This document provides details for a federal construction contract solicitation issued by the U.S. Army Corps of Engineers Engineering District New York. The solicitation is for the construction of a new Cyber Engineering and Academic Center facility at the United States Military Academy in West Point, New York. The 136,000 square foot facility will provide innovative classroom and lab spaces for three engineering departments and include a parking structure, pedestrian bridge, and signature meeting spaces. The period of performance is approximately 1461 calendar days from notice to proceed. Proposals are due electronically by the date specified in the solicitation. The procurement method will be a best value tradeoff and the estimated value is between $100-250 million. The North American Industry Classification code is 236220.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
G-005
S H
E E
T I
N D
E X
V
O L U
M E
F O
U R
W E
S T
P O
IN
T
N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
D .S
T E
L T
Z E
R
T .L
O R
E N
Z E
N -S
C H
M
ID
T
W .S
T E
V E
N S
M A
Y
,2
W D
S -1
-D
-0
W D
S -1
-D
-0
O P
T
IO
N A
L F
IE
L D
O
P T
IO
N
A L F
IE
L D
T
IT
L E
O P
T
IO
N A
L F
IE
L D
T
IT
L E
RTA SUBMISSION
C Y
B E
R
E N
G
IN
E E
R
IN
G A
C A
D E
M
IC
C E
N T
E R
A N
D P
A R
K
IN
G S
T R
U C
T U
R E
F Y
P
N
F
Y P
N
O P
T
IO
N A
L F
IE
L D
SHEET INDEX - VOLUME FOUR
SHEET ID SHEET TITLE
FA114D FIRE ALARM PLAN - FOURTH FLOOR - SECTOR D
FA114E FIRE ALARM PLAN - FOURTH FLOOR - SECTOR E
FA114F FIRE ALARM PLAN - FOURTH FLOOR - SECTOR F
FA114H FIRE ALARM PLAN - FOURTH FLOOR - SECTOR H
FA114J FIRE ALARM PLAN - FOURTH FLOOR - SECTOR J
FA701 FIRE ALARM RISER & DETAILS
FA702 FIRE ALARM DETAILS
FA703 FIRE ALARM DETAILS
PLUMBING
P-001 PLUMBING GENERAL NOTES
P-11B OVERALL PLAN - PARKING LEVEL B - PLUMBING DRAINAGE
P-11BA PLUMBING FLOOR PLAN - PARKING LEVEL B - SECTOR A
P-11BB PLUMBING FLOOR PLAN - PARKING LEVEL B - SECTOR B
P-11BC PLUMBING FLOOR PLAN - PARKING LEVEL B - SECTOR C
P-11BD PLUMBING FLOOR PLAN - PARKING LEVEL B - SECTOR D
P-11BE PLUMBING FLOOR PLAN - PARKING LEVEL B - SECTOR E
P-11BF PLUMBING FLOOR PLAN - PARKING LEVEL B - SECTOR F
P-11BG PLUMBING FLOOR PLAN - PARKING LEVEL B - SECTOR G
P-11BH PLUMBING FLOOR PLAN - PARKING LEVEL B - SECTOR H
P-11BJ PLUMBING FLOOR PLAN - PARKING LEVEL B - SECTOR J
P-11A OVERALL PLAN - PARKING LEVEL A - PLUMBING DRAINAGE
P-11AA PLUMBING FLOOR PLAN - PARKING LEVEL A - SECTOR A
P-11AB PLUMBING FLOOR PLAN - PARKING LEVEL A - SECTOR B
P-11AC PLUMBING FLOOR PLAN - PARKING LEVEL A - SECTOR C
P-11AD PLUMBING FLOOR PLAN - PARKING LEVEL A - SECTOR D
P-11AE PLUMBING FLOOR PLAN - PARKING LEVEL A - SECTOR E
P-11AF PLUMBING FLOOR PLAN - PARKING LEVEL A - SECTOR F
P-11AG PLUMBING FLOOR PLAN - PARKING LEVEL A - SECTOR G
P-11AH PLUMBING FLOOR PLAN - PARKING LEVEL A - SECTOR H
P-11AJ PLUMBING FLOOR PLAN - PARKING LEVEL A - SECTOR J
PL111 OVERALL PLAN - FIRST FLOOR - PLUMBING DRAINAGE
PL111D PLUMBING DRAINAGE PLAN - FIRST FLOOR - SECTOR D
PL111E PLUMBING DRAINAGE PLAN - FIRST FLOOR - SECTOR E
PL111F PLUMBING DRAINAGE PLAN - FIRST FLOOR - SECTOR F
PL111G PLUMBING DRAINAGE PLAN - FIRST FLOOR - SECTOR G
PL111H PLUMBING DRAINAGE PLAN - FIRST FLOOR - SECTOR H
PL111J PLUMBING DRAINAGE PLAN - FIRST FLOOR - SECTOR J
PL112 OVERALL PLAN - SECOND FLOOR - PLUMBING DRAINAGE
PL112D PLUMBING DRAINAGE PLAN - SECOND FLOOR - SECTOR D
PL112E PLUMBING DRAINAGE PLAN - SECOND FLOOR - SECTOR E
PL112F PLUMBING DRAINAGE PLAN - SECOND FLOOR - SECTOR F
PL112H PLUMBING DRAINAGE PLAN - SECOND FLOOR - SECTOR H
PL112J PLUMBING DRAINAGE PLAN - SECOND FLOOR - SECTOR J
PL113 OVERALL PLAN - THIRD FLOOR - PLUMBING DRAINAGE
PL113D PLUMBING DRAINAGE PLAN - THIRD FLOOR - SECTOR D
PL113E PLUMBING DRAINAGE PLAN - THIRD FLOOR - SECTOR E
PL113E.A PLUMBING DRAINAGE PLAN - THIRD FLOOR - SECTOR E (ALTERNATE)
PL113F PLUMBING DRAINAGE PLAN - THIRD FLOOR - SECTOR F
PL113H PLUMBING DRAINAGE PLAN - THIRD FLOOR - SECTOR H
PL113H.A PLUMBING DRAINAGE PLAN - THIRD FLOOR - SECTOR H (ALTERNATE)
PL113J PLUMBING DRAINAGE PLAN - THIRD FLOOR - SECTOR J
PL113J.A PLUMBING DRAINAGE PLAN - THIRD FLOOR - SECTOR J (ALTERNATE)
PL113L.A PLUMBING DRAINAGE PLAN - THIRD FLOOR - SECTOR L - BRIDGE TO MAHAN (ALTERNATE)
PL114 OVERALL PLAN - FOURTH FLOOR - PLUMBING DRAINAGE
PL114D PLUMBING DRAINAGE PLAN - FOURTH FLOOR - SECTOR D
PL114E PLUMBING DRAINAGE PLAN - FOURTH FLOOR - SECTOR E
PL114E.A PLUMBING DRAINAGE PLAN - FOURTH FLOOR - SECTOR E (ALTERNATE)
PL114F PLUMBING DRAINAGE PLAN - FOURTH FLOOR - SECTOR F
PL114H PLUMBING DRAINAGE PLAN - FOURTH FLOOR - SECTOR H
PL114H.A PLUMBING DRAINAGE PLAN - FOURTH FLOOR - SECTOR H (ALTERNATE)
PL114J PLUMBING DRAINAGE PLAN - FOURTH FLOOR - SECTOR J
PL114J.A PLUMBING DRAINAGE PLAN - FOURTH FLOOR - SECTOR J (ALTERNATE)
PL115 PLUMBING DRAINAGE PLAN - ROOF
PL115.A PLUMBING DRAINAGE PLAN - ROOF (ALTERNATE)
PP111 OVERALL PLAN - FIRST FLOOR - PLUMBING SERVICE
PP111D PLUMBING SERVICE PLAN - FIRST FLOOR - SECTOR D
PP111E PLUMBING SERVICE PLAN - FIRST FLOOR - SECTOR E
PP111F PLUMBING SERVICE PLAN - FIRST FLOOR - SECTOR F
PP111H PLUMBING SERVICE PLAN - FIRST FLOOR - SECTOR H
PP111J PLUMBING SERVICE PLAN - FIRST FLOOR - SECTOR J
PP112 OVERALL PLAN - SECOND FLOOR - PLUMBING SERVICE
PP112D PLUMBING SERVICE PLAN - SECOND FLOOR - SECTOR D
PP112E PLUMBING SERVICE PLAN - SECOND FLOOR - SECTOR E
PP112F PLUMBING SERVICE PLAN - SECOND FLOOR - SECTOR F
PP112H PLUMBING SERVICE PLAN - SECOND FLOOR - SECTOR H
PP112J PLUMBING SERVICE PLAN - SECOND FLOOR - SECTOR J
PP113 OVERALL PLAN - THIRD FLOOR - PLUMBING SERVICE
PP113D PLUMBING SERVICE PLAN - THIRD FLOOR - SECTOR D
PP113E PLUMBING SERVICE PLAN - THIRD FLOOR - SECTOR E
PP113F PLUMBING SERVICE PLAN - THIRD FLOOR - SECTOR F
PP113J PLUMBING SERVICE PLAN - THIRD FLOOR - SECTOR J
PP114.A OVERALL PLAN - FOURTH FLOOR (ALTERNATE) - PLUMBING SERVICE
PP114D PLUMBING SERVICE PLAN - FOURTH FLOOR - SECTOR D
PP114EJ.A PLUMBING SERVICE PLAN - FOURTH FLOOR - SECTOR E (ALTERNATE)
P-401 ENLARGED PLUMBING PLANS - MECHANICAL ROOM
P-402 ENLARGED PLUMBING PLANS - RESTROOMS
P-501 PLUMBING DETAILS SHEET 1
P-502 PLUMBING DETAILS SHEET 2
P-503 PLUMBING DETAILS SHEET 3
