
.D
A cc ep t
R ej ec t
Type of Discontinuity Remarks
C ra ck
La p
L.
O
.F
A lig ne d
D ia m et er
Le ng th Accept= / Reject= X No Apparent Defects= NADU nd er cu t
Li ne ar
R ou nd ed
Fluorescent Head Shot n/a 40 (4x10) Lb S/N n/a Model B100 4474 / 2875 n/a X Verification on recordCertification #: 19858 Central Condutor Dia:
Serial: n/a Visible Prods Spacing: n/a Cal Date: n/a n/a Direct Current Rectified 10 Lb S/N 7986 n/a Wet X Yoke Direct Current Yoke Lift Test n/a X Alternating Current Cal Date: 2/12/2018 Model:X Dry Coil # Of Turns:
Particle Type Technique Current/Equipment Calibrations (Daily) Light Meter
Fixed X White Pre-Intensity (Foot-Candles): Post-Intensity (Foot-Candles):
Lighting Equipment Lighting Type Section
X Portable Black Pre-Intensity (µW/cm²): Post-Intensity (µW/cm²):
As welded Thickness: n/a Diameter: n/a n/a Coating: n/a
Inspection Procedure: QOP 9-MT-1 ASME Section VIII, division 1, appendix 6 Material/Lighting and Inspection Information Section
Structure: Lifting Beam Material Type: Carbon Steel Surface Conditions:
Job Location: Chattanooga. TN ICS WO#: 180016 Drawing Number:
Customer: ACME Industrial piping,Inc. Customer Job #: n/a Date: 2/12/2018
Magnetic Particle Inspection Report Report Number:_____1_____
Page_3__ of _6__
11135 Dayton Pike Soddy-Daisy, TN 37379 Phone: (423) 493-0097 Fax: (423) 435-9620 Form 6/30/13
Rev: Acceptance Standard:
Length:
Amps:
Job Location: Chattanooga. TN ICS WO#: 180016 Drawing Number:
Customer: ACME Industrial piping,Inc. Customer Job #: n/a Date: 2/12/2018
As welded Thickness: n/a Diameter: n/a n/a Coating: n/a
Inspection Procedure: QOP 9-MT-1 ASME Section VIII, division 1, appendix 6 Material/Lighting and Inspection Information Section
Structure: Lifting Beam Material Type: Carbon Steel Surface Conditions:
Lighting Equipment Lighting Type Section
X Portable Black Pre-Intensity (µW/cm²): Post-Intensity (µW/cm²):
Coil # Of Turns:
n/a Direct Current Rectified 10 Lb S/N 7986 n/a Wet X Yoke Direct Current Yoke Lift Test n/a X Alternating Current Cal Date: 2/12/2018 Model:X Dry Serial: n/a
Visible Prods Spacing: n/a Cal Date: n/a n/a Model B100 4474 / 2875 n/a X Verification on recordCertification #: 19858 Central Condutor Dia:
Fluorescent Head Shot n/a 40 (4x10) Lb S/N Cal Due:
Weld Identification or Part Number
W el de r I
.D
A cc ep t
R ej ec t
Type of Discontinuity Remarks
C ra ck
La p
L.
O
.F
A lig ne d
D ia m et er
Le ng th Accept= / Reject= X No Apparent Defects= NADU nd er cu t
Li ne ar
R ou nd ed
Top side indications
Po ro si ty
Se am
Sl ag
Indication number 9 X X
Indication number 19 X X Indication number 17 X X
Indication number 21 X X
ICS Technician
No
Kevin E Collier II
Sketch/Drawing/Location of Discontinuity Images Attached: X Yes
Indication number 20 X X
Certification Number Authorized Inspector
(Sign) Level Customer ReviewerICS Technician (Print)
Magnetic Particle Inspection Report Report Number:_____1_____
Page_4__ of _6__
11135 Dayton Pike Soddy-Daisy, TN 37379 Phone: (423) 493-0097 Fax: (423) 435-9620 Form 6/30/13
Rev: Acceptance Standard:
Length:
Amps:
n/a
Certification Number Authorized Inspector
(Sign) Level Customer ReviewerICS Technician (Print) ICS Technician
Kevin E Collier II
Sketch/Drawing/Location of Discontinuity Images Attached: X Yes No
Indication number 15 X X Top side indications
Po ro si ty
Se am
Sl ag
Weld Identification or Part Number
W el de r I
.D
A cc ep t
R ej ec t
Type of Discontinuity Remarks
C ra ck
La p
L.
