Prototypical_questions_through_December_12.doc
DOC document 33 KB Posted
- Attached to
- 2013 Indiana MATOC Federal contract opportunity
- Solicitation number
- W912L9-13-R-0002
About this file
Prototypical questions through December 12 2012
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prototypical questions through December 12 Prototypical Project Questions
1. In reviewing both the contract specifications and drawings, there is no mention of the requirement of sprinklers (fire protection). Please confirm
Answer: No sprinklers are required.
2. The plans and scope conflict in that the specified bay spacing of 25ft on center places a column in the middle of entry doors #1 and #2. I suggest a bay spacing of 20ft on center to solve this problem.
Answer: Bay spacing can be adjusted to 20ft on center as the 25ft spacing would interfere with the door location.
3. Would you provide the typical and peak occupancy for proposed Room 112 (Common Area)?
Answer: Room 112 is a break room/conference room. Typical would be zero. Normal occupancy for a meeting would be 10-15 with approximately 8-10 hours of meetings a week. Peak occupancy would be 30.
4. When do you anticipate a new site drawing to be available?
Answer: New site drawing is included with these answers.