This solicitation is for the construction of a Cyber Engineering and Academic Center (CEAC) at the United States Military Academy in West Point, New York. The project involves construction of a four-story, 136,000 square foot academic building to house three engineering departments, along with associated site work including a 450-stall underground parking structure and pedestrian bridge connecting to an adjacent building. The period of performance is approximately 1461 calendar days from notice to proceed. The estimated value of construction is between $100-250 million. Proposals are due electronically and the procurement method will be best value tradeoff. The soliciting agency is the Department of the Army Corps of Engineers Engineering District New York. Interested vendors must be registered in the System for Award Management. Past performance will be evaluated in accordance with the Federal Acquisition Regulation and Defense Federal Acquisition Regulation Supplement. The primary point of contact for inquiries is provided.

View the file

Other files

File Type Posted
West Point_Mahan_Hall_HAZMAT_Report_190409.pdf PDF
CEAC_Amended for Matrix of Glazing-Caulking.pdf PDF
CEAC_Cut-Sheets_Glass Wall Systems 2 and 3.pdf PDF
CEAC_Amendment 8_Drawings.pdf PDF
CEAC_Amendment 8_Specs.pdf PDF
Amendment 0008_W912DS19R0019 (002).pdf PDF
Amendment 0007_W912DS19R0019.pdf PDF
Amendment 0007_Drawings.pdf PDF
Amendment 0007_Specifications.pdf PDF
Approved JA_Monaco Fire Alarm System for CEAC_Redacted.pdf PDF
Approved JA_ Motorola Communication System for CEAC_Redacted.pdf PDF
Approved JA_Best Hardware Lock Cylinders and Cores for CEAC_Redacted.pdf PDF
Approved JA_Tapestry Granite for CEAC_Redacted.pdf PDF
Amendment 0006_FFE Responsibility Matrix_RTA Govt Submission FIN.PDF PDF
Amendment 0006_Specifications.pdf PDF
Amendment 0006_NYR11G658.pdf PDF
Amendment 0006_W912DS19R0019.pdf PDF
Amendment 0006_Drawings.pdf PDF
Amendment 0006_HighDensity XH-Technical FFE Spec.pdf PDF
Amendment 0005_W912DS19C0019.pdf PDF
Amendment 0005_DA Permit 0-00412 Issued to USMA for Rock Loading Temp Pier in Hudson River 18JUN2020.pdf PDF
Amendment 0004_CEAC_FIO_Renderings.pdf PDF
Amendment 0004_W912DS19R0019.pdf PDF
Amendment 0004_CEAC_Site_Visit_Sign_In_18Jun2020.pdf PDF
Amendment 0003_W912DS19R0019.pdf PDF
Amendment 0002_W912DS19R0019.pdf PDF
Amendment 0002_CEAC_Drawings.pdf PDF
Amendment 0002_CEAC_Spec 01 11 00.pdf PDF
Amendment 0001_W912DS19R0019.pdf PDF
CEAC_RTA Submission_Drawings_Vol 5C_2020-05-21.pdf PDF
Solicitation_W912DS19R0019.pdf PDF
CEAC_RTA Submission_Specs_Volume 3 of 4_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 3_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 1B_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 6B_2020-05-21.pdf PDF
CEAC_RTA Submission_Specs_Volume 1 of 4_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 5B_2020-05-21.pdf PDF
CEAC_RTA Submission_Specs_Volume 4 of 4_2020-05-21.pdf PDF
CLP site plan.pdf PDF
2020-05-20 SWPPP Submission Drawings.pdf PDF
CEAC_RTA Submission_Drawings_Vol 4A 2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 2_2020-05-21.pdf PDF
2020-05-20 SWPPP Documents.pdf PDF
CEAC_RTA Submission_Drawings_Vol 5A_2020-05-21.pdf PDF
Signiture Page FONSI for CEAC EA.PDF PDF
CEAC_Sustainability Record Card.pdf PDF
CEAC_RTA Submission_Drawings_Vol 4B_2020-05-21.pdf PDF
NYSDEC POC.pdf PDF
CEAC_RTA Submission_Drawings_Vol 1A_2020-05-21.pdf PDF
NAN-2020-00412-WCR dtd 30APR20-22MAY20 FINAL.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEED v4 BD+C: New Construction and Major Renovation Project Checklist WP Cyber and Engineering Academic Center (CEAC)

