Amendment 0015_Submittal REGISTER.pdf
PDF 809 KB Posted
- Solicitation number
- W912DS26RA015
About this file
This document is a Submittal Register for the WVA North Switch Station construction project, serving as a comprehensive tracking form for all required submissions throughout the contract lifecycle.
The register itemizes over 450 distinct submittal requirements organized by construction specification sections (01 14 00 through 33 82 00), detailing the documentation, certifications, shop drawings, product data, test reports, and operational materials that contractors must provide at various project phases. Key submission categories include preconstruction submittals (SD-01) covering safety plans, qualifications, and project schedules; shop drawings (SD-02) for structural and mechanical systems; product data (SD-03) for materials and equipment; samples (SD-04); design data (SD-05); test reports (SD-06) documenting quality assurance and inspections; certificates (SD-07) verifying compliance and qualifications; manufacturer's instructions (SD-08); field reports (SD-09); operation and maintenance data (SD-10); and closeout submittals (SD-11) including as-built drawings and warranties. The register tracks submission status through multiple columns capturing contractor action dates, approval authority determinations, material need dates, and review cycles, with classification codes indicating whether approval is required (G for Government, S for Sustainable) and whether review or approval is necessary (RO, A/E). Submittals span structural steel work, electrical systems including switchgear and generators, HVAC and plumbing systems, fire alarm and security systems, site work, telecommunications infrastructure, and comprehensive facility documentation required for project handover and operations.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 80 PAGES
WVA NORTH SWITCH STATION
01 14 00 SD-01 Preconstruction Submittals
1.4.1.1 GList of Contact Personnel
1.5 GDigging Permit
SD-07 Certificates
1.29.13Rs Explosive Safety Education
Training Certificate
01 30 00 SD-01 Preconstruction Submittals
1.3View Location Map
1.4Progress and Completion
Pictures
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G RODetail Preliminary Project
Schedule
3.4.2 G RODetail Initial Project Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.2 G ROPreliminary High Performance
and Sustainable Building Checklist
1.4.1 G ROSustainability Action Plan
1.5.3.2 G ROPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 80 PAGES
01 33 29 1.5.3.2 G ROFinal High Performance and
Sustainable Building Checklist
1.5.3.2 G ROFinal Sustainability eNotebook
1.5.3.2 G ROAmended Final Sustainability
eNotebook
1.5.3.2 G ROAmended Final High
Performance and Sustainable
Building Checklist
01 35 26 SD-01 Preconstruction Submittals
1.8 G ROAccident Prevention Plan (APP)
1.16 SFinal IAQ Management Plan
1.16 G ROIndoor Air Quality (IAQ)
Management Plan
SD-06 Test Reports
1.12.2 G ROAccident Reports
1.12.3LHE Inspection Reports
1.5 G ROMonthly Exposure Reports
SD-07 Certificates
1.9 G ROActivity Hazard Analysis (AHA)
1.12.4Certificate of Compliance
1.13Hot Work Permit
1.14License Certificates
1.14.1 G ROPortable Gauge Operations
Planning Worksheet
1.14.1 G RORadiography Operation Planning
Work Sheet
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 80 PAGES
01 35 26 1.12.4 G ROStandard Lift Plan
01 45 00 SD-01 Preconstruction Submittals
1.5.2 G ROContractor Quality Control (CQC)
Plan
SD-06 Test Reports
1.12.3Verification Statement
01 45 35 SD-06 Test Reports
3.1.2Special Inspection Daily Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
2.1AC472 Accreditation
2.1Certificate of Compliance
