Exhibit E Prototypical Project Form.doc

DOC document 41 KB Posted

Attached to
2013 Indiana MATOC Federal contract opportunity
Solicitation number
W912L9-13-R-0002
Issued by
Department of the Army Indiana Army National Guard

About this file

Exhibit E Prototypical Project Form

View the file

Other files for this federal contract opportunity

Other files attached to 2013 Indiana MATOC, newest first.
File Type Posted
Prototypical_questions_through_midnight_January_9.doc DOC document
W912L9-13-R-0002_SF30_Amendment_2.pdf PDF
W912L9-13-R-0002_Amendment_2_Conformed_Solicitation.pdf PDF
Solicitation_questions_through_midnight_January_9.doc DOC document
Solicitation_questions_through_3_PM_January_9.doc DOC document
W912L9-13-R-0002_SF30_Amendment_1.pdf PDF
W912L9-13-R-0002_Amendment_1_Conformed_Solicitation.doc DOC document
Prototypical_questions_through_December_30_for_Adv_Metering.doc DOC document
Solicitation_questions_through_January_3.doc DOC document
Prototypical_questions_through_January_3.doc DOC document
Prototypical_questions_through_December_30.doc DOC document
Solicitation_questions_through_December_30.doc DOC document
Prototypical_questions_through_December_18.doc DOC document
(1_of_7)_Chapel_Admin.pdf PDF
(4_of_7)_Chapel_Admin.pdf PDF
Prototypical_questions_through_December_7.doc DOC document
(2_of_7)_Chapel_Admin.pdf PDF
Solicitation_questions_through_December_18.doc DOC document
(6_of_7)_Chapel_Admin.pdf PDF
(7_of_7)_Chapel_Admin.pdf PDF
Prototypical_questions_through_December_12.doc DOC document
(3_of_7)_Chapel_Admin.pdf PDF
(5_of_7)_Chapel_Admin.pdf PDF
Chapel_Building_Prototypical_Project_SOW.pdf PDF
Modification__1_Drawing_(2_of_7)_Chapel_Admin.pdf PDF
Pre-proposal_Conference_Slide_Show.pdf PDF
Sign-in_Sheet_for_conference.pdf PDF
Solicitation_questions_through_December_12.doc DOC document
Solicitation_questions_through_December_7.doc DOC document
REMINDER_Pre-Proposal_Conference.doc DOC document
Exhibit A Performance Relevancy Questionnaire.doc DOC document
Exhibit C Past Performance Evaluation.doc DOC document
Exhibit F Proposal Volume Contents Aid.doc DOC document
Exhibit B Subcontractor Information and Consent Form.doc DOC document
Exhibit F Proposal Volume Contents Aid.doc DOC document
Exhibit E Prototypical Project Form.doc DOC document
Exhibit G Proposal Inquiry Form .doc DOC document
Exhibit C Past Performance Evaluation.doc DOC document
Exhibit G Proposal Inquiry Form .doc DOC document
Exhibit B Subcontractor Information and Consent Form.doc DOC document
Exhibit D Technical .doc DOC document
13R0002 FY13 MATOC.pdf PDF
13R0002 FY13 MATOC.pdf PDF
Exhibit D Technical .doc DOC document
Exhibit A Performance Relevancy Questionnaire.doc DOC document
Notice_of_Pre-Proposal_Conference.doc DOC document
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ MATOC

RFP W912L9-13-R-0002

EXHIBIT E PROTOTYPICAL PROJECT

NOTICE OF PROPOSED PROJECT, SOLICITATION

Date: November 30, 2012 PROJECT TITLE AND NO.: Chapel Administration Building 2013R0002 PROJECT DESCRIPTION: Erect one (1) 36’ X 100’ pre-engineered building and construct all foundation, concrete floor, and site work.

All work shall be in strict accordance with the

( ) Plans/drawings and Specifications dated

( X ) SOW, Technical provisions & Drawings Chapel Administration Building dated November 30, 2012 and Basic Contract Master Specifications

( ) SOW (insert title) dated ____________and Basic Contract Master Specifications

MAGNITUDE OF PROJECT: ( ) Less than $25,000; ( ) $25,000-$100,000; ( ) $100,000-$250,000; ( ) $250,000-$500,000; ( X )$500,000 - $1,000,000; ( )$1,000,000 - $5,000,000.

