This document is Amendment 0008 to a federal solicitation for construction services at Watervliet Arsenal for an Electrical Switching Station North project (Contract W912DS26RA015). The amendment effective date is June 3, 2026, with proposals remaining due on June 19, 2026, at 2:00 P.M. EST. The amendment responds to bidder requests for information, which are provided for informational purposes only and do not revise the solicitation, plans, or specifications. Additionally, Amendment 0008 incorporates revised Davis-Bacon prevailing wage rates effective May 18, 2026 (General Decision Number NY20260002).
The amendment includes responses to 18 bidder inquiries addressing technical clarifications on electrical systems, conduit specifications, fiber optic installation requirements, bond beam linting details, equipment specifications, commissioning professional certifications, and DFARS cybersecurity requirements. Key government responses clarify that no system integration is required between FACU, fuel pump panel, and switching station SCADA systems; SCH 40 PVC conduit must be used under concrete slabs; rigid metallic conduit is required in areas subject to physical damage; conduit sizes can be reduced under certain circumstances; and new fiber cable must be provided from Building 110 to Building 130. The prevailing wage determination covers New York counties (Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie, and Washington) for building, heavy, and highway construction, excluding certain Columbia, Fulton, Greene, and Montgomery County areas. Bidders must acknowledge receipt of this amendment by the specified proposal due date or risk rejection of their bids.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this Amendment 0008:Block 14 (Description of Amendment/Modification):
1) Proposals due date remains 19 June 2026 @ 2:00 P.M. EST.
2) Respond to Bidder Request for information. For information Only.
3) Incorporate revised wage rates. NY20260002 05/18/2026
NOTE: Bidders must acknowledge receipt of this amendment by date specified in the bid (or as amended) by one of the following methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below. FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE
SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE
BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304)
Section 01 00 00 - General Requirements
Miscellaneous text in this section has been modified to:
Watervliet Arsenal
Electrical Switching Station North
W912DS26RA015
Amendment 0008
AMENDMENT 0008 to DRAWINGS and SPECIFICATIONS for Watervliet Arsenal Electrical Switching Station North.
TO OFFERORS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- None
W912DS26RA0150008
2. The following DRAWINGS have been REVISED and REISSUED
- None
3. The following DRAWINGS have been ADDED:
- None
4. The following DRAWINGS have been DELETED:
- None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
- None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
- None
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
- None
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- None
PROPOSER'S QUESTIONS AND GOVERNMENT REPLY
Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors "for information only" and do not revise the solicitation, plans or specifications.
BIDDER INQUIRY 94: In drawing E-602, detail A9 "Building Comm Diagram", is there an expectation that the systems shown in this diagram (FACU, Fuel Pump panel, Switching Station SCADA) interface/communicate with each other or have a single unifying interface as well?
RESPONSE: No integration between systems is required.
BIDDER INQUIRY 95: Is removal of abandoned U/G items to be removed under this contract? Or capped? Can this be quantified to carry associated cost?
RESPONSE: Utility Note 5 on C-001 states that the contractor must contact the contracting officer where existing abandoned pipes and conduit are encountered within the limit of excavation.
BIDDER INQUIRY 96: Are there any government furnished items on this project?
RESPONSE: There are no government furnished items on this contract.
BIDDER INQUIRY 97: The specifications on the type of conduit that is installed below the concrete slab is unclear. If the conduits are concrete encased, can they be SCH 40 PVC, GRC or PVC Coated GRC? It the conduits are direct buried, what type is required?
RESPONSE: Use SCH 40 PVC conduit under concrete slabs.
BIDDER INQUIRY 98: There is no specification section for conduits inside the building. Can low voltage conduits be EMT? If EMT is accepted, what type of fittings are required?
RESPONSE: Conduits subject to physical damage to be Rigid Metallic Conduit. Areas where exposed conduit is considered subject to physical include Generator Room 101 and Electrical Room 102.
BIDDER INQUIRY 99: The feeder between the generators and their respective NGR's is called out on the One-Line Diagram On Drawing RE-601 to be 5". Since there is only 1-#2, 15 KV Cable plus 1-#2 ground wire, can the conduit size be reduced?
