W912P522R0003 ProjNet Questions and Answers.pdf
PDF 1 MB Posted
- Attached to
- Old Hickory Turbine Generator Rehabilitation
- Solicitation number
- W912P522R0003
About this file
This solicitation is for a firm fixed-price construction contract to rehabilitate turbine generator units at Old Hickory Power Plant in Hendersonville, Tennessee. The scope of work includes rewinding the stator windings and replacing the turbine runners for Units 1, 2, and 3 to increase maximum generator output to 45 megawatts. Unit 4's generator was recently rewound, but its turbine runner was not replaced. Additional work involves refurbishing or replacing mechanical, electrical, and monitoring systems to support the increased loads. The estimated contract value is between $25-100 million. The project term is estimated at two years for the first unit's model testing, design, and fabrication, followed by eighteen months of installation per base unit. Interested vendors must submit technical inquiries and questions through ProjNet and attend a mandatory site visit on May 5, 2022 by registering through the contact provided. The question and answer period is open, and proposals are due June 9, 2022.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5/19/22, 3:55 PM ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech 1/15
Controlled Unclassified Information (CUI) Only
Bid Inquiry Technical Evaluators Report Unresolved Inquiries
Project: Turbine Generator Rehabilitation Review: Bidder Inquiry (00001) (sorted by CommentID ) Displaying 48 inquiries.
Id Discipline Sheet Detail Spec 9701766 Contracting SF-1442 Comment Classification: Controlled Unclassified Information (CUI)
Given the scope of the RFP, it is not possible to submit a responsive bud by the 19-May-2022 date as specified in the SF-1442.
The Contractor kindly requests the the bid due date be extended by a minimum of 45 days and further requests an expedited response to this request.
On: Apr 21 2022. Forward request by email.
1-0 Evaluation Concurred. This will be addressed in an amendment By: Kristal Jones; Contracting Division; (615-
736-7916) On: May 03 2022 2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022 Current Request Status: Request Working
Information for this report is procurement sensitive.
9701793 Contracting Contract Clauses W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Given the current market/supply-chain and transportation volatility, which was compounded by the Russian invasion of Ukraine, it is virtually impossible to get any type of price validity from material suppliers (foundries, etc.) and logistics companies. The Contractor's Board of Directors is requesting that all new contracts include an Economic Price Adjustment clause in order to approve submitting a bid.
The Contractor kindly request that an EPA clause, similar to the one in the Little Rock District's Norfork RFP, be included in the Section 00 73 00 - Supplementary Conditions.
On: Apr 21 2022. Forward request by email.
1-0 Evaluation Check and Resolve. Based on conversations with OC, approval from LRD and SCO to use EPA clauses would not happen. Also use of EPA clauses will cause the cost estimate for this project to be over $100M. By: Kristal Jones; Contracting Division; (615-736-7916) On: May 04 2022
2-0 Evaluation Concurred. No additional information will be provided. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9706983 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
We kindly request an extension to the bid due date of at least 8 weeks, until July 14th. A proposal of this magnitude typically requires a minimum of 4 months to prepare. With the requested extension, we would be at 3 months. This is just enough time to prepare a proposal, less than that is not feasible.
On: Apr 25 2022. Forward request by email.
1-0 Evaluation Concurred. This will be addressed in amendment. By: Kristal Jones; Contracting Division; (615-736-
7916) On: May 04 2022 2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022 Current Request Status: Request Working
Information for this report is procurement sensitive.
9707002 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Due to the expected duration of the project (exceeding 5 years), our surety companies will not accept to issue one bond for all units, valid until the end of the warranty period of the last unit. Would it be acceptable for the District to allow Contractor to bond https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech&RequestTimeout=1000&pagStrRowSort=SpecText https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9701766 mailto:Kristal.R.Jones@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9701793 mailto:Kristal.R.Jones@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9706983 mailto:Kristal.R.Jones@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech 2/15 each unit separately? If not, would the District consider implementing a rolling bond approach as it has been implemented in the past by USACE on other projects?
On: Apr 25 2022. Forward request by email.
1-0 Evaluation Concurred. It may be possible to implement rolling bonds for this project based on its usage in previous projects of this size and magnitude. By: Kristal Jones; Contracting Division; (615-736-7916) On: May 04 2022 2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022 Current Request Status: Request Working
Information for this report is procurement sensitive.
9707550 Hydropower instruction to Bidders 1.8 Site Visit section 20 21 00 Comment Classification: Controlled Unclassified Information (CUI)
Typical Site visit Generator data taking time is (6 to 10 hours) and requires status of the following questions on the status of the unit(s) during the site visit on May 5, 2022.
1. For data taking will the rotor be out of the machine?
2. Will all end bells are removed?
3. Are both ends of the windings and the back of the winding accessible?
4. Plant contact name and cell number?
5. Plant contact phone number at plant?
6. Do you have a spare coil available to measurements?
7. Do you folks have a spare Laminate for measurements?
8. Is it possible for the USACE to post a photo of the nameplate?
Thank you in advance for your prompt response for our pre site visit planning, On: Apr 25 2022. Forward request by email.
1-0 Evaluation For Information Only. Full access was given during site vist, contractors shall propose as shown. By:
Zach Langel; LRN Nashville District; (312-846-5421) On: May 09 2022 2-0 Evaluation Non-concurred. No additional information will be provided. By: Jack McCollister; Hydroelectric Design
Center; (503-808-5263) On: May 19 2022 Current Request Status: Request Working
Information for this report is procurement sensitive.
9710754 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications /48 13 13.00 / Para. 3.1.3 The contractor asks that the Government please confirm that the following interpretation is correct: The contractor understands that the model test results shall be presented without any adjustments for uncertainties. However, the contractor understands that test stand uncertainty shall be taken into account in evaluating the guaranteed performance.
On: Apr 27 2022. Forward request by email.
1-0 Evaluation Check and Resolve. This bidder inquiry comment is peculiar, as there is not really any ambiguity to the requirements of 48 13 13.00, paragraph 3.1.3. In particular, that paragraph mentions, "Guarantees shall be verified based on unadjusted test results." The intent is to keep uncertainty within an acceptable amount (less than 0.25%) and apply no uncertainty to results from testing. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On:
May 16 2022
2-0 Evaluation Check and Resolve. No additional information will be provided. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9710756 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 48 13 13.01 / Para. 1.5.2 a The Contractor asks that the Government please confirm that the following interpretation is correct: While the prototype WAE is verified during model testing, only the prototype power output will be verified at prototype scale (see paragraph 1.5.7.2).
On: Apr 27 2022. Forward request by email.
1-0 Evaluation Concurred. This is correct. Efficiencies are to be verified through model testing. Index testing of the first prototype unit installed will serve to verify power output and cam curve accuracy. By: Jack McCollister; Hydroelectric https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9707002 mailto:Kristal.R.Jones@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9707550 mailto:Zach.A.Langel@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9710754 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9710756 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech 3/15
Design Center; (503-808-5263) On: May 01 2022 2-0 Evaluation Concurred. No additional information will be provided By: Jack McCollister; Hydroelectric Design
Center; (503-808-5263) On: May 19 2022 Current Request Status: Request Working
Information for this report is procurement sensitive.
9710758 Hydropower W9127N23R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 48 13 13.01 / Para. 1.5.2 The Contractor asks that the Government please confirm that the following interpretation is correct: In Table 2, the Maximum Guaranteed Protype Turbine Power Output (hp) should read 28,500 hp, as is specified in Table 1.
On: Apr 27 2022. Forward request by email.
1-0 Evaluation Concurred. This comment is likely due to inconsistency between the higher points at 29.5 ft. on Tables
1 and 2. For other heads that appear on both tables, the same point (same hp) was used, but at 29.5 ft, Table 1 lists 28,000 hp and Table 2 shows 28,500 hp. Table 1 serves to define the points at which the weighted efficiency will be calculated; it is not necessary that those points be precisely at the anticipated limits, as long as they are scattered across the operating range and reflect how we value efficiency across the operating range (through the weighting factor). Table 2 shows the boundaries for limiting cavitation. Input during the HRAR indicated that 28,500 hp at 29.5 ft is within reason to expect. The first paragraph under 1.5.3.1 links the two tables together in a way, so if we are to make any changes, I believe it would be appropriate to remove "and the entire area...Table 1 operational points." from the end of that first paragraph under 1.5.3.1. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On:
May 01 2022
2-0 Evaluation Concurred. (will leave this for Amendment 3 to address with an overlapping question that was received more recently) By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9710760 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 48 13 13.01 / Para. 1.5.7.2 The Contractor asks that the Government please confirm that the following interpretation is correct: The Contractor understands that only the maximum power at a net head of 54 feet will be used to determine compliance with the prototype performance guarantee.
