Amendment 0015_Submittal REGISTER.pdf

PDF 809 KB Posted

Attached to
ELECTRICAL SWITCHING STATION NORTH, WATERVLIET ARSENAL, NEW YORK
Solicitation number
W912DS26RA015
Issued by

About this file

This document is a Submittal Register for the WVA North Switch Station construction project, serving as a comprehensive tracking form for all required submissions throughout the contract lifecycle.

The register itemizes over 450 distinct submittal requirements organized by construction specification sections (01 14 00 through 33 82 00), detailing the documentation, certifications, shop drawings, product data, test reports, and operational materials that contractors must provide at various project phases. Key submission categories include preconstruction submittals (SD-01) covering safety plans, qualifications, and project schedules; shop drawings (SD-02) for structural and mechanical systems; product data (SD-03) for materials and equipment; samples (SD-04); design data (SD-05); test reports (SD-06) documenting quality assurance and inspections; certificates (SD-07) verifying compliance and qualifications; manufacturer's instructions (SD-08); field reports (SD-09); operation and maintenance data (SD-10); and closeout submittals (SD-11) including as-built drawings and warranties. The register tracks submission status through multiple columns capturing contractor action dates, approval authority determinations, material need dates, and review cycles, with classification codes indicating whether approval is required (G for Government, S for Sustainable) and whether review or approval is necessary (RO, A/E). Submittals span structural steel work, electrical systems including switchgear and generators, HVAC and plumbing systems, fire alarm and security systems, site work, telecommunications infrastructure, and comprehensive facility documentation required for project handover and operations.

View the file

Other files

File Type Posted
Amendment 0016.pdf PDF
Amendment 0015_JA for Johnson Controls Inc Metasys.pdf PDF
Amendment 0015.pdf PDF
Amendment 0015_23 09 00 and 23 09 23.02.pdf PDF
Amendment 0014.pdf PDF
Amendment 0013.pdf PDF
Amendment 0012.pdf PDF
Amendment 0011.pdf PDF
Amendment 0011_RFI Photos.pdf PDF
Amendment 0011_33 57 55.pdf PDF
Amendment 0010.pdf PDF
Amendment 0010_Pictures_Switches Nameplates.pdf PDF
Amendment 0009.pdf PDF
Amendment 0009_Photos.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007_Pictures.pdf PDF
Amendment 0007_Site Visit Photos Compressed.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004_01 14 00.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004_C-001.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003_ Site Visit Photos.pdf PDF
Amendment 0003_Site Visit Sign In Sheet_06MAY2026.pdf PDF
Amendment 0002_G-101.pdf PDF
Amendment 0002_01 14 00.pdf PDF
Amendment 0002_01 50 00.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Amendment 0001_ JA - ESS North - Fire Alarm.pdf PDF
Amendment 0001_ Spec 33 57 55.pdf PDF
Amendment 0001_ JA - ESS North - CAC-IDS.pdf PDF
Amendment 0001_ Dwg MS101.pdf PDF
Amendment 0001_JA - ESS North - North - Square D.pdf PDF
Solicitation - W912DS26RA015.pdf PDF
Specifications.pdf PDF
Evaluation Factors.pdf PDF
Drawings.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 80 PAGES

WVA NORTH SWITCH STATION

01 14 00 SD-01 Preconstruction Submittals

1.4.1.1 GList of Contact Personnel

1.5 GDigging Permit

SD-07 Certificates

1.29.13Rs Explosive Safety Education

Training Certificate

01 30 00 SD-01 Preconstruction Submittals

1.3View Location Map

1.4Progress and Completion

Pictures

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G RODetail Preliminary Project