O
.F
A lig ne d
D ia m et er
Le ng th Accept= / Reject= X No Apparent Defects= NADU nd er cu t
Li ne ar
R ou nd ed
Cal Date: n/a n/a Model B100 4474 / 2875 n/a X Verification on recordCertification #: 19858 Central Condutor Dia:
Fluorescent Head Shot
Serial: n/a Visible Prods Spacing: n/a n/a 40 (4x10) Lb S/N Cal Due: n/a Direct Current Rectified 10 Lb S/N 7986 n/a n/a X Alternating Current Cal Date: 2/12/2018 Model:X Dry Coil # Of Turns:
Lighting Equipment Lighting Type Section
X Portable Black Pre-Intensity (µW/cm²): Post-Intensity (µW/cm²):
As welded Thickness: n/a Diameter: n/a n/a Coating: n/a
Inspection Procedure: QOP 9-MT-1 ASME Section VIII, division 1, appendix 6 Material/Lighting and Inspection Information Section
Structure: Lifting Beam Material Type: Carbon Steel Surface Conditions:
Job Location: Chattanooga. TN ICS WO#: 180016 Drawing Number:
Customer: ACME Industrial piping,Inc. Customer Job #: n/a Date: 2/12/2018
Magnetic Particle Inspection Report Report Number:_____1_____
Page_5__ of _6__
11135 Dayton Pike Soddy-Daisy, TN 37379 Phone: (423) 493-0097 Fax: (423) 435-9620 Form 6/30/13
Rev: Acceptance Standard:
Length:
Amps:
Job Location: Chattanooga. TN ICS WO#: 180016 Drawing Number:
Customer: ACME Industrial piping,Inc. Customer Job #: n/a Date: 2/12/2018
As welded Thickness: n/a Diameter: n/a n/a Coating: n/a
Inspection Procedure: QOP 9-MT-1 ASME Section VIII, division 1, appendix 6 Material/Lighting and Inspection Information Section
Structure: Lifting Beam Material Type: Carbon Steel Surface Conditions:
Lighting Equipment Lighting Type Section
X Portable Black Pre-Intensity (µW/cm²): Post-Intensity (µW/cm²):
n/a Wet X Yoke Direct Current Yoke Lift Test n/a X Alternating Current Cal Date: 2/12/2018 Model:X Dry Coil # Of Turns:
Fluorescent Head Shot
Serial: n/a Visible Prods Spacing: n/a n/a 40 (4x10) Lb S/N Cal Due: n/a Direct Current Rectified 10 Lb S/N 7986 Cal Date: n/a n/a Model B100 4474 / 2875 n/a X Verification on recordCertification #: 19858 Central Condutor Dia:
Weld Identification or Part Number
W el de r I
.D
A cc ep t
R ej ec t
Type of Discontinuity Remarks
C ra ck
La p
L.
