This document is Amendment 0001 to Solicitation W912DS26RA015, issued by the U.S. Army Corps of Engineers, New York District, Contracting Division on April 29, 2026, for the Watervliet Arsenal Electrical Switching Station North project.
The amendment extends the proposal submission deadline from May 19, 2026, to June 3, 2026, at 2:00 P.M. EST. The solicitation is unrestricted for full and open competition with HubZone preference as a single-step best value tradeoff. The contract is assigned NAICS Code 236220 with an estimated size standard of $45,000,000 and a construction magnitude between $10,000,000 and $25,000,000. Proposals must be submitted to Contract Specialist Mr. Orlando Nieves at the New York District Contracting Division, 26 Federal Plaza, Room 16-300, New York, NY 10278-0090. The amendment incorporates FAR provision clause 52.236-27 (Site Visit - Construction), requiring offerors to inspect the project site. An organized site visit is scheduled for Wednesday, May 6, 2026, at 1:00 P.M. at Building 125, Northwest Corner, Watervliet Arsenal, Watervliet, New York 12189. Participants must submit site visit requests by May 4, 2026, to Lance Woodworth (lance.a.woodworth@usace.army.mil, (518) 266-6374) or Anton Andriyanov (anton.andriyanov@usace.army.mil, (518) 974-2401). Visitors must bring proper identification and personal protective equipment; photographic documentation is prohibited due to facility security requirements. The amendment also revises Drawing MS101 and Specification Section 33 57 55, incorporates three Justifications and Approvals (J&As) regarding CAC-IDS, Fire Alarm, and Square D equipment, and addresses three bidder inquiries regarding site visit availability, RFI submission procedures via email, and the extended proposal deadline.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 6
0001 29 APR 2026 26-9
W912DS
W2SD ENDIST NEW YORK
KO CONTRACTING DIVISION, 26 FEDERAL PLAZA ROOM 16 300
NEW YORK, NY 10278-0004
UNITED STATES
ORLANDO NIEVES, EMAIL: ORLANDO.NIEVES@USACE.ARMY.MIL TELEPHONE:
(917) 790-8078
SCD: PAS:
W912DS26RA015
17 APR 2026
SEE SECTION G - CONTRACT ADMINISTRATION DATA
See Schedule
MATTHEW LUBIAK
29 APR 2026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this Amendment 0001:Block 14 (Description of Amendment/Modification):
1) Proposals due date has been extended to 03 June 2026 @ 2: 00 P.M. EST
2) Incorporate provision clause 52.236-27 Site Visit (Construction)
3) Drawing MS101 have been revised and reissued.
4) Specification section 33 57 55 have been revised and reissued.
5) Answer proposer's questions and Government reply.
6) Incorporate J&As: JA - ESS North - CAC-IDS, JA - ESS North - Fire Alarm and JA - ESS North - Square D.
Section 00 00 00 - Procurement and Contracting Requirements
The following changes have been made:
W912DS26RA0150001
Section 01 00 00 - General Requirements
Miscellaneous text in this section has been added to:
Watervliet Arsenal
Electrical Switching Station North
W912DS26RA015
Amendment 0001
52.236-27 Site Visit (Construction).
As prescribed in 36.523 , insert a provision substantially the same as the following:
Site Visit ( )Construction (Feb 1995)
(A) The clauses at , Differing Site Conditions, and , Site Investigations and Conditions Affecting 52.236-2 52.236-3 the Work, will be included in any contract awarded as a result of this . Accordingly, or quoters solicitation offerors are urged and expected to inspect the site where the work will be performed.
(B) An organized site visit has been scheduled for:
Wednesday, 06 MAY 2026 at 1300
(C) Participants will meet at:
Building 125 - Northwest Corner
Watervliet Arsenal
Watervliet, New York 12189
Email all requests to both Lance Woodworth and Anton Andriyanov site visit POC's listed on the form.
POC: Lance Woodworth, Engineering Technician
Email: lance.a.woodworth@usace.army.mil
Office Phone: (518) 266-6374
Mobile Phone: (518) 804-5727
POC: Anton Andriyanov, Project Manager
Email: anton.andriyanov@usace.army.mil
Office Phone: (518) 974-2401
All requests must be in NLT 1000 EST Monday, 04 MAY 2026 to be approved in time for the visit.
Please anticipate up to two (2) hours on day of site visit to clear the WVA security background check at the South Gate Visitor's center. Also, all visitors will need to bring proper ID and PPE (hard hat, eye glasses, safety shoes) to access the project area. Due to WVA security requirements, no photographic documentation will be permitted. Photographs may be taken by the Government as per request during the site visit. Site visit photos taken by the Government and the sign in sheet will be posted as a solicitation amendment to the original solicitation announcement.
(End of Provision)
AMENDMENT 0001 to DRAWINGS and SPECIFICATIONS for Watervliet Arsenal Electrical Switching Station North.
TO OFFERORS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- None
2. The following DRAWINGS have been REVISED and REISSUED:
- MS101
3. The following DRAWINGS have been ADDED:
- None
4. The following DRAWINGS have been DELETED:
- None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been and are provided in their entirety herein:ADDED
- None
2. The following SPECIFICATIONS SECTIONS have been in their entirety:DELETED
- None
3. The following SPECIFICATIONS SECTIONS have been and :REVISED REISSUED
- 33 57 55
4. The following SPECIFICATIONS have been but :REVISED NOT REISSUED
- None
PROPOSER'S QUESTIONS AND GOVERNMENT REPLY
Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors "for information only" and do not revise the solicitation, plans or specifications.
BIDDER INQUIRY 01: Will a site visit be held?
RESPONSE: Site visit posted in Amendment 0001.
BIDDER INQUIRY 02: We noted that all questions are to be submitted via email to the POC no later than 7 calendar days prior to due date. Is this intended to be the process for RFIs, or will ProjNet or another method be used?
RESPONSE: Email will be the process for RFIs.
BIDDER INQUIRY 03: We had anticipated 45 days for proposal submission based on the pre-solicitation notice. We will work toward the 32-day submission required by the current RFP, but given the project's technical complexity, coordination with subcontractors, and proposal volume requirements, we respectfully request the Government consider an extension of the proposal due date to allow industry to develop more competitive pricing.
RESPONSE: Solicitation was issued on 17 Apr 2026 with an original response date of 19 May 2026. Date is being revised to 3 JUN 2026.