This solicitation is for the construction of the Cyber Engineering and Academic Center (CEAC) at the United States Military Academy in West Point, New York. The project scope includes construction of a 136,000 square foot academic building, an underground parking structure with 450 parking stalls, site work including rock removal of 300,000 cubic yards, and a pedestrian bridge connecting the new building to existing facilities. The period of performance is approximately 1461 calendar days from notice to proceed. The procurement method is a request for proposal with a best value tradeoff source selection. Proposals are due electronically by the dates specified in the solicitation. The estimated value of construction is between $100-250 million. The North American Industry Classification System code for this project is 236220.

View the file

Other files

File Type Posted
West Point_Mahan_Hall_HAZMAT_Report_190409.pdf PDF
CEAC_Amended for Matrix of Glazing-Caulking.pdf PDF
CEAC_Cut-Sheets_Glass Wall Systems 2 and 3.pdf PDF
CEAC_Amendment 8_Drawings.pdf PDF
CEAC_Amendment 8_Specs.pdf PDF
Amendment 0008_W912DS19R0019 (002).pdf PDF
Amendment 0007_W912DS19R0019.pdf PDF
Amendment 0007_Drawings.pdf PDF
Amendment 0007_Specifications.pdf PDF
Approved JA_Monaco Fire Alarm System for CEAC_Redacted.pdf PDF
Approved JA_ Motorola Communication System for CEAC_Redacted.pdf PDF
Approved JA_Best Hardware Lock Cylinders and Cores for CEAC_Redacted.pdf PDF
Approved JA_Tapestry Granite for CEAC_Redacted.pdf PDF
Amendment 0006_FFE Responsibility Matrix_RTA Govt Submission FIN.PDF PDF
Amendment 0006_Specifications.pdf PDF
Amendment 0006_NYR11G658.pdf PDF
Amendment 0006_Drawings.pdf PDF
Amendment 0006_HighDensity XH-Technical FFE Spec.pdf PDF
Amendment 0005_W912DS19C0019.pdf PDF
Amendment 0005_DA Permit 0-00412 Issued to USMA for Rock Loading Temp Pier in Hudson River 18JUN2020.pdf PDF
Amendment 0004_CEAC_FIO_Renderings.pdf PDF
Amendment 0004_W912DS19R0019.pdf PDF
Amendment 0004_CEAC_Site_Visit_Sign_In_18Jun2020.pdf PDF
Amendment 0003_W912DS19R0019.pdf PDF
Amendment 0002_W912DS19R0019.pdf PDF
Amendment 0002_CEAC_Drawings.pdf PDF
Amendment 0002_01 33 29.pdf PDF
Amendment 0002_CEAC_Spec 01 11 00.pdf PDF
Amendment 0001_W912DS19R0019.pdf PDF
CEAC_RTA Submission_Drawings_Vol 5C_2020-05-21.pdf PDF
Solicitation_W912DS19R0019.pdf PDF
CEAC_RTA Submission_Specs_Volume 3 of 4_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 3_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 1B_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 6B_2020-05-21.pdf PDF
CEAC_RTA Submission_Specs_Volume 1 of 4_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 5B_2020-05-21.pdf PDF
CEAC_RTA Submission_Specs_Volume 4 of 4_2020-05-21.pdf PDF
CLP site plan.pdf PDF
2020-05-20 SWPPP Submission Drawings.pdf PDF
CEAC_RTA Submission_Drawings_Vol 4A 2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 2_2020-05-21.pdf PDF
2020-05-20 SWPPP Documents.pdf PDF
CEAC_RTA Submission_Drawings_Vol 5A_2020-05-21.pdf PDF
Signiture Page FONSI for CEAC EA.PDF PDF
CEAC_Sustainability Record Card.pdf PDF
CEAC_RTA Submission_Drawings_Vol 4B_2020-05-21.pdf PDF
NYSDEC POC.pdf PDF
CEAC_RTA Submission_Drawings_Vol 1A_2020-05-21.pdf PDF
NAN-2020-00412-WCR dtd 30APR20-22MAY20 FINAL.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE91754737

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Answ er questions to prospective offerors for informational purposes only.

2. Revise and reissue plans and specifications, as outlined below .

NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: In the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS19R0019

X 9B. DATED (SEE ITEM 11)

03-Jun-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jun-2020

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS19R0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

AMENDMENT 0006

DRAWINGS

1. The following DRAWINGS have been REVISED and REISSUED:

S-301 S-509 A-11B A-11B.A A-11A A-11A.A A-441 A-443 A-551 A-625 A-625.A A-762 I-103E

EP-112L.A

EP-114J.A

E-604 E-615 E-620 E-621 A-320 A-651 A-747 A-748

2. The following DRAWINGS have been ADDED: None.

3. The following DRAWINGS have been DELETED: None

4. The following DRAWINGS have been REVISED but NOT REISSUED: None.

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein: None.

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety: None.

3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED:

07 52 00 31 68 13

4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:

None.

OFFEROR’S QUESTIONS AND GOVERNMENT REPLY:

Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only” and do not revise the solicitation, plans or specifications.

Question 1:

Equipment downstream of ATS-LS on sheet E-604 is shown as life safety. Per NEC 700, all life safety panelboards should be provided with SPD. Only EDP-LS is shown with SPD, the downstream panels are not indicated. NEC should require that. Should it be added?

Government Response 1:

Panel ELP-HG, ELP-H-1, ELP-H-3 and ELP-SM shall be provide with a 15/3 breaker serving an 80KA separately mounted surge protector

Question 2:

Vol 4, Sheet I-131 - General note #1 indicates "refer to written FFE specification package for complete specifications and requirements of all furniture items and quantities." Specification are not provided in the bid documents. Additionally, "I" series indicate "For Reference Only". Please confirm ALL furniture shown in "I" series drawings in Vol 4 are OFOI (owner-furnished, owner-installed).

Government Response 2:

Furniture Location Plans & Schedules have been included in the drawing set "For Reference Only" to coordinate work, majority of items are GFGI (Government Furnished / Government Installed). This amendment provides the FF&E Responsibility Matrix for reference/information only to identify those items that require the Contractor to install or coordinate.

Question 3:

The contract documents indicate both Factory Mutual roofing assemblies (075200-7 / 1.4.6), and a "metal conductive mesh" within the assemblies (A-551). The roofing manufacturers do not have Factory Mutual tested assemblies with this metal conductive mesh. The mesh is an additional element that was not included in the tested assemblies, and could invalidate the test results. Can the design-team please provide direction?

Government Response 3:

The wire mesh is to be removed from the roofing assemblies. D4/A-551 is revised to remove the METAL CONDUCTIVE MESH. The specification 07 52 00 is revised as follows: 3.6.5 Field Testing delete "For ELD testing, include vertical roof membrane and flashing."

Question 4:

There are discrepancies between the shade schedule and finish floor plan as to where and what type of shades are required. Please advise which should be followed.

Government Response 4:

The roller window shades as tagged on the finish location plans 'I' series dwgs with codes WT1, WT2, WT3 and WT5 document the locations, style and finish. The Window Shade Schedules on sheet A-625 & A-625.A document the mounting type and reiterates whether shades are manual or motorized along with dimensions for reference to be verified in field. These drawings have been aligned and required edits for clarification are included in this Amendment. Electrical Power plans are adjusted as needed to align with this revised schedule for Motorized Shade locations and are included in this Amendment.

Question 5:

There are no specs for High Density Mobile Shelving and the ancillary shelving. These items typically fall under the General Contractors responsibility. The drawings however do indicate large mobile shelving system and other shelving units. Please advise as to scope and responsibilies for these items. Please provide specification section.

Government Response 5:

Storage items such as shelving were found to be best served as part of a complete furniture package (GFGI) Government Furnished /Government Installed for this project to manage cost and due to complexity in variations and types to meet Mission objectives.

The High-Density Storage with surface mounted rails and structural ramp/platform is one of the exceptions as requires integration with Contractor to provide a portion of the install for space EC-134D "Project Support".

The government shall install the rails for the Manually Operated High-Density Carriages on prepared concrete and the Contractor shall install the ramping and platform materials as detailed (F5/I-502) per the requirements of the manufacturer for the anticipated heavier rolling loads along with the specified floor finish prior to the install of the HD Storage carriages/components by the government. This amendment includes Technical Specifications for that area for information only.

Question 6:

Spec Section 26 20 00 Page 27 3.1.4.1b states that EMT shall not be "encased" in concrete, mortar, grout, or other cementitious materials. However, the word "encased" suggests/implies to be as encased in a concrete ductbank, but not necessarily intended to be in masonry walls where filled with grout. With that said, we have the following questions:

1.) Is EMT allowable in masonry walls, where the cell will be grouted?

2.) Is EMT allowable in the hollow voids of masonry walls, where not grouted?

Government Response 6:

EMT shall not be used in masonry walls filled with grout.

Question 7:

Question: Are strand anchors allowed?

See Specification 31 68 13 Section 1.3.1: Rock anchors shall be threaded bar type.

See Specification 31 68 13 Section 1.3.2.a: Rock anchors shall be threaded bar or strand type.

Government Response 7:

Strands are not allowed. Rock anchors shall be threaded bar type. An edited spec is provided in this amendment.

Question 8:

Can a performance specification or tolerance be offered for the borehole alignment check devices? Conventional Construction based "boretrak" tools/devices will not measure these semi-horizontal angles.

See Specification 31 68 13 Section 3.1.7.2: Alignment Check Government Response 8:

Tolerances are provided in paragraph 3.1.7.1.

It is contractor's responsibility to demonstrate compliance with rock anchor vertical and horizontal alignment requirements. Performance of this is a means and methods.

Question 9:

Please confirm that P.T.I. Water Tightness testing/criteria does not apply to drill holes?

See Specification 31 68 13 Section 2.4.6 Sand-Cement Grout: This paragraph refers to waterproofing grout and water tightness testing.

Government Response 9:

PTI water Tightness testing/criteria is not applicable to drill holes and will not be required. An edited spec is provided in this amendment.

Question 10:

Please confirm that the Rock Anchor Drillers Logs do not require logging of cores including geological classification?

See Specification 31 68 13 Section 3.4.4 Drillers Logs: items h, I , j refer to this.

Government Response 10:

Paragraph 3.4.4 items f, g, h, i, and j are not required. An edited spec is provided in this amendment.

Question 11:

Flooring RFI's:

1. Please provide a Step Detail if Steps are to be Polished SC2.

2. Room EC-308, Drawing I-103D; Please confirm Wall Base to be RB1.

3. Please confirm North Stair and Stair #4 are the same stair. Please confirm South Stair and Stair #1 are the same stair.

4. Are the Intermediate Landings Base Bid to be SC2?

5. Intermediate Landings; what is floor finish for Alternates 02, 05 and 06?

6. Please confirm no Control Joints are required at SC2 locations.

7. Parking Garage Elevator Cab #3 floor is; Nora Rubber Sheet RF1, please confirm.

8. Chiller Plant Area; Please confirm no flooring scope is required for the bid in this area.

9. No Wax Logo Tile for RF3 Rooms shown. Please provide details.

Government Response 11:

1.- FIO / Stairs #1, 2 and 4 that have sealed concrete for the Base Bid floor finish are detailed on sheets A7/A-747 for the Academic Buildings Levels 1 to Roof. For all stairs that are Steel Pan with Concrete Treads refer to Spec Section 05 51 00 – Metal Stairs / subsection 2.2.2.5 - Safety Nosings for Concrete treads for more detailed description for the nosing. All finished concrete treads Finish Code 'SC' shall be detailed the same with 1/4"min thick by 4" width stringer to stringer, cast aluminum with cross hatch pattern abrasive surface, embedded with anchors to be flush with concrete.

2.- CONCUR / Provide wall base RB1 for this room 3.- CONCUR / – North Stair is continuation of Stair #4 and South Stair is continuation of Stair #1. Space names and room numbers change when these two stairs change from the Academic Building Floor Levels to the Parking Garage Levels.

4.- CONCUR / Floor finish of all stair treads are to have matching intermediate landings.

5.- FIO / For the Alternates #2, #5 and #6 Terrazzo is noted as the alternative floor finish (Intermediate Landings shall always match stair treads and vice versa for continuity in elevation). Floor Pattern Plans on I-120 Series drawings clarify transition locations in more detail.