RESPONSE: Conduit can be reduced to 2".
BIDDER INQUIRY 100: Reference One-Line Diagram on Drawing E-601: Existing Loops #2 and #3 are being interrupted in existing manhole #5A and extended to new pad mounted switches #2 and #3. What is the requirement for temporary power for these two loop feeders during the cutover?
RESPONSE: Temporary power is not required. Loop feeds can be switched to isolate the and minimize the outages during splicing work.
BIDDER INQUIRY 101: Keynote 1 on Drawing ES102 indicates to route the conduits inside the building to the 480 volt Switchgear 1A1. Is a floor plan available which shows the location of the switchgear inside the building?
RESPONSE: Switchgear 1A1 is a walk-in enclosure unit substation. The 480V section of the substation is on the south end.
BIDDER INQUIRY 102: In Section 01 14 00.1.4.2, the spec talks about vibrations not to exceed the requirements of EM 385-1-1, Chapter 29. Is the government requiring the contractor to monitor the vibration levels? If so, how long do you want to monitor those vibrations? How many locations?
Simultaneously?
RESPONSE: The Contractor is to provide the proposed approach for monitoring to meet the requirements of EM-385 based on the work activities being performed.
BIDDER INQUIRY 103: Please confirm that the duct bank system from 1A2 Substation, through manholes FMH-2, FMH-3, FMH-4, FMH-5, FMH-6 and to Building 130 are all existing. Are photos of these manholes available?
RESPONSE: Provide duct bank from 1A2 to FMH-2. Duct bank from FMH- 2 through FMH-3, FMH- 4, FMH-5, FMH-6 and to Building 130 are existing. No photos are available.
BIDDER INQUIRY 104: Please confirm the following regarding the fiber installation between Building 130 and Building 110:
A) All duct bank conduits are existing?
B) All conduits from the underground duct bank into Building 130 to the "IT" connection point are existing?
C) All conduits from the underground duct bank into Building 110 to the "IT" connection point are existing?
D) The fiber cable between Building 130 and Building 110 is existing, is terminated on both ends and has been tested for proper connectivity?
RESPONSE: A) Concur, all underground duct bank conduits from B110 to B130 are existing.
B) All conduits are existing.
C) All conduits are existing.
D) Provide new fiber cable from B110 to B130. Install fiber cable in existing duct bank from B110 to B130. Refer to ES-105.
BIDDER INQUIRY 105: Since a CMMC Lvl. 2 certification is not required, but DFARS 252.204- 7008, -7012 and -7019 are applicable, please confirm that (1) the project documents, drawings and specifications released to date are not CUI/CDI, and (2) a Self-assessment per DFARS
252.204 -7019 is not required because CUI/CDI is not present in the project documents.
RESPONSE: The Contract Documents issued to date are not identified as CUI or CDI. However, bidders shall comply with all applicable DFARS requirements identified in the Contract Documents.
Nothing herein shall be interpreted as relieving the Contractor of responsibility to comply with applicable cybersecurity and information protection requirements if CUI/CDI is introduced during contract performance.
BIDDER INQUIRY 106: Please clarify the color of the EPDM roofing membrane per Section 07 53
23. Paragraph 2.1.2 implies this to be a white or gray EPDM, through it references drawing specifications that appear to be missing.
2.1.2 Energy and Cool Roof Performance
Install a roof system that meets an overall performance as specified on the drawings or by insulation specified in other sections. The roofing system will need to include a top surface finish that meets the criteria for Cool Roof Products. Provide emittance and reflectance percentages, solar reflectance index values, and slopes, to meet sustainable third-party certification requirements for Heat Island Reduction.
RESPONSE: The color of the EPDM roofing membrane should be white.
Thermal Emittance must be at least 0.75.
Solar Reflectance must be at least 0.70 initially.
Solar Reflectance Index (SRI) must be at least 78.
BIDDER INQUIRY 107: Drawing E-602
Note 1 references drawing C-103 but C-103 is not included in the drawing package.
Confirm ATS-1 emergency and normal power sources ("E" and "N") are labelled properly.
Bldg. 110, confirm new fiber between existing patch panels is SM or MM and quantity of strands.
