Prototypical_questions_through_January_3.doc

DOC document 31 KB Posted

Attached to
2013 Indiana MATOC Federal contract opportunity
Solicitation number
W912L9-13-R-0002
Issued by
Department of the Army Indiana Army National Guard

About this file

Prototypical questions through January 3

View the file

Other files for this federal contract opportunity

Other files attached to 2013 Indiana MATOC, newest first.
File Type Posted
Solicitation_questions_through_midnight_January_9.doc DOC document
W912L9-13-R-0002_SF30_Amendment_2.pdf PDF
W912L9-13-R-0002_Amendment_2_Conformed_Solicitation.pdf PDF
Prototypical_questions_through_midnight_January_9.doc DOC document
Solicitation_questions_through_3_PM_January_9.doc DOC document
W912L9-13-R-0002_SF30_Amendment_1.pdf PDF
W912L9-13-R-0002_Amendment_1_Conformed_Solicitation.doc DOC document
Prototypical_questions_through_December_30.doc DOC document
Prototypical_questions_through_December_30_for_Adv_Metering.doc DOC document
Solicitation_questions_through_January_3.doc DOC document
Prototypical_questions_through_December_18.doc DOC document
Solicitation_questions_through_December_30.doc DOC document
(7_of_7)_Chapel_Admin.pdf PDF
Prototypical_questions_through_December_12.doc DOC document
(3_of_7)_Chapel_Admin.pdf PDF
(2_of_7)_Chapel_Admin.pdf PDF
Solicitation_questions_through_December_18.doc DOC document
(6_of_7)_Chapel_Admin.pdf PDF
(5_of_7)_Chapel_Admin.pdf PDF
Chapel_Building_Prototypical_Project_SOW.pdf PDF
Modification__1_Drawing_(2_of_7)_Chapel_Admin.pdf PDF
(1_of_7)_Chapel_Admin.pdf PDF
(4_of_7)_Chapel_Admin.pdf PDF
Prototypical_questions_through_December_7.doc DOC document
Pre-proposal_Conference_Slide_Show.pdf PDF
Sign-in_Sheet_for_conference.pdf PDF
Solicitation_questions_through_December_7.doc DOC document
Solicitation_questions_through_December_12.doc DOC document
REMINDER_Pre-Proposal_Conference.doc DOC document
Exhibit C Past Performance Evaluation.doc DOC document
Exhibit G Proposal Inquiry Form .doc DOC document
Exhibit E Prototypical Project Form.doc DOC document
Exhibit B Subcontractor Information and Consent Form.doc DOC document
Exhibit F Proposal Volume Contents Aid.doc DOC document
Exhibit B Subcontractor Information and Consent Form.doc DOC document
Exhibit F Proposal Volume Contents Aid.doc DOC document
Exhibit E Prototypical Project Form.doc DOC document
Exhibit G Proposal Inquiry Form .doc DOC document
Exhibit D Technical .doc DOC document
13R0002 FY13 MATOC.pdf PDF
13R0002 FY13 MATOC.pdf PDF
Exhibit D Technical .doc DOC document
Exhibit A Performance Relevancy Questionnaire.doc DOC document
Exhibit A Performance Relevancy Questionnaire.doc DOC document
Exhibit C Past Performance Evaluation.doc DOC document
Notice_of_Pre-Proposal_Conference.doc DOC document
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ MATOC

RFP W912L9-13-R-0002

Prototypical questions through January 3 Prototypical Project Questions

1. What is the width of Fairbanks?

Answer: Typical width of Fairbanks is 22’

2. What type of HVAC system are we to price?

Answer: Refer to Question 2 on the Prototypical questions through December 30 document

3. Is this considered a complex or non-complex project?

Answer: Complex or non-complex has to do with design-build projects. Since this is not a DB project, this questions does not relate to this project.

4. Who is responsible to remove the existing concrete jersey barriers?

Answer: Owner is responsible

5. What are the depths of the existing utilities?

Answer: depths vary and are unknown

6. On sheet A1.1, what is shown around the building? Is this supposed to represent a 5’ wide sidewalk?

Answer: yes, it’s a 5’ walk/mow strip to protect siding from riding lawn mowers.

7. Sheet A2.1 calls for a siliconized polyester finish for all metal panels, standing seam roof panels, and gutters. This specification is at least 30 years old and I know of only one company who even offers this finish system anymore. This finish system requires specialized equipment to roll the material into shapes that most manufacturers have discarded years ago. The more modern finish systems are more expensive, but perform much better. Since they don’t offer this system anymore, it puts them at a competitive disadvantage. Can the specifications be updated?

Answer: Or Equal To. We have not had problems getting this in the past, but equal to options are acceptable

8. Sheet A3.1 calls for 3-hour fire rated hollow metal and wood doors. This seems to be significantly more than is required for a structure like this. From a code compliance viewpoint, none of the doors are required to be fire rated. If fire rated doors are required, we do not know of any wood door manufacturer that offers a 3-hour fire rated door. Can the fire rating on the doors be eliminated?.

Answer: Refer to Question 4 on the Prototypical questions through December 30 document.

9. Sheet A4.1 does not show any lights in the showers. Should can lights in the showers be included?

Answer: Yes, can lights in the changing area will do.

10. What size water main is required? It seems that if the water line running to Building 326 is adequate to serve both buildings, it would be better to tap into this water main. Please review and respond.

Answer: there will be a new 2” waterline to main.

11. See questions on the attached C1.1. What does this line represent? Does it need to be relocated?

Answer: This is the old site plan. The new site plan was released with amendment 2 under “Modification 1 drawing 2 of 7” and will answer this question.

12. See questions on the attached C1.1. What does this pink represent? Does it need to be relocated?

Answer: This is the old site plan. The new site plan was released with amendment 2 under “Modification 1 drawing 2 of 7” and will answer this question.

13. See questions on the attached C1.1. What does this black line represent? Does it need to be relocated?

Answer: This is the old site plan. The new site plan was released with amendment 2 under “Modification 1 drawing 2 of 7” and will answer this question.