On: Apr 27 2022. Forward request by email.
1-0 Evaluation Check and Resolve. 61,600 HP is the specified output the runner shall be capable of achieving at net heads greater than or equal to 54 feet. This is to be verified through the index testing. Compliance with guaranteed efficiencies is based upon model testing. Prototype performance with relation to the guaranteed cavitation limits is as defined under 48 13 13.01, paragraph 1.5.3. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On:
May 01 2022
2-0 Evaluation Check and Resolve. No additional information will be provided. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9710762 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 48 13 13.01 / Para. 1.5.3.2 The Contractor asks that the Government please confirm that the following interpretation is correct: The Contractor understands that the depth of cavitation must be less than 1/8 inch in an area of two square inches OR LESS.
On: Apr 27 2022. Forward request by email.
1-0 Evaluation Check and Resolve. "OR GREATER" as written in the contract is correct. Perhaps what makes the sentence confusing is the use of "within." It could be changed to read: "...or the removal of metal to a depth exceeding 1/8-inch in an area of two (2) square inches or greater." By: Jack McCollister; Hydroelectric Design Center; (503- 808-5263) On: May 01 2022
2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9710758 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9710760 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9710762 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech 4/15
9710763 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 48 13 13.01 / Para. 1.5.6 a The Contractor asks that the Government please confirm that the following interpretation is correct: The Contractor understands that the 97% peak-to-peak pressure pulsations will be the criteria for measurement.
On: Apr 27 2022. Forward request by email.
1-0 Evaluation Non-concurred. "97% peak-to-peak pressure pulsations" is not mentioned anywhere in the contract. 48
13 13.00, paragraph 3.1.11 d. defines a 7% limit to pressure pulsations within a specified range. 48 13 13.01, paragraph 1.5.6 a refers to that paragraph. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On:
May 01 2022
2-0 Evaluation Concurred. Please see spec section 48 13 13.00, paragraph 3.1.11 d. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9710765 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
W912P522R0003 final / X. CAVITATION PITTING GUARANTEE The Contractor asks that the Government please confirm that the following interpretation is correct: If a third cavitation repair is required, then a lump sum payment of $100,000 shall be paid by the contractor and no further cavitation repairs or LDs for cavitation repairs shall be performed by the Contractor.
On: Apr 27 2022. Forward request by email.
1-0 Evaluation Concurred. This is explicitly clarified in the final subparagraph of 48 13 13.01, paragraph 1.5.3.1. By:
Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 16 2022 2-0 Evaluation Concurred. Please see specification section 48 13 13.01, paragraph 1.5.3.1. By: Jack
McCollister; Hydroelectric Design Center; (503-808-5263) On: May 19 2022 Current Request Status: Request Working
Information for this report is procurement sensitive.
9711169 Hydropower W912P522R0003 Comment Classification: Public (Public) we are unable to download the final spec as of today (04-27). The bid time given for a project of this size is too short. We kindly request for 8 weeks extension for us to put together a quality proposal.
On: Apr 27 2022. Forward request by email.
1-0 Evaluation Concurred. This will be addressed in an amendment. By: Kristal Jones; Contracting Division; (615-
736-7916) On: May 04 2022 2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022 Current Request Status: Request Working
Information for this report is procurement sensitive.
9714672 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
The RFQ, Section 48 13 16.00 26, page 16, item 2.5.2.3 (Ground Insulation), requests to provide ground insulation that consists of multiple overlapped layers of mica tapes applied continuously throughout the entire length of the coil. Apply the same number of overlapped layers to achieve an equal thickness of ground insulation throughout the coil.