Schedule

3.4.2 G RODetail Initial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.2 G ROPreliminary High Performance

and Sustainable Building Checklist

1.4.1 G ROSustainability Action Plan

1.5.3.2 G ROPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 80 PAGES

01 33 29 1.5.3.2 G ROFinal High Performance and

Sustainable Building Checklist

1.5.3.2 G ROFinal Sustainability eNotebook

1.5.3.2 G ROAmended Final Sustainability

eNotebook

1.5.3.2 G ROAmended Final High

Performance and Sustainable

Building Checklist

01 35 26 SD-01 Preconstruction Submittals

1.8 G ROAccident Prevention Plan (APP)

1.16 SFinal IAQ Management Plan

1.16 G ROIndoor Air Quality (IAQ)

Management Plan

SD-06 Test Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

1.5 G ROMonthly Exposure Reports

SD-07 Certificates

1.9 G ROActivity Hazard Analysis (AHA)

1.12.4Certificate of Compliance

1.13Hot Work Permit

1.14License Certificates

1.14.1 G ROPortable Gauge Operations

Planning Worksheet

1.14.1 G RORadiography Operation Planning

Work Sheet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 80 PAGES

01 35 26 1.12.4 G ROStandard Lift Plan

01 45 00 SD-01 Preconstruction Submittals

1.5.2 G ROContractor Quality Control (CQC)

Plan

SD-06 Test Reports

1.12.3Verification Statement

01 45 35 SD-06 Test Reports

3.1.2Special Inspection Daily Reports

SD-07 Certificates

2.1AISC Certified Steel Fabricator

2.1AC472 Accreditation

2.1Certificate of Compliance

1.5 GSpecial Inspector

SD-11 Closeout Submittals

3.1.2 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction Site Plan

3.3.1 G ROTraffic Control Plan

2.2.1 G ROHaul Road Plan

1.6.1.4 G ROContractor Computer

Cybersecurity Compliance

Statements

1.6.6 G ROContractor Temporary Network

Cybersecurity Compliance

Statements

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 80 PAGES

01 50 00 3.4Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

1.6.2 G RORegulatory Notifications

1.6.4 G ROEnvironmental Manager

Qualifications

1.6.5 G ROEmployee Training Records

1.7 G ROEnvironmental Protection Plan

1.7.9.1 G RODirt and Dust Control Plan

1.11 G ROSolid Waste Management Permit

3.2.1.1 G ROStormwater Pollution Prevention

Plan

3.2.1.2 G ROStormwater Notice of Intent

3.11.2 G ROSpill Prevention Control And

Countermeasure (SPCC) Plan

SD-06 Test Reports

1.11.1 G ROMonthly Solid Waste Disposal

Report

3.2.1.3Inspection Reports

SD-07 Certificates

1.6.5 G ROEmployee Training Records

1.6.5Erosion and Sediment Control

Inspector

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 80 PAGES

01 57 19 1.6.5.1Certificate of Competency

SD-11 Closeout Submittals

1.6.2 G RORegulatory Notifications

1.6.5 G ROAssembled Employee Training

Records

1.11 G ROSolid Waste Management Permit

3.2.1.4 G ROStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 G ROStormwater Notice of Termination

3.2.1.5As-Built Topographic Survey

3.7.1 G ROWaste Determination

Documentation

3.7.2.1 G ROProject Solid Waste Disposal

Documentation Report

3.7.2.1 G ROSales Documentation

3.7.2.1Contractor Certification

3.7.3.1 G ROHazardous Waste/Debris

Management

3.7.3.6 G RODisposal Documentation for

Hazardous and Regulated Waste

01 58 00 SD-01 Preconstruction Submittals

1.4.1 G ROConstruction Project Signs

SD-02 Shop Drawings

1.3.1.1 G ROPreliminary One Line

1.4.1 G ROSign Legend Orders

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 80 PAGES

01 58 00 1.3.1.2 G ROFinal Rendering

1.3.1.3 G ROFinal Framed Rendering

01 74 19 SD-01 Preconstruction Submittals

1.7 G ROConstruction Waste Management

Plan

SD-06 Test Reports

1.9.2Quarterly Reports

1.9.3Annual Report

SD-11 Closeout Submittals

1.10 SFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.8.1Warranty Management Plan

1.8.5Warranty Tags

1.6Spare Parts Data

SD-08 Manufacturer’s Instructions

1.8.1Instructions

SD-10 Operation and Maintenance

Data

3.7 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 G ROAs-Built Drawings

3.3 G RORecord Drawings

2.2 GRecord Model

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 80 PAGES

01 78 00 1.8.1As-Built Record of Equipment and Materials

3.6As-Built Record of Equipment and Materials

3.4 G ROFinal Approved Shop Drawings

3.5 G ROConstruction Contract

Specifications

2.3 G ROCertification of EPA Designated

Items

2.4 G ROCertification Of USDA Designated

Items

3.9.1 G ROInterim DD FORM 1354

3.9.2 G ROChecklist for DD FORM 1354

3.9.2 GHigh Performance and

Sustainable Building (HPSB)

Checklist

01 78 23 SD-10 Operation and Maintenance

Data

1.4 G ROFacility Data Workbook

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

3.2.1 G ROOperation And Maintenance

Manual, Progress Submittal

3.2.2 G ROOperation And Maintenance

Manual, Prefinal Submittal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 80 PAGES