O
.F
A lig ne d
D ia m et er
Le ng th Accept= / Reject= X No Apparent Defects= NAD
Bottom side indications
Po ro si ty
Se am
Sl ag
U nd er cu t
Li ne ar
R ou nd ed
Indication number 14 X X
Indication number 18 X X Indication number 16 X X
Kevin E Collier II
Sketch/Drawing/Location of Discontinuity Images Attached: X Yes No n/a
(Sign) Level Customer ReviewerICS Technician (Print) ICS Technician
Magnetic Particle Inspection Report Report Number:_____1_____
Page_6__ of _6__
11135 Dayton Pike Soddy-Daisy, TN 37379 Phone: (423) 493-0097 Fax: (423) 435-9620 Form 6/30/13
Rev: Acceptance Standard:
Length:
Amps:
Job Location: Chattanooga. TN ICS WO#: 180016 Drawing Number:
Customer: ACME Industrial piping,Inc. Customer Job #: n/a Date: 2/12/2018
As welded Thickness: n/a Diameter: n/a n/a Coating: n/a
Inspection Procedure: QOP 9-MT-1 ASME Section VIII, division 1, appendix 6 Material/Lighting and Inspection Information Section
Structure: Lifting Beam Material Type: Carbon Steel Surface Conditions:
n/a Wet X Yoke Direct Current Yoke Lift Test n/a X Alternating Current Cal Date: 2/12/2018 Model:X Dry Coil # Of Turns:
Fluorescent Head Shot
Serial: n/a Visible Prods Spacing: n/a n/a 40 (4x10) Lb S/N Cal Due: n/a Direct Current Rectified 10 Lb S/N 7986 Cal Date: n/a n/a Model B100 4474 / 2875 n/a X Verification on recordCertification #: 19858 Central Condutor Dia:
Weld Identification or Part Number
W el de r I
.D
A cc ep t
R ej ec t
Type of Discontinuity Remarks
C ra ck
La p
L.
O
.F
A lig ne d
D ia m et er
Le ng th Accept= / Reject= X No Apparent Defects= NAD inside indications
Po ro si ty
Se am
Sl ag
U nd er cu t
Li ne ar
R ou nd ed
Indication number 10 X X
Base metal indication Indication number 12 X X Indication number 11 X X
Base metal indicationIndication number 13 X X
Kevin E Collier II
Inside hook housing
Sketch/Drawing/Location of Discontinuity Images Attached: X Yes No n/a
Magnetic Particle Inspection Report Report No: WFMT022018 Page (1) of (1)
11135 Dayton Pike Soddy-Daisy, TN 37379 Phone: (423) 493-0097 Fax: (423) 435-9620 Form 6/30/13
Acceptance Standard:
Length:
Amps:
Job Location: Chattanooga, TN ICS WO#: 180016 Drawing Number: 535-10A Customer: ACME Industrial Piping Customer Job #: n/a Date: 2/20/2018
Structure: Main Lifting Beam Hook Material Type: CS Surface Conditions: Brushed
Inspection Procedure: QOP 9 - MT-1 Rev: 6 Info.
Material/Lighting and Inspection Information Section
N/A Lighting Equipment Lighting Type Section
X Portable X Black Pre-Intensity (µW/cm²): >1,000
Thickness: n/a Diameter: Reference Spool No. N/A Coating:
Post-Intensity (µW/cm²): >1,000 Fixed White Pre-Intensity (Foot-Candles): Post-Intensity (Foot-Candles):
Coil # Of Turns: Alternating Current Cal Date: 2/20/2018 Model:Dry
Direct Current Rectified 10 Lb. X X Wet X Yoke Direct Current Yoke Lift Test
X
Certification #: 16M11K Central Condutor Dia:
Serial:
Visible Prods Spacing: Cal Date:
6 40 (4x10) Lb.
Model B-100 / 4474 S/N: 7966 X Verification on record
Cal Due:
Weld Identification or Part Number
W el de r I
.D
A cc ep t
R ej ec t
Type of Discontinuity Remarks
C ra ck
La p
L.
