About this file
This solicitation is for a firm fixed-price construction contract to rehabilitate turbine generator units at Old Hickory Power Plant in Hendersonville, Tennessee. The scope of work includes rewinding and upgrading generators for units 1, 2 and 3 to increase maximum output to 45 megawatts. It also involves replacing the Kaplan turbine runners for the same units to support the new load and increase rated output to 61,600 horsepower. For unit 4, the generator was previously rewound but the turbine runner replacement is optional. Additional work comprises inspecting and refurbishing all mechanical support systems, replacing worn components, and upgrading systems to current standards. Electrical work consists of generator rewinds, model verification, condition monitoring systems and relay/control upgrades. The term for the first unit is estimated at two years for testing, design and fabrication, followed by 18-month installations for the remaining units. The estimated contract value is between $25-100 million. The question period closes in May 2022 and site visits are scheduled for May 5th, with request forms due in advance. The solicitation is issued by the Nashville District of the U.S. Army Corps of Engineers.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D R
A W
IN
G
N O
B
C
D
4 3 2 1
R E
V
IS
IO
N
S
SIZE D
B
C
D
A
4 3 2 1
DIMENSION
LINEAR
DIAMETRAL
CONCENTRICAL
GEOMETRICAL
FROM
TO
0.015
0.010
>6
0.020
0.015
>20
0.050
0.020
>80
0.080
0.030
>160
0.120
0.040 3/4
3/8
5/8
5/16
>160
1/2
1/4
>80
5/16
3/16
>40
3/16
1/8
>2.000
2.000
1.000
1.000
0.375
DIAMETRAL
LINEAR
DIMENSION
TOL.
>315
Ø0.003 Ø0.005 Ø0.007 Ø0.010 Ø0.015 Ø3/32 Ø3/16 Ø1/4 Ø5/16 Ø3/8
Ø0.020 Ø0.060 Ø0.120
F A
B R
IC
A
T
IO
N
0°-10'
0°-20'
0°-30'
3/8
TO
FROM
< 3/8
1°
ANGULAR
DIMENSION
M A
C H
IN
IN
G
CENTER HOLE POSITION
UNDEFINED TOLERANCE
ANGULAR
DIMENSION
SHORTEST SIDE
LENGTH
SHORTEST SIDE
LENGTH
DEGREE AND MINUTEDEGREE AND MINUTE
STRAIGHTNESS
CONCENTRICITY
ROUNDNESS
PERPENDICULARITY
FROM
TO
FROM
TO
FROM
TO
DIA.
OF HOLE
DIA.
OF HOLECENTER HOLE POSITION
UNDEFINED TOLERANCE
TOL.
Ø0.015 Ø0.020 Ø0.050 Ø0.080 Ø0.120 Ø1/4 Ø5/16 Ø1/2 Ø3/4 Ø1
MACHINING AND FABRICATION DEVIATIONS FOR UNTOLERANCED DIMENSIONS
INTERPRETATION OF TOLERANCES AS PER ASME Y14.5M
0.375 1
Ø1/16
1°
<2
2° 0-30' 0-20'
Ø1/8 Ø1/4
>2
TO
FROM
GE Renewable Power Canada Inc.
Project
DRAWN BY
REVISION
SHEET NO.
of
INI. RELEASE
SCALE
DRAWING NO.
ENG.:
RESERVED GE
ENG.:
THIRD ANGLE PROJECTION
OLD HICKORY POWERHOUSE
U.S. ARMY CORPS OF ENGINEERS
SUMNER COUNTY, TN
CONTRACT NO. W912P5-17-C-002
TURBINE - GENERATOR UNIT #4 REHABILITATION
DIMENSIONS ARE IN INCHES UNLESS OTHERWISE NOTED
SEE PARTS LIST: H1030200
GE Renewable Energy
POLE TAPER
WEDGES ARRANGEMENT
H1039500 MKB 26-271 F TL
1/4"=1"
2018/01/15
M.BEL
A
1 1
H M
K B
-2
F
T L
MKB26-271FPB-01
NOTES:
1- THE FOLLOWING DOCUMENT COMPLETE THIS DRAWING:
HNASTD 00 MKB 01-204 F DC-01 (STANDARD LOCKING SHEET) AND
MKB 26-201 F DC-01.
2- FOR INSTALLATION OF THE WEDGES, SEE SPECIFICATION "ROTOR
POLE REMOVAL AND REINSTALLATION PROCEDURE"
MKB 26-201 F DC-01. AFTER THE POLES INSTALLATION, INSTALL THE
ROTOR FANS ACCORDING TO DOCUMENTS
MKB00-220FDC-04 AND DOCUMENT TRA 201116
3- TIGHTENING TORQUE: 350 Lb-ft (LUB.).
4- THE WEDGES SHOULD BE IN CONTACT WITH THE FULL LENGTH OF
THE POLE CORE "T" KEYS. AFTER WEDGING, CUT THE WEDGES FLUSH
WITH THE NUT OR SLIGHTLY LOWER IN ORDER TO REINSTALL THE
EXISTING LOCKING PLATE.
PROJECT HNA # 1584
AU1 CU4
GE
UNIT No.
USACE
UNIT No.
(4
R
IM
(4
W E
D G
E S
TOP VIEW
A
A
S E
E
N O
T E
S E
E
N O
T E
SECTION "A-A"
SEE DETAIL 1
DETAIL 1
SCALE 1"=1"
SPEC: 48 13 16.00
PARAGRAPH: 3.21.9
ITEM N/A
EXISTING POLE ASSEMBLY
EXISTING POLE ASSEMBLY
EXISTING ROTOR RIM
EXISTING LOCKING PLATE
SEE NOTE 3
A1
A2
A LOC D.S-O
A1 MODIFY NOTE 21D
2021-6-10
A2 MODIFY NOTE 31D
A3 AS BUILT-
AS BUILT
THIS DRAWING HAS BEEN UPDATED
ACCORDING TO SURVEYS
DONE AT SITE-SHOP.
IT SHALL NOT BE USED FOR
MANUFACTURING PURPOSES.
REFERENCE
NOT OEM DRAWING
DR
AW
IN
G
N O
B
C
D
4 3 2 1
R
EV
IS
IO
N S
SIZE D
B
C
D
A
4 3 2 1
DIMENSION
LINEAR
DIAMETRAL
CONCENTRICAL
GEOMETRICAL
FROM
TO
0.015
0.010
>6
0.020
0.015
>20
0.050
0.020
>80
0.080
0.030
>160
0.120
0.040 3/4
3/8
5/8
5/16
>160
1/2
1/4
>80
5/16
3/16
>40
3/16
1/8
>2.000 2.000
1.000
1.000
0.375
DIAMETRAL
LINEAR
DIMENSION
TOL.
>315
Ø0.003 Ø0.005 Ø0.007 Ø0.010 Ø0.015 Ø3/32 Ø3/16 Ø1/4 Ø5/16 Ø3/8
Ø0.020 Ø0.060 Ø0.120
FA
BR
IC
AT
IO
N
0°-10'
0°-20'
0°-30'
3/8
TO
FROM
< 3/8
1°
ANGULAR
DIMENSION
M
AC
H
IN
IN
G
CENTER HOLE POSITION
UNDEFINED TOLERANCE
ANGULAR
DIMENSION
SHORTEST SIDE
LENGTH
SHORTEST SIDE
LENGTH
DEGREE AND MINUTEDEGREE AND MINUTE
STRAIGHTNESS
CONCENTRICITY
ROUNDNESS
PERPENDICULARITY
FROM
TO
FROM
TO
FROM
TO
DIA.
OF HOLE
DIA.
OF HOLECENTER HOLE POSITION
UNDEFINED TOLERANCE
TOL.
Ø0.015 Ø0.020 Ø0.050 Ø0.080 Ø0.120 Ø1/4 Ø5/16 Ø1/2 Ø3/4 Ø1
MACHINING AND FABRICATION DEVIATIONS FOR UNTOLERANCED DIMENSIONS
INTERPRETATION OF TOLERANCES AS PER ASME Y14.5M
0.375 1
Ø1/16
1°
<2
2° 0-30' 0-20'
Ø1/8 Ø1/4
>2
TO
FROM
GE Renewable Power Canada Inc.
Project
DRAWN BY
REVISION
SHEET NO.
of
INI. RELEASE
SCALE
DRAWING NO.
ENG.:
RESERVED GE
ENG.:
THIRD ANGLE PROJECTION
OLD HICKORY POWERHOUSE
U.S. ARMY CORPS OF ENGINEERS
SUMNER COUNTY, TN
CONTRACT NO. W912P5-17-C-002
TURBINE - GENERATOR UNIT #4 REHABILITATION
DIMENSIONS ARE IN INCHES UNLESS OTHERWISE NOTED
SEE PARTS LIST: H1030200
GE Renewable Energy
SET OF POLE
TAPER WEDGES
H1039500 MKB 26-271 F TU
4"=1"
2018/01/11
M.BEL.
A 1 1
H
M
KB
6-
F
TU
MKB26-271FPB-01
DETAIL OF DRAWING NO.: H-1039500 MKB 26-271 F TL
NOTES:
1- THE FOLLOWING DOCUMENT(S) COMPLETE THIS DRAWING: N/A
2- TOTAL WEIGHT: 9.7 Lbs
3- SURFACE FINISHES 125 MICRO INCHES EXCEPT IF OTHERWISE NOTED.
4- BREAK ALL SHARP EDGES.
5- THIS TOLERANCE MUST BE RESPECTED FOR A WEDGE PRESSED
AGAINST A FLAT SURFACE.
PROJECT HNA # 1584
AU1 CU4
GE
UNIT No.
USACE
UNIT No.
INSPECTION SKETCH
(WEDGES PRE-ASSEMBLY)
SCALE 1"=1"
46.5"
54.5"
8.000"
0.
2" ±0
.0
0.625"+0 -0.020"
(0 .2
1/16" X 45°
1/16" X 45°
0.625"+0 -0.020"
0.
0" ±0
.0
(0 .2
0.975"+0 -0.010"
TO BE MAINTAINED
OVER FULL LENGTH.
SEE NOTE 5
DETAIL 2
DRIVING WEDGE
DETAIL 1
STAND KEY
SPEC: 48 13 16.00
PARAGRAPH: 3.21.9
ITEM N/A
0.0104" PER INCH
0.0104" PER INCH0.002"
SEE NOTE 5
0.002"
SEE NOTE 5
0.060"
0.060"
A
0.010" A
1/32" X 45°
1/32" X 45°
A LOC D.S-O
A1 AS BUILT.-
2021-6-10
AS BUILT
THIS DRAWING HAS BEEN UPDATED
ACCORDING TO SURVEYS
DONE AT SITE-SHOP.
IT SHALL NOT BE USED FOR
MANUFACTURING PURPOSES.
REFERENCE
NOT OEM DRAWING
| MKB 26-271 F TL Pole Taper Wedges Arrangement |
| MKB 26-271 F TU Set of Pole Taper Wedges |
File details come from the government source that posted it. Updated .