Spec_-_Volume_2.pdf

PDF 5 MB Posted

Attached to
FY13 Flight Activity Facility, Lakehurst Naval Station, New Jersey
Solicitation number
W912DS-13-R-0017
Issued by

About this file

Specs Vol 2

View the file

Other files

File Type Posted
EP602.pdf PDF
EP407.pdf PDF
EP601.pdf PDF
EP411.pdf PDF
10_56_26.pdf PDF
ET105.pdf PDF
M-701.pdf PDF
ES105.pdf PDF
EP404.pdf PDF
Amendment_0007.pdf PDF
A-606.pdf PDF
41_22_13.15.pdf PDF
F-103.pdf PDF
ET601.pdf PDF
ET106.pdf PDF
ET103.pdf PDF
Amendment_0006_Attachment_6.pdf PDF
Amendment_0006_Attachment_4.pdf PDF
Amendment_0006_Attachment_2.pdf PDF
Amendment_0006_Attachment_10.pdf PDF
Amendment_0006_Attachment_3.pdf PDF
Amendment_0006_Attachment_9.pdf PDF
Amendment_0006_Attachment_8.pdf PDF
Amendment_0006.pdf PDF
Amendment_0006_Attachment_1.pdf PDF
Amendment_0006_Attachment_5.pdf PDF
Amendment_0006_Attachment_7.pdf PDF
Amendment_0005_Revised_Drawings.pdf PDF
Amendment_0005.pdf PDF
WBS_Fill-In.pdf PDF
Revised_drawings_-_Amendment_4.pdf PDF
Amendment_0004.pdf PDF
Specifications_-_Amendment__4.pdf PDF
Revised_Civil_Drawings_-_Amendment_3.pdf PDF
Revised_Architectural_Drawing_2_-_Amendment_3.pdf PDF
Specifications_-_Amendment_3.pdf PDF
Revised_Architectural_Drawing_1_-_Amendment_3.pdf PDF
Revised_Interior_Drawings_-_Amendment_3.pdf PDF
AMENDMENT_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_2 _Revised_Specs..pdf PDF
Amendment_2 _Drawings.pdf PDF
Drawings_1__M-306_and_M-603.pdf PDF
Amendment_0001.pdf PDF
Drawings_2___B-107_THRU_B-111.pdf PDF
Drawing_Vol_1B_.pdf PDF
00800_Exhibits.pdf PDF
Drawing_Vol_2C.pdf PDF
Drawing_Vol_1A_.pdf PDF
Drawing_Vol_2A.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FFYY1133 CCEERRDDEECC FFLLIIGGHHTT AACCTTIIVVIITTYY FFAACCIILLIITTYY ((PPNN 007711667755)) LLaakkeehhuurrsstt NNAAEESS JJBB MMccGGuuiirree//DDiixx//LLaakkeehhuurrsstt,, NNJJ

RRTTAA SSuubbmmiissssiioonn FFeebbrruuaarryy 1199,, 22001133 VVoolluummee 22 ooff 22

SSppeecciiffiiccaattiioonnss

CCOOMMMMUUNNIICCAATTIIOONNSS--EELLEECCTTRROONNIICCSS RREESSEEAARRCCHH

DDEEVVEELLOOPPMMEENNTT && EENNGGIINNEEEERRIINNGG CCEENNTTEERR ((CCEERRDDEECC))

CCoonnttrraacctt NNoo:: WW9900FFYYQQ--1100--DD--00000088 TTaasskk OOrrddeerr NNoo:: CCEE0033

FY13 CERDEC FLIGHT ACTIVITY FACILITY READY TO ADVERTISE SUBMISSION

LAKEHURST NAES - JB MCGUIRE/DIX/LAKEHURST, NEW JERSEY FEBRUARY 19, 2013

PROJECT TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00 SPECIAL CONTRACT REQUIREMENTS [See Synopsis]

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 31 32 GEOTECHNICAL DATA

01 32 01.00 18 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 LEED(TM) DOCUMENTATION

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 02.00 18 QUALITY CONTROL SYSTEM (QCS)