Y ?Y ?N N D 1 IPc1 1

Y ?Y ?N N 7 0 0 9 16 5 1 0 7 13

D N LTc1 16 D Y MRp1 Required D 1 LTc2 1 C Y MRp2 Required D 1 1 LTc3 2 D 5 MRc1 5 D 3 2 LTc4 5 C 1 1 MRc2 2 D 5 LTc5 5 C 1 1 MRc3 2 D 1 LTc6 1 C 1 1 MRc4 2 D 1 LTc7 1 C 2 MRc5 2 D 1 LTc8 Green Vehicles (LEED v4.1: Electric Vehicles) 1

9 0 0 7 Indoor Environmental Quality 16 6 0 0 4 10 D Y IEQp1 Required

C Y SSp1 Required D Y IEQp2 Required D 1 SSc1 1 D 2 IEQc1 2 D 2 SSc2 2 C 3 IEQc2 3 D 1 SSc3 1 C 1 IEQc3 Construction Indoor Air Quality Management Plan 1 D 3 SSc4 3 C 2 IEQc4 2 D 2 SSc5 2 D 1 IEQc5 1 D 1 SSc6 1 D 1 1 IEQc6 2

D 3 IEQc7 3 4 0 0 7 11 D 1 IEQc8 1

D Y WEp1 Required D 1 IEQc9 1 D Y WEp2 Required D Y WEp3 Building-Level Water Metering Required 6 0 0 0 Innovation 6 D 2 WEc1 2 D 1 INc1.1 1 D 1 5 WEc2 6 D 1 INc1.2 1 D 2 WEc3 2 D 1 INc1.3 1 D 1 WEc4 Water Metering 1 D 1 INc1.4 1

C 1 INc1.5 Exemplary Performance: Low-Emitting Materials (LEED v4.1) 1 19 0 0 14 33 C 1 INc2 1

C Y EAp1 Required D Y EAp2 Required 2 0 0 2 Regional Priority 4 D Y EAp3 Required D 1 RPc1 RP: 1 Point Indoor Water Use Reduction 1 D Y EAp4 Required D 1 RPc2 RP: 1 Point Heat Island Reduction 1 C 6 EAc1 6 D 1 RPc3 RP: 3 Points Building Life-Cycle Impact Reduction 1 D 11 7 EAc2 18 D 1 RPc4 RP: 2 Pts High Priority Site 1 D 1 EAc3 1 C 2 EAc4 2 59 1 0 50 TOTALS Possible Points: 110 D 3 EAc5 3 Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110 D 1 EAc6 1 D 2 EAc7 2 Legend Y: Yes ?Y: Maybe-Yes ?N: Maybe-No N: No

D: Design Phase credit C: Construction Phase credit

Construction Activity Pollution Prevention Site Assessment

High Priority Site (Option 1) Surrounding Density and Diverse Uses

Sustainable Sites

Project Name:

Date:

Location and Transportation

Sensitive Land Protection LEED for Neighborhood Development Location

Materials and Resources Storage and Collection of Recyclables

Integrative Process

Construction and Demolition Waste Management Planning

5/15/2020

Green Power and Carbon Offsets

Heat Island Reduction

Outdoor Water Use Reduction Indoor Water Use Reduction

Outdoor Water Use Reduction Indoor Water Use Reduction

Enhanced Commissioning

Building-Level Energy Metering

Water Efficiency

Fundamental Commissioning and Verification Energy and Atmosphere

Minimum Energy Performance

Renewable Energy Production

Light Pollution Reduction

Enhanced Refrigerant Management

Optimize Energy Performance

Enhanced Indoor Air Quality Strategies Low-Emitting Materials

Indoor Air Quality Assessment

Building Life-Cycle Impact Reduction

Access to Quality Transit

Reduced Parking Footprint (LEED v4.1)

Open Space Rainwater Management

Environmental Tobacco Smoke Control

Bldg. Product Disclosure and Opt. - Material Ingredients (LEED v4.1)

Site Development - Protect or Restore Habitat

Bldg. Product Disclosure and Opt. - Sourcing of Raw Materials (LEED v4.1) Bicycle Facilities

Construction and Demolition Waste Management

Minimum Indoor Air Quality Performance

Bldg. Product Disclosure / Opt. - Env. Product Declarations (LEED v4.1)

Advanced Energy Metering Demand Response

Fundamental Refrigerant Management

Cooling Tower Water Use

Thermal Comfort

Daylight

EBOM: Purchasing Lamps or Sustainable Purchasing Exemplary Performance Reduced Parking Footprint

Interior Lighting

Acoustic Performance Quality Views

LEED Accredited Professional

EBOM: Occupant Comfort Survey Walkable Project Site

01 33 29 - ATTACHMENT a

01 33 29 - ATTACHMENT a

01 33 29 - ATTACHMENT b

01 33 29 - ATTACHMENT b

01 33 29
CEAC spec 01 33 29 - ATTACHMENT b - Ammendment 2