P-601 PLUMBING SCHEDULES SHEET 1
P-602 PLUMBING SCHEDULES SHEET 2
P-701.1 SANITARY DRAINAGE RISER DIAGRAM PART 1
P-701.2 SANITARY DRAINAGE RISER DIAGRAM PART 2
P-701.3 SANITARY DRAINAGE RISER DIAGRAM PART 3
P-702.1 DOMESTIC WATER RISER DIAGRAM PART 1
P-702.2 DOMESTIC WATER RISER DIAGRAM PART 2
P-703.1 DIAGRAMS - STORM DRAINAGE RISER PART 1
P-703.2 DIAGRAMS - STORM DRAINAGE RISER PART 2
P-704 DIAGRAMS - NATURAL GAS RISER
P-705.1 DIAGRAMS - COMPRESSED AIR RISER PART 1
P-705.2 DIAGRAMS - COMPRESSED AIR RISER PART 2
P-706 TYPICAL RESTROOM RISER DIAGRAM
SHEET INDEX - VOLUME FOUR
SHEET ID SHEET TITLE
I-144E.A SIGNAGE LOCATION PLAN - FOURTH FLOOR - SECTOR E (ADD ALT #03)
I-144H.A SIGNAGE LOCATION PLAN - FOURTH FLOOR - SECTOR H (ADD ALT #03)
I-144J.A SIGNAGE LOCATION PLAN - FOURTH FLOOR - SECTOR J (ADD ALT #03)
I-501 INTERIOR DETAILS & FLOOR TRANSITIONS
I-502 INTERIOR DETAILS
FIRE PROTECTION
FX001 FIRE PROTECTION GENERAL NOTES
FX11B FIRE PROTECTION PLAN - PARKING LEVEL B - OVERALL
FX11BA FIRE PROTECTION PLAN - PARKING LEVEL B - SECTOR A
FX11BB FIRE PROTECTION PLAN - PARKING LEVEL B - SECTOR B
FX11BC FIRE PROTECTION PLAN - PARKING LEVEL B - SECTOR C
FX11BD FIRE PROTECTION PLAN - PARKING LEVEL B - SECTOR D
FX11BE FIRE PROTECTION PLAN - PARKING LEVEL B - SECTOR E
FX11BF FIRE PROTECTION PLAN - PARKING LEVEL B - SECTOR F
FX11BG FIRE PROTECTION PLAN - PARKING LEVEL B - SECTOR G
FX11BH FIRE PROTECTION PLAN - PARKING LEVEL B - SECTOR H
FX11BJ FIRE PROTECTION PLAN - PARKING LEVEL B - SECTOR J
FX11A FIRE PROTECTION PLAN - PARKING LEVEL A - OVERALL
FX11AA FIRE PROTECTION PLAN - PARKING LEVEL A - SECTOR A
FX11AB FIRE PROTECTION PLAN - PARKING LEVEL A - SECTOR B
FX11AC FIRE PROTECTION PLAN - PARKING LEVEL A - SECTOR C
FX11AD FIRE PROTECTION PLAN - PARKING LEVEL A - SECTOR D
FX11AE FIRE PROTECTION PLAN - PARKING LEVEL A - SECTOR E
FX11AF FIRE PROTECTION PLAN - PARKING LEVEL A - SECTOR F
FX11AG FIRE PROTECTION PLAN - PARKING LEVEL A - SECTOR G
FX11AH FIRE PROTECTION PLAN - PARKING LEVEL A - SECTOR H
FX11AJ FIRE PROTECTION PLAN - PARKING LEVEL A - SECTOR J
FX111 FIRE PROTECTION PLAN - FIRST FLOOR - OVERALL
FX111D FIRE PROTECTION PLAN - FIRST FLOOR - SECTOR D
FX111E FIRE PROTECTION PLAN - FIRST FLOOR - SECTOR E
FX111F FIRE PROTECTION PLAN - FIRST FLOOR - SECTOR F
FX111H FIRE PROTECTION PLAN - FIRST FLOOR - SECTOR H
FX111J FIRE PROTECTION PLAN - FIRST FLOOR - SECTOR J
FX112 FIRE PROTECTION PLAN - SECOND FLOOR - OVERALL
FX112.A FIRE PROTECTION PLAN - SECOND FLOOR - OVERALL (ALTERNATE)
FX112D FIRE PROTECTION PLAN - SECOND FLOOR - SECTOR D
FX112E FIRE PROTECTION PLAN - SECOND FLOOR - SECTOR E
FX112F FIRE PROTECTION PLAN - SECOND FLOOR - SECTOR F
FX112H FIRE PROTECTION PLAN - SECOND FLOOR - SECTOR H
FX112J FIRE PROTECTION PLAN - SECOND FLOOR - SECTOR J
FX113 FIRE PROTECTION PLAN - THIRD FLOOR - OVERALL
FX113D FIRE PROTECTION PLAN - THIRD FLOOR - SECTOR D
FX113E FIRE PROTECTION PLAN - THIRD FLOOR - SECTOR E
FX113F FIRE PROTECTION PLAN - THIRD FLOOR - SECTOR F
FX113H FIRE PROTECTION PLAN - THIRD FLOOR - SECTOR H
FX113J FIRE PROTECTION PLAN - THIRD FLOOR - SECTOR J
FX114 FIRE PROTECTION PLAN - FOURTH FLOOR - OVERALL
FX114.A FIRE PROTECTION PLAN - FOURTH FLOOR - OVERALL (ALTERNATE)
FX114D FIRE PROTECTION PLAN - FOURTH FLOOR - SECTOR D
FX114E FIRE PROTECTION PLAN - FOURTH FLOOR - SECTOR E
FX114F FIRE PROTECTION PLAN - FOURTH FLOOR - SECTOR F
FX114H FIRE PROTECTION PLAN - FOURTH FLOOR - SECTOR H
FX114J FIRE PROTECTION PLAN - FOURTH FLOOR - SECTOR J
FX701 FIRE PROTECTION DETAILS
FX702 FIRE PROTECTION DETAILS
FX703 FIRE PROTECTION RISER
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES
FA11B FIRE ALARM PLAN - PARKING LEVEL B - OVERALL
FA11BA FIRE ALARM PLAN - PARKING LEVEL B - SECTOR A
FA11BB FIRE ALARM PLAN - PARKING LEVEL B - SECTOR B
FA11BC FIRE ALARM PLAN - PARKING LEVEL B - SECTOR C
FA11BD FIRE ALARM PLAN - PARKING LEVEL B - SECTOR D
FA11BE FIRE ALARM PLAN - PARKING LEVEL B - SECTOR E
FA11BF FIRE ALARM PLAN - PARKING LEVEL B - SECTOR F
FA11BG FIRE ALARM PLAN - PARKING LEVEL B - SECTOR G
FA11BH FIRE ALARM PLAN - PARKING LEVEL B - SECTOR H
FA11BJ FIRE ALARM PLAN - PARKING LEVEL B - SECTOR J
FA11A FIRE ALARM PLAN - PARKING LEVEL A - OVERALL
FA11AA FIRE ALARM PLAN - PARKING LEVEL A - SECTOR A
FA11AB FIRE ALARM PLAN - PARKING LEVEL A - SECTOR B
FA11AC FIRE ALARM PLAN - PARKING LEVEL A - SECTOR C
FA11AD FIRE ALARM PLAN - PARKING LEVEL A - SECTOR D
FA11AE FIRE ALARM PLAN - PARKING LEVEL A - SECTOR E
FA11AF FIRE ALARM PLAN - PARKING LEVEL A - SECTOR F
FA11AG FIRE ALARM PLAN - PARKING LEVEL A - SECTOR G
FA11AH FIRE ALARM PLAN - PARKING LEVEL A - SECTOR H
FA11AJ FIRE ALARM PLAN - PARKING LEVEL A - SECTOR J
FA111 FIRE ALARM PLAN - FIRST FLOOR - OVERALL
FA111D FIRE ALARM PLAN - FIRST FLOOR - SECTOR D
FA111E FIRE ALARM PLAN - FIRST FLOOR - SECTOR E
FA111F FIRE ALARM PLAN - FIRST FLOOR - SECTOR F
FA111H FIRE ALARM PLAN - FIRST FLOOR - SECTOR H
FA111J FIRE ALARM PLAN - FIRST FLOOR - SECTOR J
FA112 FIRE ALARM PLAN - SECOND FLOOR - OVERALL
FA112.A FIRE ALARM PLAN - SECOND FLOOR - OVERALL (ALTERNATE)
FA112D FIRE ALARM PLAN - SECOND FLOOR - SECTOR D
FA112E FIRE ALARM PLAN - SECOND FLOOR - SECTOR E
FA112F FIRE ALARM PLAN - SECOND FLOOR - SECTOR F
FA112H FIRE ALARM PLAN - SECOND FLOOR - SECTOR H
FA112J FIRE ALARM PLAN - SECOND FLOOR - SECTOR J
FA113 FIRE ALARM PLAN - THIRD FLOOR - OVERALL
FA113.A FIRE ALARM PLAN - THIRD FLOOR - OVERALL (ALTERNATE)
FA113D FIRE ALARM PLAN - THIRD FLOOR - SECTOR D
FA113E FIRE ALARM PLAN - THIRD FLOOR - SECTOR E
FA113F FIRE ALARM PLAN - THIRD FLOOR - SECTOR F
FA113H FIRE ALARM PLAN - THIRD FLOOR - SECTOR H
FA113J FIRE ALARM PLAN - THIRD FLOOR - SECTOR J
FA114 FIRE ALARM PLAN - FOURTH FLOOR - OVERALL
FA114.A FIRE ALARM PLAN - FOURTH FLOOR - OVERALL (ALTERNATE)
SHEET INDEX - VOLUME FOUR
SHEET ID SHEET TITLE
GENERAL
G-001.4 COVER SHEET - VOLUME FOUR
G-002 SHEET INDEX - VOLUME ONE
G-003 SHEET INDEX - VOLUME TWO
G-004 SHEET INDEX - VOLUME THREE
G-005 SHEET INDEX - VOLUME FOUR
G-006 SHEET INDEX - VOLUME FIVE
G-007 SHEET INDEX - VOLUME SIX
INTERIORS
I-001 INTERIOR FINISH SCHEDULE & GENERAL NOTES
I-002 INTERIOR FINISH SCHEDULE (CONT.)
I-10B INTERIOR FINISH LOCATION PLAN - PARKING LEVEL B
I-10A INTERIOR FINISH LOCATION PLAN - PARKING LEVEL A
I-101 INTERIOR FINISH REFERENCE PLAN - FIRST FLOOR - OVERALL
I-101.A INTERIOR FINISH REFERENCE PLAN - FIRST FLOOR - BID ALTERNATES
I-101D INTERIOR FINISH LOCATION PLAN - FIRST FLOOR - SECTOR D
I-101E INTERIOR FINISH LOCATION PLAN - FIRST FLOOR - SECTOR E
I-101F INTERIOR FINISH LOCATION PLAN - FIRST FLOOR - SECTOR F
I-101H INTERIOR FINISH LOCATION PLAN - FIRST FLOOR - SECTOR H
I-101J INTERIOR FINISH LOCATION PLAN - FIRST FLOOR - SECTOR J
I-102 INTERIOR FINISH REFERENCE PLAN - SECOND FLOOR - OVERALL
I-102.A INTERIOR FINISH LOCATION PLAN - SECOND FLOOR - BID ALTERNATES
I-102D INTERIOR FINISH LOCATION PLAN - SECOND FLOOR - SECTOR D
I-102E INTERIOR FINISH LOCATION PLAN - SECOND FLOOR - SECTOR E
I-102F INTERIOR FINISH LOCATION PLAN - SECOND FLOOR - SECTOR F
I-102H INTERIOR FINISH LOCATION PLAN - SECOND FLOOR - SECTOR H
I-102J INTERIOR FINISH LOCATION PLAN - SECOND FLOOR - SECTOR J
I-102L.A INTERIOR FINISH LOCATION PLAN - SECOND/THIRD FLOOR - SECTOR L (ADD ALT #01)
I-103 INTERIOR FINISH REFERENCE PLAN - THIRD FLOOR - OVERALL
I-103.A INTERIOR FINISH REFERENCE PLAN - THIRD FLOOR - BID ALTERNATES
I-103D INTERIOR FINISH LOCATION PLAN - THIRD FLOOR - SECTOR D
I-103E INTERIOR FINISH LOCATION PLAN - THIRD FLOOR - SECTOR E
I-103F INTERIOR FINISH LOCATION PLAN - THIRD FLOOR - SECTOR F
I-103H INTERIOR FINISH LOCATION PLAN - THIRD FLOOR - SECTOR H
I-103J INTERIOR FINISH LOCATION PLAN - THIRD FLOOR - SECTOR J
I-104 INTERIOR FINISH REFERENCE PLAN - FOURTH FLOOR - OVERALL
I-104.A INTERIOR FINISH REFERENCE PLAN - FOURTH FLOOR - OVERALL (ADD ALT #03)
I-104D INTERIOR FINISH LOCATION PLAN - FOURTH FLOOR - SECTOR D
I-104E.A INTERIOR FINISH LOCATION PLAN - FOURTH FLOOR - SECTOR E (ADD ALT #03)
I-104H.A INTERIOR FINISH LOCATION PLAN - FOURTH FLOOR - SECTOR H (ADD ALT #03)
I-104J.A INTERIOR FINISH LOCATION PLAN - FOURTH FLOOR - SECTOR J (ADD ALT #03)
I-120 ENLARGED PATTERN PLANS - ATRIUM & CORRIDORS
I-121 ENLARGED PATTERN PLANS - TYP. CLASSROOM SPACES
I-122 ENLARGED PATTERN PLANS - CAPSTONES
I-123 ENLARGED PATTERN PLANS - TOILET ROOMS
I-124.A FLOOR PATTERN PLAN - FIRST FLOOR (ADD ALT #05) & (ADD ALT #02)
I-125.A FLOOR PATTERN PLAN - SECOND FLOOR (ADD ALT #06) & (ADD ALT #02)
I-126.A FLOOR PATTERN PLAN - THIRD FLOOR (ADD ALT #06) & (ADD ALT #02)
I-127.A FLOOR PATTERN PLAN - FOURTH FLOOR (ADD ALT #03) & (ADD ALT #02)
I-128.A ENLARGED PATTERN PLANS - ADD ALTS
I-129 ENLARGED PATTERN PLANS - THIRD FLOOR TYP. CLASSROOM SPACES
I-130.1 FURNITURE SCHEDULE
I-130.2 ENLARGED FURNITURE PLANS AND ELEVATIONS
I-130.3 ENLARGED FURNITURE PLANS AND ELEVATIONS
I-131 FURNITURE REFERENCE PLAN - FIRST FLOOR - OVERALL
I-131D FURNITURE LOCATION PLAN - FIRST FLOOR - SECTOR D
I-131E FURNITURE LOCATION PLAN - FIRST FLOOR - SECTOR E
I-131F FURNITURE LOCATION PLAN - FIRST FLOOR - SECTOR F
I-131H FURNITURE LOCATION PLAN - FIRST FLOOR - SECTOR H
I-131J FURNITURE LOCATION PLAN - FIRST FLOOR - SECTOR J
I-132 FURNITURE REFERENCE PLAN - SECOND FLOOR - OVERALL
I-132D FURNITURE LOCATION PLAN - SECOND FLOOR - SECTOR D
I-132E FURNITURE LOCATION PLAN - SECOND FLOOR - SECTOR E
I-132F FURNITURE LOCATION PLAN - SECOND FLOOR - SECTOR F
I-132H FURNITURE LOCATION PLAN - SECOND FLOOR - SECTOR H
I-132J FURNITURE LOCATION PLAN - SECOND FLOOR - SECTOR J
I-132L.A FURNITURE LOCATION PLAN - SECOND/THIRD FLOOR - SECTOR L (ADD ALT #01)
I-133 FURNITURE REFERENCE PLAN - THIRD FLOOR - OVERALL
I-133D FURNITURE LOCATION PLAN - THIRD FLOOR - SECTOR D
I-133E FURNITURE LOCATION PLAN - THIRD FLOOR - SECTOR E
I-133F FURNITURE LOCATION PLAN - THIRD FLOOR - SECTOR F
I-133H FURNITURE LOCATION PLAN - THIRD FLOOR - SECTOR H
I-133J FURNITURE LOCATION PLAN- THIRD FLOOR - SECTOR J
I-134.A FURNITURE REFERENCE PLAN - FOURTH FLOOR - OVERALL (ADD ALT #03)
I-134E.A FURNITURE LOCATION PLAN - SECTOR E (ADD ALT #03)
I-134H.A FURNITURE LOCATION PLAN - FOURTH FLOOR - SECTOR H (ADD ALT #03)
I-134J.A FURNITURE LOCATION PLAN - FOURTH FLOOR - SECTOR J (ADD ALT #03)
I-140.1 SIGNAGE MOUNTING & GENERAL NOTES
I-140.2 SIGNAGE TYPES
I-140.3A SIGNAGE SCHEDULE
I-140.3B SIGNAGE SCHEDULE (CONT.)
I-140.4A SIGNAGE SCHEDULE (ADD ALT #01 AND #03)
I-14B SIGNAGE LOCATION PLANS - PARKING LEVEL B
I-14A SIGNAGE LOCATION PLANS - PARKING LEVEL A
I-141D SIGNAGE LOCATION PLAN - FIRST FLOOR - SECTOR D
I-141E SIGNAGE LOCATION PLAN - FIRST FLOOR - SECTOR E
I-141F SIGNAGE LOCATION PLAN - FIRST FLOOR - SECTOR F
I-141H SIGNAGE LOCATION PLAN - FIRST FLOOR - SECTOR H
I-141J SIGNAGE LOCATION PLAN - FIRST FLOOR - SECTOR J
I-142D SIGNAGE LOCATION PLAN - SECOND FLOOR - SECTOR D
I-142E SIGNAGE LOCATION PLAN - SECOND FLOOR - SECTOR E
I-142F SIGNAGE LOCATION PLAN - SECOND FLOOR - SECTOR F
I-142H SIGNAGE LOCATION PLAN - SECOND FLOOR - SECTOR H
I-142J SIGNAGE LOCATION PLAN - SECOND FLOOR - SECTOR J
I-142L.A SIGNAGE LOCATION PLAN - SECOND FLOOR - SECTOR L (ADD ALT #01)
I-143D SIGNAGE LOCATION PLAN - THIRD FLOOR - SECTOR D
I-143E SIGNAGE LOCATION PLAN - THIRD FLOOR - SECTOR E
I-143F SIGNAGE LOCATION PLAN - THIRD FLOOR - SECTOR F
I-143H SIGNAGE LOCATION PLAN - THIRD FLOOR - SECTOR H
I-143J SIGNAGE LOCATION PLAN - THIRD FLOOR - SECTOR J
I-144D SIGNAGE LOCATION PLAN - FOURTH FLOOR - SECTOR D
A
M E
N D
M E
N T
/0
/2
ROCK ANCHOR GENERAL NOTES:
1. DRILL ROCK ANCHOR HOLES TO THE DEPTH NOTED ON THE ROCK BOLT SCHEDULE ON THIS DRAWING.
2.CLEAN THE HOLES WITH WATER AND/OR AIR IMMEDIATELY BEFORE CEMENT GROUTING.
3.SMOOTH SHEATHING SHALL COVER THE UNBONDED (FREE) LENGTH OF THE ROCK ANCHOR. CENTRALIZERS SHALL BE SPACED AT 10' MAX. C-C SPACING
ALONG THE LENGTH OF THE ROCK ANCHOR.
4.PLACE CEMENT GROUT USING TREMIE PIPE WHICH EXTENDS TO THE BOTTOM OF ROCK ANCHOR. PUMP UNTIL CLEAN CEMENT GROUT IS FLOWING FROM THE
DRILL HOLE.
5. THE ROCK ANCHOR CEMENT GROUT SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OUTLINED IN SPECIFICATION SECTION 31 68 13.
6. THE CEMENT GROUT MIX SHALL BE ONE 94 LB. BAG OF PORTLAND CEMENT MIXED WITH 5 GALLONS OF POTABLE WATER. THE WATER-CEMENT RATIO SHOULD
BE BETWEEN 0.40 AND 0.45 BY WEIGHT.
7. THE ROCK ANCHOR SHALL BE ASTM A722, 150 KSI MINIMUM ULTIMATE STRENGTH THREADED BAR (ASTM A722/722M-18) AS MANUFACTURED BY WILLIAMS
FORM ENGINEERING CORP. OR APPROVED EQUAL.
8.BEARING PLATES SHALL BE 50 KSI STEEL.
9.PROVIDE A GENERALLY FLAT SURFACE FOR THE ROCK ANCHOR STEEL PLATE TO BEAR AGAINST THE ROCK FACE. INSTALL THE STEEL PLATE SO IT IS
PERPENDICULAR TO THE AXIS OF THE ROCK ANCHOR.
10. TEST ROCK ANCHORS IN ACCORDANCE WITH THE REQUIREMENTS DESCRIBED ON DRAWING B-601.
11. THE ROCK ANCHOR LOCK-OFF LOAD SHALL NOT EXCEED 70% OF THE DESIGN LOAD OF THE PRESTRESSING STEEL.
12. IF ROCK ANCHOR LOCK-OFF FAILS OR PULL OUT FAILURE OCCURS, THEN THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACT OFFICER AND THE
ENGINEER BEFORE TAKING FURTHER ACTION.
13. ALL ROCK ANCHOR, BARS, BEARING PLATES AND NUTS SHALL BE EPOXY COATED.
14. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
U
N
B
O
N
D
E
D
F
R
E
L
N
G
T
H
W
I
T
H
S
M
O
O
P
A
S
T
I
C
E
A
T
H
R
E
F
R
O
H
E
D
U
L
E
B
O
N
N
G
T
H
R
E
F
H
E
D
U
L
E
D
R
I
L
L
H
O
L
E
M
I
N
SMOOTH PLASTIC LINER
CEMENT GROUT
" GRADE 150
EPOXY COATED
THREADED BAR
BEARING PLATE
8" X 8" X 1
C
E
N
T
R
A
L
I
Z
E
A
X
I
M
U
A
C
I
G
C
B-501
R O
K
C
H O
R
D
E T
A I L
S
N
O T
E S
H K
P
K P
L
J H
M
A
M E
N D
M E
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
US Army Corps of Engineers
N E
W
Y
O R
K
D
I S
T R
I C
T
F
E D
E R
A L
P
L A
Z A
N E
W
Y
O R
K
N
Y
W D
S D
M A
Y
A N
S I
D
W D
S D
W E
I N
T
N
Y
C Y
B E
G
I N
E E
R I N
G
A C
A D
E M
N
T E
R
A
R
K I N
G
S
T R
U C
T U
R E
F Y
P
N
F
Y
P
N
RTA SUBMISSION
G C
N
I
M
U
M
12"
DRILL HOLE
SHEATH
PRE-STRESSING
STEEL BAR
GROUT
PVC CENTRALIZER
@ 10'-0" C-C
MAX SPACING
PLAN VIEW SIDE VIEW
DRY PACK PAD AS NEEDED
SPIKE PLATE
ROCK FALL
PROTECTION MESH
BEARING NUT
BEARING NUT
N
PVC CENTRALIZER
@ 10'-0" C-C
MAX SPACING
PRE-STRESSING STEEL BAR
F9
ROCK ANCHOR SPIKE PLATE
SCALE: NTS
D1
ROCK FALL PROTECTION MESH
SCALE: NTS
D3
SPIKE PLATE
SCALE: NTS
A7
ROCK ANCHOR UNBONDED SEC
SCALE: NTS
A9
ROCK ANCHOR BONDED SEC
SCALE: NTS
D5
ROCK ANCHOR DETAIL
SCALE: NTS
B-501
A7
B-501
A9
B9
ROCK SLOPE DRAINAGE PIPE
SCALE: NTS
B6
ROCK SLOPE DRAINAGE PREFORATED PIPE
SCALE: NTS
3"
4" ±
GROUT SEAL
M
IN
GROUT SEAL
3" PREFORATED
DRAINAGE PIPE
D R
A I N
A G
E
H O
L E
ROCK FACE CUT
5° ±
ROCK SLOPE DRAINAGE HOLE:
NOMINAL 3" DIAMETER SCHEDULE 40 (SCH 40) PREFORATED PIPE
ROCK FALL PROTECTION MESH:
1. INSTALL ROCK FALL PROTECTION MESH TO THE LIMITS SHOWN ON THE CONTRACT DRAWINGS.
2. ROCK FALL PROTECTION MESH SHALL BE FIXED AT TOP OF ROCK CUT WITH ANCHORS TO BE DESIGNED BY CONTRACTOR AS PER
MANUFACTURES REQUIREMENTS.
3. ROCK FALL PROTECTION MESH SHALL BE MACCAFERRI - GALVANIZED DOUBLE TWISTED WIRE MESH 6X8 WITH NOMINAL MESH
OPENING OF 2.5 INCH AND MUST MEET MINIMUM CRITERIA AS FOLLOWS OR APPROVED EQUAL.
THE DOUBLE TWISTED HEXAGONAL MESH AND WIRE SHALL BE MANUFACTURED IN ACCORDANCE WITH ASTM A 975, STYLE 3 COATING, GALVANIZED AND PVC COATED STEEL WIRE.
MINIMUM MESH WIRE PROPERTIES SHALL BE AS FOLLOWS:
4. THE ROCK FALL PROTECTION MESH SHALL BE FASTENED TO THE ROCK ANCHORS USING SPIKE PLATE AS SHOW ON DRAWING B-501
AND TO THE LIMITS SHOWN ON THE CONTRACT DRAWINGS.
D
ROCK ANCHOR GENERAL NOTES:
1. DRILL ROCK ANCHOR HOLES TO THE DEPTH NOTED ON THE ROCK BOLT SCHEDULE ON THIS DRAWING.
2.CLEAN THE HOLES WITH WATER AND/OR AIR IMMEDIATELY BEFORE CEMENT GROUTING.
3.SMOOTH SHEATHING SHALL COVER THE UNBONDED (FREE) LENGTH OF THE ROCK ANCHOR. CENTRALIZERS SHALL BE SPACED AT 10' MAX. C-C
SPACING ALONG THE LENGTH OF THE ROCK ANCHOR.
4.PLACE CEMENT GROUT USING TREMIE PIPE WHICH EXTENDS TO THE BOTTOM OF ROCK ANCHOR. PUMP UNTIL CLEAN CEMENT GROUT IS
FLOWING FROM THE DRILL HOLE.
5. THE ROCK ANCHOR CEMENT GROUT SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OUTLINED IN SPECIFICATION SECTION 31 68 13.
6. THE CEMENT GROUT MIX SHALL BE ONE 94 LB. BAG OF PORTLAND CEMENT MIXED WITH 5 GALLONS OF POTABLE WATER. THE WATER-CEMENT
RATIO SHOULD BE BETWEEN 0.40 AND 0.45 BY WEIGHT.
7. THE ROCK ANCHOR SHALL BE ASTM A722, 150 KSI MINIMUM ULTIMATE STRENGTH THREADED BAR (ASTM A722/722M-18) AS MANUFACTURED BY
WILLIAMS FORM ENGINEERING CORP. OR APPROVED EQUAL.
8.BEARING PLATES SHALL BE 50 KSI STEEL.
9.PROVIDE A GENERALLY FLAT SURFACE FOR THE ROCK ANCHOR STEEL PLATE TO BEAR AGAINST THE ROCK FACE. INSTALL THE STEEL PLATE
SO IT IS PERPENDICULAR TO THE AXIS OF THE ROCK ANCHOR.
10. TEST ROCK ANCHORS IN ACCORDANCE WITH THE REQUIREMENTS DESCRIBED ON DRAWING B-601.
11. THE ROCK ANCHOR LOCK-OFF LOAD SHALL NOT EXCEED 70% OF THE DESIGN LOAD OF THE PRESTRESSING STEEL.
12. IF ROCK ANCHOR LOCK-OFF FAILS OR PULL OUT FAILURE OCCURS, THEN THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACT
OFFICER AND THE ENGINEER BEFORE TAKING FURTHER ACTION.
13. ALL ROCK ANCHOR, BARS, BEARING PLATES AND NUTS SHALL BE EPOXY COATED.
14. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
U
N
B
O
N
D
R
E
N
G
T
H
W
I
O
O
A
S
T
E
A
T
H
R
E
F
H
E
D
U
L
E
B
O
N
G
T
H
R
E
F
H
E
D
U
L
E
D
R
I
L
L
H
O
L
E
M
I
N
SMOOTH PLASTIC LINER
CEMENT GROUT
" GRADE 150
EPOXY COATED
THREADED BAR
BEARING PLATE
8" X 8" X 1
C
E
N
T
R
A
L
I
Z
E
X
I
M
A
C
I
C
B-501.A
R O
C
H O
R
D
E T
A I L
S
N
O T
E S
A
L T
E R
N A
T E
H K
P
K P
L
J H
M
A
M E
N D
M E
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
US Army Corps of Engineers
N E
W
Y
O R
K
D
I S
T R
I C
T
F
E D
E R
A L
P
L A
Z A
N E
W
Y
O R
K
N
Y
W D
S D
M A
Y
A N
S I
D
W D
S D
W E
I N
T
N
Y
C Y
B E
G
I N
E E
R I N
G
A C
A D
E M
N
T E
R
A
R
K I N
G
S
T R
U C
T U
R E
F Y
P
N
F
Y
P
N
RTA SUBMISSION
G C
N
I
M
U
M
12"
DRILL HOLE
SHEATH
PRE-STRESSING
STEEL BAR
GROUT
PVC CENTRALIZER
@ 10'-0" C-C
MAX SPACING
PLAN VIEW SIDE VIEW
DRY PACK PAD AS NEEDED
SPIKE PLATE
ROCK FALL
PROTECTION MESH
BEARING NUT
BEARING NUT
N
PVC CENTRALIZER
@ 10'-0" C-C
MAX SPACING
PRE-STRESSING STEEL BAR
F9
ROCK ANCHOR SPIKE PLATE
SCALE: NTS
D1
ROCK FALL PROTECTION MESH
SCALE: NTS
D3
SPIKE PLATE
SCALE: NTS
A7
ROCK ANCHOR UNBONDED SEC
SCALE: NTS
A9
ROCK ANCHOR BONDED SEC
SCALE: NTS
D5
ROCK ANCHOR DETAIL
SCALE: NTS
B-501
A7
B-501
A9
B9
ROCK SLOPE DRAINAGE PIPE
SCALE: NTS
B6
ROCK SLOPE DRAINAGE PREFORATED PIPE
SCALE: NTS
3"
4" ±
GROUT SEAL
M
IN
GROUT SEAL
3" PREFORATED
DRAINAGE PIPE
D R
A I N
A G
E
H O
L E
ROCK FACE CUT
5° ±
ROCK SLOPE DRAINAGE HOLE:
NOMINAL 3" DIAMETER SCHEDULE 40 (SCH 40) PREFORATED PIPE
ROCK FALL PROTECTION MESH:
1. INSTALL ROCK FALL PROTECTION MESH TO THE LIMITS SHOWN ON THE CONTRACT DRAWINGS.
2. ROCK FALL PROTECTION MESH SHALL BE FIXED AT TOP OF ROCK CUT WITH ANCHORS TO BE DESIGNED BY CONTRACTOR AS PER
MANUFACTURES REQUIREMENTS.
3. ROCK FALL PROTECTION MESH SHALL BE MACCAFERRI - GALVANIZED DOUBLE TWISTED WIRE MESH 6X8 WITH NOMINAL MESH
OPENING OF 2.5 INCH AND MUST MEET MINIMUM CRITERIA AS FOLLOWS OR APPROVED EQUAL.
THE DOUBLE TWISTED HEXAGONAL MESH AND WIRE SHALL BE MANUFACTURED IN ACCORDANCE WITH ASTM A 975, STYLE 3 COATING, GALVANIZED AND PVC COATED STEEL WIRE.
MINIMUM MESH WIRE PROPERTIES SHALL BE AS FOLLOWS:
4. THE ROCK FALL PROTECTION MESH SHALL BE FASTENED TO THE ROCK ANCHORS USING SPIKE PLATE AS SHOW ON DRAWING B-501
AND TO THE LIMITS SHOWN ON THE CONTRACT DRAWINGS.
D
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
US Army Corps of Engineers
N E
W
Y
O R
K
D
I S
T R
I C
T
F
E D
E R
A L
P
L A
Z A
N E
W
Y
O R
K
N
Y
W D
S D
M A
Y
A N
S I
D
W D
S D
W E
I N
T
N
Y
C Y
B E
G
I N
E E
R I N
G
A C
A D
E M
N
T E
R
A
R
K I N
G
S
T R
U C
T U
R E
F Y
P
N
F
Y
P
N
RTA SUBMISSION
G C
THE MAXIMUM TEST LOAD IN A PROOF TEST SHALL BE HELD FOR TEN (10) MINUTES. THE JACK SHALL BE ADJUSTED AS NECESSARY IN ORDER TO MAINTAIN A CONSTANT LOAD.
THE LOAD-HOLD PERIOD SHALL START AS SOON AS THE MAXIMUM TEST LOAD IS APPLIED AND THE ROCK ANCHOR MOVEMENT WITH RESPECT TO A FIXED REFERENCE SHALL
BE MEASURED AND RECORDED AT 1 MINUTE, 2, 3, 4, 5, 6 AND 10 MINUTES. IF THE ROCK ANCHOR MOVEMENT BETWEEN ONE (1) AND TEN (10) MINUTES EXCEEDS 0.04 INCH, THE
MAXIMUM TEST LOAD SHALL BE HELD FOR AND ADDITIONAL 50 MINUTES. IF THE LOAD HOLD IS EXTENDED, THE GROUND ANCHOR MOVEMENTS SHALL BE RECORDED AT 15
MINUTES, 20, 30, 40, 50 AND 60 MINUTES.
1- EXTENDED CREEP TESTS:
A. AN EXTENDED CREEP TEST SHALL BE PERFORMED ON THE NUMBER OF ROCK ANCHORS AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER OF RECORD. THE
ENGINEER OR RECORD SHALL SELECT THE ROCK ANCHORS TO BE PERFORMANCE TESTED. THE STRESSING EQUIPMENT SHALL BE CAPABLE OF MEASURING AND
MAINTAINING THE HYDRAULIC PRESSURE WITHIN 50 PSI. A LOAD CELL SHALL BE USED TO MONITOR SMALL CHANGES IN LOAD DURING CONSTANT LOAD-HOLD PERIODS.
B. THE EXTENDED CREEP TEST SHALL BE MADE BY INCREMENTALLY LOADING AND UNLOADING THE ROCK ANCHOR IN ACCORDANCE WITH THE PERFORMANCE TEST
SCHEDULE IN SHOWN ON THIS PLAN. AT THE END OF EACH LOADING CYCLE, THE LOAD SHALL BE HELD CONSTANT FOR THE OBSERVATION PERIOD INDICATED IN THE
EXTENDED CREEP TEST SCHEDULE BELOW. IN A CREEP TEST, THE PRIMARY PRESSURE GAUGE AND REFERENCE PRESSURE GAUGE WILL BE USED TO MEASURE THE
APPLIED LOAD AND THE LOAD CELL WILL BE USED TO MONITOR SMALL CHANGES IN LOAD DURING CONSTANT LOAD-HOLD PERIODS. THE JACK SHALL BE ADJUSTED AS
NECESSARY IN ORDER TO MAINTAIN A CONSTANT LOAD.
C. THE CONTRACTOR SHALL PLOT THE ROCK ANCHOR MOVEMENT AND THE RESIDUAL MOVEMENT MEASURED IN AN EXTENDED CREEP TEST. THE CONTRACTOR SHALL ALSO
PLOT THE CREEP MOVEMENT FOR EACH LOAD HOLD AS A FUNCTION OF THE LOGARITHM OF TIME.
ROCK ANCHOR ACCEPTANCE CRITERIA:
A. A PERFORMANCE- TESTED OR PROOF- TESTED ROCK ANCHOR WITH A 10 MINUTE LOAD-HOLD SHALL BE ACCEPTABLE IF THE: (1) ROCK ANCHOR RESISTS THE MAXIMUM TEST LOAD
WITH LESS THAN 0.04 INCH OF MOVEMENT BETWEEN 1 MINUTE AND 10 MINUTES; AND (2) TOTAL ELASTIC MOVEMENT AT THE MAXIMUM TEST LOAD EXCEEDS 80 PERCENT OF THE
THEORETICAL ELASTIC ELONGATION OF THE UNBONDED LENGTH.
B. A PERFORMANCE- TESTED OR PROOF- TESTED ROCK ANCHOR WITH A 60 MINUTE LOAD-HOLD SHALL BE ACCEPTABLE IF THE: (1) ROCK ANCHOR RESISTS THE MAXIMUM TEST LOAD
WITH A CREEP RATE THAT DOES NOT EXCEED 0.08 INCH IN THE LAST (0.2 MM)/LOG CYCLE OF TIME; AND (2) TOTAL ELASTIC MOVEMENT AT THE MAXIMUM TEST LOAD EXCEEDS 80
PERCENT OF THE THEORETICAL ELASTIC ELONGATION OF THE FREE LENGTH.
C. A ROCK ANCHOR SUBJECTED TO EXTENDED CREEP TESTING IS ACCEPTABLE IF THE: (1) ROCK ANCHOR RESISTS THE MAXIMUM TEST LOAD WITH A CREEP RATE THAT DOES NOT
EXCEED 0.08 INCH IN THE LAST LOG CYCLE OF TIME; AND (2) TOTAL ELASTIC MOVEMENT AT THE MAXIMUM TEST LOAD EXCEEDS 80 PERCENT OF THE THEORETICAL ELASTIC
ELONGATION OF THE UNBONDED LENGTH.
D. THE INITIAL LIFT-OFF READING SHALL BE WITHIN PLUS OR MINUS FIVE (5) PERCENT OF THE DESIGNED LOCK- OFF LOAD. IF THIS CRITERION IS NOT MET, THEN THE ANCHOR LOAD
SHALL BE ADJUSTED ACCORDINGLY AND THE INITIAL LIFT-OFF READING REPEATED.
PROCEDURES FOR ANCHORS FAILING ACCEPTANCE CRITERIA:
A. ANCHORS THAT DO NOT SATISFY THE MINIMUM APPARENT UNBONDED FREE LENGTH CRITERIA SHALL BE EITHER REJECTED AND REPLACED AT NO ADDITIONAL COST TO THE
GOVERNMENT OR LOCKED OFF AT NOT MORE THAN 50 PERCENT OF THE MAXIMUM ACCEPTABLE LOAD ATTAINED.
B. REGROUTABLE ANCHORS WHICH SATISFY THE MINIMUM APPARENT UNBONDED FREE LENGTH CRITERIA BUT WHICH FAIL THE EXTENDED CREEP TEST AT THE TEST LOAD MAY BE
POST-GROUTED AND SUBJECTED TO AN ENHANCED CREEP CRITERION. THIS ENHANCED CRITERION REQUIRES A CREEP MOVEMENT OF NOT MORE THAN 0.04 INCH BETWEEN 1
MINUTE AND 60 MINUTES AT TEST LOAD. ANCHORS WHICH SATISFY THE ENHANCED CREEP CRITERION SHALL BE LOCKED OFF AT THE DESIGN LOCK-OFF LOAD. ANCHORS WHICH
CANNOT BE POST- GROUTED OR REGROUTABLE ANCHORS THAT DO NOT SATISFY THE ENHANCED CREEP CRITERION SHALL EITHER BE REJECTED OR LOCKED OFF AT 50% OF THE
MAXIMUM ACCEPTABLE TEST LOAD ATTAINED.
ANCHOR LOCK-OFF:
A. AFTER TESTING HAS BEEN COMPLETED, THE LOAD IN THE ANCHOR SHALL BE SUCH THAT AFTER SEATING LOSSES (I.E., WEDGE SEATING), THE SPECIFIED LOCK-OFF LOAD HAS BEEN
APPLIED TO THE ANCHOR. IF NO LOCK-OFF LOAD IS PROVIDED ON THE PLANS, THE LOCK-OFF LOAD IS TO BE BETWEEN 75 AND 100 PERCENT OF THE ANCHOR DESIGN LOAD.
B-601
R O
C
H O
R
T
E S
T I N
G
N O
T E
S
H K
P
K P
L
J H
M
A
M E
N D
M E
STRESSING, LOAD TESTING AND ACCEPTANCE:
GENERAL: EACH ROCK ANCHOR SHALL BE TESTED. NO LOAD GREATER THAN TEN (10) PERCENT OF THE DESIGN LOAD CAN BE APPLIED TO THE ROCK ANCHOR PRIOR TO
TESTING. THE MAXIMUM TEST LOAD SHALL BE NO LESS THAN 1.33 TIMES THE DESIGN LOAD AND SHALL NOT EXCEED 80 PERCENT OF THE SPECIFIED MINIMUM ULTIMATE
TENSILE STRENGTH (SMTS) OF THE PRESTRESSING STEEL OF THE ANCHOR.
STRESSING EQUIPMENT: THE TESTING EQUIPMENT SHALL CONSIST OF:
A DIAL GAUGE OR VERNIER SCALE CAPABLE OF MEASURING TO THE NEAREST 0.001 INCH SHALL BE USED TO MEASURE THE ROCK ANCHOR MOVEMENT. THE
MOVEMENT-MEASURING DEVICE SHALL HAVE A MINIMUM TRAVEL EQUAL TO TWICE THE THEORETICAL ELASTIC ELONGATION OF THE TOTAL ANCHOR LENGTH AT THE
MAXIMUM TEST LOAD AND IT SHALL HAVE ADEQUATE TRAVEL, SO THE ROCK ANCHOR MOVEMENT CAN BE MEASURED WITHOUT RESETTING THE DEVICE AT AN INTERIM
POINT.
A HYDRAULIC JACK AND PUMP SHALL BE USED TO APPLY THE TEST LOAD. THE JACK AND A CALIBRATED PRIMARY PRESSURE GAUGE SHALL MEASURE THE APPLIED
LOAD. TESTING CANNOT COMMENCE UNTIL THE ENGINEER OF RECORD AND THE CONTRACTING OFFICER HAS APPROVED THE CALIBRATION. THE PRIMARY PRESSURE
GAUGE SHALL BE GRADUATED IN 100 PSI INCREMENTS OR LESS. STRESSING EQUIPMENT SHALL BE CAPABLE OF STRESSING THE WHOLE ANCHOR IN ONE STROKE TO
THE SPECIFIED TEST LOAD AND THE EQUIPMENT SHALL BE CAPABLE OF STRESSING THE ANCHOR TO THE MAXIMUM SPECIFIED TEST LOAD WITHIN 75 PERCENT OF THE
RATED CAPACITY. THE PUMP SHALL BE CAPABLE OF APPLYING EACH LOAD INCREMENT IN LESS THAN 60 SECONDS.
THE EQUIPMENT SHALL PERMIT THE ANCHOR TO BE STRESSED IN INCREMENTS SO THAT THE LOAD IN THE ANCHOR CAN BE RAISED OR LOWERED IN ACCORDANCE WITH
THE TEST SPECIFICATIONS AND ALLOW THE ANCHOR TO BE LIFT-OFF TESTED TO CONFIRM THE LOCK-OFF LOAD.
A CALIBRATED REFERENCE PRESSURE GAUGE SHALL ALSO BE KEPT AT THE SITE TO PERIODICALLY CHECK THE PRODUCTION (I.E., PRIMARY PRESSURE) GAUGE. THE
REFERENCE GAUGE SHALL BE CALIBRATED WITH THE TEST JACK AND PRIMARY PRESSURE GAUGE. THE REFERENCE PRESSURE GAUGE SHALL BE STORED INDOORS
AND NOT SUBJECTED TO ADVERSE TREATMENT.
THE CONTRACTOR SHALL PROVIDE AN ELECTRICAL RESISTANCE LOAD CELL AND READOUT TO BE USED WHEN PERFORMING AN EXTENDED CREEP TEST.
THE STRESSING EQUIPMENT SHALL BE PLACED OVER THE ROCK ANCHOR IN SUCH A MANNER THAT THE JACK, BEARING PLATES, LOAD CELLS AND STRESSING
ANCHORAGE ARE AXIALLY ALIGNED WITH THE TENDON AND THE TENDON IN CENTERED WITHIN THE EQUIPMENT.
LOAD TESTING SETUP:
A. DIAL GAUGES SHALL BEAR ON THE PULLING HEAD OF THE JACK AND THEIR STEMS SHALL BE COAXIAL WITH THE ANCHOR DIRECTION. THE GAUGES SHALL BE
SUPPORTED ON AN INDEPENDENT, FIXED FRAME, WHICH WILL NOT MOVE AS A RESULT OF STRESSING OR OTHER CONSTRUCTION ACTIVITIES DURING THE
OPERATION.
B. PRIOR TO SETTING THE DIAL GAUGES, AN ALIGNMENT LOAD (AL) OF NO MORE THAN 5 % OF DESIGN LOAD SHALL BE PLACED ON THE ANCHOR.
C. STRESSING SHALL NOT BEGIN BEFORE THE GROUT HAS REACHED ADEQUATE STRENGTH.
PERFORMANCE TESTS:
A. THE NUMBER OF ROCK ANCHORS AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER OF RECORD SHALL BE PERFORMANCE TESTED IN ACCORDANCE
WITH THE PROCEDURES DESCRIBED BELOW. THE ENGINEER OF RECORD SHALL SELECT THE GROUND ANCHORS TO BE PERFORMANCE TESTED. THE REMAINING
GROUND ANCHORS SHALL BE TESTED IN ACCORDANCE WITH THE PROOF TEST PROCEDURES (SEE PART 5).
B. THE PERFORMANCE TEST SHALL BE MADE BY INCREMENTALLY LOADING AND UNLOADING THE ROCK ANCHOR IN ACCORDANCE WITH THE SCHEDULE PROVIDED. THE
LOAD SHALL BE RAISED FROM ONE INCREMENT TO ANOTHER IMMEDIATELY AFTER RECORDING THE ROCK ANCHOR MOVEMENT. THE ROCK ANCHOR MOVEMENT
SHALL BE MEASURED AND RECORDED TO THE NEAREST 0.001 INCH WITH RESPECT TO AN INDEPENDENT FIXED POINT AT THE ALIGNMENT LOAD AND AT EACH
INCREMENT OF LOAD. THE LOAD SHALL BE MONITORED WITH THE PRIMARY PRESSURE GAUGE. THE REFERENCE PRESSURE GAUGE SHALL BE PLACED IN SERIES
WITH THE PRIMARY PRESSURE GAUGE DURING EACH PERFORMANCE TEST. IF THE LOAD DETERMINED BY THE REFERENCE PRESSURE GAUGE AND THE LOAD
DETERMINED BY THE PRIMARY PRESSURE GAUGE DIFFER BY MORE THAN TEN (10) PERCENT, THE JACK, THE PRIMARY PRESSURE GAUGE AND THE REFERENCE
PRESSURE GAUGE SHALL BE RECALIBRATED AT NO EXPENSE TO THE GOVERNMENT. AT LOAD INCREMENTS OTHER THAN THE MAXIMUM TEST LOAD, THE LOAD
SHALL BE HELD JUST LONG ENOUGH TO OBTAIN THE MOVEMENT READING.
C. THE MAXIMUM TEST LOAD IN A PERFORMANCE TEST SHALL BE HELD FOR TEN (10) MINUTES. (SEE PERFORMANCE TEST & SCHEDULE TABLE BELOW).
D. THE JACK SHALL BE ADJUSTED AS NECESSARY IN ORDER TO MAINTAIN A CONSTANT LOAD. THE LOAD-HOLD PERIOD SHALL START AS SOON AS THE MAXIMUM TEST LOAD IS APPLIED
AND THE ROCK ANCHOR MOVEMENT, WITH RESPECT TO A FIXED REFERENCE, SHALL BE MEASURED AND RECORDED AT 1 MINUTE, 2, 3, 4, 5, 6 AND 10 MINUTES. IF THE ROCK
ANCHOR MOVEMENT BETWEEN ONE (1) AND TEN (10) MINUTES EXCEEDS 0.04 INCH, THE MAXIMUM TEST LOAD SHALL BE HELD FOR AN ADDITIONAL 50 MINUTES. IF THE LOAD-HOLD IS
EXTENDED, THE ROCK ANCHOR MOVEMENT SHALL BE RECORDED AT 15 MINUTES, 20, 30, 40, 50 AND 60 MINUTES.
PROOF TESTS:
THE PROOF TEST SHALL BE PERFORMED BY INCREMENTALLY LOADING THE ROCK ANCHOR IN ACCORDANCE WITH THE FOLLOWING SCHEDULE. THE LOAD SHALL BE RAISED
FROM ONE INCREMENT TO ANOTHER IMMEDIATELY AFTER RECORDING THE ROCK ANCHOR MOVEMENT. THE ROCK ANCHOR MOVEMENT SHALL BE MEASURED AND RECORDED
TO THE NEAREST 0.001 INCH WITH RESPECT TO AN INDEPENDENT FIXED REFERENCE POINT AT THE ALIGNMENT LOAD AND AT EACH INCREMENT OF LOAD. THE LOAD SHALL BE
MONITORED WITH THE PRIMARY PRESSURE GAUGE. AT LOAD INCREMENTS OTHER THAN THE MAXIMUM TEST LOAD, THE LOAD SHALL BE HELD JUST LONG ENOUGH TO OBTAIN
THE MOVEMENT READING.
B
C
B
E
C
C
BM
W
W
W
W
W
E
D
E
C
C B
S
E
C
C
P
E
S
SS
D
C
W W
A
C
A
C
E
E
C B
C
B
E
E
C B
C B
C
B
C P
A C
A C
E
C
B
S
C B
S
C B
E
E
D
C B
C
C B
C
D
C B
A
C
D
C P
S
S
S
S
D
S
D
S
D
P
V
C
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S A
N
S A
N
S
A
N
S
S A
N S
A N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S A
N
S A
N
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
A
N
S
A
N
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S D
S D
S D
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
D
S
D
S
D
S
D
S D
S D
S
D
S
D
S
D
S
D
S
D
S D
S D
S D
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
BRICK
BUILDING
(ELECTRICAL)
CONC
STAIRS
6' CHAIN LINK FENCE
GAS LINE ENCLOSURE
SHED
STONE
RETAINING WALL
STAIRS
RETAINING
WALL
RESERVED
PARKING
15 MPH
RESERVED
PARKING
ASPH. GUTTER
YIELD
15MPH
RESTRICTED PARKING
E
E
E
E
E
E
E
E
E
E
E
E
E
E
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
E
E
E E
E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
C O
M M
H
P
S
H
P
S
H P
S
H P
S
H P
S
H P
S
H P
S
H P
S
H P
S
H P
S
H P
S
H P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M
M
C
O
M
M
C O
M
M
C O
M
M
C O
M
M
C O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
SAMH2487K29
RIM:154.76
(S) INV. IN:148.72
(SW) INV. IN:149.17
(W) INV. IN:149.17
INV. OUT:148.64
RIM:153.30
(S) INV. IN:149.02
(SW) INV. IN:148.99
(W) INV. IN:149.88
INV. OUT:148.92
SAMH2467K29
RIM:152.91
(S) INV. IN:149.36
(SW) INV. IN:149.91
INV. OUT:149.28
SWMH2477K29
RIM:153.22
(S) INV. IN:150.04
(SW) INV. IN:150.12
INV. OUT:149.97
SAMH9328K29
RIM:194.76
INV. IN:190.86
INV. OUT:190.43
RIM:200.99
TREE ROOT
OVER LID
SAMH9335K29
RIM:193.77
INV. IN:188.09
INV. OUT:188.46
STCB2483K29
RIM:146.24
INV. IN:141.62
INV. OUT:140.54
STCB2481K29
RIM:146.43
INV. OUT:143.11
STMH2488K29
RIM:155.45
(E) INV. OUT:150.40
(SW) INV. IN:150.65 (SEALED)
(W) INV. IN:150.65
RIM:151.77
(N) INV. OUT:145.52
(SW) INV. IN:147.22
STMH2506K29
RIM:159.83
(N) INV. IN:157.63
(E) INV. OUT:157.83
(S) INV. IN:157.23
(SE) INV. IN:158.13
(W) INV. IN:157.63
STMH2478K29
RIM:152.30
(W) INV. IN:148.10
(NW) INV. IN:148.35
INV. OUT:148.10
STCF9336K29
RIM:177.11
(SE) INV. IN:176.06
(SW) INV. IN:176.11
INV. OUT:175.91
6" PVC
STCF9337K29
RIM:187.46
INV. OUT:186.12
STCF9327K29
RIM:194.00
INV. IN:191.56
INV. OUT:191.30
STCB2501K29
RIM:165.08
INV. OUT:163.83
STCB2502K29
RIM:166.51
INV. OUT:162.81
STMH2510K29
RIM:182.40
(SW) INV. IN:179.40
(S) INV. IN:179.29
INV. OUT:179.15
STCF9337K29
RIM:195.73
INV. OUT:192.68
STCB2511K29
RIM:181.97
INV. OUT:179.70
STCB2496K29
RIM:169.91
INV. IN:165.29
INV. OUT:165.21
STCB2491K29
RIM:158.08
(SE) INV. IN:155.18
(SW) INV. IN:155.18
INV. OUT:155.15
STMH2498K29
RIM:179.16
(S) INV. IN:175.32
(W) INV. IN:175.23
INV. OUT:175.26
STMH2493K29
RIM:165.70
(SE) INV. IN:163.44
(NW) INV. IN:163.61
INV. OUT:163.02
STCB2492K29
RIM:158.22
(NE) INV. OUT:156.52
(NW) INV. OUT:156.42
STCB2499K29
RIM:178.92
INV. OUT:176.67
STORY
WOOD
FRAME
HOUSE
#9
4 B
AY
BRIC
K
GARAGE
2 STORY
WOOD FRAME
HOUSE
#10
S
T
O
T
A
I
N
I
W
L
L
W
I
L
S
A
D
W
I
L
S
A
D
1" TO 30"
WOODED AREA
1" - 30" MIXED
WOODED AREA
C
O
N
T
T
E
R
T H
A Y
E R
R O
A D
(A S
P H
A L T
G
U
I D
E
R
A
I
I
I L
W BEAM GUIDE RAIL
GARAGE
#20
P
O
R
C
H
P
O
R
C
H
STORY
BRICK
HOUSE
#8
2 STORY
WOOD
FRAME
HOUSE
#7
2 STORY
WOOD
FRAME
HOUSE
#6
T
H
A
Y
A
D
A
S
P
H
A
L
T
R
E
T
A
I N
I
L
L
S
T
O
T
A
I N
I
L
L
F R
E N
C H
D R
A
IN
W
O
R
B
A
S
P
H
W
A
L
K
C
O
N
C
G
U
T
T
E
R
C
O
N
C
G
U
T
T
E
R
R
E
T
A
I N
I
L
L
R
E
T
A
I N
I
L
L
R
E T
A
IN
IN
G
W
A L L
R
E
T
A
I N
I
L
L
C
H
A
N
C
E
A
S
P
H
W
A
L
K
A
S
P
H
W
A
L
K
C
O
N
C
W
A
L
K
C
O
N
C
W
A
L
K
C O
N C
. W
A L K
S T
N . R
E T
A
IN
IN
G
W A
L L
C O
N C
. C U
R B
C O
N C
. C U
R B
C
O
N
C
C
U
R
B
C
O
N
C
C
U
R
B
P
O
R
C
H
S
T
O
L
K
S
T
A
I R
S
P
A
T
I O
S
T
A
I R
S
P
O
R
C
H
P
L
A
N
T
I
D
S
T
N
R
E
T
A
I N
I
L
L
R
E
T
A
I N
I
L
L
C
O
N
C
S
T
A
I R
S
R
E
T
A
I N
I N
G
W
A
F
E
N
C
E
W
I L
S
A
D
A
S
P
H
A
L
T
W
I L
S
A
D
R
E
T
A
I N
I N
G
W
A
L
L
S
T
A
I R
S
C
O
N
N
N
E
L
P
O
R
C
H
CONC. G
UTTER
D
E
C
K
COVERED
PORCH
C
O
N
D
U
I T
F
R
E
N
A
I
N
4"
ORN.
S T
O P
STOP
30"
OAK
24" OAK
5"
OAK
16"
LOCUST
14"
OAK
18"
SYC.
1" - 30" M
IX
E D
W O
O D
E D
A R
E A
ASPH.
PARKING
LOT
RIP RAP DITCH
24"
OAK
ASPH.
DRIVE
24"
OAK
ASPH.
DRIVE
16"
OAK
24"
OAK
W
O
O
D
E
N
T
R
A
C
L
O
S
E
R
8"
PINE
6"
PINE
30"
OAK
L
E
D
G
E
12"
SPRUCE
10"
BEECH
6"
PINE
8"
PINES
24"
OAK
P
A
T
I O
S
T
N
W
A
L
L
S
T
A
I R
S
8"
ORN.
36"
OAK
P
P
R
C
P
C
I P
V
P
P
C
P
P
V
C
P
P
V
C
P
P
V
C
R
C
P
P
10" CIP
P
C
R
C
P
P
V
C
C
R
C
P
" R
C P
R
C
P
R
C
P
P
" H
D P
E
P
P
P
R
C P
8"
PINE
13"
APPLE
T
E
N
A
R
K
I N
G
4'
STOCKADE
FENCE
RESIDENTIAL
ONE
WAY
NO
PARKING
48"
OAK
G
G
G
G
G
G
G
G
G
G
G
G P
S
S
A
N
S
A
N
C
TENANT
PARKING
TENANT
PARKING
DO NOT
ENTER
S
T
N
R
E
T
A
I N
I
L
L
C
O
N
C
P
O
R
C
H
S
T
A
I R
S
S T
N . R
E T
. W A
LL
I R
N
C
E
WOODED AREA
WITH VISIBLE
BOULDERS
D
R
A
I
N
A
A
L
E
C
O
N
C
C
U
R
B
S T
N
R
E T
A I N
IN
L L
C
O
N
C
C
U
R
B
CONC. MH
VAULT
S
A
N
X
X
X
X
G
G
G
G
G
G
G
G
G
G
G
G
G
G
P
10" PVC
EXISTING WATERLINE PER
WEST POINT GIS MAPPING
APPROXIMATE LOCATION OF
EXISTING WATERLINE WITHIN
WODDED AREA PATH
W W W W W W W W W W W W W W
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
MEET
EXISTING
N
NOTES:
1. THE ENTIRE AREA WITHIN THE LIMIT OF PROJECT AREA SHALL
BE CLEARED AND REGRADED AS REQUIRED FOR
CONSTRUCTION OF THE PROPOSED IMPROVEMENTS.
2. CONTRACTOR TRAILERS AND/OR MATERIAL STORAGE SHALL BE
KEPT WITHIN THE LIMIT OF PROJECT AREA. REFER TO SHEET
CS108 FOR ADDITIONAL STORAGE AND STAGING AREAS AND
TRUCK ACCESS.
3. EXCAVATE ROCK TO DEPTHS AS REQUIRED FOR
CONSTRUCTION OF SITE IMPROVEMENTS.
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
US Army Corps of Engineers
N E
W
Y
O R
K
D
I S
T R
I C
T
F
E D
E R
A L
P
L A
Z A
N E
W
Y
O R
K
N
Y
W D
S D
M A
Y
A N
S I
D
W D
S D
W E
I N
T
N
Y
C Y
B E
G
I N
E E
R I N
G
A C
A D
E M
N
T E
R
A
R
K I N
G
S
T R
U C
T U
R E
F Y
P
N
F
Y
P
N
RTA SUBMISSION
G C
J M
D P
K M
D E
M O
L I T
I O
N
P
L A
N
S
O U
T H
C I V
I L
CD102
M A
T C
H
L
I N
E
C
D
30' 60'0
N
A1
DEMOLITION PLAN - SOUTH
SCALE: 1"=30'
SHEET KEYNOTES
1. INDIVIDUAL TREE(S) TBR (TYP.)
2. ASPHALT PAVEMENT / ASPHALT WALKWAY TBR
3. COMMUNICATION CONDUIT / DUCTBANK / MANHOLE / CABLING TBR
4. ELECTRICAL CONDUIT / DUCTBANK / MANHOLE TBR
5. CONCRETE DRAINAGE GUTTER TBR
6. STORM DRAINAGE PIPING SYSTEM AND STRUCTURES TBR (TYP.)
7. RETAINING WALL(S) AND STAIRS TBR (TYP.)
8. IRON FENCE AND GATE(S) TBR
9. SIGNAGE TBR (TYP.)
10. GUARDRAIL TBR
11. WOOD FRAME HOUSE / DECK / PORCH / PATIO / AC UNIT / BILCO DOOR,
ETC. TBR
12. STONE WALL(S) TBR (TYP.)
13. CONCRETE CURBING TBR (TYP.)
14. RIP RAP DRAINAGE TBR
15. LIGHT(S) UTILITY POLE(S) TBR (TYP.)
16. CONCRETE WALKWAY TBR (TYP.)
17. CONCRETE / STONE STAIRS TBR (TYP.)
18. SANITARY LINE TBR (TYP.)
19. SAW CUT EXISTING PAVEMENT
20. PAVEMENT REMOVAL FULL DEPTH FOR UTILITY INSTALLATION
21. PAVEMENT 2" MILLING
22. APPROXIMATE LIMIT OF PROJECT AREA
23. APPROXIMATE LIMIT OF ROCK EXCAVATION
24. WOODED AREA TO BE CLEARED OF ALL VEGETATION
25. WATERMAIN TBR, CUT & CAP @ EXISTING TO REMAIN, ALL LOCATIONS
26. APPROXIMATE LIMIT OF WOODED AREA REMOVAL. NEW TREE LINE
27. GARAGE AND ASPHALT DRIVE TBR
28. RETAINING WALL TBR (EXISTING WALL #27)
29. CHAIN LINK FENCE TBR
A M
E N
D M
E N
T
A M
E N
D M
E N
T
AutoCAD SHX Text
CBS51
AutoCAD SHX Text
CBS52
AutoCAD SHX Text
CBS53
AutoCAD SHX Text
CBS54
AutoCAD SHX Text
CBS55
AutoCAD SHX Text
SB2
AutoCAD SHX Text B1
AutoCAD SHX Text
B1 (PHASE II)
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
US Army Corps of Engineers
N E
W
Y
O R
K
D
I S
T R
I C
T
F
E D
E R
A L
P
L A
Z A
N E
W
Y
O R
K
N
Y
W D
S D
M A
Y
A N
S I
D
W D
S D
W E
I N
T
N
Y
C Y
B E
G
I N
E E
R I N
G
A C
A D
E M
N
T E
R
A
R
K I N
G
S
T R
U C
T U
R E
F Y
P
N
F
Y
P
N
RTA SUBMISSION
G C
J M
D P
K M
C O
N S
T R
U C
T I O
N
D
E T
A I L S
C I V
I L
C-515
E1
CHILLED WATER TRENCH
NOT TO SCALE
75"
8" 60" 8"
TRENWA PRECAST
CONCRETE TRENCH,
OR APPROVED EQUAL
WATER TIGHT
NEOPRENE
BEARING PAD
IMPACT CHANNEL
TYPICAL SECTION (24"x60" INSIDE DIMENSION)
E3
NOT TO SCALE
CONCRETE PRECAST
TRENCH BOX (TYP.)
EXISTING GRADE
NYSDOT SUBBASE
TYPE 2
6"
(TYP.)
CHIP AWAY
EXISTING ROCK
E5
NOT TO SCALE
12"
M
I N
NATIVE SOIL BACK FILL
(TYP.)
EXISTING / PROPOSED
GRADE AS REQUIRED
NOTES:
1. PRECAST TRENCH SHALL BE DESIGNED FOR H20
LOADING.
2. PRECAST TRENCH SECTIONS SHALL BE 10' +/-.
NYSDOT SUBBASE
TYPE 2
E8
4" PERFORATED PIPE DRAIN
NOT TO SCALE
16"
FILTER FABRIC
4" PERFORATED
PVC PIPE
MIN. EQUAL TO
PIPE DIA.
4" MIN. (VARIES)
WALL
S L O
P E
T O
W
A R
D D
R A
IN
NYSDOT CRUSHED GRAVEL TYPE 1
EXISTING UNDISTURBED SOIL /
COMPACTED STRUCTURAL FILL
D8
SWALE DETAIL (SW-2)
NOT TO SCALE
3'
EXISTING UNDISTURBED SOIL /
COMPACTED STRUCTURAL FILL
COMPACT TO 90% MODIFIED
PROCTOR DENSITY (ASTM D-1557)
FINISHED GRADE
NOTE:
SEE DRAINAGE & UTILITY PLANS FOR SWALE SIZE & LOCATION.
3'
2'
0.5
SERVICE AREA
DRIVE CURB FACE
ROCK SLOPE AT
GRADE
"O"- RING WATERTIGHT
RUBBER GASKET JOINT PER
ASTM - 443
PRECAST PIPE OPENING
WITH INTEGALLY CAST
FLEXIBLE PIPE CONNECTOR
ASTM-923
FIRST PIECE 1'- 4" MAXIMUM
LENGTH OUTGOING PIPE
6" CRUSHED STONE
EXISTING UNDISTURBED SOIL /
COMPACTED STRUCTURAL FILL
4,000 PSI CONCRETE
90 P.V.C. ELBOW
6" MIN. CONCRETE ENCASEMENT
VARIABLE LENGTH
P.V.C.BEND AS REQUIRED
INCOMING PIPE
D
D
BENCHING
NON-SHRINK GROUT
OR APPROVED EQUAL
FOR CONSTRUCTION ABOVE
THIS POINT, SEE PRECAST
MANHOLE DETAIL
45° P.V.C. WYE BRANCH
(TEE IF DROP IS LESS
THAN 3'- 6")
A8
SANITARY DROP MANHOLE
NOT TO SCALE
" 3
1 2
1 4
3" 3"
3'-1 1/2" (TYP.)
4 x 9 ROUGH - SAWN
TIMBER GUARDRAIL
BLOCKOUT
6 x 10 x 9' - 11 1/2"
LONG ROUGH - SAWN
TIMBER GUARDRAIL
6"
4"
3/4"
CONCRETE
PAD
12"
(4) - 1" DIA. HIGH STRENGTH
(A325) KELBOND ANCHOR BOLTS
IN 1
" DIA. PREDRILLED HOLES
OR APPROVED EQUAL
T
O
G
R O
U N
D
M
I N
BASE PLATE
W6 X 20 POST
SECTION "A"
4 x 9 ROUGH - SAWN
TIMBER GUARDRAIL
BLOCKOUT
W6 X 20 POST
6 x 10 x 9' - 11 1/2" LONG
ROUGH - SAWN TIMBER
GUARDRAIL
BASE PLATE MOUNTING
FOR TIMBER GUIDERAIL
A
A
PLAN VIEW
STEEL BLOCKING PLATE
NOTE:
SEE SHEET C-516 FOR ADDITIONAL GUIDE RAIL
INFORMATION.
A1
SURFACE MOUNTED GUIDERAIL DETAIL
NOT TO SCALE
E
Q U
A
C E
1 1/2" DIA. STAINLESS
STEEL HANDRAIL
1 1/2" DIA. STAINLESS
STEEL POST @ 5'-0" O.C.
(MAX.)
(TYP.)
A5
SURFACE MOUNTED HANDRAIL DETAIL
NOT TO SCALE
6"x6"x1/2" THICK
STAINLESS STEEL
PLATE W/4 1/2" DIA. x 6"
LONG ANCHOR BOLTS
CONCRETE
LOADING DOCK
6" OPENING W/ SLOTTED
COVER AND DRAIN TO
DAYLIGHT EVERY 50'
NOTE:
PROVIDE EXTERIOR DRAINAGE SYSTEM PER CHILLED WATER
TRENCH INSTALLATION IN SOIL DETAIL.
NOTE:
PROVIDE EXTERIOR DRAINING SYSTEM ENTIRE LENGTH, PROVIDE
DISCHARGE PIPE TO DAY LIGHT EVERY 20'
FILTER FABRIC
NYSDOT CRUSHED
GRAVEL TYPE 1
18"
(MIN.)
3" RIP RAP
6" THICK
6" PERFORATED
PVC PIPE
6" SOLID WALL PVC PIPE
@ 0.50% MIN.
DISCHARGE PIPE
DAY LIGHT PIPE
PROVIDE 3'x3'x6" RIP
RAP PAD
12"THICK
CHILLED WATER TRENCH
INSTALLATION IN ROCK
CHILLED WATER TRENCH
INSTALLATION IN SOIL
EXTERIOR
DRAINAGE
SYSTEM
SOD
SOD ENTIRE WIDTH OF SWALE
C8
SWALE DETAIL (SW-1)
NOT TO SCALE
3'
EXISTING UNDISTURBED SOIL /
COMPACTED STRUCTURAL FILL
COMPACT TO 90% MODIFIED
PROCTOR DENSITY (ASTM D-1557)
FINISHED GRADE
NOTE:
SEE DRAINAGE & UTILITY PLANS FOR SWALE SIZE & LOCATION.
3'
5'
SOD
SOD ENTIRE WIDTH OF SWALE
A M
E N
D M
E N
T
ELEVATION VIEW
GRADE RING/RISER
PER MANUFACTURER
CONTRACTOR TO GROUT
TO FINISHED GRADE
S U
M P
T Y
P
STEP
TYP.
TRANSFER OPENING
TRANSFER
OPENING
PLAN VIEW
(TOP SLAB NOT SHOWN FOR CLARITY)
DRAINDOWN
CARTRIDGE
DECK
WEIR
INLET
BAY
HI FLO
CARTRIDGE
STEPS
(LOCATION
MAY VARY)
OUTLET
BAY
BYPASS
WEIR
FLOATABLES
BAFFLE
OUTLET
TRANSFER
OPENING
INLET
TRANSFER
OPENING
CARTRIDGE DECK
CARTRIDGE
FRAME AND COVER
(PER MANUFACTURER)
11'-0"
INLET PIPE
OUTLET PIPE
BOTTOM OF
FLOATABLES
BAFFLE
TOP OF
BYPASS WEIR
SECTION A-A
DRAINDOWN
CARTRIDGE
CARTRIDGE
DECK
MAINTENANCE
ACCESS WALL
HI-FLO
CARTRIDGE
MAINTENANCE
ACCESS WALL
(M.A.W.)
CONTRACTOR TO GROUT
TO FINISHED GRADE
GRADE
RINGS/RISERS
OUTLET
PIPE
CARTRIDGE
DECK
SEPARATOR
SKIRT
INLET PIPE
(STANDARD 6" ABOVE
OUTLET, MAY VARY)
FRAME AND COVER
(PER MANUFACTURER)
6'-0"
PLAN VIEW
STEPS
(LOCATION
MAY VARY)
FLOW
F
L
O
W
A
A
N
M
A T
C H
M
O
H
A T
C H
M
I N
FIBERGLASS SEPARATION
CYLINDER AND INLET
CENTER OF STRUCTURE,
SCREEN AND SUMP OPENING
PVC HYDRAULIC
SHEAR PLATE
1'-9"
FIBERGLASS
SEPARATION CYLINDER
AND INLET
SOLIDS STORAGE
SUMP
SEPARATION
SCREEN
INLET PIPE
(MULTIPLE INLET PIPES
MAY BE ACCOMMODATED)
OUTLET PIPE
PVC HYDRAULIC
SHEAR PLATE
M A
Y
V
A R
Y
FLOW
PERMANENT
POOL ELEV.
OIL BAFFLE
SKIRT
CONTRACTOR TO GROUT
TO FINISHED GRADE
GRADE
RINGS/RISERS
A
A
48" [1219] I.D. MANHOLE
STRUCTURE
TOP SLAB ACCESS
V A
R I E
S
M
A
X
F
L
O
W
+/-65°
M A
X
BB
FRAME AND COVER
(PER MANUFACTURER)
PLAN VIEW B-B
ELEVATION A-A
WATER QUALITY DESIGN NOTES
CARTRIDGE LENGTH
FLOW RATE HIGH-FLO / DRAINDOWN (CFS) (PER CART)
CARTRIDGE SELECTION
OUTLET INVERT TO STRUCTURE INVERT (A)
MAX. TREATMENT (CFS)
4.90 3.67 2.45 1.36
15"27"40"54"
0.049 / 0.0250.089 / 0.0450.133 / 0.0670.178 / 0.089
3'-3"4'-3"5'-4"6'-6"
DECK TO INSIDE TOP (MIN) (B)
5.00
THE TREATMENT CAPACITY IS A FUNCTION OF THE CARTRIDGE LENGTH AND THE NUMBER OF CARTRIDGES. THE
STANDARD PEAK DIVERSION STYLE WITH PRECAST TOP SLAB IS SHOWN. ALTERNATE OFFLINE VAULT AND/OR SHALLOW
ORIENTATIONS ARE AVAILABLE. A NYSDEC 1.40" WQ PEAK CONVEYANCE CAPACITY OF 3.35 CFS SHALL BE USED.
4.00 4.00 4.00
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
US Army Corps of Engineers
N E
W
Y
O R
K
D
I S
T R
I C
T
F
E D
E R
A L
P
L A
Z A
N E
W
Y
O R
K
N
Y
W D
S D
M A
Y
A N
S I
D
W D
S D
W E
I N
T
N
Y
C Y
B E
G
I N
E E
R I N
G
A C
A D
E M
N
T E
R
A
R
K I N
G
S
T R
U C
T U
R E
F Y
P
N
F
Y
P
N
RTA SUBMISSION
G C
J M
D P
K M
C O
N S
T R
U C
T I O
N
D
E T
A I L S
C I V
I L
C-517
A1
WATER QUALITY UNIT #1 DETAIL (WQS-1)
NOT TO SCALE
A5
WATER QUALITY UNIT #2 DETAIL (WQS-2)
NOT TO SCALE
C8
WATER QUALITY UNIT #3 AND #4 DETAIL (WQS-3 AND WQS-4)
NOT TO SCALE
GENERAL NOTES:
1. CONTRACTOR SHALL PROVIDE ALL REQUIRED MATERIALS ASSOCIATED WITH THE WATER QUALITY STRUCTURE.
2. THE WATER QUALITY STRUCTURE SHALL BE DESIGNED TO TREAT THE PEAK NYSDEC 1.40" WQ FLOW RATE OF 3.35 CFS WITH A VOLUME OF 12,647
CF. CONTRACTOR TO CONFIRM STRUCTURE MEETS REQUIREMENTS OF PROJECT.
3. PRECAST STRUCTURE, FRAMES, AND COVERS SHALL MEET AASHTO HS-25 LOADING.
4. CONTRACTOR SHALL CONFIRM ACTUAL GROUNDWATER ELEVATION PRIOR TO CONSTRUCTION.
5. STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C-857, ASTM C-918, AND AASHTO LOAD FACTOR DESIGN METHOD.
6. OUTLET PIPE INVERT IS EQUAL TO THE CARTRIDGE DECK ELEVATION.
7. THE OUTLET PIPE DIAMETER FOR NEW INSTALLATIONS IS RECOMMENDED TO BE ONE PIPE SIZE LARGER THAN THE INLET PIPE AT EQUAL OR
GREATER SLOPE.
INSTALLATION NOTES
A. THE CONTRACTOR SHALL PROVIDE ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS THAT ARE SITE-SPECIFIC DESIGN
CONSIDERATIONS. REQUIRED INSTALLATION MEASURES SHALL BE DESIGNED BY THE MANUFACTURER OR BY A PROFESSIONAL ENGINEER
LICENSED IN THE STATE OF NEW YORK.
B. CONTRACTOR SHALL PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE STRUCTURE.
C. CONTRACTOR SHALL INSTALL AND LEVEL THE STRUCTURE, SEALING THE JOINTS, LINE ENTRY AND EXIT POINTS (NON-SHRINK GROUT WITH
APPROVED WATERSTOP OR FLEXIBLE BOOT).
D. CONTRACTOR SHALL TAKE APPROPRIATE MEASURES TO PROTECT CARTRIDGES FROM CONSTRUCTION-RELATED EROSION RUNOFF.
E. CARTRIDGE INSTALLATION SHALL OCCUR ONLY AFTER SITE HAS BEEN STABILIZED AND THE UNIT IS CLEAN AND FREE OF DEBRIS. CONTACT THE
MANUFACTURER TO COORDINATE CARTRIDGE INSTALLATION WITH SITE STABILIZATION.
WATER QUALITY DESIGN NOTES
THE TREATMENT CAPACITY IS A FUNCTION OF THE CARTRIDGE SELECTION AND THE NUMBER OF CARTRIDGES.
THE STANDARD MANHOLE STYLE IS SHOWN. Ø72" MANHOLE PEAK TREATMENT CAPACITY IS 1.16 CFS. IF THE SITE
CONDITIONS EXCEED 1.16 CFS AN UPSTREAM BYPASS STRUCTURE IS REQUIRED.
CARTRIDGE DEPTH
FLOW RATE HIGH-FLO / DRAINDOWN (cfs) (per cart)
15"
CARTRIDGE SELECTION
27"40"54"
0.05 / 0.0250.09 / 0.0450.13 / 0.0650.18 / 0.09
MAX. CARTS HIGH-FLO / DRAINDOWN 6 / 1
3'-2"OUTLET INVERT TO STRUCTURE INVERT (A) 4'-2"5'-3"6'-5"
GENERAL NOTES:
1. CONTRACTOR SHALL PROVIDE ALL MATERIALS ASSOCIATED WITH THE WATER QUALITY STRUCTURE.
2. THE WATER QUALITY STRUCTURE SHALL BE DESIGNED TO TREAT THE PEAK NYSDEC 1.40" WQ FLOW RATE OF 0.73 CFS
WITH A VOLUME OF 3,200 CF. CONTRACTOR TO CONFIRM STRUCTURE MEETS REQUIREMENTS OF PROJECT.
3. PRECAST STRUCTURE, FRAMES, AND COVERS SHALL MEET AASHTO HS-25 LOADING.
4. CONTRACTOR SHALL CONFIRM ACTUAL GROUNDWATER ELEVATION PRIOR TO CONSTRUCTION.
5. STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C-857, ASTM C-918, AND AASHTO LOAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .