Prototypical_questions_through_December_12.doc

DOC document 33 KB Posted

Attached to
2013 Indiana MATOC Federal contract opportunity
Solicitation number
W912L9-13-R-0002
Issued by
Department of the Army Indiana Army National Guard

About this file

Prototypical questions through December 12 2012

View the file

Other files for this federal contract opportunity

Other files attached to 2013 Indiana MATOC, newest first.
File Type Posted
W912L9-13-R-0002_SF30_Amendment_2.pdf PDF
W912L9-13-R-0002_Amendment_2_Conformed_Solicitation.pdf PDF
Prototypical_questions_through_midnight_January_9.doc DOC document
Solicitation_questions_through_midnight_January_9.doc DOC document
Solicitation_questions_through_3_PM_January_9.doc DOC document
W912L9-13-R-0002_SF30_Amendment_1.pdf PDF
W912L9-13-R-0002_Amendment_1_Conformed_Solicitation.doc DOC document
Prototypical_questions_through_December_30_for_Adv_Metering.doc DOC document
Solicitation_questions_through_January_3.doc DOC document
Prototypical_questions_through_January_3.doc DOC document
Prototypical_questions_through_December_30.doc DOC document
Prototypical_questions_through_December_18.doc DOC document
Solicitation_questions_through_December_30.doc DOC document
(2_of_7)_Chapel_Admin.pdf PDF
Solicitation_questions_through_December_18.doc DOC document
(6_of_7)_Chapel_Admin.pdf PDF
(5_of_7)_Chapel_Admin.pdf PDF
Chapel_Building_Prototypical_Project_SOW.pdf PDF
Modification__1_Drawing_(2_of_7)_Chapel_Admin.pdf PDF
(1_of_7)_Chapel_Admin.pdf PDF
(4_of_7)_Chapel_Admin.pdf PDF
Prototypical_questions_through_December_7.doc DOC document
(7_of_7)_Chapel_Admin.pdf PDF
(3_of_7)_Chapel_Admin.pdf PDF
Pre-proposal_Conference_Slide_Show.pdf PDF
Sign-in_Sheet_for_conference.pdf PDF
Solicitation_questions_through_December_7.doc DOC document
Solicitation_questions_through_December_12.doc DOC document
REMINDER_Pre-Proposal_Conference.doc DOC document
Exhibit F Proposal Volume Contents Aid.doc DOC document
Exhibit B Subcontractor Information and Consent Form.doc DOC document
Exhibit F Proposal Volume Contents Aid.doc DOC document
Exhibit E Prototypical Project Form.doc DOC document
Exhibit G Proposal Inquiry Form .doc DOC document
Exhibit D Technical .doc DOC document
13R0002 FY13 MATOC.pdf PDF
13R0002 FY13 MATOC.pdf PDF
Exhibit D Technical .doc DOC document
Exhibit A Performance Relevancy Questionnaire.doc DOC document
Exhibit A Performance Relevancy Questionnaire.doc DOC document
Exhibit C Past Performance Evaluation.doc DOC document
Exhibit C Past Performance Evaluation.doc DOC document
Exhibit G Proposal Inquiry Form .doc DOC document
Exhibit E Prototypical Project Form.doc DOC document
Exhibit B Subcontractor Information and Consent Form.doc DOC document
Notice_of_Pre-Proposal_Conference.doc DOC document
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prototypical questions through December 12 Prototypical Project Questions

1. In reviewing both the contract specifications and drawings, there is no mention of the requirement of sprinklers (fire protection). Please confirm

Answer: No sprinklers are required.

2. The plans and scope conflict in that the specified bay spacing of 25ft on center places a column in the middle of entry doors #1 and #2. I suggest a bay spacing of 20ft on center to solve this problem.

Answer: Bay spacing can be adjusted to 20ft on center as the 25ft spacing would interfere with the door location.

3. Would you provide the typical and peak occupancy for proposed Room 112 (Common Area)?

Answer: Room 112 is a break room/conference room. Typical would be zero. Normal occupancy for a meeting would be 10-15 with approximately 8-10 hours of meetings a week. Peak occupancy would be 30.

4. When do you anticipate a new site drawing to be available?

Answer: New site drawing is included with these answers.