01 78 23 3.2.3 G ROOperation And Maintenance

Manual, Final Submittal

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

3.1.1 G ROTraining Plan

1.6.6.7 G RORecord Drawings And Utility

Systems

01 78 24.00 10 SD-01 Preconstruction Submittals

1.3.1Facility Data Project Execution

Plan

SD-10 Operation and Maintenance

Data

3.1 G ROFacility Data Workbook, Construction Progress

3.1 G ROFacility Document Set, Construction Progress

SD-11 Closeout Submittals

3.2 G ROFacility Data Workbook, Construction Final

1.3.3 G ROFacility Document Set, Construction Final

3.2 G ROFacility Document Set, Construction Final

01 91 00.15 SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 80 PAGES

01 91 00.15 3.6 G AECompleted Construction

Observation Checklists

3.4 G AEInterim Construction Phase

Commissioning Plan

3.4 G AEFinal Construction Phase

Commissioning Plan

1.10 G AEIssues Log

3.7.3 G AEIntegrated Systems Test Plan

3.7.3 G AEPhase 1 Testing - North Switch

Station

3.7.4 G AENorth And South Switch Station

Integrated Systems Test Plan

3.7.4 G AEPhase 2 Testing - North And

South Switch Stations

3.11 G AEFinal Commissioning Report

3.11 G AEFinal Commissioning Report

3.11 G AEInterim Commissioning Report

SD-07 Certificates

1.8 GCommissioning Firm

1.11 G AECertificate of Readiness

SD-10 Operation and Maintenance

Data

3.9 G AESystems Manual

3.10 G AEMAINTENANCE AND SERVICE

LIFE PLAN

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 80 PAGES

01 91 00.15 3.11 G AEFinal Commissioning Report

3.11 G AEFinal Commissioning Report

3.12 G AEUpdated Final Commissioning

Report

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.7 GNotification

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.6 GQuality Control Program

1.6.7 GQuality Control Personnel

Certifications

1.6.7Quality Control Organizational

Chart

1.6.9 GLaboratory Accreditation

3.3.9Maturity Method Data

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.4.5 SJoint Sealants

2.4.4 SJoint Filler

2.1Formwork Materials

2.3.3.2 SRecycled Aggregate Materials

2.3.1 SCementitious Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 80 PAGES

03 30 00 2.4.6Vapor Retarder and Vapor Barrier

2.4.1Concrete Curing Materials

2.6 SReinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.2.2Biodegradable Form Release

Agent

1.6.3.2Pumping Concrete

2.4.2Nonshrink Grout

SD-04 Samples

1.6.5.1Slab Finish Sample

1.6.5.2Surface Finish Samples

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.12.3.3 GCompressive Strength Tests