1.5 GSpecial Inspector
SD-11 Closeout Submittals
3.1.2 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 G ROConstruction Site Plan
3.3.1 G ROTraffic Control Plan
2.2.1 G ROHaul Road Plan
1.6.1.4 G ROContractor Computer
Cybersecurity Compliance
Statements
1.6.6 G ROContractor Temporary Network
Cybersecurity Compliance
Statements
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 80 PAGES
01 50 00 3.4Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.6.1Preconstruction Survey
1.6.2 G RORegulatory Notifications
1.6.4 G ROEnvironmental Manager
Qualifications
1.6.5 G ROEmployee Training Records
1.7 G ROEnvironmental Protection Plan
1.7.9.1 G RODirt and Dust Control Plan
1.11 G ROSolid Waste Management Permit
3.2.1.1 G ROStormwater Pollution Prevention
Plan
3.2.1.2 G ROStormwater Notice of Intent
3.11.2 G ROSpill Prevention Control And
Countermeasure (SPCC) Plan
SD-06 Test Reports
1.11.1 G ROMonthly Solid Waste Disposal
Report
3.2.1.3Inspection Reports
SD-07 Certificates
1.6.5 G ROEmployee Training Records
1.6.5Erosion and Sediment Control
Inspector
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 80 PAGES
01 57 19 1.6.5.1Certificate of Competency
SD-11 Closeout Submittals
1.6.2 G RORegulatory Notifications
1.6.5 G ROAssembled Employee Training
Records
1.11 G ROSolid Waste Management Permit
3.2.1.4 G ROStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 G ROStormwater Notice of Termination
3.2.1.5As-Built Topographic Survey
3.7.1 G ROWaste Determination
Documentation
3.7.2.1 G ROProject Solid Waste Disposal
Documentation Report
3.7.2.1 G ROSales Documentation
3.7.2.1Contractor Certification
3.7.3.1 G ROHazardous Waste/Debris
Management
3.7.3.6 G RODisposal Documentation for
Hazardous and Regulated Waste
01 58 00 SD-01 Preconstruction Submittals
1.4.1 G ROConstruction Project Signs
SD-02 Shop Drawings
1.3.1.1 G ROPreliminary One Line
1.4.1 G ROSign Legend Orders
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 80 PAGES
01 58 00 1.3.1.2 G ROFinal Rendering
1.3.1.3 G ROFinal Framed Rendering
01 74 19 SD-01 Preconstruction Submittals
1.7 G ROConstruction Waste Management
Plan
SD-06 Test Reports
1.9.2Quarterly Reports
1.9.3Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.8.1Warranty Management Plan
1.8.5Warranty Tags
1.6Spare Parts Data
SD-08 Manufacturer’s Instructions
1.8.1Instructions
SD-10 Operation and Maintenance
Data
3.7 G ROOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 G ROAs-Built Drawings
3.3 G RORecord Drawings
2.2 GRecord Model
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 80 PAGES
01 78 00 1.8.1As-Built Record of Equipment and Materials
3.6As-Built Record of Equipment and Materials
3.4 G ROFinal Approved Shop Drawings
3.5 G ROConstruction Contract
Specifications
2.3 G ROCertification of EPA Designated
Items
2.4 G ROCertification Of USDA Designated
Items
3.9.1 G ROInterim DD FORM 1354
3.9.2 G ROChecklist for DD FORM 1354
3.9.2 GHigh Performance and
Sustainable Building (HPSB)
Checklist
01 78 23 SD-10 Operation and Maintenance
Data
1.4 G ROFacility Data Workbook
3.1.1 G ROTraining Plan
3.1.3 G ROTraining Outline
3.1.2 G ROTraining Content
3.2.1 G ROOperation And Maintenance
Manual, Progress Submittal
3.2.2 G ROOperation And Maintenance
Manual, Prefinal Submittal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 80 PAGES
01 78 23 3.2.3 G ROOperation And Maintenance
Manual, Final Submittal
SD-11 Closeout Submittals
3.1.4 G ROTraining Video Recording
3.1.6 G ROValidation of Training Completion
3.1.1 G ROTraining Plan
1.6.6.7 G RORecord Drawings And Utility
Systems
01 78 24.00 10 SD-01 Preconstruction Submittals
1.3.1Facility Data Project Execution
Plan
SD-10 Operation and Maintenance
Data
3.1 G ROFacility Data Workbook, Construction Progress
3.1 G ROFacility Document Set, Construction Progress
SD-11 Closeout Submittals
3.2 G ROFacility Data Workbook, Construction Final
1.3.3 G ROFacility Document Set, Construction Final
3.2 G ROFacility Document Set, Construction Final
01 91 00.15 SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 80 PAGES
01 91 00.15 3.6 G AECompleted Construction
Observation Checklists
3.4 G AEInterim Construction Phase
Commissioning Plan
3.4 G AEFinal Construction Phase
Commissioning Plan
1.10 G AEIssues Log
3.7.3 G AEIntegrated Systems Test Plan
3.7.3 G AEPhase 1 Testing - North Switch
Station
3.7.4 G AENorth And South Switch Station
Integrated Systems Test Plan
3.7.4 G AEPhase 2 Testing - North And
South Switch Stations
3.11 G AEFinal Commissioning Report
3.11 G AEFinal Commissioning Report
3.11 G AEInterim Commissioning Report
SD-07 Certificates
1.8 GCommissioning Firm
1.11 G AECertificate of Readiness
SD-10 Operation and Maintenance
Data
3.9 G AESystems Manual
3.10 G AEMAINTENANCE AND SERVICE
LIFE PLAN
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 80 PAGES
01 91 00.15 3.11 G AEFinal Commissioning Report
3.11 G AEFinal Commissioning Report
3.12 G AEUpdated Final Commissioning
Report
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.7 GNotification
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.6 GQuality Control Program
1.6.7 GQuality Control Personnel
Certifications
1.6.7Quality Control Organizational
Chart
1.6.9 GLaboratory Accreditation
3.3.9Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.5 SJoint Sealants
2.4.4 SJoint Filler
2.1Formwork Materials
2.3.3.2 SRecycled Aggregate Materials
2.3.1 SCementitious Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 80 PAGES
03 30 00 2.4.6Vapor Retarder and Vapor Barrier
2.4.1Concrete Curing Materials
2.6 SReinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.2.2Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
2.4.2Nonshrink Grout
SD-04 Samples
1.6.5.1Slab Finish Sample
1.6.5.2Surface Finish Samples
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.12.3.3 GCompressive Strength Tests
3.12.3.5Unit Weight of Structural
Concrete
3.12.3.1Slump Tests
2.3.2Water
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 80 PAGES
03 30 00 3.12.3.4Air Content
SD-07 Certificates
2.6.1Reinforcing Bars
1.6.3.3Safety Data Sheets
1.6.7.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5 SJoint Sealants
2.4.1Curing Compound
04 20 00 SD-02 Shop Drawings
3.3.4.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2 GClay or Shale Brick
2.2.3.2.1 GCement
2.4.1.1 GCementitious Materials
2.6.8 GInsulation
SD-04 Samples
1.3.1.1 GMock-Up Panel
2.2.2 GClay or Shale Brick
2.2.3.2 GConcrete Masonry Units (CMU)
2.4.1.3 GAdmixtures for Masonry Mortar
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 80 PAGES
04 20 00 2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
2.6.6 GClay Masonry Expansion-Joint
Materials
2.6.8 GInsulation
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
2.2.3.3Fire-Rated Concrete Masonry
Units
3.2.5 GBracing Calculations
SD-06 Test Reports
2.2.2.1.4Efflorescence Test
2.2.3.3Fire-Rated Concrete Masonry
Units
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
3.6.1.4Prism Tests
3.6.1.5Single-Wythe Masonry Wall
Water Penetration Test
SD-07 Certificates
1.3.2Special Masonry Inspector
Qualifications
2.2.2Clay or Shale Brick
2.2.3.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 80 PAGES
04 20 00 2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
2.6.8Insulation
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.1.3 SClay Units
2.2.3.2.2 SRecycled Content
05 05 20 SD-01 Preconstruction Submittals
1.5.1.1 GInstaller Qualifications
1.5.1.2 GPost-Installed Anchor Special
Inspector Qualifications
SD-03 Product Data
2.1.1.3 GMechanical Anchors in Concrete
2.1.1.4 GAdhesive Anchor System in
Concrete
2.1.1.5 GMechanical and Adhesive
Anchors in Masonry
3.1.3 GNon-Shrink, Non-Metallic Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 80 PAGES
05 05 20 SD-06 Test Reports
3.3.4 GPost-Installed Anchor Special
Inspections Report
SD-07 Certificates
2.1.1.1 GPost-Installed Anchor
Certification
SD-08 Manufacturer’s Instructions
2.1.1.2 GManufacturer's Printed
Installation Instructions
3.1.3 GNon-Shrink, Non-Metallic Grout
1.5Manufacturer's Safety Data
Sheets
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.4.2Non-Shrink Grout
2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
2.2.3 SRecycled Content for Steel Pipe
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 80 PAGES
05 12 00 SD-05 Design Data
1.4.3 GDesign Calculations For Steel
Connections
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.6.1.2Weld Inspection Reports
3.6.2.1Direct Tension Indicator Washer
Inspection Reports
3.6.3.1Bolt Testing Reports
3.6.4Embrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
1.4.4.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.6.1.1Certified Welding Inspector
3.6.1.2NDT Technician
3.3Welding Procedure Specifications
(WPS)
1.3Aisc Structural Steel Fabricator
Quality Certification
1.3Aisc Structural Steel Erector
Quality Certification
2.5Galvanizing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 80 PAGES
05 21 00 SD-01 Preconstruction Submittals
1.3.2Welder Qualification
SD-02 Shop Drawings
1.3.1 GSteel Joist Framing
SD-03 Product Data
2.3 SRecycled Content Of Steel
Products
SD-05 Design Data
2.2 GDesign Calculations
SD-06 Test Reports
3.4Erection Inspection
3.4Welding Inspections
SD-07 Certificates
1.3.2Certification of Compliance
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.4Galvanizing Repair Paint
2.1.4Touch-Up Paint
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
2.1 SRecycled Content of Steel
Products
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 80 PAGES
05 30 00 2.1.1Metal Roof Deck Units
2.2.4Flexible Closure Strips
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3Welder Qualifications
1.3.3Welding Procedures
1.3.4.1Fire Safety
1.3.4.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
05 50 13 SD-02 Shop Drawings
2.8 GAngles and Plates
2.5 GFloor Gratings
2.5 GRoof Walkways
2.6 GBollards
SD-03 Product Data
2.4Corner Guards
2.7 GDownspout Terminations
2.1 SRecycled Content
SD-07 Certificates
2.1 GCertificates of Compliance
2.2 GCertified Mill
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 80 PAGES
05 51 33 2.3 G AELadders
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
1.5.1 GFabrication Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.1.2 GProtective Coating
2.2.8 GSteel Railings and Handrails
1.2.1 GAnchorage and Fastening
Systems
SD-06 Test Reports
1.4.1 GWelding Inspections
2.3 GMill Test Reports
SD-07 Certificates
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-02 Shop Drawings
2.2.1 GNailing Strips
SD-03 Product Data
1.8Fire-retardant Treatment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 80 PAGES
06 10 00 2.4.2Adhesives
SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
1.9.1Certificates of Grade
2.3.1.1 SCertified Sustainably Harvested
Plywood for Other Uses
1.7Preservative Treatment
2.4.2 SIndoor Air Quality for Aerosol
Adhesives
2.4.2 SIndoor Air Quality for Non-aerosol
Adhesives
07 21 13 SD-02 Shop Drawings
1.3 GManufacturer's Standard Details
SD-03 Product Data
1.4 GEnvironmental Data for Materials
2.1 GBlock or Board Insulation
2.2 GVapor Retarder
2.3 GPressure Sensitive Tape
2.4 GProtection Board or Coating
2.5 GAccessories
1.5.2 SEnergy Star Label For Insulation
Product
2.1.4 SRecycled Content for Block or
Board Insulation
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 80 PAGES
07 21 13 2.1.5 SIndoor Air Quality For Block Or
Board Insulation
SD-08 Manufacturer’s Instructions
3.3.1Insulation Installation and
Handling
2.5.1Adhesive
SD-11 Closeout Submittals
1.8.1 GDraft Guarantee
1.8.1 GFinal Guarantee
1.8.2 GDraft Warranty
1.8.2 GFinal Warranty
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
1.3 GVerification of Existing Conditions
SD-03 Product Data
2.1 GInsulation
1.4 GCover Board
2.4 GFasteners
2.3 GMoisture Control
2.1.2 SRecycled Content For Insulation
SD-05 Design Data
1.7 GWind Resistance
SD-07 Certificates
1.6 GInstaller Qualifications
2.1.3 SIndoor Air Quality For Insulation
2.1.4 SAcceptable Foam Blowing Agents
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 80 PAGES
07 22 00 SD-08 Manufacturer’s Instructions
2.4 GFasteners
2.1 GInsulation
07 27 19.01 SD-01 Preconstruction Submittals
1.7.1 GQualifications of Manufacturer
1.7.2 GQualifications of Installer
SD-02 Shop Drawings
1.4.1 G AESelf-adhering Air Barrier Shop
Drawings
SD-03 Product Data
2.1 G AESelf-adhering Air Barrier
2.2 G AEPrimers, Adhesives, and Mastics
1.4.2 GSafety Data Sheets
SD-06 Test Reports
1.7.3 GField Peel Adhesion Test
1.4.3 GFlame Propagation of Wall
Assemblies
3.4.1 GSite Inspections and Testing
SD-08 Manufacturer’s Instructions
1.4.2 GSelf-adhering Air Barrier
Manufacturer's Printed Instructions
2.2 GPrimers, Adhesives, and Mastics
07 42 63 SD-01 Preconstruction Submittals
1.5.3Qualification of Manufacturer
1.5.4Qualification of Installer
1.5.4.1Qualifications for Welding Work
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 80 PAGES
07 42 63 SD-02 Shop Drawings
1.5.1 G AEFabrication and Installation
drawings
1.5.1 G AEWall Panel Assemblies
1.5.1 G AEFlashing and Accessories
1.5.1 G AEAnchorage Systems
SD-03 Product Data
1.5.9Certification
1.5.1sustainable acquisition
1.5.1Manufacturer's catalog data
1.5.1Factory Color Finish
1.5.1 G AESub-girts and Formed Shapes
1.5.1 G AEClosure Materials
1.5.1Insulation
1.5.1Pressure Sensitive Tape
2.3.4.1Sealants and Caulking
1.5.1Galvanizing Repair Paint
1.5.1Accessories
SD-04 Samples
1.5.1Wall Panel Assemblies
1.5.1Fasteners
1.5.1Metal Closure Strips
1.5.1Insulation
1.5.1manufacturer's color charts and chips
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 80 PAGES
07 42 63 1.5.1Wind Design Analysis
SD-06 Test Reports
3.7.2Leakage Tests
1.3.2Wind Load Tests
1.3.2Seismic Tests
1.5.1Factory Color Finish
SD-07 Certificates
1.5.1Fasteners
1.5.1Galvanizing Repair Paint
1.5.1wall system assembly wind load and fire rating classification listings
SD-08 Manufacturer’s Instructions
1.5.1Installation of Wall Panels
SD-11 Closeout Submittals
1.8Warranty
1.5.1Instructions
1.5.1Safety Data Sheets
1.5.120 year 'No-Dollar-Limit' Warranty
07 53 23 SD-02 Shop Drawings
1.3.1Roof Plan Drawing
1.3.1Wind Load Calculations
1.3.1Boundaries of Enhanced
Perimeter
1.3.1Corner Attachments of Roof
System Components
1.3.1Location of Perimeter Half-Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 80 PAGES
07 53 23 1.3.1Spacing of Perimeter, Corner, and Infield Fasteners
1.3.1Slopes and Drain Locations
SD-03 Product Data
2.2Cement
2.1.1 G AEEPDM Sheet
2.1.2 SHeat Island Reduction
2.1.3Seam Tape
2.1.5Bonding Adhesive
2.1.4Lap Splice Adhesive
2.1.7Water Cutoff Mastic/Water Block
2.1.6Lap Cleaner, Lap Sealant, and
Edge Treatment
3.3Flashings
2.1.8Flashing Accessories
2.1.8.1Flashing Tape
2.1.9Fasteners and Plates
2.1.13Roof Insulation
2.1.10Protection Mat
2.1.11Pre-Manufactured Accessories
1.8 GWarranty
SD-05 Design Data
1.4.3 GWind Uplift Calculations
SD-07 Certificates
1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 80 PAGES
07 53 23 1.4.3 GWind Uplift Resistance
SD-08 Manufacturer’s Instructions
3.2 GApplication
3.2.3 GApplication Method
3.3.2 GMembrane Flashing
2.1.3Seam Tape
3.2.4Tape Seams / Lap Splices
3.2.5Perimeter Attachment
3.2.4Primer
3.2.6Fasteners
2.1.10Protection Mat
2.1.11Pre-Manufactured Accessories
1.6 GCold Weather
SD-11 Closeout Submittals
1.8Warranty
3.10Information Card
3.9Instructions To Government
Personnel
07 60 00 SD-02 Shop Drawings
2.2.1 GExposed Sheet Metal
3.1.14 GDownspouts
3.1.10 GBase Flashing
3.1.11 GCounterflashing
3.1.19 GFlashing at Roof Penetrations
and Equipment Supports
2.2.11 GReglets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 80 PAGES
07 60 00 3.1.15 GScuppers
3.1.21 GCopings
3.1.16 GConductor Heads
2.1 SRecycled Content
SD-03 Product Data
2.2.8 GCool Roof
SD-04 Samples
1.4.2 GFinish Samples
SD-07 Certificates
2.2.7.1 GWarranty on Finishes
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 GCleaning and Maintenance
07 80 00 SD-02 Shop Drawings
2.3 G AERoof Safety Railings
SD-03 Product Data
2.3 G AERoof Safety Railings
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 80 PAGES
07 84 00 SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
2.5 GCaulking
2.6 GCleaning Solvents
3.1 GField Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
2.5 SIndoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1 G AEDoors
2.1 G AEDoors
2.5 G AEFrames
2.5 G AEFrames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 80 PAGES
08 11 13 2.3 G AEAccessories
SD-03 Product Data
2.1 G AEDoors
2.1 SRecycled Content for Steel Door
Product
2.5 G AEFrames
2.5 SRecycled Content for Steel Frame
Product
2.3Accessories
08 33 23 SD-02 Shop Drawings
2.2.1 G AEOverhead Coiling Doors
2.2.3 G AECounterbalancing Mechanism
2.2.4 G AEManual Door Operators
2.2.1.3 G AEBottom Bars
2.1.1.1 G AEGuides
2.2.3.1 G AEMounting Brackets
2.2.2.2 G AEHood
2.1.1.1 G AEInstallation Drawings
SD-03 Product Data
2.2.1 G AEOverhead Coiling Doors
2.2.2 G AEHardware
2.2.3 G AECounterbalancing Mechanism
2.2.4 G AEManual Door Operators
2.2.1.1 SRecycled content for steel curtain
slats
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 80 PAGES
08 33 23 1.3.4 GMock-Up
2.2.1.2 GInsulated Curtains
SD-05 Design Data
2.2.1 G AEOverhead Coiling Doors
2.2.2 G AEHardware
2.2.3 G AECounterbalancing Mechanism
2.2.4 G AEManual Door Operators
SD-07 Certificates
1.3.2 GInstaller Qualifications
SD-10 Operation and Maintenance
Data
1.3.3 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
1.3.1 GWarranty
08 71 00 SD-02 Shop Drawings
1.3 G AEManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 G AEHardware Schedule
2.3.6 GKeying System
SD-03 Product Data
2.3 G AEHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 80 PAGES
08 71 00 1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
1.3Glazing Accessories
2.2.3.1Sealants
SD-04 Samples
2.2.2Glazing Compound
2.2.5Tape
2.2.5Sealing Tapes
SD-08 Manufacturer’s Instructions
2.2Setting and Sealing Materials
3.2Glass Setting
08 91 00 SD-02 Shop Drawings
1.4Wall Louvers
SD-03 Product Data
2.2Metal Wall Louvers
SD-04 Samples
1.5 GWall Louver Samples
09 90 00 SD-02 Shop Drawings
3.10Piping Identification
SD-03 Product Data
2.1 GCoating
2.1Product Data Sheets
SD-04 Samples
2.2 GColor
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 80 PAGES
09 90 00 SD-07 Certificates
1.5.5.2 GQualification Testing
1.5.4Indoor Air Quality for Paints and
Primers
1.5.4Indoor Air Quality for
Consolidated Latex Paints
SD-08 Manufacturer’s Instructions
2.1Mixing
1.7.1Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings
09 96 00 SD-01 Preconstruction Submittals
1.3 GEquipment List
SD-03 Product Data
2.2.1 GEpoxy Coatings
SD-04 Samples
1.3 GColor Chips
SD-07 Certificates
2.2.1 GEpoxy Coatings
3.1.4 GManufacturer's Printed
Instructions
10 14 00.20 SD-02 Shop Drawings
1.3.2 GDetail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 80 PAGES
10 14 00.20 2.1 GRoom Identification And
Directional Signage System
2.2 GExit Door Tactile Sign
SD-04 Samples
1.3.1 GInterior Signage
2.2 GExit Door Tactile Sign
SD-10 Operation and Maintenance
Data
3.2 GApproved Manufacturer's
Instructions
3.2.2 GProtection and Cleaning
10 44 16 SD-02 Shop Drawings
2.1.1 GFire Extinguishers
Part 2 GAccessories
2.2.1 GWall Brackets
1.5 GSchedule
SD-03 Product Data
2.1.1 GFire Extinguishers
Part 2 GAccessories
2.2.1 GWall Brackets
3.2.1 GReplacement Parts List
SD-04 Samples
1.3.1 GEquipment Samples
SD-07 Certificates
2.1.1 GFire Extinguishers Certifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 80 PAGES
10 44 16 1.4 GManufacturer's Warranty with
Inspection Tag
12 50 00.13 10 SD-01 Preconstruction Submittals
1.6.3 GStorage Location
SD-02 Shop Drawings
3.3.1 GInstallation Drawings
SD-03 Product Data
2.3 GProduct Data
2.3 GProduct Style Options
SD-04 Samples
2.3.3 GFinishes
SD-07 Certificates
1.5 GAuthorized Dealer
1.5 GCertified Furniture Installers
1.5 GLicensed Electrician
1.5 GCertified Telecommunications
Installer
2.3 GManufacturer's Certification
1.7 GWarranty
SD-10 Operation and Maintenance
Data
3.5 GFurniture, Data Package 1
SD-11 Closeout Submittals
2.1.1 SReduced VOC's for Furniture
2.1.2 SRecycled Content of Furniture
2.1.3 SBio-Based Content of Furniture
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 80 PAGES
21 13 16 SD-01 Preconstruction Submittals
1.2.4 G AEQualified Fire Protection Engineer
(QFPE)
1.4.2.1 G AESprinkler System Designer
1.4.2.2 G AESprinkler System Installer
1.4.2.3 G AENitrogen Generation System
Commissioning Technician
SD-02 Shop Drawings
1.2.1.1 G AEShop Drawing
SD-03 Product Data
2.2.1 G AEPipe
2.3.1.2 G AEFittings
2.3.3 G AEValves
2.10.5 G AERelief Valves
2.9 G AESprinklers
2.3.2 G AEPipe Hangers and Supports
2.6.1 G AESprinkler Alarm Switch
2.6.3 G AEValve Supervisory (Tamper)
Switch
2.8 G AEFire Department Connection
2.7 G AEBackflow Prevention Assembly
2.3.3.3 G AEHose Valve
2.6.2 G AEHigh/Low-Nitrogen Pressure
Supervisory Switch
1.4.2.3 G AENitrogen Generation System
2.1.2 G AENameplates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 80 PAGES
21 13 16 2.4 G AEDry Pipe Valve
SD-05 Design Data
1.2.1.2 G AEHydraulic Calculations
SD-06 Test Reports
3.7.1 G AETest Procedures
SD-07 Certificates
3.7.2.1 G AEVerification of Compliant
Installation
3.7.2.2 G AERequest for Government Final
Test
SD-10 Operation and Maintenance
Data
3.9 G AEOperating and Maintenance
(O&M) Instructions
1.6 G AESpare Parts
SD-11 Closeout Submittals
3.9 G AEAs-built drawings
22 00 00 SD-03 Product Data
2.2Fixtures
2.2.1 G AEEmergency Eye Wash
2.2.1 G AEPreservative
SD-06 Test Reports
3.3Tests, Flushing and Disinfection
SD-07 Certificates
1.3Materials and Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 80 PAGES
22 00 00 SD-10 Operation and Maintenance
Data
3.3.1 GPlumbing System
22 05 48.00 20 SD-03 Product Data
2.3 G AEIsolators
2.6 G AEFlexible Connectors
2.7 G AEFlexible Duct Connectors
2.9 G AEPipe Guides
2.8 G AESeismic Snubbers
3.1.3 G AEVertical Stops
2.10 G AEThrust Restraints
3.1.12Machinery Foundations and
Subbases
1.4.2Machinery Manufacturer's Sound
Data
SD-05 Design Data
1.4.3Machinery
1.4.4Machinery Over 300 Pounds
SD-06 Test Reports
2.8Seismic Snubbers
3.2.3.1Equipment Vibration Tests
3.2.3.2Equipment Sound Level Tests
2.4Protected Spring Isolators
SD-08 Manufacturer’s Instructions
3.1.1Vibration and Noise Isolation
Components
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 80 PAGES
23 05 15 SD-01 Preconstruction Submittals
1.2 G AEMaterial, Equipment, and Fixture
Lists
SD-02 Shop Drawings
1.2 G AERecord Drawings
1.2 G AEConnection Diagrams
1.2 G AECoordination Drawings
1.2 GFabrication Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.2 G AEPipe and Fittings
2.3 G AEPiping Specialties
2.4 G AEValves
2.5 G AEMiscellaneous Materials
2.6 G AESupporting Elements
1.2 GEquipment Foundation Data
2.7Identification Systems
SD-04 Samples
1.2 G AEManufacturer's Standard Color
Charts
SD-05 Design Data
2.2 GPipe and Fittings
2.3 GPiping Specialties
2.4 GValves
SD-06 Test Reports
3.1 GHydrostatic Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 80 PAGES
23 05 15 3.1 GAir Tests
3.1 GValve-Operating Tests
3.1 GDrainage Tests
3.1 GPneumatic Tests
3.1 GNon-Destructive Electric Tests
3.1 GSystem Operation Tests
SD-07 Certificates
1.4.2 GRecord of Satisfactory Field
Operation
1.4.3 GList of Qualified Permanent
Service Organizations
1.2 GListing of Product Installations
1.2 GRecords of Existing Conditions
3.1 GSurface Resistance
3.1 GShear and Tensile Strengths
3.1 GTemperature Ratings
3.1 GBending Tests
3.1 GFlattening Tests
3.1 GTransverse Guided Weld Bend
Tests
SD-10 Operation and Maintenance
Data
3.12 GOperation and Maintenance
Manuals
23 05 48.19 SD-02 Shop Drawings
3.1Coupling and Bracing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 80 PAGES
23 05 48.19 2.2Equipment Restraint
1.2.4 G AEContractor Designed Bracing
SD-03 Product Data
3.1 G AECoupling and Bracing
2.2 G AEEquipment Restraint
1.2.4 G AEContractor Designed Bracing
3.5Anchor Bolts
2.2.2Vibration Isolators
SD-05 Design Data
1.2.4Design Calculations
SD-06 Test Reports
3.5 GAnchor Bolts
23 05 93 SD-01 Preconstruction Submittals
1.5.3.1 G ATAB Firm
1.2 G ATAB Team Assistants
1.2 G ATAB Team Engineer
1.5.3.2 GTAB Specialist
1.2 G ATAB Team Field Leader
SD-02 Shop Drawings
1.3.3 G ATAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 G AEquipment and Performance
Data
1.5.3.4 G ATAB Related HVAC Submittals
1.5.2 G ATAB Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 80 PAGES
23 05 93 1.5.2 G ACalibration
1.3.3 G ASystems Readiness Check
1.5.4 G ATAB Execution
SD-06 Test Reports
1.6.1.1 G ATAB Design Review Report
1.5.5.1 G ATAB Report for Season 1
1.5.5.1 G ATAB Report for Season 2
SD-07 Certificates
1.5.1 G AIndependent TAB Agency and
Personnel Qualifications
1.6.1 G ATAB Submittal and Work
Schedule
1.6.1.2 G ATAB Pre-Field Engineering
Report
1.5.3.1 G ATAB Firm
1.3.3 G ADesign Review Report
1.6.1 GAdvanced Notice for TAB Field
Work
1.6.1 GPrerequisite HVAC Work Check
Out List
23 07 00 SD-02 Shop Drawings
3.2.1.8 GMICA Plates
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
3.4Equipment Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 80 PAGES
23 07 00 2.3.1 SRecycled content for insulation materials
SD-03 Product Data
2.3 G AEPipe Insulation Systems
3.2 G AEPipe Insulation Systems
3.3 G AEDuct Insulation Systems
3.4 G AEEquipment Insulation Systems
SD-04 Samples
2.2.1.2 GThermal Insulation
3.1.1 GDisplay Samples
SD-07 Certificates
2.2.1 SIndoor air quality for adhesives
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
23 08 00 SD-03 Product Data
2.1 G AETest Equipment
SD-06 Test Reports
1.5 G AEPipe Flushing, Testing, And
Water Treatment Reports
3.3 G AECompleted Pre-Functional
Checklists
3.11 G AESeasonal Test Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 80 PAGES
23 08 00 3.14 G AEPost-Construction Trend Log
Report
SD-07 Certificates
1.6 G AECertificate Of Readiness
23 09 00 SD-02 Shop Drawings
3.3 G AEDDC Contractor Design Drawings
3.3…