6.- NON-CONCUR / On sheet S-001 - General Structural Notes, requirements for control joints ("Contraction Joints") to minimize random cracking are described for the various locations and concrete types. Additionally, on S series drawings - Structural Framing Plans, Keynote 033000- 31 identifies Contraction Joints with details on Sheet S-504.

7.- CONCUR / Parking Garage Elevator is to have floor finish RF1 – "Noraplan – Sentica" Rubber Sheet flooring 3mm 8.- CONCUR / There is no flooring scope besides patch and repairs to match existing conditions for this area.

9.- FIO / I am not familiar with this term "No Wax Logo Tile" or where that is referenced in the documents. As described on the finish schedule Finish Code RF3 is a "Static Dissipative Tile" installed with grounding per mfr instructions for Telecom rooms. The recommended care and maintenance routine for the specified product does not require waxing and is not recommend per their Maintenance Instructions.

Question 12:

Please advise if the furniture listed in drawing I-130.1 are to be provided by the government or contractor?

Government Response 12:

Furniture Location Plans & Schedules have been included in the drawing set "For Reference Only" to coordinate work.

The majority of items are GFGI (Government Furnished / Government Installed) with an exception being the High- Density Storage that requires Contractor involvement to install the flooring as detailed on Sheet I-502 after the government installs the rails. The government shall also install the carriages and shelving units.

This Amendment includes the FF&E Responsibility Matrix for your reference that identifies those items requiring the Contractor to install or coordinate.

Question 13:

Is there a 27-4100 bid spec? There is a lot of Audio / Video shown in drawings TA001 through TA507 and no spec called out. Is this being bid under a separate offer or is it a sole-source contract?

Government Response 13:

There is no spec. The A/V Equipment is government furnished / government installed. The related infrastructure as depicted in the drawings is contractor furnished / contractor installed.

Question 14:

Based on the RFI responses it is understood that all metal shelving shall be furnished and installed by the owner and per equipment matrix.

Drawing A411D.27 provides details of HHS tube steel framing and additional steel elements associated with the metal partitions.

Please confirm this will be provided by the owner as well.

Government Response 14:

The scope of work as documented on sheet A411D.27 for storage of the Metal Partition components is to be provided by the Contractor.

Question 15:

Please provide manufacturer, model and specifications for the Air Compressor AC1,2,3,4. Not specified on plans or specifications.

Government Response 15:

Basis of design is model LSQ15A6 by Powerex, or equal.

Question 16:

Please provide manufacturer and model for water softener WS-1. Not indicated on plans or specifications.

Government Response 16:

Basis of design is model CTM-90 by Culligan, or equal.

Question 17:

Please provide manufacturer and model number for HWRP-1. Not indicated on plans or specifications.

Government Response 17:

Basis of design is model ecocirc XL 110-180 by Bell & Gossett, or equal.

Question 18:

Please provide manufacturer and model number for DWBP-1,2,3. Not indicated on plans or specifications.

Government Response 18:

Basis of design is a triplex end suction system using Model 2010 pumps by Canariis, or equal.

Question 19:

Please provide an extension of bid due date as there are a number of missing items yet to be addressed.

Government Response 19:

PROPOSAL DUE DATE FOR TECHNICAL PORTION:

20 July 2020, 2:00PM EDT

PROPOSAL DUE DATE FOR PRICE PORTION:

29 July 2020, 2:00PM EDT

Question 20:

Since it may be desirable for an Offeror to team with a subcontractor for the purposes of the technical submission, and since most subcontractors will likely still be working on their pricing for the project after July 20, would you please consider extending the due date for the technical submission to the same July 29 date as the price submission is due?

Government Response 20:

The government is not considering another due date extension at this time.

PROPOSAL DUE DATE FOR TECHNICAL PORTION:

20 July 2020, 2:00PM ET

PROPOSAL DUE DATE FOR PRICE PORTION:

29 July 2020, 2:00PM ET

Question 21:

Amendment No. 5 indicates the technical portion of the proposal is due July 20, 2020 by 2PM EST and pricing proposals due July 29, 2020 by 2PM EST. Since the pricing portion can have an impact on the technical portion of the proposal (teaming arrangements, project approach, etc.) we request the due dates for both technical and pricing be the same due date.

Government Response 21:

The government is not considering another due date extension at this time.

PROPOSAL DUE DATE FOR TECHNICAL PORTION:

20 July 2020, 2:00PM ET

PROPOSAL DUE DATE FOR PRICE PORTION:

29 July 2020, 2:00PM ET

Question 22:

Please clarify if the flooring selections AF1 & AF2 are to have a pre applied factory finish of the specified SDT Tile and Carpet Tile respectively or if this field applied for the floor finish installation of said products.

Government Response 22:

Carpet over raised access flooring (AF2) shall be installed in the field and the SDT finish on raised access flooring (AF1) shall be factory applied per manufacturers requirements as described in the written specs _09 69 13 Rigid Grid Access Flooring, they are not to be combined.

Question 23:

Can Thayer Road or other haul off routes be closed to all traffic for rock haul off? Or will we be required to maintain traffic on these routes?

Government Response 23:

All haul routes will remain open for normal traffic.

Question 24:

Can the use of a temporary load out facility on shore be used to load material to barges directly on shore without the use of a temporary dock / pier if the right equipment is used?

Government Response 24:

The contractor will be responsible for disposing of fractured rock in accordance with all Federal, State, or local requirements. Means and methods for disposing of fractured rock include, but are not limited to, building a temporary pier in accordance with DA Permit NAN-2020-00412.

Regardless of whether the temporary pier is built or not, the contractor may still utilize the staging and laydown area shown on CS108 for barge loading operations. Methods for rock removal utilizing the Hudson River which vary from DA Permit NAN-2020-00412 may require revisions to the permit application, and the contractor would be responsible for preparing and executing such revisions.

Question 25:

Are there any limited hours for hauling rock material off site by trucking?

Government Response 25:

Please review 01 14 00 paragraphs 1.2.3 and 1.2.4.

Question 26:

Please advise as to if the Small Business Plan shall be submitted with the Technical Proposal bid date or with the Price Proposal bid date. It is difficult to submit a plan to early in time as it will not be known until bid day (price) as to which anticipated subcontractors will be used.

Government Response 26:

The Small Business Plan shall be submitted with the Technical Proposal.

Question 27:

Specification 01 35 91, 1.7.1 indicates a Historic Treatment Field Supervisor. Is this a stand alone individual or can this be the Superintendent personnel.

Government Response 27:

01 35 91 paragraph 1.7.1 does not prohibit the historic treatment field supervisor from performing other duties/roles.

Question 28:

Based on the later due date for the Price Proposal Submission per Amendment #5 and considering that the major subcontracting costs do not come in until bid day or just prior, will it be acceptable for Prime Offeror's (GENERAL CONTRACTORS) to be able to include teaming agreements with the Price Proposal Submission and not with the Technical proposal submission date.

Government Response 28:

Teaming agreements must be submitted with the Technical Proposal.

The government is not considering another due date extension at this time.

PROPOSAL DUE DATE FOR TECHNICAL PORTION:

20 July 2020, 2:00PM ET

PROPOSAL DUE DATE FOR PRICE PORTION:

29 July 2020, 2:00PM ET

Question 29:

Please provide manufacturer and model number for SP-1,2. Not indicated on plans or specifications.

Government Response 29:

Basis of design is model 185/4185 by Zoeller, or equal.

Question 30:

Please provide manufacturer and model number for SP-3,4. Not indicated on plans or specifications.

Government Response 30:

Basis of design is model 188/4188 by Zoeller, or equal.

Question 31:

Please provide manufacturer and model number for EPSP-1,2,3. Not indicated on plans or specifications.

Government Response 31:

Basis of design is package 940-0008, featuring model 161 pump, by Zoeller, or equal.

Question 32:

Are there any limitations on the trucking or weight limits that are acceptable on the haul routes?

For both the barge location and other haul off routes?

Government Response 32:

While there are no posted weight restrictions on West Point roads, specification section 01 11 00 requires the contractor to repair damages to roadways curbs, and other infrastructure. For roadways outside West Point boundary, it is the contractor's responsibility to determine and comply with roadway limitations and restrictions.

(End of Summary of Changes)