RESPONSE:
1. Refer to drawing C-101 for overall site and utility layout plan.
2. Yes, sources are labeled correctly.
3. Provide 12 strand MM fiber.
BIDDER INQUIRY 108: Drawing E-604
Drawing requires "HMI with operator buttons for each mode of operation."
Are these physical buttons for each mode? A spring-loaded back to a neutral position for mode selection? Or an HMI-based button for the selected mode?
SWGR remote communication
Confirm ESS-South breaker status, trip/fault status, and power usage is from each breaker's respective SEL-751A via the new Cat6 cable to the new RTAC and subsequently to the new SCADA in ESS-North.
Confirm Bldg. 143 (Main Substation) breaker status, trip/fault status, and power usage is from each breaker's respective SEL-751A/SEL-351 via the new 12S/SM fiber to the ESS-North SCADA.
RESPONSE:
1. HMI-based buttons for the selected mode.
2. Yes, ESS-South breaker status signals is via the new CAT6 cable.
3. Yes, Main Substation breaker status signals is via new 12S/SM fiber.
BIDDER INQUIRY 109: Estops: For each estop location, please confirm if it is an estop for each engine generator or a single estop for all engine generators.
RESPONSE: Provide estop to all engine generators from any EPO station.
BIDDER INQUIRY 110: SPECIFICATION 26 32 15.00, SECTION 2.14.3.1 Battery - This section requires nickel-cadmium batteries and lead-acid, SAE Type D batteries (see below). Please advise which of the two battery options should be provided. "Provide maintenance free nickel-cadmium battery with sufficient capacity, at the minimum indoor and maximum indoor temperature specified, to provide the specified cranking periods. Valve-regulated lead-acid batteries are not acceptable."
And "Provide maintenance free, sealed, lead-acid, SAE Type D engine starting batteries."
RESPONSE: Provide nickel-cadmium batteries sized to meet the cranking period and engine starting power requirement.
BIDDER INQUIRY 111: SPECIFICATION 26 32 15.00, SECTION 2.1.1 Engine Generator Parameter Schedule - This section requires a maximum voltage deviation of 10% of rated voltage with step load increase and the step load increase provided is 100% of service load at 0.8 PF (see below). Multiple emergency diesel generator OEMs have indicated that they cannot meet this requirement. Please advise on how you would like them to proceed.
RESPONSE: Reduce the max step load increase to 25%.
BIDDER INQUIRY 112: Plan Section E1/S-503 calls for a continuous bond beam lintel above an openings, which appears to be part of the overall lintel depth (height) specified. The various openings for louvers and doors are at different elevations, and it would not be possible for this to be continuous for the length of the wall as implied for each opening. Please clarify intent and limits of the lintels.
RESPONSE: Where a bond beam indicated as "continuous" in the lintel schedule is interrupted by a wall opening, the lintel horizontal reinforcement above the opening must extend 24" minimum beyond the rough opening edge. The design intent is for the continuous bond beam to be present around the full building perimeter above personnel doors (to facilitate potential future door modifications).
BIDDER INQUIRY 113: Plan Section G1/S-504 shows a sloped bond beam detail; please clarify where this applies in plan.
RESPONSE: There are no sloped bond beams on the project. Please disregard G1/S-504.
BIDDER INQUIRY 114: SECTION 33 01 50 - 2.3 LEAK DETECTION SYSTEM - TO THE BEST
OF OUR KNOWLEDGE, THERE IS NOT A DOUBLE WALL PIPING LEAK DETECTION SYSTEM
USING NEGATIVE PRESSURE THAT CAN DETERMINE WHICH WALL IS LEAKING OR THAT
CAN PROVIDE PRODUCT DISCRIMINATION. WHAT IS THE BASIS OF DESIGN FOR THIS
SYSTEM?
RESPONSE: Section 33 01 50 is UFGS master wording without any edits. There are manufactures with comparable systems.
BIDDER INQUIRY 115: ES-103 and E-602 ES-103, Note 2: "PROVIDE PATCH PANEL IN
SWITCHGEAR. PROVIDE PATCH CORD TO CONNECT TWO STRANDS TO THE EXISTING
NETWORK SWITCH SEL2730M IN EXISTING SWITCHGEAR." E-602, Bldg 143 detail: shows new fiber connecting to the new patch panel then a fiber patch cord to the existing fiber cabinet.
Confirm the new fiber patch cord only connects to the SEL-2730M switch in the switchgear.
RESPONSE: Concur, connect to existing SEL-2730M switch to provide all programming to enable remote access to the existing SCADA system in Main Substation Control Building.
BIDDER INQUIRY 116: Drawing Package, Sheets E-601, E-602 and E-603 - On sheet E-601, A1 One Line Diagram - Medium Voltage, The ESS-North Paralleling Switchgear identifies "FEEDER #7, SPARE" and on sheet E-603, K9 Relaying for Feeder Breakers #5-7 (TYP OF 3), identifies that there is a "FEEDER BREAKER #7". However, on sheet E-602, G12 Paralleling Switchgear Elevation, a "FEEDER #7, SPARE" is not shown. Please confirm that a spare feeder #7 is required for the ESS -North Paralleling Switchgear.
RESPONSE: Concur, provide spare FEEDER #7 as shown on sheet E-601 and E-603.
BIDDER INQUIRY 117: SPECIFICATION 01 91 00.15, SECTION 1.8.1.1 Lead Commissioning Specialist (CxC) - This section requires the CxC must be certified in one of the following:
"NEBB Building System Commissioning Professional (CxCP)
ACG Certified Commissioning Authority (CxA)
ICB/TABB Certified Commissioning Supervisor
BCA Certified Commissioning Professional (CCP)
AEE Certified Building Commissioning Professional (CBCP)
University of Wisconsin-Madison Qualified Commissioning Process
Provider (QCxP)
ASHRAE Building Commissioning Professional (BCxP)."
Can a Professional Engineer (PE) License with a resume of Federal Project CxC experience be used as a replacement for certification?
RESPONSE: No, certification for CxC is required as identified in 01 91 00.15.
WAGE RATES
"General Decision Number: NY20260002 05/18/2026
State: New York
Construction Types: Building, Heavy and Highway
Counties: New York Counties of Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie and Washington
Excludes Building Construction in COLUMBIA, FULTON, GREENE & MONTGOMERY Counties
Modification Number Publication Date 1 01/30/2026 2 05/18/2026
ASBE0040-002 05/01/2025
Rates Fringes
HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO
PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING;
VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION
MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT
FROM MECHANCIAL SYSTEMS)............................$ 41.74 27.58
ASBESTOS/INSULATOR WORKER (SCOPE OF WORK: INCLUDES
APPLICATION OF ALL INSULATING MATERIALS,
PROTECTIVE, COVERINGS, COATING AND FINISHING TO
ALL TYPES OF MECHANICAL SYSTEMS.)...................$ 41.74 27.58
BOIL0197-002 01/01/2025
Rates Fringes
BOILERMAKER.........................................$ 43.34 27.66
BRNY0002-019 12/03/2025
Rates Fringes
BRICKLAYER (BRICKLAYERS, STONE MASONS, CEMENT
MASONS, PLASTERERS, POINTERS, CAULKERS & CLEANERS)..$ 41.79 22.33
CARP0279-006 07/01/2025
Rates Fringes
CARPENTERS: CARPENTERS, MILLWRIGHTS, PILE DRIVERS
(HEAVY AND HIGHWAY CONSTRUCTION (COLUMBIA AND
GREENE COUNTIES))...................................$ 44.72 31.23
CARP0291-005 07/01/2025
Rates Fringes
CARPENTERS: (WASHINGTON COUNTY BUILDING)...........$ 36.38 24.65
CARPENTERS: (SARATOGA COUNTY BUILDING).............$ 36.38 24.65
CARP0291-008 07/01/2025
Rates Fringes
CARPENTERS: HEAVY & HIGHWAY CONSTRUCTION (ALBANY,
FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND
SCHOHARIE COUNTIES).................................$ 44.28 24.50
CARPENTERS & SOFT FLOOR LAYERS: BUILDING
CONSTRUCTION (EXCLUDING MONTGOMERY COUNTY) (ALBANY,
FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND
SCHOHARIE COUNTIES).................................$ 36.38 24.65
CARP0291-010 07/01/2024
Rates Fringes
CARPENTERS: DIVERS..................................$ 69.28 24.50
CARPENTERS: (DIVERS (DRY DAY))......................$ 45.28 24.50
CARPENTERS: (CARPENTERS)............................$ 44.28 24.50
ELEC0236-001 06/01/2024
Rates Fringes
ELECTRICIAN (ALBANY; COLUMBIA; FULTON; GREENE (THAT
PORTION NORTH OF A LINE FOLLOWING THE SOUTH LIMITS
OF THE CITY OF CATSKILL); MONTGOMERY; RENSSELAER,
SARATOGA; SCHENECTADY; SCHOHARIE; WASHINGTON).......$ 48.00 32.09
ELEC0363-004 04/01/2024
Rates Fringes
ELECTRICIAN (GREENE COUNTY (PORTION OF)) FOOTNOTE:
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S
DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY,
PRESIDENTIAL ELECTION DAY, VETERAN'S DAY,
THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS
DAY.................................................$ 46.50 40.57
ELEC1249-003 05/05/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS MECHANIC FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 42.29 30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86 35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER
UNIT) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57 31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A.
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29 30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS FLAGMAN FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 31.72 29.87
ELEC1249-004 05/05/2025
Rates Fringes ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC
(Substation:).......................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;
Pipetype cable ins..................................$ 61.56 36.21 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Substation:)............................$ 61.56 36.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;
Pipetype cable installat............................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).........................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;
Pipetype cab........................................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Substation:)......................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)....$ 55.40 31.78 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN
(Substation:).......................................$ 35.34 30.12 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;
Pipetype cable installation)........................$ 64.59 42.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Substation:).......................................$ 63.14 33.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES;
RAILROAD CATENARY INSTALLATION AND MAINTENANCE,
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.............................................$ 49.25 31.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND
MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER
THE HOLIDAY.........................................$ 49.25 31.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE:
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY..............................$ 61.56 36.21
ELEC1249-007 05/05/2025
Rates Fringes
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING
ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS
AND ROAD WEATHER INFORMATION SYSTEMS: MECHANIC
(COLUMBIA COUNTY). PAID HOLIDAYS: A. MEMORIAL
DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS
AFTER THE HOLIDAY...................................$ 43.35 30.73
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING
ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS
AND ROAD WEATHER INFORMATION SYSTEMS: LINEMAN AND
TECHNICIAN (COLUMBIA COUNTY). PAID HOLIDAYS: A.
MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY..............................$ 54.19 35.69
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING
ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS
AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN
TRUCK DRIVER (TRACTOR-TRAILER UNIT). PAID HOLIDAYS:
A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK
STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE
OR TWO DAYS AFTER THE HOLIDAY. (COLUMBIA COUNTY)....$ 43.53 30.75
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING
ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS
AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN
TRUCK DRIVER (COLUMBIA COUNTY). PAID HOLIDAYS: A.
MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY,
GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK
STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE
OR TWO DAYS AFTER THE HOLIDAY.......................$ 49.25 31.15
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING
ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS
AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN
DIGGING MACHINE OPERATOR (COLUMBIA COUNTY)..........$ 48.77 31.31
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING
ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS
AND ROAD WEATHER INFORMATION SYSTEMS: FLAGMAN
(COLUMBIA COUNTY). PAID HOLIDAYS: A. MEMORIAL
DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS
AFTER THE HOLIDAY...................................$ 32.51 29.93
ELEC1249-008 01/01/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT
OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73 6.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53 6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A.
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81 6.99
ELEV0035-001 01/01/2025
Rates Fringes
ELEVATOR CONSTRUCTOR (ALBANY; COLUMBIA (TOWNS OF
CLAVERACK, HILLSDALE, GHENT, STOCKPORT, AUSTERLITZ,
CANAAN, NEW LEBANON, CHATHAM, KINDERHOOK, STYVESANT
AND GREENPORT); FULTON; GREENE (TOWNS OF DURHAM,
GREENVILLE, NEW BALTIMORE, COXCSACKIE AND ATHENS);
MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY,
SCHOHARIE AND WASHINGTON COUNTIES). FOOTNOTE:
A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR
HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS
BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED.
B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY;
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING
DAY; AND CHRISTMAS DAY..............................$ 57.73 38.44
ELEV0138-004 01/01/2026
Rates Fringes
ELEVATOR MECHANIC (COLUMBIA COUNTY (THE TOWNS OF
ANCRAM, CLERMONT, COPAKE, GALLATIN, GERMANTOWN,
LIVINGSTON, AND TAGHKANIC); GREEN COUNTY (THE TOWNS
OF HUNTER AND CATSKILL)) FOOTNOTE: A.VACATION:
6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR
ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR
HOURLY RATE FOR ALL HOURS WORKED. B. PAID
HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY;
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING
DAY; AND CHRISTMAS DAY..............................$ 76.12 38.98
ENGI0158-008 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR: GROUP C FORK LIFT, HIGH
LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER,
BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR,
MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR,
WELDING MACHINE, WELL POINT, MECHANICAL HEATER,
GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS,
ELECTRIC SUBMERSIBLE PUMP 4"" AND OVER, MURPHY TYPE
DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE
MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM),
SEEDING, AND MULCHING MACHINES, PUMPS (EXCLUDING
MONTGOMERY COUNTY) HAZARDOUS WORK - ANYTIME
OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR
ABOVE, $2.50 PER HOUR OVER REGULAR RATE. FOOTNOTE:
A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY.......................................$ 51.01 33.20
POWER EQUIPMENT OPERATOR: GROUP A(1) CRANE,
HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE,
PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE,
BOOM TRUCK (OVER 5 TONS) EXCLUDING MONTGOMERY
COUNTY GROUP A(1): CRANE PREMIUMS: 1 OVER
150'- $1.00 2 OVER 200'- $2.00 HAZARDOUS WORK
- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH
LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.
FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY.....................$ 55.42 33.20
POWER EQUIPMENT OPERATOR (BUILDING): GROUP B
BACKHOE, (RUBBER-TIRED BACKHOE/LOADER COMBINATION),
BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER,
LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER,
BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS,
SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER,
SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER,
CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER
HOISTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE,
THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND
OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM
SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD
AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER,
MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN
AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER
LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER
(EXCLUDING MONTGOMERY COUNTY) HAZARDOUS WORK -
ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL
C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.
FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY.....................$ 53.91 33.20
POWER EQUIPMENT OPERATOR (BUILDING): GROUP A
SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE FULL
SWING), GRADALLS, POWER ROAD GRADER, ALL CMI
EQUIPMENT, FRONT-END RUBBER TIRE LOADER,
TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING
MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP,
BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT
AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND
UNDER), MAINTENANCE ENGINEER, SELF CONTAINED
CRAWLER, DRILL-HYDRAULIC ROCK DRILL. (EXCLUDING
MONTGOMERY COUNTY) HAZARDOUS WORK - ANYTIME
OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR
ABOVE, $2.50 PER HOUR OVER REGULAR RATE. FOOTNOTE:
A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY.......................................$ 54.93 33.20
ENGI0158-026 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS: GROUP 3..................$ 53.82 33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP
7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 58.91 33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP
6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY.......................................$ 60.30 33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP
5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY.......................................$ 61.80 33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP
4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, AND CHRISTMAS DAY............$ 63.30 33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP
2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER
TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS
SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED),
BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED),
BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT
(NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS,
CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE
PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED,
CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR
MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.),
GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER
(15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE,
KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS,
L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR
STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE,
PLANT ENGINEER, PROFILER (105 H.P. AND UNDER),
GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER
BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER,
REVINIUS WIDENER, ROLLER (GRADE AND FILL),
SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER
(BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM
CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE
PLANT REFRIGERATION EQUIPMENT (FOR SOIL
STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE
SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK
DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER,
TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER
HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE),
WINCH, WINCH CAT FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 56.39 33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP
1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM,
AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC
FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED,
RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT
212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT
PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM
TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX
CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE,
SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE,
CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE,
OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE
DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE,
DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE
HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT
END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER
(SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM),
HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST,
MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP)
WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER,
PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR
EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT
PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC
SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC
PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER),
MULCHING MACHINE, OILER, PARAPET CONCRETE OR
PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER,
TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER
MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR
(MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 57.30 33.55
IRON0012-011 07/01/2024
Rates Fringes
IRONWORKERS:: STRUCTURAL, ORNAMENTAL, RODMAN,
MACHINERY MOVER, RIGGER, FENCE ERECTOR,
REINFORCING, STONE DERRICKMEN (ALBANY; COLUMBIA;
FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN,
MAYFIELD, NORTHAMPTON AND PERTH); GREENE,
MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN,
MOHAWK AND ROOT); RENSSELAER, SARATOGA;
SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:)...$ 38.50 25.48
IRONWORKERS:: SHEETER, BUCKER-UP (ALBANY; COLUMBIA;
FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN,
MAYFIELD, NORTHAMPTON AND PERTH); GREENE,
MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN,
MOHAWK AND ROOT); RENSSELAER, SARATOGA;
SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:)...$ 38.75 25.48
IRONWORKERS:: SHEETER (ALBANY; COLUMBIA; FULTON
(ALBIN, BLEECKER, BROAD, JOHNSTOWN, MAYFIELD,
NORTHAMPTON AND PERTH); GREENE, MONTGOMERY
(AMSTERDAM, CHARLESTON, FLORIDA, GLEN, MOHAWK AND
ROOT); RENSSELAER, SARATOGA; SCHENECTADY;
SCHOHARIE; AND WASHINGTON COUNTIES:)................$ 38.75 25.48
IRON0440-007 07/01/2025
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN,
MACHINERY MOVER, RIGGER, FENCE ERECTOR,
REINFORCEMENT, AND STONE DERRICKMAN (FULTON (TWPS.
OF CAROGA, EPHRATAH, OPPENHEIM, STRATFORD);
MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN, PALATINE,
ST. JOHNSVILLE):)...................................$ 35.50 31.39
LABO0017-001 07/01/2019
Rates Fringes
LABORER GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS
MATERIAL ABATEMENT FOREMAN (GREENE COUNTY
(TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY) FOOTNOTE:
A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LINCOLN'S
BIRTHDAY, LABOR DAY, ELECTION DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE
EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE
SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY
FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING
SO FOR LEGITIMATE REASONS...........................$ 48.00 27.15
LABORER GROUP 3: Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4"""" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe concrete, clearing, blacktop, drill, paving and blaster etc., Hydraulic drill or similar, forklift for masonry only, Blaster and asphalt screedman
GREENE COUNTY (TOWNSHIP OF CATSKILL) HEAVY &
HIGHWAY FOOTNOTE: a. PAID HOLIDAYS: New Years Day, President's Day, Memorial Day, Independence Day, Lincoln's Birthday, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas Day, provided the employee is an employee of the company prior to the scheduled holiday and reports to work the first day following the holiday unless prevented from doing so for legitimate reasons.............................................$ 43.15 27.15
LABORER GROUP 2: GENERAL LABORERS, CHUCK TENDER,
HANDLING AND DISTRIBUTING DRINKING WATER,
DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS,
NIPPER, POWDER CARRIER, MAGAZINE TENDER, WAREHOUSE
LABORERS, CONCRETE MAN, VIBRATOR MAN, MASON TENDER,
MORTAR MAN, SPRAYING, BRUSHING AND COVERING OF
CONCRETE FOR CURING AND PRESERVATIVE PURPOSES,
TRAFFIC STRIPER, SCAFFOLD BUILDER, CONCRETE CURB
AND SIDEWALK FORM SETTER; PERMANENT TRAFFIC
STRIPING AND REFLECTIVE DEVICES, PLACING AND
MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS,
BARRICADES, TRAFFIC PATTERNS, AND ALL TEMPORARY
REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL,
CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT
OR LIGHT TENDERS, TOOL ROOM, DEWATERING PUMP MEN,
PITMAN, DUMPMEN, SNOW REMOVAL AND FIREWATCH,
ASPHALT MAN, JOINT SETTER, SIGNAL PERSON,
PIPELAYER, PIPE LINING AND RELINING, WELLPOINTS,
CONDUIT AND DUCT LAYER, WIRE PULLER, RIP RAP AND
DRY STONE LAYER, STEEL ROD CARRIER, CORE DRILL,
ROCK SPLITTER, HILTI GUN AIR OR ELECTRIC,
JACKHAMMER, BUSH HAMMER, PAVEMENT BREAKER, CHIPPING
HAMMER, WAGON DRILL, AIR TRACK, JIB RIG, JOY DRILL,
GUNITE AND SAND BLASTING, COAL PASSER AND OTHER
MACHINE OPERATORS, POWER TOOL OPERATOR, SPRAYER AND
NOZZLE MAN ON MULCHING AND SEEDING MACHINE, ALL
GUARD RAIL AND FENCE, ALL SEEDING AND SOD LAYING,
ALL LANDSCAPE WORK, GRADE CHECKER, ALL BRIDGE WORK,
WALK BEHIND SELF-PROPELLED POWER SAW, GRINDER,
GROOVER OR SIMILAR TYPE MACHINE, WALK BEHIND TAMPER
AND ROLLER OF ALL TYPES, SALVAGE, STRIPPING,
WRECKING AND DISMANTLING LABORER (INCLUDING BARMAN,
CUTTING TORCH AND BURNER MAN), SHEETING AND SHORING
COMING UNDER LABORERS JURISDICTION, BIT GRINDER,
OPERATOR OF FORM PIN PULLER AND DRIVERS,
SANDBLASTING, JOINT AND JET SEALER, FILLING AND
WIRING BASKETS FOR GABION WALLS, PERMANENT SIGN
MAN, MEDIAN BARRIER, STA-WALL OR SIMILAR TYPE
PRODUCT, CHAIN SAW OPERATOR, RAILROAD TRACK
LABORER, WATERPROOFER, PRE-STRESSED AND PRE-CAST
CONCRETE BRICK, BLOCK AND STONE PAVERS, POWER TOOLS
USED TO PERFORM WORK USUALLY DONE BY LABORERS,
POWER BUGGY AND PUMPCRETE OPERATOR, FIREPROOF,
PLASTER AND CAUSTIC PUMP, ASBESTOS, TOXIC,
BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR
HAZARDOUS MATERIALS ABATEMENT WHEN PROTECTIVE
CLOTHING AND EQUIPMENT IS NOT REQUIRED, POWER BRUSH
CUTTER, RETENTION LINERS, ARTIFICIAL TURF,
RETAINING WALLS, WALK BEHIND SURFACE PLANER,
WELDING RELATED TO LABORERS WORK, REMOTE CONTROLLED
EQUIPMENT NORMALLY OPERATED BY LABORERS, ALL
TECHNICIAN WORK INCLUDING BUT NOT LIMITED TO
STITCHING, SEAMING, HEAT WELDING, FIREPROOF
SPRAYER, MORTAR MIXER, CONCRETE FINISHER, FORM
SETTER FOR CONCRETE CURBS AND FLATWORK. GUNITE
NOZZLE MAN, STONE CUTTERS, GRANITE STONE LAYER,
MANHOLE, CATCH BASIN OR INLET INSTALLING, LASER
MEN. GROUND MAN ON MILLING MACHINE (GREENE COUNTY
(TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY) FOOTNOTE:
A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LINCOLN'S
BIRTHDAY, LABOR DAY, ELECTION DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE
EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE
SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY
FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING
SO FOR LEGITIMATE REASONS...........................$ 38.90 27.15
LABORER GROUP 1: FLAGPERSON, GATEPERSON (GREENE
COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY)
FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,
PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LINCOLN'S BIRTHDAY, LABOR DAY, ELECTION DAY,
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY,
PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY
PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK
THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS
PREVENTED FROM DOING SO FOR LEGITIMATE REASONS.....
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .