Prototypical_questions_through_December_30.doc

DOC document 28 KB Posted

Attached to
2013 Indiana MATOC Federal contract opportunity
Solicitation number
W912L9-13-R-0002
Issued by
Department of the Army Indiana Army National Guard

About this file

Prototypical Questions through December 30

View the file

Other files for this federal contract opportunity

Other files attached to 2013 Indiana MATOC, newest first.
File Type Posted
Solicitation_questions_through_midnight_January_9.doc DOC document
W912L9-13-R-0002_SF30_Amendment_2.pdf PDF
W912L9-13-R-0002_Amendment_2_Conformed_Solicitation.pdf PDF
Prototypical_questions_through_midnight_January_9.doc DOC document
Solicitation_questions_through_3_PM_January_9.doc DOC document
W912L9-13-R-0002_SF30_Amendment_1.pdf PDF
W912L9-13-R-0002_Amendment_1_Conformed_Solicitation.doc DOC document
Prototypical_questions_through_December_30_for_Adv_Metering.doc DOC document
Solicitation_questions_through_January_3.doc DOC document
Prototypical_questions_through_January_3.doc DOC document
Prototypical_questions_through_December_18.doc DOC document
Solicitation_questions_through_December_30.doc DOC document
(5_of_7)_Chapel_Admin.pdf PDF
Chapel_Building_Prototypical_Project_SOW.pdf PDF
Modification__1_Drawing_(2_of_7)_Chapel_Admin.pdf PDF
(7_of_7)_Chapel_Admin.pdf PDF
Prototypical_questions_through_December_12.doc DOC document
(3_of_7)_Chapel_Admin.pdf PDF
(2_of_7)_Chapel_Admin.pdf PDF
Solicitation_questions_through_December_18.doc DOC document
(6_of_7)_Chapel_Admin.pdf PDF
(1_of_7)_Chapel_Admin.pdf PDF
(4_of_7)_Chapel_Admin.pdf PDF
Prototypical_questions_through_December_7.doc DOC document
Pre-proposal_Conference_Slide_Show.pdf PDF
Sign-in_Sheet_for_conference.pdf PDF
Solicitation_questions_through_December_7.doc DOC document
Solicitation_questions_through_December_12.doc DOC document
REMINDER_Pre-Proposal_Conference.doc DOC document
Exhibit D Technical .doc DOC document
13R0002 FY13 MATOC.pdf PDF
13R0002 FY13 MATOC.pdf PDF
Exhibit D Technical .doc DOC document
Exhibit A Performance Relevancy Questionnaire.doc DOC document
Exhibit C Past Performance Evaluation.doc DOC document
Exhibit G Proposal Inquiry Form .doc DOC document
Exhibit E Prototypical Project Form.doc DOC document
Exhibit B Subcontractor Information and Consent Form.doc DOC document
Exhibit F Proposal Volume Contents Aid.doc DOC document
Exhibit B Subcontractor Information and Consent Form.doc DOC document
Exhibit F Proposal Volume Contents Aid.doc DOC document
Exhibit E Prototypical Project Form.doc DOC document
Exhibit G Proposal Inquiry Form .doc DOC document
Exhibit A Performance Relevancy Questionnaire.doc DOC document
Exhibit C Past Performance Evaluation.doc DOC document
Notice_of_Pre-Proposal_Conference.doc DOC document
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ MATOC

RFP W912L9-13-R-0002

Prototypical questions through December 30

Prototypical Project Questions

1. According to our engineer the Mech RM 103 needs to be a 2 hour fire rated room, can you confirm this?

Answer: A 2 hr rating on the Mech room will work

2. Are there any HVAC specifications and ducting drawings? Will this building have a roof mounted heating and cooling system or furnace and heat pumps?

Answer: The Contractor is responsible for HVAC Plans, gas fired furnace

3. According to our engineer the kitchenette needs to be a 1 hour fire rated room with a commercial rated hood with fire suppression built in. Can you confirm this? If so then the suspended ceiling will need to be changed as well as the pass thru into the common area.

Answer: Standard rating will apply in the kitchenette, owner will be responsible for hood and/or fire suppression.

4. There are no requirements for 3 hour fire ratings on buildings of this size according to international building code. Is there a specific reason for a 3 hour fire rating on these doors? If so then the glass in the doors will need to be changed since the industry cannot provide a 3 hour fire rating on full lite entry glass doors or side lites such as the door to the common area.

Answer: A 90 min rating will suffice.

5. What is the occupancy of the common room? This may change the overall fire rating for this room and the structure itself?

Answer: Owner says there will be no more than 20-25 people in room at any given time.

6. When the group talked about LEEDs building for this project at the pre-solicitation meeting, you noted that the building was not going to be a LEED Certified project. Do you still want to build this building with LEED materials such as; crushed concrete for backfill, fly ash cement, recycled steel products, low voc adhesives, paint, cabinets, Low E with Argon windows, etc?

Answer: LEED certification is not required. However, the SOW states: Energy conservation and life cycle cost for active and passive systems must be considered to the greatest extent practical. Also, recycled or recovered “green” products must be considered and specified to the greatest extent practical.