GE Request to change the text for the following: provide ground insulation that consists of multiple overlapped layers of mica tapes applied continuously throughout the entire length of the coil. Apply sufficient number of overlapped layers to achieve an required thickness of ground insulation throughout the coil to support the electrical stress in each area and meet the minimum required gap between parallel arms.
Reason for change: The straight part insulation is applied by an automatic taping machine while the insulation in the knuckles may be applied manually. A scarf join located in the overhang (after the bend) will ensure a good overlap of the insulation from the straight part to the insulation in the knuckles. Compression of the insulation in the overhangs is performed mainly by shrinking tapes and flat metal shims which could lead to a wider variation of the insulation thickness compared to the straight part of the coils. Therefore, ground wall insulation thickness in the overhangs could be thicker than in the slot part if the number of layers is the same. Knowing that electrical stress in the overhangs is lower than in the slot part, it is less critical to have a https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9710763 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9710765 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9711169 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech 5/15 smaller number of mica layers in overhangs. As a consequence, to avoid reducing the clearance between the overhangs, and in order to meet the Corona tests requirement after winding installation, GE would design the knuckle insulation with less number of mica layers. In all cases, the final validation of the coils will be performed through the electrical tests and the mockup geometry check (i.e., air distance between coils) to ensure the expected lifetime of the winding.
On: Apr 29 2022. Forward request by email.
1-0 Evaluation Concurred. *DRAFT REPLY
Concur, see revised specification language. By: Rudy Hernandez; Hydroelectric Design Center; ((503) 808-4234) On: May 13 2022
2-0 Evaluation Concurred. Will be addressed via amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9714674 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
The RFQ section 48 13 16.00 26, page 16, item 2.5.2.4 (Coil Consolidation) requests to bond the slot and end winding portions of the assembled strands into a homogenous structure of controlled size using heat and pressure.
GE request to change the text for the following: Bond the slot portion of the assembled strands into a homogenous structure of controlled size using heat and pressure
Reason for request: The overhangs of green coils are not consolidated
On: Apr 29 2022. Forward request by email.
1-0 Evaluation Concurred. *DRAFT REPLY
Concur, see revised specification language. By: Rudy Hernandez; Hydroelectric Design Center; ((503) 808-4234) On: May 13 2022
2-0 Evaluation Concurred. Will be addressed via amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9714675 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
The RFQ, Section 48 13 16.00 26, page 28, item 3.4.(b) (Coil dissections) requests one (1) slice from the coil grading tape section within 1.5" to 2" from the edge of the grading tape nearest the slot.
GE request to change to One (1) slice from the coil grading tape section 1.0" from the edge of the grading tape nearest the slot.
Reason for request: 1.5" to 2" is in the bending area
On: Apr 29 2022. Forward request by email.
1-0 Evaluation Concurred. *DRAFT REPLY
Concur, see revised specification language. By: Rudy Hernandez; Hydroelectric Design Center; ((503) 808-4234) On: May 13 2022
2-0 Evaluation Concurred. Will be addressed via amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9714676 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
The RFQ, Section 48 13 16.00 26, page 29, item 3.5.2 (Thermal Cycling test Method) requests to perform the diagnostic tests listed in IEEE 1310, clauses 7.1, 7.2, 7.3, 7.4, and 7.5 prior to and at the completion of the thermal cycling test.
GE request to change to Perform the diagnostic tests listed in IEEE 1310, clauses 7.1, 7.2, 7.3, 7.4, and 7.5 prior to and at the completion of the thermal cycling test, for information.
Reason for request: GE considers that diagnostic Test results during and after Thermal Cycling Test will be for information only.
The acceptance criteria for Thermal cycling is the Voltage Endurance Test.
On: Apr 29 2022. Forward request by email.
https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9714672 mailto:Rudy.Hernandez@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9714674 mailto:Rudy.Hernandez@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9714675 mailto:Rudy.Hernandez@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9714676 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech 6/15
1-0 Evaluation Concurred. *DRAFT REPLY Concur, see revised specification language. By: Rudy Hernandez; Hydroelectric Design Center; ((503) 808-4234) On: May 13 2022
2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9714677 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
The RFQ, Section 48 13 16.00 26, page 46, item 3.26 (d) (Blackout test) requests to perform blackout tests at 9.2 kV and 15.8 kV as described in IEEE 1799 paragraph 6.3. No corona visible to the naked eye will be allowed.