3.12.3.5Unit Weight of Structural

Concrete

3.12.3.1Slump Tests

2.3.2Water

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 80 PAGES

03 30 00 3.12.3.4Air Content

SD-07 Certificates

2.6.1Reinforcing Bars

1.6.3.3Safety Data Sheets

1.6.7.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5 SJoint Sealants

2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.3.4.1 GCut CMU

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2 GClay or Shale Brick

2.2.3.2.1 GCement

2.4.1.1 GCementitious Materials

2.6.8 GInsulation

SD-04 Samples

1.3.1.1 GMock-Up Panel

2.2.2 GClay or Shale Brick

2.2.3.2 GConcrete Masonry Units (CMU)

2.4.1.3 GAdmixtures for Masonry Mortar

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 80 PAGES

04 20 00 2.6.2 GAnchors, Ties, and Bar

Positioners

2.6.3 GJoint Reinforcement

2.6.6 GClay Masonry Expansion-Joint

Materials

2.6.8 GInsulation

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

2.2.3.3Fire-Rated Concrete Masonry

Units

3.2.5 GBracing Calculations

SD-06 Test Reports

2.2.2.1.4Efflorescence Test

2.2.3.3Fire-Rated Concrete Masonry

Units

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

3.6.1.4Prism Tests

3.6.1.5Single-Wythe Masonry Wall

Water Penetration Test

SD-07 Certificates

1.3.2Special Masonry Inspector

Qualifications

2.2.2Clay or Shale Brick

2.2.3.2Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 80 PAGES

04 20 00 2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

2.6.8Insulation

SD-08 Manufacturer’s Instructions

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.1.3 SClay Units

2.2.3.2.2 SRecycled Content

05 05 20 SD-01 Preconstruction Submittals

1.5.1.1 GInstaller Qualifications

1.5.1.2 GPost-Installed Anchor Special

Inspector Qualifications

SD-03 Product Data

2.1.1.3 GMechanical Anchors in Concrete

2.1.1.4 GAdhesive Anchor System in

Concrete

2.1.1.5 GMechanical and Adhesive

Anchors in Masonry

3.1.3 GNon-Shrink, Non-Metallic Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 80 PAGES

05 05 20 SD-06 Test Reports

3.3.4 GPost-Installed Anchor Special

Inspections Report

SD-07 Certificates

2.1.1.1 GPost-Installed Anchor

Certification

SD-08 Manufacturer’s Instructions

2.1.1.2 GManufacturer's Printed

Installation Instructions

3.1.3 GNon-Shrink, Non-Metallic Grout

1.5Manufacturer's Safety Data

Sheets

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.4.2Non-Shrink Grout

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

2.2.3 SRecycled Content for Steel Pipe

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 80 PAGES

05 12 00 SD-05 Design Data

1.4.3 GDesign Calculations For Steel

Connections

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.6.1.2Weld Inspection Reports

3.6.2.1Direct Tension Indicator Washer

Inspection Reports

3.6.3.1Bolt Testing Reports

3.6.4Embrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

1.4.4.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.6.1.1Certified Welding Inspector

3.6.1.2NDT Technician

3.3Welding Procedure Specifications

(WPS)

1.3Aisc Structural Steel Fabricator

Quality Certification

1.3Aisc Structural Steel Erector

Quality Certification

2.5Galvanizing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 80 PAGES

05 21 00 SD-01 Preconstruction Submittals

1.3.2Welder Qualification

SD-02 Shop Drawings

1.3.1 GSteel Joist Framing

SD-03 Product Data

2.3 SRecycled Content Of Steel

Products

SD-05 Design Data

2.2 GDesign Calculations

SD-06 Test Reports

3.4Erection Inspection

3.4Welding Inspections

SD-07 Certificates

1.3.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.1.4Galvanizing Repair Paint

2.1.4Touch-Up Paint

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

2.1 SRecycled Content of Steel

Products

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 80 PAGES

05 30 00 2.1.1Metal Roof Deck Units

2.2.4Flexible Closure Strips

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

05 50 13 SD-02 Shop Drawings

2.8 GAngles and Plates

2.5 GFloor Gratings

2.5 GRoof Walkways

2.6 GBollards

SD-03 Product Data

2.4Corner Guards

2.7 GDownspout Terminations

2.1 SRecycled Content

SD-07 Certificates

2.1 GCertificates of Compliance

2.2 GCertified Mill

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 80 PAGES

05 51 33 2.3 G AELadders

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

1.5.1 GFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.1.2 GProtective Coating

2.2.8 GSteel Railings and Handrails

1.2.1 GAnchorage and Fastening

Systems

SD-06 Test Reports

1.4.1 GWelding Inspections

2.3 GMill Test Reports

SD-07 Certificates

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 10 00 SD-02 Shop Drawings

2.2.1 GNailing Strips

SD-03 Product Data

1.8Fire-retardant Treatment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 80 PAGES

06 10 00 2.4.2Adhesives

SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

1.9.1Certificates of Grade

2.3.1.1 SCertified Sustainably Harvested

Plywood for Other Uses

1.7Preservative Treatment

2.4.2 SIndoor Air Quality for Aerosol

Adhesives

2.4.2 SIndoor Air Quality for Non-aerosol

Adhesives

07 21 13 SD-02 Shop Drawings

1.3 GManufacturer's Standard Details

SD-03 Product Data

1.4 GEnvironmental Data for Materials

2.1 GBlock or Board Insulation

2.2 GVapor Retarder

2.3 GPressure Sensitive Tape

2.4 GProtection Board or Coating

2.5 GAccessories

1.5.2 SEnergy Star Label For Insulation

Product

2.1.4 SRecycled Content for Block or

Board Insulation

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 80 PAGES

07 21 13 2.1.5 SIndoor Air Quality For Block Or

Board Insulation

SD-08 Manufacturer’s Instructions

3.3.1Insulation Installation and

Handling

2.5.1Adhesive

SD-11 Closeout Submittals

1.8.1 GDraft Guarantee

1.8.1 GFinal Guarantee

1.8.2 GDraft Warranty

1.8.2 GFinal Warranty

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3 GVerification of Existing Conditions