01 45 04.00 18 CONTRACTOR QUALITY CONTROL

01 45 20.00 18 TESTING FOR MECHANICAL AND ELECTRICAL SYSTEMS

01 45 35 SPECIAL INSPECTION

01 52 60.00 18 CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 62 35 RECYCLED/RECOVERED MATERIALS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00.00 18 CLOSEOUT SUBMITTALS

01 78 23.00 18 OPERATION AND MAINTENANCE DATA

01 91 10 GENERAL COMMISSIONING REQUIREMENTS

DIVISION 03 - CONCRETE

03 15 00.00 10 CONCRETE ACCESSORIES

03 30 00 CAST-IN-PLACE CONCRETE

03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION

DIVISION 04 - MASONRY

04 20 00 MASONRY

DIVISION 05 - METALS

05 05 23 WELDING, STRUCTURAL

05 12 00 STRUCTURAL STEEL

05 21 19 OPEN WEB STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 23 ALTERNATING TREAD STEEL STAIR

05 51 33 METAL LADDERS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 ARCHITECTURAL CASEWORK

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

06 61 19 QUARTZ SURFACING FABRICATIONS

PROJECT TABLE OF CONTENTS Page 1 e3enmdjl Typewritten Text 00 80 00.18 PICTURES, MAPS & EXHIBITS [See Exhibits]

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 08 00 COMMISSIONING OF THERMAL AND MOISTURE PROTECTION

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 00.45 10 BUILDING AIR BARRIER SYSTEM

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIER

07 42 43 ALUMINUM COMPOSITE WALL PANELS

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 72 53 SNOW GUARDS

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

07 95 00 EXPANSION CONTROL

DIVISION 08 - OPENINGS

08 08 00 COMMISSIONING OF OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS, WINDOWS AND FRAMES

08 14 00 WOOD DOORS

08 33 13 METAL ROLLING COUNTER DOORS

08 33 23 OVERHEAD COILING DOORS

08 34 16.20 VERTICAL LIFT FABRIC DOORS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 51 13 ALUMINUM WINDOWS

08 60 45 TRANSLUCENT PANELS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 06 90 COLOR SCHEDULE

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 00 CERAMIC TILE

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 65 36 STATIC-CONTROL RESILIENT FLOORING

09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM

09 68 00 CARPET

09 72 00 WALL COVERINGS

09 77 20 FIBERGLASS REINFORCED WALL PANELS

09 83 13 ACOUSTICAL WALL TREATMENT

09 90 00 PAINTS AND COATINGS

09 96 00 HIGH-PERFORMANCE COATINGS

PROJECT TABLE OF CONTENTS Page 2

DIVISION 10 - SPECIALTIES

10 14 01 EXTERIOR SIGNAGE

10 14 02 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 21 26 WELDING CURTAINS

10 22 13 WIRE MESH PARTITIONS

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS AND CABINETS

10 51 13 METAL LOCKERS

10 53 00 MANUFACTURED CANOPY

10 55 23 MAIL BOXES

10 56 26 MOTORIZED MOBILE STORAGE SYSTEM

10 81 13 BIRD NETTING

DIVISION 11 - EQUIPMENT

11 31 13 ELECTRIC KITCHEN EQUIPMENT

11 94 00 RIGID RAIL FALL RESTRAINT SYSTEM

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

12 22 00 CURTAINS AND DRAPES

12 24 13 ROLLER WINDOW SHADES

12 48 13.13 ENTRANCE FLOOR MATS

DIVISION 14 - CONVEYING EQUIPMENT

14 45 00 VERTICAL PERSONNEL LIFT

PROJECT TABLE OF CONTENTS Page 3

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 13 39 HIGH EXPANSION FOAM (HEF) FIRE PROTECTION SYSTEM

21 30 00 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 13 23 UNDERGROUND INTERCEPTOR TANKS

22 15 14 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 11 25 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 35 00.00 10 OVERHEAD VEHICLE TAILPIPE AND WELDING FUME EXHAUST REMOVAL

SYSTEMS

23 35 19.00 20 INDUSTRIAL VENTILATION AND EXHAUST

23 52 00 HEATING BOILERS

23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 74 33.00 40 PACKAGED, INDOOR, DIRECT GAS-FIRED MAKEUP AIR-UNITS (MAU-01,

MAU-02A, MAU-02B, MAU-04 and MAU-05)

23 81 47 WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

23 82 46 ELECTRIC UNIT HEATERS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 10 COMMISSIONING OF ELECTRICAL SYSTEMS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00 SWITCHBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 32 13.00 20 SINGLE OPERATION GENERATOR SETS

26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 41 00.00 20 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

26 56 20.00 10 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS

PROJECT TABLE OF CONTENTS Page 4

PROJECT TABLE OF CONTENTS Page 5

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 20 00.00 20 ELECTRONIC SECURITY SYSTEMS (ESS), COMMERCIAL

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS

32 01 26.71 GROOVING FOR AIRFIELD PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 10 DRAINAGE LAYER

32 11 23 AGGREGATE BASE COURSE

32 11 34 PORTLAND CEMENT-STABILIZED BASE OR SUBBASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 15 HOT-MIX ASPHALT (HMA) FOR AIRFIELDS

32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY

PAVEMENTS

32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 24.00 10 PAVEMENT MARKINGS

32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

32 84 24 IRRIGATION SPRINKLER SYSTEMS

32 92 19 SEEDING

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 11 23 NATURAL GAS PIPING

33 16 15 WATER STORAGE STEEL TANKS

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 46 16 SUBDRAINAGE SYSTEM

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING

41 22 23.19 MONORAIL HOISTS

-- End of Project Table of Contents --

SECTION 21 13 13.00 10

WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

05/09

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

Air Force Engineering Technical Letter (ETL)

ETL 02-15 (2002) Fire Protection Engineering Criteria - New Aircraft Facilities (Air Force)

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI A13.1 (2007) Standards for Pipe Marking

ASME INTERNATIONAL (ASME)

ASME B16.1 (2010) Gray Iron Threaded Fittings;

Classes 25, 125 and 250

ASME B16.11 (2011) Forged Fittings, Socket-Welding and Threaded

ASME B16.21 (2011) Nonmetallic Flat Gaskets for Pipe Flanges

ASME B16.3 (2011) Malleable Iron Threaded Fittings, Classes 150 and 300

ASME B16.4 (2006) Standard for Gray Iron Threaded Fittings; Classes 125 and 250

ASME B16.9 (2007) Standard for Factory-Made Wrought Steel Buttwelding Fittings

ASME B18.2.2 (2010) Standard for Square and Hex Nuts

ASTM INTERNATIONAL (ASTM)

ASTM A 135/A 135M (2009) Standard Specification for Electric-Resistance-Welded Steel Pipe

ASTM A 183 (2003; R 2009) Standard Specification for Carbon Steel Track Bolts and Nuts

ASTM A 193/A 193M (2009) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications

SECTION 21 13 13.00 10 Page 1

ASTM A 449 (2007b) Standard Specification for Hex Cap Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use

ASTM A 47/A 47M (1999; R 2009) Standard Specification for Ferritic Malleable Iron Castings

ASTM A 53/A 53M (2007) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A 536 (1984; R 2009) Standard Specification for Ductile Iron Castings

ASTM A 563 (2007a) Standard Specification for Carbon and Alloy Steel Nuts

ASTM A 795/A 795M (2008) Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use

ASTM F 436 (2011) Hardened Steel Washers

FM GLOBAL (FM)

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/CC_host/ pages/public/custom/FM/login.cfm

MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS

INDUSTRY (MSS)

MSS SP-71 (2011) Gray Iron Swing Check Valves, Flanged and Threaded Ends

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 13 (2010; Errata 10-1; tia 10-1 AND 11-2) Installation of Sprinkler Systems

NFPA 170 (2012) Standard for Fire Safety and Emergency Symbols

NFPA 24 (2010) Standard for the Installation of Private Fire Service Mains and Their Appurtenances

UNDERWRITERS LABORATORIES (UL)

UL Bld Mat Dir (2011) Building Materials Directory

UL Fire Prot Dir (2011) Fire Protection Equipment Directory

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-310-04 (2007; Change 1) Seismic Design for

SECTION 21 13 13.00 10 Page 2

Buildings

UFC 3-600-01 (2006; Change 1, July 14, 2009) Fire Protection Engineering for Facilities

UFC 4-010-01 (2012) DoD Minimum Antiterrorism Standards for Buildings

1.2 SYSTEM DESCRIPTION

Provide wet pipe sprinkler system in all areas of the building. Except as modified herein, the system shall be designed and installed in accordance with NFPA 13, UFC 3-600-01 and ETL 02-15. Pipe sizes shall be determined by hydraulic calculation. Design any portions of the sprinkler system that are not indicated on the drawings including locating sprinklers, piping and equipment, and size piping and equipment when this information is not indicated on the drawings or is not specified herein.

The design of the sprinkler system shall be based on hydraulic calculations, and the other provisions specified herein. Furnish piping offsets, fittings, and any other accessories as required to provide a complete installation and to eliminate interference with other construction. Install sprinkler system over and under ducts, piping and platforms when such equipment can negatively effect or disrupt the sprinkler discharge pattern and coverage.

1.2.1 Hydraulic Design

Hydraulically design the Maintenance Bay wet pipe system to discharge a minimum density of 0.20 gpm/square foot over the hydraulically most demanding 5000 square feet of Hangar Bay. Support area design densities and areas are indicated on the drawings. The minimum pipe size for branch lines in gridded systems shall be 1-1/4 inch. Hydraulic calculations shall be in accordance with the Area/Density Method of NFPA 13. Water velocity in the piping shall not exceed 20 ft/s above grade and 10 ft/s below grade.

1.2.1.1 Basis for Calculations

The design of the system shall be based upon the water supply identified in Section 21 13 39 HIGH EXPANSION FOAM (HEF) FIRE PROTECTION SYSTEM operating with the supply from the fire pumps provided in Section 21 30 00. Hangar Bay sprinkler systems shall have a corresponding HEF system discharging concurrently in a single calculation. Hydraulic calculations shall be based upon the Hazen-Williams formula with a "C" value of 120 for steel piping, 150 for copper tubing and PVC, 140 for new cement-lined ductile-iron piping, and 100 for existing underground piping.

1.2.1.2 Hydraulic Calculations

Prepare hydraulic calculations as outlined in NFPA 13, except that calculations shall be performed by computer using software intended specifically for fire protection system design using the design data shown on the drawings. Software that uses k-factors for typical branch lines is not acceptable. Calculations shall substantiate that the design area used in the calculations is the most demanding hydraulically. Water supply curves and system requirements shall be plotted on semi-logarithmic graph paper so as to present a summary of the complete hydraulic calculation for both supply curve and demand curve. Computer generated water supply curves will not satisfy requirement. Provide a summary sheet listing sprinklers and foam generators in the design area and their respective hydraulic

SECTION 21 13 13.00 10 Page 3 reference points, elevations, actual discharge pressures and actual flows.

Elevations of hydraulic reference points (nodes) shall be indicated.

Documentation shall identify each pipe individually and the nodes connected thereto. Provide a friction loss curve for each friction loss device.

Indicate the diameter, length, flow, velocity, friction loss, number and type of fittings, total friction loss in the pipe, equivalent pipe length and Hazen-Williams coefficient for each pipe. Maximum velocity for above grade piping shall be 20 fps. For gridded systems, calculations shall show peaking of demand area friction loss to verify that the hydraulically most demanding area is being used. Also for gridded systems, a flow diagram indicating the quantity and direction of flows shall be included. A drawing showing hydraulic reference points (nodes) and pipe designations used in the calculations shall be included and shall be independent of shop drawings. Hangar Bay wet pipe system shall be calculated to discharge concurrently with HEF system as described in Section 21 13 39 HIGH EXPANSION FOAM (HEF) FIRE PROTECTION SYSTEM. Demand hydraulic calculations shall be based on the weakest combined water supply curve when the fire water tank is at the low level; supply hydraulic calculations shall be based on the strongest combined water supply curve when the fire water tank is at the high level.