O
.F
A lig ne d
D ia m et er
Le ng th Accept= / Reject= X No Apparent Defects= NADU nd er cu t
Li ne ar
R ou nd ed
X Fluorescent Head Shot
Lifting Hook
Po ro si ty
Se am
Sl ag
NAD
No
Kevin E Collier II
Sketch/Drawing/Location of Discontinuity Images Attached: X Yes
N/A
Visual Inspection Report Castings
Report Number: VT0220
Page (11) of (11)
11135 Dayton Pike Soddy-Daisy, TN 37379 Phone: (423) 493-0097 Fax: (423) 435-9620 Form 6/30/13
Rev: Acceptance Standard:
N/A Certification Number Authorized Inspector
(Sign) Level Customer Reviewer(Print) ICS TechnicianICS Technician
No
Pictures for reference only.
Kevin E. Collier II
Images Attached: Yes XSketch/Drawing/Location of Discontinuity
NADLifting Link Lifting Device
X Verification on Record
U nd er si ze d w el d Accept = / Reject = X No Apparent Defects = NAD
NAD
U nd er cu t
U nd er fil l
Ex ce ss iv e Co nv ex ity
W el d Re pa ir Heat Number (if applicable) Drawing Number and Serial Number
Final Visual Remarks
A cc ep t
R ej ec t
G as
H ol es
Sh rin ka ge
La ps
Te ar s
C ra ck
Po ro si ty
6" scale Post-Intensity (Foot Candles): >100 fc Other: V-WAC Gage Pre-Intensity (Foot Candles): >100 fc Cal Date:
Cal Due:
X Hi-Lo GageFillet Gages Fixed Serial:
X Model:
Direct Viewing Technique X Remote Viewing Technique:
Mirror Bridgecam Portable
Remote Viewing Device S/N:
Inspection Aids/Instruments Lighting Information (White Light) Light Meter
Are Dimensions within acceptable limits Yes No X N/A
Inspection Procedure: QOP 9-VT-1 6 AWS D1.1 Material/Lighting and Inspection Information
Component Identification: Lifting Device for main Shaft & Inner Head Cover
Job Location: Chattanooga T.N. ICS WO#: 180016 Drawing Number: 38689 Customer: ACME Industrial Piping Inc. Customer Job #: Date: 2/20/2018
Visual Inspection Report Castings
Report Number: VT0220
Page (10) of (11)
11135 Dayton Pike Soddy-Daisy, TN 37379 Phone: (423) 493-0097 Fax: (423) 435-9620 Form 6/30/13
Rev: Acceptance Standard:
N/A Certification Number Authorized Inspector
Level Customer Reviewer(Print)ICS Technician ICS Technician (Sign)
No
Picture for reference only.
Kevin E. Collier II
Sketch/Drawing/Location of Discontinuity Images Attached: Yes X
Pedestal X XX
Heat Number (if applicable) Drawing
Number and Serial Number
Final Visual Remarks
A cc ep t
R ej ec t
G as
H ol es
Sh rin ka ge
La ps
Te ar s
X Verification on Record
U nd er si ze d w el d Accept = / Reject = X No Apparent Defects = NAD
C ra ck
Po ro si ty
U nd er cu t
U nd er fil l
Ex ce ss iv e Co nv ex ity
W el d Re pa ir
6" scale Post-Intensity (Foot Candles): >100 fc Cal Due:
Other: V-WAC Gage Pre-Intensity (Foot Candles): >100 fc Cal Date:
Fixed Serial:X Fillet Gages Hi-Lo Gage X Portable Model:Mirror Bridgecam
