Amendment 0002_CEAC_Spec 01 11 00.pdf

PDF 51 KB Posted

Attached to
Cyber Engineering and Academic Center (CEAC), United States Military Academy, West Point, NY
Solicitation number
W912DS19R0019
Issued by

About this file

This document summarizes the scope of work for a federal construction contract solicitation. The U.S. Army Corps of Engineers, New York District is seeking proposals for the construction of a new 136,000 square foot Cyber Engineering and Academic Center (CEAC) at the United States Military Academy in West Point, New York. The project scope includes the academic building, an underground 450-space parking structure, site work, utilities, and demolition. A pedestrian bridge and fourth floor conference spaces are included in select bid alternates. The period of performance is approximately 1461 calendar days with proposals due as outlined in the solicitation. The estimated value of construction is between $100,000,000 and $250,000,000. Interested offerors must register in the System for Award Management to receive the solicitation and any amendments via the beta.SAM.gov website.

View the file

Other files

File Type Posted
West Point_Mahan_Hall_HAZMAT_Report_190409.pdf PDF
CEAC_Amended for Matrix of Glazing-Caulking.pdf PDF
CEAC_Cut-Sheets_Glass Wall Systems 2 and 3.pdf PDF
CEAC_Amendment 8_Drawings.pdf PDF
CEAC_Amendment 8_Specs.pdf PDF
Amendment 0008_W912DS19R0019 (002).pdf PDF
Amendment 0007_W912DS19R0019.pdf PDF
Amendment 0007_Drawings.pdf PDF
Amendment 0007_Specifications.pdf PDF
Approved JA_Monaco Fire Alarm System for CEAC_Redacted.pdf PDF
Approved JA_ Motorola Communication System for CEAC_Redacted.pdf PDF
Approved JA_Best Hardware Lock Cylinders and Cores for CEAC_Redacted.pdf PDF
Approved JA_Tapestry Granite for CEAC_Redacted.pdf PDF
Amendment 0006_FFE Responsibility Matrix_RTA Govt Submission FIN.PDF PDF
Amendment 0006_Specifications.pdf PDF
Amendment 0006_NYR11G658.pdf PDF
Amendment 0006_W912DS19R0019.pdf PDF
Amendment 0006_Drawings.pdf PDF
Amendment 0006_HighDensity XH-Technical FFE Spec.pdf PDF
Amendment 0005_W912DS19C0019.pdf PDF
Amendment 0005_DA Permit 0-00412 Issued to USMA for Rock Loading Temp Pier in Hudson River 18JUN2020.pdf PDF
Amendment 0004_CEAC_FIO_Renderings.pdf PDF
Amendment 0004_W912DS19R0019.pdf PDF
Amendment 0004_CEAC_Site_Visit_Sign_In_18Jun2020.pdf PDF
Amendment 0003_W912DS19R0019.pdf PDF
Amendment 0002_W912DS19R0019.pdf PDF
Amendment 0002_CEAC_Drawings.pdf PDF
Amendment 0002_01 33 29.pdf PDF
Amendment 0001_W912DS19R0019.pdf PDF
CEAC_RTA Submission_Drawings_Vol 5C_2020-05-21.pdf PDF
Solicitation_W912DS19R0019.pdf PDF
CEAC_RTA Submission_Specs_Volume 3 of 4_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 3_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 1B_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 6B_2020-05-21.pdf PDF
CEAC_RTA Submission_Specs_Volume 1 of 4_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 5B_2020-05-21.pdf PDF
CEAC_RTA Submission_Specs_Volume 4 of 4_2020-05-21.pdf PDF
CLP site plan.pdf PDF
2020-05-20 SWPPP Submission Drawings.pdf PDF
CEAC_RTA Submission_Drawings_Vol 4A 2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 2_2020-05-21.pdf PDF
2020-05-20 SWPPP Documents.pdf PDF
CEAC_RTA Submission_Drawings_Vol 5A_2020-05-21.pdf PDF
Signiture Page FONSI for CEAC EA.PDF PDF
CEAC_Sustainability Record Card.pdf PDF
CEAC_RTA Submission_Drawings_Vol 4B_2020-05-21.pdf PDF
NYSDEC POC.pdf PDF
CEAC_RTA Submission_Drawings_Vol 1A_2020-05-21.pdf PDF
NAN-2020-00412-WCR dtd 30APR20-22MAY20 FINAL.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cyber & Engineering Center and Parking Structure 08 June 2020 West Point Military Academy, West Point, NY RTA Amendment 2

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

a. The Contractor shall be required to (i) commence work under this contract within five (5) calendar days after the date the Contractor receives the Notice to Proceed, (ii) prosecute the work diligently, and

(iii) complete the entire work ready for use, not later than 1460 1461 calendar days after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(FAR 52.212-3)

b. All work shall be in accordance with the drawings and specifications or instructions attached hereto and made a part thereof, or to be furnished hereafter by the Contracting Officer and subject, in every detail, to his supervision, direction, and instructions.

c. Contract requirements may be specified, in part or in whole, within the Solicitation package, referenced Codes and other publications. Restating of a requirement (in part or whole) does not relieve the Contractor of full compliance with all parts of the Solicitation package, referenced Codes and other publications, as well as, all parts of requirements, below. The contractor shall comply with the mandatory and advisory criteria of all contract-referenced Codes and publications except, when inter-related and/or conflicted requirements are encountered, the more stringent contract requirements shall govern. All contract requirements shall be implemented, and adhered to, by the Contractor and at the Contractor's expense. Unless specifically stated otherwise, all items and work required to complete the contract shall be provided and performed by the contractor.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes the following and incidental related work.

a. Construction of a 136,000 sf Engineering Center consisting of a three level above grade stone clad steel framed structure with two below grade parking levels. Project includes an instructional building with mission-critical laboratory and laboratory support spaces, guard booth, an air conditioning plant, project fabrication spaces, high bay space with overhead lift capability, project display spaces, collaborative work spaces, capstone work spaces, conference rooms, spray booths, loading dock, a mass notification system, Building Information Systems (BIS), fire detection system, Intrusion Detection System (IDS), and Energy Monitoring Control Systems (EMCS) connection to the installation central system. Supporting facilities include utilities, site improvements including extension of existing historic pedestrian walk, relocation of existing passive and active barriers, paving, vehicular drives, parking, walks, curbs and gutters, and storm drainage. Access for individuals with disabilities is provided.

Sustainability/Energy measures are provided.

SECTION 01 11 00 Page 1

AdamsL3 Cross-Out

b. Construction also includes a two-story below grade parking structure for faculty, staff and visitors. The primary facility includes a parking structure with an access road. The parking structure and walkways include lighting to support an electronic security system.

Supporting facilities include solar array on the roof, electric service, outdoor security lighting, electric car charging stations, Common Access Card (CAC) readers enabled control access gates, fire protection (including additional fire hydrants), an elevator, stairs, paving, sidewalks, curbs and gutters, storm drainage, information systems, signage, site improvements, and landscaping.

In addition, all digging within the historically sensitive areas of post is to be done with the oversight of DPW Cultural Resources. All incidental work associated with the above is also included.

1.2.2 Location

The work is located at West Point Military Academy, NY, on the west side of the Thayer Road, south of existing Building 606 and west of Mahan Hall. The exact location will be shown by the Contracting Officer.

1.3 DFARS 236.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS

This project is estimated between $100,000,000 to $250,000,000.

1.4 AUTHORIZED CONSTRUCTION AREA AND TRESPASSING

Do not inflict damage upon land and properties outside the authorized construction area by unwarranted entry upon, passage through, damage to, or disposal of, material on such land or property. The Contractor may make a separate agreement with any other party, regarding the use of, or right to, land or facilities outside the contract area. If such an agreement is made, it must be in writing and a copy shall be provided to the Contracting Officer. The Contractor must hold and save the Government, its officers, and agents free from liability arising from trespassing or damage occasioned by his operations.

1.5 DEMOLITION PHASING

Demolition will be phased as depicted in the CD series drawings, with the intention of maintaining vehicular access to the West Point Central area (north of the project site), throughout the CEAC project duration.

1.6 ROCK REMOVAL

Rock removal from West Point is permitted via land side hauling via truck and / or usage of barges on the Hudson River in accordance with permits.

Permits have been obtained and are provided within this solicitation. If the contractor elects to use barges on the Hudson River, they must comply with all permit restrictions. Any deviations from the permits are to be fully accommodated by the contractor, including but not limited to:

existing permit modifications, additional permits, and cost associated with facilities to support the deviation. The contractor is responsible to repair roadways, curbs, sidewalks rail grade crossings and any other infrastructure on West Point damaged from hauling materials.

SECTION 01 11 00 Page 2

1.7 BID ALTERNATES

a. Add Alternates: The following items are to be priced for inclusion into the project with all materials, accessories, installation, labor and other costs as shown in the drawing and specified herein. Drawing numbers associated with add and/or deduct alternates are identified with a .A for a suffix.

No. Description Included in Base Bid

Alternate to be priced

1 Bridge to Mahan - The purpose of this bridge is to provide horizontal circulation between the CEAC building and Mahan Hall. The bridge will connect the second floor of CEAC to the third floor of Mahan, immediately south of Arnold Auditorium.

The bridge will include small conference room spaces and open seating areas for collaboration, study, and group activities. The bridge roof will be a connected exterior walkway between the third-floor level of CEAC and the fourth-floor level of Mahan.

Not included Perform all work necessary for construction of the bridge in its entirety, including structural foundations and framing, MEP & FP systems, interior finishes, and exterior treatments. Demolish portions of Mahan Hall to accept the bridge.

2 Terrazzo Finished flooring throughout the North Stair

Concrete finish Perform all work necessary for installation of Terrazzo flooring throughout the North Stair

SECTION 01 11 00 Page 3

No. Description Included in Base Bid

Alternate to be priced

3 Rooftop Conference Center - Two spaces, constructed on the roof, are to be built. They will be located on the fourth floor of CEAC and provide breathtaking panoramic views of Thayer Walk, the Hudson River, and beyond. The main communicating stair will open to the pre-function space connecting two meeting rooms, an outdoor terrace, an elevator and core support spaces. A pantry supports both meeting rooms, as does additional toilet facilities and vertical circulation.

The first meeting room is a signature meeting space with high-end audio-visual infrastructure and an accessible terrace.

This area is intended to be used for events hosting dignitaries, colloquia, conferences, and prospective students.

Not included Perform all work necessary for construction of the roof-top conference center and exterior trrrace according to applicable plans.

SECTION 01 11 00 Page 4

No. Description Included in Base Bid

Alternate to be priced

4 Chiller Plant for full build-out (850 T) - The chiller plant requirement for CEAC including the Bid Alternates listed in 1 and 3 above is 620650 tons. There is space in the Davis Barracks chiller plant for an 850-ton chiller. This bid alternate is to build out the full capacity of the Davis Chiller Plant to 850 tons

Build out the Davis Chiller Plant to accommodate the demand of CEAC as listed below.

Base Building 650 tons

Perform all work necessary for construction of the Build out the full capacity of the Davis Chiller Plant to 850 tons

5 Terrazzo throughout first floor corridors

Terrazzo flooring on the main atrium/ communicating space

Perform all work necessary for installation of Terrazzo flooring throughout the corridors on the first floor

6 Terrazzo through 2nd and 3rd floor corridors

Polished concrete flooring in the 2nd and 3rd floor corridors

Perform all work necessary for installation of Terrazzo flooring in the 2nd and 3rd floor corridors

7 South Outdoor Classroom - a hardscape surface with integrated benches/seating and additional exterior lighting to be used as a gathering and teaching space.

Not included Perform all work necessary for installation of hardscape, benches, and exterior lighting. Includes fine grading changes to base bid for positive drainage of hardscape.

b. Deduct Alternates: The following item is to be priced for exclusion from the project and should be listed as a separate line item within the bid. Drawing numbers associated with add and/or deduct alternates are identified with a .A for a suffix. Disregard any and all references to deducts #1, 3, 4 and 5 within the specifications and

SECTION 01 11 00 Page 5

AdamsL3 Cross-Out drawings.

No. Description Included in Base Bid

Alternate to be priced

2 Eliminate the western row of parking at both levels; reduce service yard and rock excavation

A Parking Structure is to be an underground facility, beneath CEAC, and will be restricted to authorized personnel only.

Per the DD1391, the parking structure is to accommodate 450 parking spaces.

Entry is from the south, and the parking structure is arrayed as four bays, laid out in an east-west orientation, laid out over two levels. Each bay on each floor maintains approximately 30 spaces. The parking structure supports CEAC, the plaza in front of CEAC, and the service yard behind the building.

The western-most bay of the parking garage on both levels is to be deleted, reducing 60 parking stalls and reducing the volume of rock to be cut from the hillside and associated rock stabilization measures. MEP & FP systems will be reduced accordingly. Site work changes include alterations of the service yard access route., and reduction of the east-west width of the service yard.

1.8 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

SECTION 01 11 00 Page 6

c. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to the existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) for those items not identified to be demolished or altered under this project.

d. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

e. Repair or replace portions of existing work which have been altered during construction operations including roadways, curbs, sidewalks, rail grade crossings, to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.9 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

No excavation whether minor or major including trenching, sidewalk replacement, etc. will be permitted without an approved digging permit.

Contractor shall apply for renewal of work permits as required if the work continues beyond the original permit expiration date. Contact local utility locating service a minimum of 15 days prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work. Work on or near roadways shall be flagged in accordance with the safety requirements in Safety and Health Requirements Manual EM 385-1-1, which forms a part of these specifications. Work located along the alert force route shall not cause blockage, and the Contractor shall maintain unobstructed access for alert force traffic at all times.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.

Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.9.1 Notification Prior to Excavation

Notify the Contracting Officer at least 30 days prior to starting excavation work. The Contractor shall be responsible for obtaining a digging permit prior to commencing any excavation. The digging permit is referred to as the "Dig-Safe Permit" and the procedure for obtaining this permit is as follows:

SECTION 01 11 00 Page 7

a. The Contractor shall notify the Contracting Officer in writing 30 working days prior to commencing any excavation. Notification letter and a completed Dig Safe Permit Request will be submitted to the Contracting Officer and must include areas to be excavated, reason for excavation, depth of excavation, and any supporting information such as drawings to allow the processing of permit. A copy of the Dig Safe Permit Request is attached at the end of Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS.

The top portion of the request must be filled out by the Contractor. The Contractor shall not be compensated for any delay caused by failure to notify government on timely basis to obtain the digging permit.

b. Once the permit is approved and signed by the Chief of the Utilities Division a Dig-Safe Permit will be issued to the contractor. From the issuance of the Dig-Safe permit, the Contractor has two weeks to commence excavation, after that the permit will no longer be valid and will have to be re-submitted.

c. Once utilities have been identified and marked, it is the responsibility of the contractor to maintain markings throughout the duration of the project.

d. In the event that any utility line is damaged, all excavation will stop, and the Contracting Officer and U&FD (845-938-2818) will be contacted immediately. The U&FD will take appropriate action to effect safe repair. If utility lines are uncovered which were not identified in the Dig-Safe, the U&FD will be contacted, and a determination will be made as to which utility is involved and whether the lines are active or abandoned. When an unknown line is uncovered, it will be treated as "live" until determined otherwise.

e. The Dig-Safe permit may be received by the requestor with special instructions. These instructions must be complied with. These instructions will involve procedures that are determined safe by the Chief, Utilities and Facilities Division and will have to be followed.

f. Excavation may generate further actions depending upon each situation.

Unknown utility locations must be recorded and drawings changed to show location.

g. There are no exceptions to the Dig-Safe Permit process.

h. See SOP 11-7 ANNEX V for additional requirements to obtain a Dig Safe Permit.

1.10 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within five miles of the construction site.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

SECTION 01 11 00 Page 8

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 9

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 01 11 00 Page 10

01 11 00 - SUMMARY OF WORK
PART 1 GENERAL
1.1 FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.3 DFARS 236.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS
1.4 AUTHORIZED CONSTRUCTION AREA AND TRESPASSING
1.5 DEMOLITION PHASING
1.6 ROCK REMOVAL
1.7 BID ALTERNATES
1.8 EXISTING WORK
1.9 LOCATION OF UNDERGROUND UTILITIES
1.9.1 Notification Prior to Excavation

1.10 SALVAGE MATERIAL AND EQUIPMENT

PART 2 PRODUCTS
PART 3 EXECUTION