CLP site plan.pdf
PDF 2 MB Posted
- Attached to
- Cyber Engineering and Academic Center (CEAC), United States Military Academy, West Point, NY
- Solicitation number
- W912DS19R0019
About this file
This document summarizes a solicitation for construction services relating to the Cyber Engineering and Academic Center project at the United States Military Academy in West Point, New York. The U.S. Army Corps of Engineers, New York District intends to award a firm fixed-price construction contract through a Request for Proposal process. Services required include construction of a 136,000 square foot academic building to house three engineering departments, an underground parking structure with 450 parking stalls beneath the building, site work including landscaping and removal of 300,000 cubic yards of granite, and a pedestrian bridge connecting the new building to an existing one. Additional project elements are a signature meeting space and colloquium space on the top floor. The period of performance is approximately 1461 calendar days from notice to proceed. The NAICS code is 236220 and estimated value is between $100-250 million. Proposals are due electronically as indicated in the solicitation.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B-T1
4.25MVA
13.8-4.16 kV
A-4 / A-8
B-PMS 1
15kV, 600A, 4-WAY
PAD MOUNT SWITCH
B-T2
4.25MVA
13.8-4.16 kV
B-PMS 2
15kV, 600A, 4-WAY
PAD MOUNT SWITCH
(CEAC SWITCH)
B-PMS 3
15kV, 600A, 5-WAY
PAD MOUNT SWITCH
(UPG-2003 SWITCH)
DESCRIPTIONREV DRAWN CHECKEDDATE
(YY-MM-DD)
STATUS
APPROVED
A 19-06-21 SRP
2 3 4 5 6
A
B
C
D
E
OFSHEET
DRAWING#
TITLE
PROJECT
SITE
REV
PROJECT# SCALE :
A
B
C
D
E
2 3 4 5
FOR OFFICIAL USE ONLY (FOUO)
PROPRIETARY & CONFIDENTIAL
U.S. ARMY GARRISON - WEST POINT, NY (USAG-WP)
PROPOSED CEAC ROUTING
SUBSTATION B SITE PLAN - NEW
XXX-XXXX
E-PLN-300
N.T.S.
A
GENERAL NOTES:
A. SITE PLAN ASSUMES PRIOR COMPLETION OF ISDC 6/9 COMBINATION PROJECT.
KEY NOTES:
1. NONE.
SUBSTATION B
OVERHEAD RIGID
GALVANIZED CONDUIT
INCLUDE (1) T-SUPPORT
SIMILAR TO EXISTING
CABLE TRENCH
LOCATION OF EXISTING ACCESS
HOLE INTO BUILDING 604
UNDERGROUND
CABLES
SWITCH TO BE INSTALLED
UNDER CEAC PROJECT
CEAC XFMR
2000/2240KVA (55/65 deg C)
13.8KV - 480/277
KNAN
5.75%
PAD
SPARE
SUBSTATION B
NC
600A600A
NC
600A
NO
600A
CEAC SWITCH
15kV, 600A
WIND TUNNEL (FUTURE)
500KVA
13.8KV - 480/277
KNAN
5.75%
PAD
15kV, 200A 15kV, 200A
MH-9
DESCRIPTIONREV DRAWN CHECKEDDATE
(YY-MM-DD)
STATUS
APPROVED
A CEAC 90% DESIGN 19-04-19 SRP
B 90% REVIEW COMMENT INCORPORATION 19-06-21 SRP
IFR
IFR
2 3 4 5 6
A
B
C
D
E
OFSHEET
DRAWING#
TITLE
PROJECT
SITE
REV
PROJECT# SCALE :
A
B
C
D
E
2 3 4 5
FOR OFFICIAL USE ONLY (FOUO)
PROPRIETARY & CONFIDENTIAL
U.S. ARMY GARRISON - WEST POINT, NY (USAG-WP)
CYBER ENGINEERING ACADEMIC CENTER - CEAC
ONELINE DIAGRAM - NEW
E-606
N.T.S.
1 1 B
GENERAL NOTES:
A. THIS DOCUMENT IS INTENDED TO PROVIDE PERTINENT
ELECTRICAL INFORMATION (E.G. SERVICE TRANSFORMER
ELECTRICAL RATINGS) TO OTHERS FOR DESIGN AND/OR
CONSTRUCTION ACTIVITIES OUTSIDE CLP's SCOPE.
KEY NOTES:
1. IMPEDANCE REFLECTS NOMINAL PER INDUSTRY STANDARD.
TRANSFORMER IMPEDANCE TO BE MEASURED AFTER
MANUFACTURE.
2. 15KV CABLE TO BE CONNECTED TO ANOTHER SWITCH
INSTALLED AS PART OF SEPARATE PROJECT. CONNECTION
TO BE INCLUDED IN THE SCOPE OF THIS PROJECT.
3. 15KV FEEDER TO BE INSTALLED AS PART OF SEPARATE
PROJECT. CABLE TERMINATION AND CONNECTION TO NEW
SWITCH TO BE INCLUDED IN THE SCOPE OF THIS PROJECT.
4. FUTURE WIND TUNNEL MOTOR HAS NOT BEEN APPROVED
FOR CEAC PROJECT YET. AS SUCH, WIND TUNNEL FEED AND
TRANSFORMER ARE SHOWN FOR INFORMATION ONLY.
TRANSFORMER SIZE IS ESTIMATED.
BY CLP
BY OTHERS
| E-PLN-300__NEW-SUB B_NEW_A |
| Sheets and Views |
| SUB B_NEW_A |
| ES-101_90pctRevised |
| E-SLD-CEAC-E-606 |
| Sheets and Views |
| E-606 |
File details come from the government source that posted it. Updated .