Remote Viewing Device S/N:
Inspection Aids/Instruments Lighting Information (White Light) Light Meter
N/A
Direct Viewing Technique X Remote Viewing Technique:
Are Dimensions within acceptable limits Yes No X
Inspection Procedure: QOP 9-VT-1 6 AWS D1.1 Material/Lighting and Inspection Information
Component Identification: PEDESTAL, for assembling rotor
Job Location: Chattanooga T.N. ICS WO#: 180016 Drawing Number: 161D221 Customer: ACME Industrial Piping Inc. Date: 2/20/2018Customer Job #:
Visual Inspection Report Castings
Report Number: VT0220
Page (9) of (11)
11135 Dayton Pike Soddy-Daisy, TN 37379 Phone: (423) 493-0097 Fax: (423) 435-9620 Form 6/30/13
Rev: Acceptance Standard:
N/A Certification Number Authorized Inspector
(Sign) Level Customer ReviewerICS Technician (Print) ICS Technician
No
Kevin E. Collier II
Images Attached: X YesSketch/Drawing/Location of Discontinuity
YOKE X XX
Heat Number (if applicable) Drawing
Number and Serial Number
Final Visual Remarks
A cc ep t
R ej ec t
G as
H ol es
Sh rin ka ge
La ps
Te ar s
X Verification on Record
U nd er si ze d w el d Accept = / Reject = X No Apparent Defects = NAD
C ra ck
Po ro si ty
U nd er cu t
U nd er fil l
Ex ce ss iv e Co nv ex ity
W el d Re pa ir
6" scale Post-Intensity (Foot Candles): >100 fc Cal Due:
Other: V-WAC Gage Pre-Intensity (Foot Candles): >100 fc Cal Date:
Fixed Serial:X Fillet Gages Hi-Lo Gage X Portable Model:Mirror Bridgecam
Remote Viewing Device S/N:
Inspection Aids/Instruments Lighting Information (White Light) Light Meter
N/A
Direct Viewing Technique X Remote Viewing Technique:
Are Dimensions within acceptable limits Yes No X
Inspection Procedure: QOP 9-VT-1 6 AWS D1.1 Material/Lighting and Inspection Information
Component Identification: YOKE
Job Location: Chattanooga T.N. ICS WO#: 180016 Drawing Number: 162D321
Visual Inspection Report Castings
Report Number: VT0220
Page (8) of (11)
11135 Dayton Pike Soddy-Daisy, TN 37379 Phone: (423) 493-0097 Fax: (423) 435-9620 Form 6/30/13
Rev: Acceptance Standard:QOP 9-VT-1
James Steward II
N/A
RemarksFinal Visual
X
6" scale
X
Sketch/Drawing/Location of Discontinuity
(B) X
Heat Number (if applicable) Drawing
Number and Serial Number A cc ep t
R ej ec t
G as
H ol es
Sh rin ka ge
La ps
Te ar s
C ra ck
(A) Half lifting rig assembly
Po ro si ty
X X
No
X
Accept = / Reject = X No Apparent Defects = NADU nd er si ze d w el d
U nd er cu t
Images Attached: X Yes
ACME Industrial Piping Inc.
AWS D1.1
Remote Viewing Technique:
Lighting Information (White Light) Light Meter Model:
Serial:
Cal Date:
Cal Due:
X
ICS Technician (Print) ICS Technician (Sign) Level
Material/Lighting and Inspection Information
Date:
40027Job Location: Chattanooga T.N.
Customer Job #:
ICS WO#: 180016 Drawing Number:
2/20/2018
Inspection Procedure:
Customer:
Component Identification:
Post-Intensity (Foot Candles): >100 fc Pre-Intensity (Foot Candles): >100 fc
Authorized InspectorCertification Number
Customer Reviewer
Lifting Rig for Pipes in Main Shaft
Are Dimensions within acceptable limits Yes No X N/A
Direct Viewing Technique X
Inspection Aids/Instruments
X Mirror Fillet Gages
Bridgecam
Remote Viewing Device S/N:
Verification on Record
X Portable FixedHi-Lo Gage
Other: V-WAC Gage
X X
U nd er fil l
X X
W el d Re pa ir
Su rf ac e
Co nd iti on
Pictures for reference only
Visual Inspection Report Castings
Report Number: VT0220
Page (7) of (11)
11135 Dayton Pike Soddy-Daisy, TN 37379 Phone: (423) 493-0097 Fax: (423) 435-9620 Form 6/30/13
Rev: Acceptance Standard:
N/A Certification Number Authorized Inspector
(Sign) Level Customer ReviewerICS Technician (Print) ICS Technician
No
James Steward II
Images Attached: X YesSketch/Drawing/Location of Discontinuity
X XLink 4 X
Link 2 Link 1 X
X X
NAD
Link 3 X
XX
Heat Number (if applicable) Drawing
Number and Serial Number
Final Visual Remarks
A cc ep t
R ej ec t
G as
H ol es
Sh rin ka ge
La ps
Te ar s
X Verification on Record
U nd er si ze d w el d Accept = / Reject = X No Apparent Defects = NAD
C ra ck
Po ro si ty
U nd er cu t
U nd er fil l
Su rf ac e
Co nd iti on
W el d Re pa ir
6" scale Post-Intensity (Foot Candles): >100 fc Cal Due:
Other: V-WAC Gage Pre-Intensity (Foot Candles): >100 fc Cal Date:
Fixed Serial:X Fillet Gages Hi-Lo Gage X Portable Model:Mirror Bridgecam
Remote Viewing Device S/N:
Inspection Aids/Instruments Lighting Information (White Light) Light Meter
N/A
Direct Viewing Technique X Remote Viewing Technique:
Are Dimensions within acceptable limits Yes No X
Inspection Procedure: QOP 9-VT-1 6 AWS D1.1 Material/Lighting and Inspection Information
Component Identification: 1-1/2" Lifting Links
Job Location: Chattanooga T.N. ICS WO#: 180016 Drawing Number: 38688
Visual Inspection Report Castings
Report Number: VT0220
Page (6) of (11)
11135 Dayton Pike Soddy-Daisy, TN 37379 Phone: (423) 493-0097 Fax: (423) 435-9620 Form 6/30/13
Rev: Acceptance Standard:
N/A Certification Number Authorized Inspector
(Sign) Level Customer ReviewerICS Technician (Print) ICS Technician
No
James Steward II
Images Attached: X YesSketch/Drawing/Location of Discontinuity
Link 2 Link 1 X X X X
X X X
Heat Number (if applicable) Drawing
Number and Serial Number
Final Visual Remarks
A cc ep t
R ej ec t
G as
H ol es
Sh rin ka ge
La ps
Te ar s
X Verification on Record
U nd er si ze d w el d Accept = / Reject = X No Apparent Defects = NAD
C ra ck
Po ro si ty
U nd er cu t
U nd er fil l
Ex ce ss iv e Co nv ex ity
W el d Re pa ir
6" scale Post-Intensity (Foot Candles): >100 fc Cal Due:
Other: V-WAC Gage Pre-Intensity (Foot Candles): >100 fc Cal Date:
Fixed Serial:X Fillet Gages Hi-Lo Gage X Portable Model:Mirror Bridgecam
Remote Viewing Device S/N:
Inspection Aids/Instruments Lighting Information (White Light) Light Meter
N/A
Direct Viewing Technique X Remote Viewing Technique:
Are Dimensions within acceptable limits Yes No X
Inspection Procedure: QOP 9-VT-1 6 AWS D1.1 Material/Lighting and Inspection Information
Component Identification: 2-1/2" Lifting Links
Job Location: Chattanooga T.N. ICS WO#: 180016 Drawing Number: 39178-A
Visual Inspection Report Castings
Report Number: VT0220
Page (5) of (11)
11135 Dayton Pike Soddy-Daisy, TN 37379 Phone: (423) 493-0097 Fax: (423) 435-9620 Form 6/30/13
Rev: Acceptance Standard:
N/A Certification Number Authorized Inspector
(Sign) Level Customer ReviewerICS Technician (Print) ICS Technician
No
James Steward II
Images Attached: X YesSketch/Drawing/Location of Discontinuity
X X X X X X
Pedestal 4 X X
Pedestal 2
Pedestal 5 X X
Pedestal 1 X X
X XPedestal 3 X X X
X X X X X X X X
Heat Number (if applicable) Drawing
Number and Serial Number
Final Visual…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .