Prototypical_questions_through_December_30_for_Adv_Metering.doc

DOC document 17 KB Posted

Attached to
2013 Indiana MATOC Federal contract opportunity
Solicitation number
W912L9-13-R-0002
Issued by
Department of the Army Indiana Army National Guard

About this file

Prototypical questions through December 30 relating to the Advanced Metering

View the file

Other files for this federal contract opportunity

Other files attached to 2013 Indiana MATOC, newest first.
File Type Posted
Solicitation_questions_through_midnight_January_9.doc DOC document
Prototypical_questions_through_midnight_January_9.doc DOC document
W912L9-13-R-0002_SF30_Amendment_2.pdf PDF
W912L9-13-R-0002_Amendment_2_Conformed_Solicitation.pdf PDF
Solicitation_questions_through_3_PM_January_9.doc DOC document
W912L9-13-R-0002_SF30_Amendment_1.pdf PDF
W912L9-13-R-0002_Amendment_1_Conformed_Solicitation.doc DOC document
Prototypical_questions_through_December_30.doc DOC document
Solicitation_questions_through_January_3.doc DOC document
Prototypical_questions_through_January_3.doc DOC document
Solicitation_questions_through_December_30.doc DOC document
Prototypical_questions_through_December_18.doc DOC document
(7_of_7)_Chapel_Admin.pdf PDF
Prototypical_questions_through_December_12.doc DOC document
(3_of_7)_Chapel_Admin.pdf PDF
(1_of_7)_Chapel_Admin.pdf PDF
(4_of_7)_Chapel_Admin.pdf PDF
Prototypical_questions_through_December_7.doc DOC document
(5_of_7)_Chapel_Admin.pdf PDF
Chapel_Building_Prototypical_Project_SOW.pdf PDF
Modification__1_Drawing_(2_of_7)_Chapel_Admin.pdf PDF
(2_of_7)_Chapel_Admin.pdf PDF
Solicitation_questions_through_December_18.doc DOC document
(6_of_7)_Chapel_Admin.pdf PDF
Pre-proposal_Conference_Slide_Show.pdf PDF
Sign-in_Sheet_for_conference.pdf PDF
Solicitation_questions_through_December_12.doc DOC document
Solicitation_questions_through_December_7.doc DOC document
REMINDER_Pre-Proposal_Conference.doc DOC document
Exhibit C Past Performance Evaluation.doc DOC document
Exhibit G Proposal Inquiry Form .doc DOC document
Exhibit E Prototypical Project Form.doc DOC document
Exhibit B Subcontractor Information and Consent Form.doc DOC document
Exhibit A Performance Relevancy Questionnaire.doc DOC document
Exhibit C Past Performance Evaluation.doc DOC document
Exhibit D Technical .doc DOC document
13R0002 FY13 MATOC.pdf PDF
13R0002 FY13 MATOC.pdf PDF
Exhibit D Technical .doc DOC document
Exhibit A Performance Relevancy Questionnaire.doc DOC document
Exhibit F Proposal Volume Contents Aid.doc DOC document
Exhibit B Subcontractor Information and Consent Form.doc DOC document
Exhibit F Proposal Volume Contents Aid.doc DOC document
Exhibit E Prototypical Project Form.doc DOC document
Exhibit G Proposal Inquiry Form .doc DOC document
Notice_of_Pre-Proposal_Conference.doc DOC document
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prototypical (Advanced Metering) questions through December 30 Prototypical Advanced Metering Project Questions

1. Is there a current PM contractor for the LONWorks system?

Answer: CMS and JDH are PM contractors that have installed the Honeywell Enterprise Buildings Integrator (EBI) that utilizes the Tropos Wireless Mesh at Camp Atterbury and at Muscatatuck.

(NOTE: The EBI utilizes LON-Works technologies and components. The building controls are all LON-Works components that utilize an open source technology that feed back into the EBI Utility Monitoring and Control System (UMCS). LON-Works is the required communication protocol.)

1. If so, what is the point of contact for that contactor?

Answer:

CMS: Mark Preis, Project Manager 691 Industrial Boulevard Bargersville, IN 46106 t: 317-412-9852, f: 317-422-4470, tel:317-422-4470, c: 317-333-3872

JDH: Dick Whicker, 8109 Network Dr.

Plainfield, IN 46168 317-839-0520 Office, 317-650-9677 Mobile dwhicker@jdhcontracting.com Honeywell Government Solutions: Mark Woodward Cell (816)308-1458 mark.woodward@honeywell.com

1. Do you have a list of contactors who have performed installations over the past couple of years?

Answer: Both PM Contractors utilize Honeywell Government Solutions to install the components at the Building Point of Connection (BPOC) to the EBI frontend; IE. The Honeywell Government Solutions contractor integrates all building control points, and installs and integrates the advanced meters and Tropos wireless mesh technology.

1. Any other relevant information regarding this scope of work is appreciated in advance.

Answer: The Camp Atterbury’s Utility Monitoring and Control System (UMCS), the Honeywell Enterprise Buildings Integrator (EBI), utilizes LON-Works technologies and components. The building controls are all LON-Works components that utilize an open source technology that feeds back into the Honeywell EBI UMCS. LON-Works is the required communication protocol.

The CONTRACTOR shall ensure that the new construction building is completely integrated into Atterbury's existing Utility Monitoring and Control System (UMCS). The Contractor SHALL install an approved wireless mesh infrastructure and integrate all desired building control points into the CAJMTC UMCS Network.

The Building Point of Connection (BPOC) and wireless router SHALL be provided and commissioned by the systems integrator (Sub contractor) per 25 10 10, 3.5.5. As detailed in 23 09 23, the prime contractor SHALL provide a fully commissioned LonWorks system and provide to their sub contractor (in this case, a Honeywell Government Solutions certified Enterprise Building Integrator technician) an LNS database and FTT10 cabling to BPOC.

This process ensures that there is no violation of any or all DICAP certifications and Certificate of Net-Worthiness that the systems integrator has obtained in order to ensure ARCAS compliance and connectivity.

In accordance with UFGS Specifications 23-09-23 and 25-10-10, the following meter points and equipment will be provided and integrated into CAJMTC’s EBI UMCS:

1) Wireless Router

2) BPOC

3) The Electrical Meter

4) The Water Meter

5) The Gas Meter

6) The CO Detectors (by way of alarm system panel)

7) The Smoke Detectors (by way of alarm system panel) The points for following equipment maybe integrated into CAJMTC’s EBI UMCS. The building scope will detail, if applicable, the DDC control for HVAC systems identified.

1) All physical inputs & outputs, applicable set points, schedules & alarms

2) The Night Setbacks

3) Occupied and Un-Occupied Sensors

4) The Exterior Lighting (Integration Only)