GE request to change to perform blackout tests at 9.2 kV and the voltage at the maximum line voltage of the winding diagram as described in IEEE1799 paragraph 6.3. No corona visible to the naked eye will be allowed. Use a corona imaging instrument as backup to visual observations.
Reason for request: The voltage level of the blackout test is impacting directly the air distance design between the coil overhangs and corona camera avoids misunderstandings during test.
On: Apr 29 2022. Forward request by email.
1-0 Evaluation Concurred. *DRAFT REPLY
Revised specification language for one test at 10 kV. See revised specification language. By: Rudy Hernandez; Hydroelectric Design Center; ((503) 808-4234) On: May 13 2022
2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9717863 Hydropower Section 00 22 16 - 7.1 Comment Classification: Controlled Unclassified Information (CUI)
Section 00 22 16 – 7.1 Volume 1 – Factor 1 – Past Performance:
We kindly request that the allowed magnitude for each project reference to be increased up to 200 MW and 200MVA.
On: May 02 2022. Forward request by email.
1-0 Evaluation Non-concurred. Non-concur. 200MW is much too far from being relevant to current scope (~45 MW &
~45 MVA after rehab). Range is already sufficient to not overly restrict relevancy. By: Joseph Van Deusen; Electrical & Mechanical Design Section; (615-736-5623) On: May 12 2022
2-0 Evaluation Non-concurred. No additional information will be provided. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9721438 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
We kindly request that the Government make the following drawings available:
- stator frame;
- pole keys;
- pole assembly drawing.
On: May 04 2022. Forward request by email.
1-0 Evaluation Concurred. *Draft Reply
The Government does not have OEM drawings for the stator frame, pole keys, or Pole Assembly. The Government does have pole key drawings developed during the Unit 4 rehab which it will provide. These drawings also have limited pole assembly information. See amendment for these drawings. By: Rudy Hernandez; Hydroelectric Design Center;
((503) 808-4234) On: May 19 2022
2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022
Current Request Status: Request Working mailto:Rudy.Hernandez@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9714677 mailto:Rudy.Hernandez@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9717863 mailto:Joseph.R.VanDeusen@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9721438 mailto:Rudy.Hernandez@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech 7/15
Information for this report is procurement sensitive.
9725138 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 01 22 00.00 / Para. 1.3.8 and 48 13 13.04 / Para. 3.12.4 Item No. 3212 Machining of Stay Ring Mounting Flange for Outer Head Cover, Unit 3 (OPTIONAL)
3.12.4 Machining of Stay Ring Headcover Mounting Flange (Base for Unit 3 and Optional for Units 1 and 2)
Please confirm if this work for Unit 3 shall be considered as base or optional.
On: May 06 2022. Forward request by email.
1-0 Evaluation Concurred. Recommend that we make minor adjustments to 48 13 13.04 to make this consistent optional scope for Units 1-3. Amendment detail for Section 48 13 13.04. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 16 2022
2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9725142 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 01 22 00.00 / Para. 1.3.4 and 48 13 13.04 / Para. 3.16.4
Does one (1) facing plate mean one (1) 30 degrees section or the facing plates for one (1) complete bottom ring?
On: May 06 2022. Forward request by email.
1-0 Evaluation Concurred. Will clarify with amendment to 01 22 00.00 and 48 13 13.04. One facing plate refers to one
30-degree segment of facing plate. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 16
2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9725148 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 48 13 13.04 / Para. 3.20.9
"However, the Contractor shall include 1/4" of machining stock on the gate end faces."
Does the machining stock have do be Nitronic 60 (for a total of 1/2" plate or 11/32" overlay) or will the Nitronic be added later?
On: May 06 2022. Forward request by email.
1-0 Evaluation Concurred. Spare gates should be as ready for use as practical. The machining stock should be
Nitronic 60. Will address via amendment to 48 13 13.04. By: Jack McCollister; Hydroelectric Design Center; (503- 808-5263) On: May 16 2022
2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9725149 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 48 13 13.04 / Para. 3.23.1
"The wicket gate stem bushing housings (the bores into which the wicket gate bushings are inserted) in the headcover and bottom ring shall be field line bored using a Contractor furnished boring bar that will remain the property of the Contractor."
Can it be done in shop instead of field?
https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9725138 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9725142 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9725148 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech 8/15
On: May 06 2022. Forward request by email.
1-0 Evaluation Non-concurred. Non-concur. No change recommended. Specs should be as written such that field machining is performed for all WG bores. We can entertain a detailed plan as a variance after award where there is more control over the method. Changing the prescribed method prior to award is not recommended. Therefore, no change. WG bores specified to be maching in the field as currently written. By: Joseph Van Deusen; Electrical & Mechanical Design Section; (615-736-5623) On: May 12 2022
2-0 Evaluation Non-concurred. No additional information will be provided. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9725153 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 48 13 13.04 / Para. 3.28.6 b
"The spare guide bushing shall be stored throughout the rehabilitation of all units and a total of four sets of oil head bushings will be supplied such that the Government will be left with a spare operating rod guide bushing following completion of the Contract."
Should be "a total of four rod guide bushings" instead of "a total of four sets of oil head bushings"?
On: May 06 2022. Forward request by email.
1-0 Evaluation Concurred. Needs to be corrected via amendment to 48 13 13.04. By: Jack McCollister; Hydroelectric
Design Center; (503-808-5263) On: May 16 2022 2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022 Current Request Status: Request Working
Information for this report is procurement sensitive.
9725156 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 48 13 13.07 / Para. 1.1.1 a
"This SECTION governs the base refurbishment of the turbine guide bearings for Units 1 and 3 and the inspection and optional refurbishment of the turbine guide bearings for Units 2 and 4."
What is the bid item no. for Refurbish Turbine Guide Bearing of Unit 4 as optional?
On: May 06 2022. Forward request by email.
1-0 Evaluation Concurred. Section 01 22 00.00 will be amended to update CLINs to cover optional bearing scope of
Unit 4. Bid list needs to be updated to match. Added CLINS are 4028, 4029, 4030, 4071, 4207, 4208, 4209, 4210, and 4211. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 16 2022
2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9725210 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 48 13 13.09 / Para. 3.2.10
"The first set of thickness measurements shall be taken after all damaged material has been excavated and after the mild steel filler metal has been placed to build up excavated areas but before the stainless steel weld overlay. A second set of thickness measurements shall be taken after all final machining and finishing of the overlay has been completed. The thickness of the 1/4 inch stainless steel overlay shall be calculated by calculating the difference between the third measurement (final stainless surface) and the second measurement (machined carbon steel surface)."
Should be: "the second measurement (final stainless surface) and the first measurement (machined carbon steel surface)"?
On: May 06 2022. Forward request by email.
1-0 Evaluation Concurred. Yes, will amend this section. By: Jack McCollister; Hydroelectric Design Center; (503-808-
5263) On: May 16 2022 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9725149 mailto:Joseph.R.VanDeusen@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9725153 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9725156 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9725210 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech 9/15
2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9725224 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 01 22 00.00 / Para. 1.3.2 / and Technical Specifications / 48 13 13.04 / Para. 3.22.10 e
"Item No. 0203 Furnish Set of Wicket Gate Shear Pins, Spare (OPTIONAL)"
"3.22.10 e. Furnish twenty-four (24) spare shear pins and necessary accessories having the same design breaking strength and dimensions as the replacement pins installed."
Section 48 13 13.04, Para. 3.22.10 e shown the supply of spare shear pins as base scope and bid item No. 0203 is optional.
Please clarify.
On: May 06 2022. Forward request by email.
1-0 Evaluation Concurred. Language in describing CLIN 0203 in the M&P will be corrected via amendment for the optional spare set. For the base sets of shear pins for U1, U2, and U3, refer to CLINs 1043, 2043, and 3043. By:
Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 16 2022
2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9725235 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 01 22 00.00/ Para. 1.3.3
"Item No. 1040 Provide Multi-jackbolt Tensioning Nuts for Blade Piston Rod."
No details in section 48 13 13.04 about this work for Unit 1 to 3. Please clarify.
On: May 06 2022. Forward request by email.
1-0 Evaluation Concurred. Will amend 48 13 13.04. By: Jack McCollister; Hydroelectric Design Center; (503-808-
5263) On: May 16 2022 2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022 Current Request Status: Request Working
Information for this report is procurement sensitive.
9725249 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 01 22 00.00 / Para. 1.3.4 / and Technical Specifications / 48 13 13.04 / Para. 3.32.7
"Item No. 1210 Wicket Gate Servomotor Bore Machining, Unit 1 (OPTIONAL)"
"3.32.7 Bore Gate Servomotor Cylinders"
Section 48 13 13.04, Para. 3.32.7 shown the work as base scope and bid items No. 1210, 2210 and 3210 are optional. Please clarify.
On: May 06 2022. Forward request by email.
1-0 Evaluation Concurred. Amended 48 13 13.04 to indicate that chrome plating piston rods is optional (para. 3.32.8).
Removed 1210, 2210, and 3210 from M&P; these need to be removed from bid list as well. Base scope for boring of servo cylinders already included as CLINs 1034, 2034, and 3034 By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 16 2022 mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9725224 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9725235 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9725249 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech 10/15
2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9725268 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 01 22 00.00 / Para. 1.3.4 / and Technical Specifications / 48 13 13.04 / Para. 3.32.8
"Item No. 1203 Chrome Plate Gate Servo Piston Rod, Unit 1 (OPTIONAL)"
"3.32.8 Chrome Plate Piston Rods"
Section 48 13 13.04, Para. 3.32.8 shown the work as base scope and bid items No. 1203, 2203 and 3203 are optional. Please clarify.
On: May 06 2022. Forward request by email.
1-0 Evaluation Concurred. Amended 48 13 13.04, paragraph 3.32.8 title to reflect this as optional scope. By: Jack
McCollister; Hydroelectric Design Center; (503-808-5263) On: May 16 2022 2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022 Current Request Status: Request Working
Information for this report is procurement sensitive.
9725273 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 01 22 00.00 / Para. 1.3.4
"Item No. 1214 Replace 150 Stationary Thrust Bearing Springs, Unit 1 (OPTIONAL)"
No details in section 48 13 13.06 about this work for Unit 1 to 4 as optional. Please clarify.
On: May 06 2022. Forward request by email.
1-0 Evaluation Concurred. Will amend 48 13 13.06 to include replacement spring scope requirements. By: Jack
McCollister; Hydroelectric Design Center; (503-808-5263) On: May 17 2022 2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022 Current Request Status: Request Working
Information for this report is procurement sensitive.
9725290 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 01 22 00.00 / Para. 1.3.2
"Item No. 0204 Furnish New Blade Servomotor Piston Rod (OPTIONAL)"
Please confirm that this item is for a spare New Blade Servomotor Piston Rod.
On: May 06 2022. Forward request by email.
1-0 Evaluation Concurred. It is not intended as a spare, but as a risk-reduction approach that the Government will evaluate as an optional scope. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 17 2022 2-0 Evaluation Concurred. No additional information will be provided. By: Jack McCollister; Hydroelectric Design
Center; (503-808-5263) On: May 19 2022 Current Request Status: Request Working
Information for this report is procurement sensitive.
9732824 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI) mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9725268 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9725273 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9725290 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech 11/15
Technical Specifications / 48 13 13.01 / Para. 3.6.3.1 d
"The outer edge or tip of the blades shall be machined to the contour of the discharge ring with the blades locked in a position corresponding to the minimum blade angle of no less than 16.5 degrees."
The contractor requests that the minimum blade angle of 16.5 degrees be removed from the technical specification.
On: May 11 2022. Forward request by email.
1-0 Evaluation Concurred. This will be addressed through amendment. By: Jack McCollister; Hydroelectric Design
Center; (503-808-5263) On: May 17 2022 2-0 Evaluation Concurred. Will be addressed by amendment. By: Jack McCollister; Hydroelectric Design Center;
(503-808-5263) On: May 19 2022 Current Request Status: Request Working
Information for this report is procurement sensitive.
9732832 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
Technical Specifications / 40 05 13.00 / Para. 3.7.1
"All turbine oil supply and returning piping located between the main oil supply and return drain headers shall be removed and replaced with new equipment per the requirements above. This includes all valves, strainers, and associated appurtenances."
Would it be possible to receive from the Gourvenment the existing drawings of the piping to be replaced and highlighting the specific lines?
On: May 11 2022. Forward request by email.
1-0 Evaluation Concurred. Reference drawings Q15-79/553, 554, and 555 show the main oil supply/return headers and the oil piping/equipment to be replaced. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 17 2022
2-0 Evaluation Concurred. Please see reference drawings Q15-79/553, 554, and 555. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9735344 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
The contractor acknowledges USACE extension until June 9th, 5 weeks short of the initial request. This USACE opportunity require lots of resources and attention to details to ensure an adequate response.
After further analysis of the RFQ requirements, required clarifications, contractor resources, and conditions of the supply chain market, we amend our initial 8 weeks request for an extension of the bid due date.
The contractor now requests a bid due date of August 5th 2022.
We kindly ask for answer within one week so we can decide if we have the capacity to pursue this opportunity.
On: May 12 2022. Forward request by email.
1-0 Evaluation Check and Resolve. Based on the current schedule, the proposal due date could be extended to July 8.
Going beyond this date would impact getting this project awarded. By: Kristal Jones; Contracting Division; (615-736- 7916) On: May 16 2022
2-0 Evaluation Check and Resolve. (Already addressed as part of amendment 1) By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9735689 Hydropower W912P522R0003 Comment Classification: Public (Public)
We noticed that the cover page (and only the cover page) of one of the documents: W91P522R000+RTA+Tspe cs is still marked as CUI. However, the document is also now publicly available on SAM so we understand that no part of this document is actually meant to be controlled as CUI. If this was an error and the document should not have been made public, please let us know at your earliest convenience.
On: May 12 2022. Forward request by email.
1-0 Evaluation Concurred. The document is meant to be available to the public By: Kristal Jones; Contracting
Division; (615-736-7916) On: May 16 2022 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9732824 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9732832 mailto:Jack.F.McCollister@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9735344 mailto:Kristal.R.Jones@usace.army.mil mailto:Jack.F.McCollister@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=9735689 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminUnresolvedReport&strReportType=AllTech 12/15
2-0 Evaluation Concurred. No additional information will be provided. By: Jack McCollister; Hydroelectric Design Center; (503-808-5263) On: May 19 2022
Current Request Status: Request Working Information for this report is procurement sensitive.
9735930 Contracting Bid Due Date Comment Classification: Controlled Unclassified Information (CUI)
The 3-week extension of the bid due date is not sufficient to allow for the preparation and submittal a responsive bid.
The contractor kindly requests an additional extension of a minimum of 8 weeks and further requests a response by no later than May 20.
On: May 13 2022. Forward request by email.
1-0 Evaluation Check and Resolve. Based on the current schedule, the proposal due date could be extended to July
8. By: Kristal Jones; Contracting Division; (615-736-7916) On: May 16 2022 2-0 Evaluation Check and Resolve. (already addressed in Amendment 1) By: Jack McCollister; Hydroelectric Design
Center; (503-808-5263) On: May 19 2022 Current Request Status: Request Working
Information for this report is procurement sensitive.
9738726 Hydropower W912P522R0003 Comment Classification: Controlled Unclassified Information (CUI)
52.211-18 (Variation in Estimated Quantity) specifies that if the quantity of a unit-priced item in the contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party.
We understand that for some of the CLINs, USACE can ask the contractor to provide quantities up to 15% more without an adjustment to the price. Please confirm our understanding. Also if our understanding is correct, please provide a list of the CLINs which can be subject to FAR 52.211-18.
On: May 16 2022. Forward request by email.
1-0 Evaluation Non-concurred. The questioner's interpretation is accurate (though incomplete), but no change is necessary. This is basic information of how the FAR Clause works as written.