Amendment 0004_W912DS19R0019.pdf

PDF 451 KB Posted

Attached to
Cyber Engineering and Academic Center (CEAC), United States Military Academy, West Point, NY
Solicitation number
W912DS19R0019
Issued by

About this file

This document provides details for a federal construction contract opportunity issued by the U.S. Army Corps of Engineers Engineering District New York. The project involves construction of a new 136,000 square foot Cyber Engineering and Academic Center building on the campus of the United States Military Academy at West Point to provide innovative learning spaces for three academic engineering departments. The scope of work includes building construction, site work involving removal of approximately 300,000 cubic yards of granite rock, an underground parking structure with 450 parking stalls, and a pedestrian bridge connecting the new building to an existing academic building. The period of performance is approximately 1461 calendar days from notice to proceed. Offerors must be registered in the System for Award Management and proposals are due electronically as a request for proposal with a best value tradeoff source selection method. The estimated value of the construction is between $100 million and $250 million.

View the file

Other files

File Type Posted
West Point_Mahan_Hall_HAZMAT_Report_190409.pdf PDF
CEAC_Amended for Matrix of Glazing-Caulking.pdf PDF
CEAC_Cut-Sheets_Glass Wall Systems 2 and 3.pdf PDF
CEAC_Amendment 8_Drawings.pdf PDF
CEAC_Amendment 8_Specs.pdf PDF
Amendment 0008_W912DS19R0019 (002).pdf PDF
Amendment 0007_W912DS19R0019.pdf PDF
Amendment 0007_Drawings.pdf PDF
Amendment 0007_Specifications.pdf PDF
Approved JA_Monaco Fire Alarm System for CEAC_Redacted.pdf PDF
Approved JA_ Motorola Communication System for CEAC_Redacted.pdf PDF
Approved JA_Best Hardware Lock Cylinders and Cores for CEAC_Redacted.pdf PDF
Approved JA_Tapestry Granite for CEAC_Redacted.pdf PDF
Amendment 0006_FFE Responsibility Matrix_RTA Govt Submission FIN.PDF PDF
Amendment 0006_Specifications.pdf PDF
Amendment 0006_NYR11G658.pdf PDF
Amendment 0006_W912DS19R0019.pdf PDF
Amendment 0006_Drawings.pdf PDF
Amendment 0006_HighDensity XH-Technical FFE Spec.pdf PDF
Amendment 0005_W912DS19C0019.pdf PDF
Amendment 0005_DA Permit 0-00412 Issued to USMA for Rock Loading Temp Pier in Hudson River 18JUN2020.pdf PDF
Amendment 0004_CEAC_FIO_Renderings.pdf PDF
Amendment 0004_CEAC_Site_Visit_Sign_In_18Jun2020.pdf PDF
Amendment 0003_W912DS19R0019.pdf PDF
Amendment 0002_W912DS19R0019.pdf PDF
Amendment 0002_CEAC_Drawings.pdf PDF
Amendment 0002_01 33 29.pdf PDF
Amendment 0002_CEAC_Spec 01 11 00.pdf PDF
Amendment 0001_W912DS19R0019.pdf PDF
CEAC_RTA Submission_Drawings_Vol 5C_2020-05-21.pdf PDF
Solicitation_W912DS19R0019.pdf PDF
CEAC_RTA Submission_Specs_Volume 3 of 4_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 3_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 1B_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 6B_2020-05-21.pdf PDF
CEAC_RTA Submission_Specs_Volume 1 of 4_2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 5B_2020-05-21.pdf PDF
CEAC_RTA Submission_Specs_Volume 4 of 4_2020-05-21.pdf PDF
CLP site plan.pdf PDF
2020-05-20 SWPPP Submission Drawings.pdf PDF
CEAC_RTA Submission_Drawings_Vol 4A 2020-05-21.pdf PDF
CEAC_RTA Submission_Drawings_Vol 2_2020-05-21.pdf PDF
2020-05-20 SWPPP Documents.pdf PDF
CEAC_RTA Submission_Drawings_Vol 5A_2020-05-21.pdf PDF
Signiture Page FONSI for CEAC EA.PDF PDF
CEAC_Sustainability Record Card.pdf PDF
CEAC_RTA Submission_Drawings_Vol 4B_2020-05-21.pdf PDF
NYSDEC POC.pdf PDF
CEAC_RTA Submission_Drawings_Vol 1A_2020-05-21.pdf PDF
NAN-2020-00412-WCR dtd 30APR20-22MAY20 FINAL.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE91754737

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Answer questions to prospective offerors for informational purposes only.

2. Revise plans and specifications, as outlined below .

3. Post the site visit sign-in sheet from 18 June 2020.

NOTE: Offeror must acknowledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the following methods: In the space provided on SF1442, by separate letter, or by signing block 15 below. FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

1. CONTRACT ID CODE PAGE OF PAGES

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS19R0019

X 9B. DATED (SEE ITEM 11)

03-Jun-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Jun-2020

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS19R0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS

The following have been deleted:

52.225-10 Notice of Buy American Requirement--Construction

Materials

MAY 2014

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

AMENDMENT 0004

DRAWINGS

1. The following DRAWINGS have been REVISED and REISSUED: None.

2. The following DRAWINGS have been ADDED: None.

3. The following DRAWINGS have been DELETED: None

4. The following DRAWINGS have been REVISED but NOT REISSUED:

A-400: Add General Note 5: “The government will require access to the building for installation of Government Furnished and Installed Equipment during the systems testing and commissioning phase of the project. Coordination of this access will be through the Contracting Officer's Representative. The Contractor shall protect all GFGI Equipment from damage caused by Construction activities for remaining duration of contract. The following list contains what rooms early access will be needed: Heavy Dynamic Testing, Structural Fabrication, High Bay Corrals, Water Jet, Concrete, Hydrology, Automotive Lab, Lobby, Robotics High Bay, Secure Storage, Controls, Storage, Robotics, High End Fabrication, EECS Water Jet, Mechatronics, Telecom Equipment Room, Enviro, 3D Printing, Telecom, Materials Science, Biomechanics, Manufacturing, Thermodynamics, Aeronautical, Power Lab, Project Management, Human Design, Experimenter, Interview, North Room, South Stair Tower, Service Yard.”

A-401: Add General Note 5: “The government will require access to the building for installation of Government Furnished and Installed Equipment during the systems testing and commissioning phase of the project. Coordination of this access will be through the Contracting

Officer's Representative. The Contractor shall protect all GFGI Equipment from damage caused by Construction activities for remaining duration of contract. The following list contains what rooms early access will be needed: Heavy Dynamic Testing, Structural Fabrication, High Bay Corrals, Water Jet, Concrete, Hydrology, Automotive Lab, Lobby, Robotics High Bay, Secure Storage, Controls, Storage, Robotics, High End Fabrication, EECS Water Jet, Mechatronics, Telecom Equipment Room, Enviro, 3D Printing, Telecom, Materials Science, Biomechanics, Manufacturing, Thermodynamics, Aeronautical, Power Lab, Project Management, Human Design, Experimenter, Interview, North Room, South Stair Tower, Service Yard.”

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein: None.

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety: None.

3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED: None.

4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:

SECTION 01 35 26 Add paragraph 1.7.2.14:

1.7.2.14 COVID-19 Monitoring Plan

Include a site specific COVID-19 monitoring plan which addresses at a minimum the following elements:

a. Procedures for periodic sanitation inspections.

b. Procedures for disinfecting project site to include high traffic areas in accordance with Center for Disease Control (CDC) guidelines.

c. Site specific measures to practice social distancing while working on the project.

d. Employee training on the signs, symptoms, and protection measures in accordance with CDC guidelines.

e. Follow current published best practices by CDC, World Health Organization, and OSHA:

(1) www.coronavirus.com

(2) www.cdc.gov/coronavirus

(3) www.osha.gov/SLTC/covid-19

f. Where more stringent federal, state, or local government COVID-19 restrictions or guidelines apply, follow the more stringent restrictions or guidelines.

OFFEROR’S QUESTIONS AND GOVERNMENT REPLY:

Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only” and do not revise the solicitation, plans or specifications.

Question 1:

In the notice of offerors item 5, the variation in estimated quantity is listed to be incorporated only to items 0004 and 0006, please confirm the intent is not to items 0003 and 0004.

Government Response 1:

FAR Clause 52.211-18, Variation in Estimated Quantity, is incorporated by reference and is applicable only to item Nos. 0004 and 0006AB.

Question 2:

Will we be allowed to escalate (inflation) the dollar value of our past projects to the current dollar?

Government Response 2:

For the purposes of Evaluation Factor 1, Offerors are not allowed to escalate nor inflate construction dollar value to meet the relevancy criteria.

Question 3:

Is there a BIM model available?

Government Response 3:

The BIM model can be provided to the contractor after the contract has been awarded. The government cannot provide a BIM model prior to award of the contract.

Question 4:

Please clarify the below, does the value of general conditions staff count towards meeting the 20% requirement?

o 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) The Contractor shall perform on the site, and with its own organization, work equivalent to at least 20 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

Government Response 4:

Yes - everything the prime contractor self-performs, including general conditions staffing, counts toward meeting the 20% requirement.

Question 5:

Under 1. 7 CONTRACTOR's KEY MANAGEMENT PERSONNEL: The contract documents are specific about the role of each full time team member, is the ACOE willing to adjust the staffing requirements and allow reduced staffing commitments to include and allow individuals to wear a different hat?

Government Response 5:

The contractor shall meet the minimum requirements described in SECTION 01 30 00. All Key Management Personnel Qualifications are to be submitted at the Preconstruction Conference and are subject to Contracting Officer Approval. The Preconstruction Conference occurs after award of the contract but prior to commencement of any work at the site.

Question 6:

Hello, Are AutoCAD files available for this project?

Government Response 6:

The CAD files can be provided to the contractor after the contract has been awarded. The government cannot provide a CAD files prior to award of the contract.

Question 7:

In accordance with solicitation section 3, relevant past performance 5.1.2 of the solicitation, the submitted projects must have been completed no later than 10 years, please define what escalation formula, criteria, calculation, assumptions, etc. can be used by the contractor for projects completed more than 5 years ago Government Response 7:

For the purposes of Evaluation Factor 1, Offerors are not allowed to escalate nor inflate construction dollar value to meet the relevancy criteria.

Question 8:

According with the solicitation section 3, 3.3 volume 1, contractor team arrangement experience will be considered, please clarify if there is a team arrangement, will the team experience be submitted as part of the 5 projects requested under relevant past performance 5.1.2 or will the offeror be allowed more than 5 projects to demonstrate the team experience?

Government Response 8:

Contractor should demonstrate five (5) projects total. In the case of entities that have formed a contractor team arrangement, the experience and performance history of any member of the team, whether or not gained while working with the other member(s) of the currently- proposed contractor team arrangement, will be considered as a part of the evaluation of the five (5) projects.

Question 9:

Reviewing this solicitation I see that both FAR 52.225-9 and -11 are included. Since the magnitude of construction is $100MM or more, I would assume that -11 under trade agreements would apply. Can you please include an addendum clarifying which one applies?

Government Response 9:

FAR 52.225-9 does not apply and it not included. It is referenced in FAR 52.225-10, which is now removed per this Amendment.

Question 10:

Will the Owner agree to indemnify the Contractor for pre-existing hazardous materials?

Government Response 10:

Contractor shall comply with Division 02 specifications. FAR Clause 52.236-2 Differing Site Conditions is incorporated by reference.

Question 11:

Will the Owner agree to be the Generator of all pre-existing hazardous materials encountered onsite?

Government Response 11:

Comply with SECTION 02 81 00 paragraph 3.1. When accumulating hazardous waste onsite, comply with generator requirements in 40 CFR 262 and any applicable state or local law or regulations.

Question 12:

Specification section 042000 only addresses the auxiliary materials and execution of concrete masonry units relative to the masonry work. Please provide specification sections for the stone (cast, limestone, and granite) scopes of work.

Government Response 12:

Please review SECTION 04 20 00 Page 11.

Specification section 042000 is the standard USG specification for unit masonry including cast stone, limestone and granite. With the exception of the larger limestone panels indicated on the drawings all other limestone, granite and cast stone units use basic unit masonry techniques and methods for building the stone veneer walls. As indicated on the drawings the larger limestone panels anchorage is to be engineered by stone manufacturer. No additional specifications are to be provided.

Question 13:

In a case where the Offeror or one of its affiliates was a member of a joint venture that contracted for the construction of a large project, may that project be considered as relevant past performance for the purposes of 5.1 of this solicitation? If so, are there any specific parameters related to the nature of that JV or contracting arrangement for that prior project that must be met and/or detailed in the Offeror's response to this solicitation?

Government Response 13:

In the case of joint ventures, the "Prime Offeror" experience includes entities with signed agreements. In the case of affiliates, Past performance of an Offeror's "affiliate," as that term is defined in FAR 2.101, will be evaluated if the Offeror demonstrates a firm commitment that the affiliate will participate meaningfully in the performance of the contract. This commitment and meaningful participation shall be described in a document signed by authorized representatives of both the Offeror and its affiliate.

Question 14:

It appears two statements within section 5.1.2 related to relevant past performance may be in conflict with one another. The first paragraph of this section states that "A minimum of two (2) projects should be examples showing rock excavation and removal as described in this solicitation." However, the last paragraph states that "Projects do not have to meet all criteria to be considered." Is it a minimum requirement that at least two projects submitted must each have at least 80,000 CY of rock removal, or, will projects with fewer than 80,000 CY of rock removal still be considered relevant as to rock excavation scope when evaluating past performance?

Government Response 14:

Past Performance Relevancy Ratings will be assigned in accordance with Table 1, which appears on page 24 of the Solicitation dated 3-June-2020. As indicated on Table 1, past performance efforts may be rated Very Relevant, Relevant, Somewhat Relevant, or Not Relevant.

(End of Summary of Changes)