PERFORMANCE PERIOD: 180 Days, after receipt of Notice to Proceed

SITE VISIT: A site visit will be conducted in conjunction with the MATOC pre-proposal meeting. See Section 00100 of the solicitation for details.

PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds, and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.

PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/CESO/Pages/EM385-1-1.aspx WAGE DETERMINATION: Currently, General Decision Number: IN120002 11/23/2012 IN2 for Johnson County is applicable to this task order. Rates can be found at http://www.wdol.gov/wdol/scafiles/davisbacon/IN.html Scroll down to Johnson County and select BLD-IN2. However, the current prevailing Wage Determination will be incorporated at time of award. In the event the current prevailing Wage Determination is changed by the Department of Labor after the closing date of this solicitation, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. This does not constitute and shall not be construed as discussions if award without discussions is contemplated.

PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the RFP. Even if you do not plan on selecting Camp Atterbury as a bidding location, you must still provide pricing information on the prototypical project. The lowest bid technically acceptable that comes from an offeror that selects Camp Atterbury as a bid location would be awarded the project, should funding become available.

The Following Provisions/Clauses if marked [X] are applicable to this task order

[ X ] Availability of funds (FAR Clause 52.232-18) Funds are not presently available for this procurement.

[ ] Contract Clause 52.211-12 LIQUIDATED DAMAGES If applicable , the following amounts will be applicable to this TASK ORDER: NA.

[ X ] Contract Clause 52.246-21 Warranty of Construction, is applicable to this task order.

[ X ] 52.204-10 REPORTING: Executive Compensation and First Tier Subcontract Awards (Jul 2010) Is applicable to this order. The following are the codes needed to accomplish the reporting TAS_________, Agency_____________ (codes to be provided at time of award) [ ] Alternate proposal. The government at its option will accept and evaluate alternate proposals; however offerors must also price the project as specified. Alternate proposals should include enough detail for the Government to understand the alternate as well as its benefits. Costs and or credits shall be listed separately. Offerors who do not provide alternate proposals may not be notified in the event the government elects to accept an alternate proposal from another offeror.

[ X ] DFARS 252.236-7006 COST LIMITATION (JAN 1997)

(a) Certain items in this solicitation are subject to statutory cost limitations. The limitations are stated in the Schedule.

(b) An offer which does not state separate prices for the items identified in the Schedule as subject to a cost limitation may be considered nonresponsive.

(c) Prices stated in offers for items subject to cost limitations shall include an appropriate apportionment of all costs, direct and indirect, overhead, and profit.

(d) Offers may be rejected which—

(1) Are materially unbalanced for the purpose of bringing items within cost limitations; or

(2) Exceed the cost limitations, unless the limitations have been waived by the Government prior to award.

[ ] PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY. (September 2002) This special contract clause IS APPLICABLE TO THIS TASK ORDER.

[ ] FAR 52.217-5 Evaluation of Options applies to this solicitation

[ ] FAR 52.217-7 Option for Increased Quantity- Separately Priced Line Item applies to award when option(s) not taken at time of award. The Government reserves the right to award option individual line items at time of basic line item award or after award, but not later than 90 days after initial award. Performance period upon award of options will not be extended.

EXHIBIT E MATOC PROPOSAL FORM

Include this form completed with your proposal

PROJECT NO.: 2013R0002

CHAPEL ADMINISTRATION BUILDING

PROJECT DESCRIPTION: Project provides for the furnishing of all plant, labor, material, equipment, appliances and supervision necessary to erect one (1) 36’ X 100’ pre-engineered building and construct all foundation, concrete floor, and site work in accordance with the task order requirements for “Chapel Administration Building. This project is for a Firm Fixed Task Order against the MATOC IDIQ Contract. Project is subject to a statutory limit of $750,000. DFARS Provision 252.236-7006 Cost Limitation is applicable.

Item

Number

Description

Quantity Unit

Amount

Project No. 2013R0002

1 JOB

Lump Sum****

Chapel Admin Bldg ****The lump sum amount should include $10,000 for the Duke Energy EF Agreement the GC will be required to coordinate and pay in accordance with the SOW.

SIGNATURE:

COMPANY NAME

Name and title of person authorized to sign