SD-03 Product Data

2.1 GInsulation

1.4 GCover Board

2.4 GFasteners

2.3 GMoisture Control

2.1.2 SRecycled Content For Insulation

SD-05 Design Data

1.7 GWind Resistance

SD-07 Certificates

1.6 GInstaller Qualifications

2.1.3 SIndoor Air Quality For Insulation

2.1.4 SAcceptable Foam Blowing Agents

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 80 PAGES

07 22 00 SD-08 Manufacturer’s Instructions

2.4 GFasteners

2.1 GInsulation

07 27 19.01 SD-01 Preconstruction Submittals

1.7.1 GQualifications of Manufacturer

1.7.2 GQualifications of Installer

SD-02 Shop Drawings

1.4.1 G AESelf-adhering Air Barrier Shop

Drawings

SD-03 Product Data

2.1 G AESelf-adhering Air Barrier

2.2 G AEPrimers, Adhesives, and Mastics

1.4.2 GSafety Data Sheets

SD-06 Test Reports

1.7.3 GField Peel Adhesion Test

1.4.3 GFlame Propagation of Wall

Assemblies

3.4.1 GSite Inspections and Testing

SD-08 Manufacturer’s Instructions

1.4.2 GSelf-adhering Air Barrier

Manufacturer's Printed Instructions

2.2 GPrimers, Adhesives, and Mastics

07 42 63 SD-01 Preconstruction Submittals

1.5.3Qualification of Manufacturer

1.5.4Qualification of Installer

1.5.4.1Qualifications for Welding Work

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 80 PAGES

07 42 63 SD-02 Shop Drawings

1.5.1 G AEFabrication and Installation

drawings

1.5.1 G AEWall Panel Assemblies

1.5.1 G AEFlashing and Accessories

1.5.1 G AEAnchorage Systems

SD-03 Product Data

1.5.9Certification

1.5.1sustainable acquisition

1.5.1Manufacturer's catalog data

1.5.1Factory Color Finish

1.5.1 G AESub-girts and Formed Shapes

1.5.1 G AEClosure Materials

1.5.1Insulation

1.5.1Pressure Sensitive Tape

2.3.4.1Sealants and Caulking

1.5.1Galvanizing Repair Paint

1.5.1Accessories

SD-04 Samples

1.5.1Wall Panel Assemblies

1.5.1Fasteners

1.5.1Metal Closure Strips

1.5.1Insulation

1.5.1manufacturer's color charts and chips

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 80 PAGES

07 42 63 1.5.1Wind Design Analysis

SD-06 Test Reports

3.7.2Leakage Tests

1.3.2Wind Load Tests

1.3.2Seismic Tests

1.5.1Factory Color Finish

SD-07 Certificates

1.5.1Fasteners

1.5.1Galvanizing Repair Paint

1.5.1wall system assembly wind load and fire rating classification listings

SD-08 Manufacturer’s Instructions

1.5.1Installation of Wall Panels

SD-11 Closeout Submittals

1.8Warranty

1.5.1Instructions

1.5.1Safety Data Sheets

1.5.120 year 'No-Dollar-Limit' Warranty

07 53 23 SD-02 Shop Drawings

1.3.1Roof Plan Drawing

1.3.1Wind Load Calculations

1.3.1Boundaries of Enhanced

Perimeter

1.3.1Corner Attachments of Roof

System Components

1.3.1Location of Perimeter Half-Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 80 PAGES

07 53 23 1.3.1Spacing of Perimeter, Corner, and Infield Fasteners

1.3.1Slopes and Drain Locations

SD-03 Product Data

2.2Cement

2.1.1 G AEEPDM Sheet

2.1.2 SHeat Island Reduction

2.1.3Seam Tape

2.1.5Bonding Adhesive

2.1.4Lap Splice Adhesive

2.1.7Water Cutoff Mastic/Water Block

2.1.6Lap Cleaner, Lap Sealant, and

Edge Treatment

3.3Flashings

2.1.8Flashing Accessories

2.1.8.1Flashing Tape

2.1.9Fasteners and Plates

2.1.13Roof Insulation

2.1.10Protection Mat

2.1.11Pre-Manufactured Accessories

1.8 GWarranty

SD-05 Design Data

1.4.3 GWind Uplift Calculations

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 80 PAGES

07 53 23 1.4.3 GWind Uplift Resistance

SD-08 Manufacturer’s Instructions

3.2 GApplication

3.2.3 GApplication Method

3.3.2 GMembrane Flashing

2.1.3Seam Tape

3.2.4Tape Seams / Lap Splices

3.2.5Perimeter Attachment

3.2.4Primer

3.2.6Fasteners

2.1.10Protection Mat

2.1.11Pre-Manufactured Accessories

1.6 GCold Weather

SD-11 Closeout Submittals

1.8Warranty

3.10Information Card

3.9Instructions To Government

Personnel

07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

3.1.14 GDownspouts

3.1.10 GBase Flashing

3.1.11 GCounterflashing

3.1.19 GFlashing at Roof Penetrations

and Equipment Supports

2.2.11 GReglets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 80 PAGES

07 60 00 3.1.15 GScuppers

3.1.21 GCopings

3.1.16 GConductor Heads

2.1 SRecycled Content

SD-03 Product Data

2.2.8 GCool Roof

SD-04 Samples

1.4.2 GFinish Samples

SD-07 Certificates

2.2.7.1 GWarranty on Finishes

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 GCleaning and Maintenance

07 80 00 SD-02 Shop Drawings

2.3 G AERoof Safety Railings

SD-03 Product Data

2.3 G AERoof Safety Railings

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 80 PAGES

07 84 00 SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

2.4 GBackstops

2.5 GCaulking

2.6 GCleaning Solvents

3.1 GField Adhesion

SD-07 Certificates

2.1.1 SIndoor Air Quality For Interior

Sealants

2.1.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.1.4 SIndoor Air Quality For Interior

Acoustical Sealants

2.5 SIndoor Air Quality For Interior

Caulking

08 11 13 SD-02 Shop Drawings

2.1 G AEDoors

2.1 G AEDoors

2.5 G AEFrames

2.5 G AEFrames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 80 PAGES

08 11 13 2.3 G AEAccessories

SD-03 Product Data

2.1 G AEDoors

2.1 SRecycled Content for Steel Door

Product

2.5 G AEFrames

2.5 SRecycled Content for Steel Frame

Product

2.3Accessories

08 33 23 SD-02 Shop Drawings

2.2.1 G AEOverhead Coiling Doors

2.2.3 G AECounterbalancing Mechanism

2.2.4 G AEManual Door Operators

2.2.1.3 G AEBottom Bars

2.1.1.1 G AEGuides

2.2.3.1 G AEMounting Brackets

2.2.2.2 G AEHood

2.1.1.1 G AEInstallation Drawings

SD-03 Product Data

2.2.1 G AEOverhead Coiling Doors

2.2.2 G AEHardware

2.2.3 G AECounterbalancing Mechanism

2.2.4 G AEManual Door Operators

2.2.1.1 SRecycled content for steel curtain

slats

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 80 PAGES

08 33 23 1.3.4 GMock-Up

2.2.1.2 GInsulated Curtains

SD-05 Design Data

2.2.1 G AEOverhead Coiling Doors

2.2.2 G AEHardware

2.2.3 G AECounterbalancing Mechanism

2.2.4 G AEManual Door Operators

SD-07 Certificates

1.3.2 GInstaller Qualifications

SD-10 Operation and Maintenance

Data

1.3.3 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

1.3.1 GWarranty

08 71 00 SD-02 Shop Drawings

1.3 G AEManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 G AEHardware Schedule

2.3.6 GKeying System

SD-03 Product Data

2.3 G AEHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 80 PAGES

08 71 00 1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

1.3Glazing Accessories

2.2.3.1Sealants

SD-04 Samples

2.2.2Glazing Compound

2.2.5Tape

2.2.5Sealing Tapes

SD-08 Manufacturer’s Instructions

2.2Setting and Sealing Materials

3.2Glass Setting

08 91 00 SD-02 Shop Drawings

1.4Wall Louvers

SD-03 Product Data

2.2Metal Wall Louvers

SD-04 Samples

1.5 GWall Louver Samples

09 90 00 SD-02 Shop Drawings

3.10Piping Identification

SD-03 Product Data

2.1 GCoating

2.1Product Data Sheets

SD-04 Samples

2.2 GColor

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 80 PAGES

09 90 00 SD-07 Certificates

1.5.5.2 GQualification Testing

1.5.4Indoor Air Quality for Paints and

Primers

1.5.4Indoor Air Quality for

Consolidated Latex Paints

SD-08 Manufacturer’s Instructions

2.1Mixing

1.7.1Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 GCoatings

09 96 00 SD-01 Preconstruction Submittals

1.3 GEquipment List

SD-03 Product Data

2.2.1 GEpoxy Coatings

SD-04 Samples

1.3 GColor Chips

SD-07 Certificates

2.2.1 GEpoxy Coatings

3.1.4 GManufacturer's Printed

Instructions

10 14 00.20 SD-02 Shop Drawings

1.3.2 GDetail Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 80 PAGES

10 14 00.20 2.1 GRoom Identification And

Directional Signage System

2.2 GExit Door Tactile Sign

SD-04 Samples

1.3.1 GInterior Signage

2.2 GExit Door Tactile Sign

SD-10 Operation and Maintenance

Data

3.2 GApproved Manufacturer's

Instructions

3.2.2 GProtection and Cleaning

10 44 16 SD-02 Shop Drawings

2.1.1 GFire Extinguishers

Part 2 GAccessories

2.2.1 GWall Brackets

1.5 GSchedule

SD-03 Product Data

2.1.1 GFire Extinguishers

Part 2 GAccessories

2.2.1 GWall Brackets

3.2.1 GReplacement Parts List

SD-04 Samples

1.3.1 GEquipment Samples

SD-07 Certificates

2.1.1 GFire Extinguishers Certifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 80 PAGES

10 44 16 1.4 GManufacturer's Warranty with

Inspection Tag

12 50 00.13 10 SD-01 Preconstruction Submittals

1.6.3 GStorage Location

SD-02 Shop Drawings

3.3.1 GInstallation Drawings

SD-03 Product Data

2.3 GProduct Data

2.3 GProduct Style Options

SD-04 Samples

2.3.3 GFinishes

SD-07 Certificates

1.5 GAuthorized Dealer

1.5 GCertified Furniture Installers

1.5 GLicensed Electrician

1.5 GCertified Telecommunications

Installer

2.3 GManufacturer's Certification

1.7 GWarranty

SD-10 Operation and Maintenance

Data

3.5 GFurniture, Data Package 1

SD-11 Closeout Submittals

2.1.1 SReduced VOC's for Furniture

2.1.2 SRecycled Content of Furniture

2.1.3 SBio-Based Content of Furniture

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 80 PAGES

21 13 16 SD-01 Preconstruction Submittals

1.2.4 G AEQualified Fire Protection Engineer

(QFPE)

1.4.2.1 G AESprinkler System Designer

1.4.2.2 G AESprinkler System Installer

1.4.2.3 G AENitrogen Generation System

Commissioning Technician

SD-02 Shop Drawings

1.2.1.1 G AEShop Drawing

SD-03 Product Data

2.2.1 G AEPipe

2.3.1.2 G AEFittings

2.3.3 G AEValves

2.10.5 G AERelief Valves

2.9 G AESprinklers

2.3.2 G AEPipe Hangers and Supports

2.6.1 G AESprinkler Alarm Switch

2.6.3 G AEValve Supervisory (Tamper)

Switch

2.8 G AEFire Department Connection

2.7 G AEBackflow Prevention Assembly

2.3.3.3 G AEHose Valve

2.6.2 G AEHigh/Low-Nitrogen Pressure

Supervisory Switch

1.4.2.3 G AENitrogen Generation System

2.1.2 G AENameplates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 80 PAGES

21 13 16 2.4 G AEDry Pipe Valve

SD-05 Design Data

1.2.1.2 G AEHydraulic Calculations

SD-06 Test Reports

3.7.1 G AETest Procedures

SD-07 Certificates

3.7.2.1 G AEVerification of Compliant

Installation

3.7.2.2 G AERequest for Government Final

Test

SD-10 Operation and Maintenance

Data

3.9 G AEOperating and Maintenance

(O&M) Instructions

1.6 G AESpare Parts

SD-11 Closeout Submittals

3.9 G AEAs-built drawings

22 00 00 SD-03 Product Data

2.2Fixtures

2.2.1 G AEEmergency Eye Wash

2.2.1 G AEPreservative

SD-06 Test Reports

3.3Tests, Flushing and Disinfection

SD-07 Certificates

1.3Materials and Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 80 PAGES

22 00 00 SD-10 Operation and Maintenance

Data

3.3.1 GPlumbing System

22 05 48.00 20 SD-03 Product Data

2.3 G AEIsolators

2.6 G AEFlexible Connectors

2.7 G AEFlexible Duct Connectors

2.9 G AEPipe Guides

2.8 G AESeismic Snubbers

3.1.3 G AEVertical Stops

2.10 G AEThrust Restraints

3.1.12Machinery Foundations and

Subbases

1.4.2Machinery Manufacturer's Sound

Data

SD-05 Design Data

1.4.3Machinery

1.4.4Machinery Over 300 Pounds

SD-06 Test Reports

2.8Seismic Snubbers

3.2.3.1Equipment Vibration Tests

3.2.3.2Equipment Sound Level Tests

2.4Protected Spring Isolators

SD-08 Manufacturer’s Instructions

3.1.1Vibration and Noise Isolation

Components

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 80 PAGES

23 05 15 SD-01 Preconstruction Submittals

1.2 G AEMaterial, Equipment, and Fixture

Lists

SD-02 Shop Drawings

1.2 G AERecord Drawings

1.2 G AEConnection Diagrams

1.2 G AECoordination Drawings

1.2 GFabrication Drawings

3.1 GInstallation Drawings

SD-03 Product Data

2.2 G AEPipe and Fittings

2.3 G AEPiping Specialties

2.4 G AEValves

2.5 G AEMiscellaneous Materials

2.6 G AESupporting Elements

1.2 GEquipment Foundation Data

2.7Identification Systems

SD-04 Samples

1.2 G AEManufacturer's Standard Color

Charts

SD-05 Design Data

2.2 GPipe and Fittings

2.3 GPiping Specialties

2.4 GValves

SD-06 Test Reports

3.1 GHydrostatic Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 80 PAGES

23 05 15 3.1 GAir Tests

3.1 GValve-Operating Tests

3.1 GDrainage Tests

3.1 GPneumatic Tests

3.1 GNon-Destructive Electric Tests

3.1 GSystem Operation Tests

SD-07 Certificates

1.4.2 GRecord of Satisfactory Field

Operation

1.4.3 GList of Qualified Permanent

Service Organizations

1.2 GListing of Product Installations

1.2 GRecords of Existing Conditions

3.1 GSurface Resistance

3.1 GShear and Tensile Strengths

3.1 GTemperature Ratings

3.1 GBending Tests

3.1 GFlattening Tests

3.1 GTransverse Guided Weld Bend

Tests

SD-10 Operation and Maintenance

Data

3.12 GOperation and Maintenance

Manuals

23 05 48.19 SD-02 Shop Drawings

3.1Coupling and Bracing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 80 PAGES

23 05 48.19 2.2Equipment Restraint

1.2.4 G AEContractor Designed Bracing

SD-03 Product Data

3.1 G AECoupling and Bracing

2.2 G AEEquipment Restraint

1.2.4 G AEContractor Designed Bracing

3.5Anchor Bolts

2.2.2Vibration Isolators

SD-05 Design Data

1.2.4Design Calculations

SD-06 Test Reports

3.5 GAnchor Bolts

23 05 93 SD-01 Preconstruction Submittals

1.5.3.1 G ATAB Firm

1.2 G ATAB Team Assistants

1.2 G ATAB Team Engineer

1.5.3.2 GTAB Specialist

1.2 G ATAB Team Field Leader

SD-02 Shop Drawings

1.3.3 G ATAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3 G AEquipment and Performance

Data

1.5.3.4 G ATAB Related HVAC Submittals

1.5.2 G ATAB Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 80 PAGES

23 05 93 1.5.2 G ACalibration

1.3.3 G ASystems Readiness Check

1.5.4 G ATAB Execution

SD-06 Test Reports

1.6.1.1 G ATAB Design Review Report

1.5.5.1 G ATAB Report for Season 1

1.5.5.1 G ATAB Report for Season 2

SD-07 Certificates

1.5.1 G AIndependent TAB Agency and

Personnel Qualifications

1.6.1 G ATAB Submittal and Work

Schedule

1.6.1.2 G ATAB Pre-Field Engineering

Report

1.5.3.1 G ATAB Firm

1.3.3 G ADesign Review Report

1.6.1 GAdvanced Notice for TAB Field

Work

1.6.1 GPrerequisite HVAC Work Check

Out List

23 07 00 SD-02 Shop Drawings

3.2.1.8 GMICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 80 PAGES

23 07 00 2.3.1 SRecycled content for insulation materials

SD-03 Product Data

2.3 G AEPipe Insulation Systems

3.2 G AEPipe Insulation Systems

3.3 G AEDuct Insulation Systems

3.4 G AEEquipment Insulation Systems

SD-04 Samples

2.2.1.2 GThermal Insulation

3.1.1 GDisplay Samples

SD-07 Certificates

2.2.1 SIndoor air quality for adhesives

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

23 08 00 SD-03 Product Data

2.1 G AETest Equipment

SD-06 Test Reports

1.5 G AEPipe Flushing, Testing, And

Water Treatment Reports

3.3 G AECompleted Pre-Functional

Checklists

3.11 G AESeasonal Test Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 80 PAGES

23 08 00 3.14 G AEPost-Construction Trend Log

Report

SD-07 Certificates

1.6 G AECertificate Of Readiness

23 09 00 SD-02 Shop Drawings

3.3 G AEDDC Contractor Design Drawings

3.3…