1.2.2 Sprinkler Coverage

Sprinklers shall be uniformly spaced on branch lines. Sprinklers shall provide coverage throughout 100 percent of the building. This includes, but is not limited to, telephone rooms, electrical equipment rooms, boiler rooms, switchgear rooms, transformer rooms, and other electrical and mechanical spaces. Coverage per sprinkler shall be in accordance with NFPA 13, but shall not exceed 100 square feet for extra hazard occupancies, 130 square feet for ordinary hazard occupancies, and 225 square feet for light hazard occupancies.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. All submittals must be submitted to and approved by the USACE Center of Expertise (TCX) for hangar fire protection: Ravi Grewal, PE, US Army Corps of Engineers, Middle East District, 201 Prince Frederick Drive, Winchester, VA 22604, Phone: (540) 665-3901. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction

Fire Protection Specialist; G, AE

The name and documentation of certification of the proposed Fire Protection Specialist, no later than 14 days after the Notice to Proceed and prior to the submittal of the sprinkler system drawings and hydraulic calculations. Submit qualifications of Shop Drawing Preparer if different from Fire Protection Specialist.

Sprinkler System Installer; G, AE

The name and documentation of certification of the proposed Sprinkler System Installer, concurrent with submittal of the Fire Protection Specialist Qualifications.

Fire Protection Related Submittals; G, AE

SECTION 21 13 13.00 10 Page 4

A list of the Fire Protection Related Submittals, no later than 7 days after the approval of the Fire Protection Specialist.

These submittals shall include fire suppression, detection, and alarm, underground systems supplying the fire protection system, etc.

SD-02 Shop Drawings

Shop Drawings; G, AE

Three copies of the Sprinkler System Shop Drawings, no later than 45 working days prior to the start of sprinkler system installation. Shop drawings shall be prepared according to NFPA 13 requirements. Base symbols on NFPA 170. Submit concurrent with product data and Section 21 13 39 HIGH EXPANSION FOAM (HEF) FIRE

PROTECTION SYSTEM.

As-Built Drawings

As-built shop drawings, at least 14 days after completion of the Final Tests, updated to reflect as-built conditions after all related work is completed. Drawings shall be on reproducible full-size mylar film. Include all piping, equipment and sprinkler locations.

SD-03 Product Data

Materials and Equipment; G, AE

Manufacturer's catalog data included with the Sprinkler System Drawings for all items specified herein. The data shall be clearly marked or highlighted to show model, size, options, etc., that are intended for consideration. Data shall be adequate to demonstrate compliance with all contract requirements. In addition, provide a complete equipment list that includes equipment description, model number and quantity. Submit concurrently with shop drawings.

Spare Parts

Spare parts data for each different item of material and equipment specified.

Preliminary Test Plan and Test Procedures; G, AE

Proposed procedures for Preliminary Tests, no later than 60 days prior to the proposed start of the tests. Proposed date and time to begin the preliminary tests. Submit a list of tests to be conducted, blank forms for recording test data for each test, the procedure to be followed for each test, a list of all equipment required for each test, and calibration certificates for all testing equipment.

Final Acceptance Test Plan and Test Procedures; G, AE

Proposed procedures, schedule and personnel required for Final Acceptance Test, no later than 30 days prior to the proposed start of the tests. Proposed date and time to begin Final Acceptance

SECTION 21 13 13.00 10 Page 5

Test, submitted with the Final Acceptance Test Procedures.

Notification shall be provided at least 30 days prior to the proposed start of the test. Notification shall include a copy of the Contractor's Material & Test Certificates, four copies of the Preliminary Test DVD, preliminary as-builts, O&M manuals, as well as, preliminary test reports. At least 15 days prior to final acceptance testing, provide a copy of the "punch list" of deficiencies prepared at the completion of preliminary tests and their means of resolution.

Onsite Training; G, AE

Proposed Onsite Training schedule, at least 14 days prior to the start of related training.

SD-05 Design Data

Sway Bracing; G, AE

Load calculations for sizing of sway bracing. Systems are required to be protected against damage from earthquakes. Design and install in accordance with NFPA 13 and UFC 3-310-04. Support calculations for equipment over 30 pounds shall be in accordance with UFC 4-010-01. Calculations shall be sealed and signed by a professional structural engineer.

a. Identify each brace with a brace number on shop drawings.

b. Provide seismic bracing calculations in accordance with NFPA 13, latest edition, Figures A.9.3.5(a) and A.9.3.5(b). Do not used edited copies of Figures A.9.3.5(a) and A.9.3.5(b)

c. Clearly identify on calculation sheet each brace with corresponding brace number on drawings.

d. Clearly identify if the brace is a longitudinal or lateral brace.

e. Sway bracing calculations shall be signed and sealed by a registered professional engineer.

Hydraulic Calculations; G, AE

Hydraulic calculations, including a drawing showing hydraulic reference points and pipe segments. Submit concurrently with shop drawings sealed and signed by the Fire Protection Specialist per ETL 02-15, paragraph A1.6.1.1.1. Hangar wet pipe sprinkler system calculations shall be performed per the requirements of Section 21 13 39 HIGH EXPANSION FOAM (HEF) FIRE PROTECTION SYSTEM for concurrent flow of the HEF system.

SD-06 Test Reports

Preliminary Test Report; G, RO

Four copies of the completed Preliminary Test Report, no later than 14 days after the completion of the Preliminary Tests. The Preliminary Test Report shall include both the Contractor's Material and Test Certificate for Underground Piping, the

SECTION 21 13 13.00 10 Page 6

Contractor's Material and Test Certificate for Aboveground Piping, the printout of all testing from fire alarm and foam control panel, plus the DVD recording of the preliminary testing. All items in the Preliminary Test Report shall be signed by the Fire Protection Specialist. See Section 21 13 39 HIGH EXPANSION FOAM (HEF) FIRE PROTECTION SYSTEM for additional requirements.

Final Acceptance Test Report; G, RO

Four copies of the completed Final Acceptance Test Report, no later than 14 days after the completion of the Final Acceptance Test. Include four copies of the DVD recording of the final testing. All items in the Final Acceptance Report shall be signed by the Fire Protection Specialist.

SD-07 Certificates

Certificates of Qualifications of Welders; G, RO

Inspection by Fire Protection Specialist; G, RO

SD-10 Operation and Maintenance Data

Operating and Maintenance Instructions; G, RO

Six manuals listing step-by-step procedures required for system startup, operation, shutdown, and routine maintenance, in accordance with Section 01 78 23.00 18 OPERATION AND MAINTENANCE DATA, at least 14 days prior to field training. The manuals shall include the manufacturer's name, model number, parts list, list of parts and tools that should be kept in stock by the owner for routine maintenance including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization (including address and telephone number) for each item of equipment. Include a copy of the posted instructions. Include a key-plan type block diagram showing geographic limits of each new fire suppression system.

Include fire suppression system schematic diagram annotated with zone and device identifiers corresponding to the annotated key plan and fire alarm system identifiers.

1.4 QUALITY ASSURANCE

Compliance with referenced NFPA standards is mandatory. This includes advisory provisions listed in the appendices of such standards, as though the word "shall" had been substituted for the word "should" wherever it appears. In the event of a conflict between specific provisions of this specification and applicable NFPA standards, this specification shall govern. Reference to "authority having jurisdiction" shall be interpreted to mean the Contracting Officer.

1.4.1 Fire Protection Specialist

a. Perform work specified in this section under the supervision of and certified by the Fire Protection Specialist. The Fire Protection Specialist shall be a qualified Fire Protection Engineer (FPE) as defined in ETL 02-15, Paragraph A1-6.1.1.1 and shall sign all shop drawings, hydraulic calculations and reports. The Fire Protection Specialist shall be directly employed by the Contractor and not by any

SECTION 21 13 13.00 10 Page 7 subcontractor. The Fire Protection Specialist shall be regularly engaged in the design and installation of the type and complexity of system specified in the Contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.

b. Installation drawings, shop drawings and as-built drawings shall be prepared by the Fire Protection Specialist or by an individual who is experienced with the types of work specified, and is a qualified FPE as defined in ETL 02-15, Paragraph A1-6.1.1.1, or a NICET certified Level IV technician. Drawings and calculations shall be sealed and signed by the Fire Protection Specialist, and if not prepared by the Fire Protection Specialist, shall also by signed by the NICET IV certified individual described above.

1.4.2 Sprinkler System Installer

Work specified in this section shall be performed by the Sprinkler System Installer who is regularly engaged in the installation of the type and complexity of system specified in the contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.

1.4.3 Shop Drawings

Shop Drawings shall conform to the requirements established for working plans as prescribed in NFPA 13. Drawings shall include plan and elevation views demonstrating that the equipment will fit the allotted spaces with clearance for installation and maintenance. Each set of drawings shall include the following:

a. Descriptive index of drawings in the submittal with drawings listed in sequence by drawing number. A legend identifying device symbols, nomenclature, and conventions used.

b. Floor plans drawn to a scale not less than 1/8" = 1'-0" which clearly show locations of sprinklers, risers, pipe hangers, seismic separation assemblies, sway bracing, inspector's test connections, drains, and other applicable details necessary to clearly describe the proposed arrangement. Each type of fitting used and the locations of any welded joints shall be indicated. Show provisions for flushing per NFPA 13, including flushing connections at all cross mains. Show location of access panels in ceilings.

c. Actual center-to-center dimensions between sprinklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler feed mains, cross-mains and branch lines to finished floor and roof or ceiling. A detail shall show the dimension from the sprinkler and sprinkler deflector to the ceiling in finished areas.

d. Longitudinal and transverse building sections showing typical branch line and cross-main pipe routing as well as elevation of each typical sprinkler above finished floor.

e. Details of each type of riser assembly; pipe hanger; sway bracing for earthquake protection, and restraint of underground water main at point-of-entry into the building, and electrical devices and interconnecting wiring.

SECTION 21 13 13.00 10 Page 8

1.5 DELIVERY, STORAGE, AND HANDLING

All equipment delivered and placed in storage shall be housed in a manner to preclude any damage from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Additionally, all pipes shall either be capped or plugged until installed.

1.6 EXTRA MATERIALS

Submit spare parts data for each different item of material and equipment specified. The data shall include a complete list of parts and supplies, with current unit prices and source of supply, and a list of parts recommended by the manufacturer to be replaced after 1 year and 3 years of service. A list of special tools and test equipment required for maintenance and testing of the products supplied by the Contractor shall be included.

PART 2 PRODUCTS

2.1 STANDARD PRODUCTS

Provide materials and equipment which are standard products of a manufacturer regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening.

2.2 NAMEPLATES

All equipment shall have a nameplate that identifies the manufacturer's name, address, type or style, model or serial number, and catalog number.

2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE

Provide Materials and Equipment that have been tested by Underwriters Laboratories, Inc. and are listed in UL Fire Prot Dir or approved by Factory Mutual and listed in FM APP GUIDE. Where the terms "listed" or "approved" appear in this specification, such shall mean listed in UL Fire Prot Dir or FM APP GUIDE.

2.4 UNDERGROUND PIPING COMPONENTS

Refer to Section 21 13 39 HIGH EXPANSION FOAM (HEF) FIRE PROTECTION SYSTEM.

2.5 ABOVEGROUND PIPING COMPONENTS

Aboveground piping shall be steel.

2.5.1 Steel Piping Components

2.5.1.1 Steel Pipe

Except as modified herein, steel pipe shall be black or galvanized as permitted by NFPA 13 and shall conform to applicable provisions of ASTM A 795/A 795M, ASTM A 53/A 53M, or ASTM A 135/A 135M. Pipe shall be Schedule 40. Pipe shall be marked with the name of the manufacturer, kind of pipe, and ASTM designation. Schedule 10 pipe is not permitted.

SECTION 21 13 13.00 10 Page 9

2.5.1.2 Fittings for Non-Grooved Steel Pipe

Fittings shall be cast iron conforming to ASME B16.4, steel conforming to ASME B16.9 or ASME B16.11, or malleable iron conforming to ASME B16.3.

Galvanized fittings shall be used for piping systems or portions of piping systems utilizing galvanized piping. Fittings into which sprinklers, drop nipples or riser nipples (sprigs) are screwed shall be threaded type.

Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe, weld-o-lets and welded fittings shall not be used. Fittings which require making a hole in the pipe shall not be used.

2.5.1.3 Grooved Mechanical Joints and Fittings

Joints and fittings shall be designed for not less than 175 psi service and shall be the product of the same manufacturer; segmented welded fittings shall not be used. Fitting and coupling houses shall be malleable iron conforming to ASTM A 47/A 47M, Grade 32510 or ductile iron conforming to ASTM A 536, Grade 65-45-12. Gasket shall be the flush type that fills the entire cavity between the fitting and the pipe. Nuts and bolts shall be heat-treated steel conforming to ASTM A 183 and shall be cadmium plated or zinc electroplated. Fittings which require making a hole in the pipe shall not be used.

2.5.1.4 Flanges

Flanges shall conform to NFPA 13 and ASME B16.1. Gaskets shall be non-asbestos compressed material in accordance with ASME B16.21, 1/16 inch thick, and full face or self-centering flat ring type.

2.5.1.5 Bolts, Nut, and Washers

Bolts shall be conform to ASTM A 449, Type 1 and shall extend no less than three full threads beyond the nut with bolts tightened to the required torque. Nuts shall be hexagon type conforming to ASME B18.2.2 or ASTM A 193/A 193M, Grade 5 or ASTM A 563, Grade C3 or DH3. Washers shall meet the requirements of ASTM F 436. Flat circular washers shall be provided under all bolt heads and nuts.

2.5.2 Pipe Hangers

Hangers shall be listed in UL Fire Prot Dir or FM APP GUIDE and of the type suitable for the application, construction, and pipe type and sized to be supported. Hangers shall conform to NFPA 13 requirements for areas subject to earthquakes. Support piping from building structure only. Do not hang from underside of roof deck or from other equipment or materials.

2.5.3 Valves

2.5.3.1 Control Valve and Gate Valve

Manually operated sprinkler control valve and gate valve shall be outside stem and yoke (OS&Y) type and shall be listed in UL Bld Mat Dir or FM APP GUIDE. Butterfly valves are not allowed except in the test header for throttling.

2.5.3.2 Check Valve

Check valve 2 inches and larger shall be listed in UL Bld Mat Dir or

SECTION 21 13 13.00 10 Page 10

FM APP GUIDE. Check valves 4 inches and larger shall be of the swing type with flanged cast iron body and flanged inspection plate, shall have a clear waterway and shall meet the requirements of MSS SP-71, for Type 3 or 4.

2.6 RISER CHECK VALVE

Assembly shall include a riser check valve, standard trim piping, pressure gauges, main drain, and other components as required for a fully operational system.

2.7 WATERFLOW ALARM HORN/STROBE

Refer to Section 28 31 76 FIRE ALARM AND MASS NOTIFICATION

2.8 ALARM INITIATING AND SUPERVISORY DEVICES

2.8.1 Sprinkler Waterflow Indicator Switch, Vane Type

Switch shall be vane type with a pipe saddle and cast aluminum housing.

The electro-mechanical device shall include a flexible, low-density polyethylene paddle conforming to the inside diameter of the fire protection pipe. The device shall sense water movements and be capable of detecting a sustained flow of 10 gpm or greater. The device shall contain a retard device adjustable from 0 to 90 seconds to reduce the possibility of false alarms caused by transient flow surges. The switch shall be tamper resistant and contain two SPDT (Form C) contacts arranged to transfer and send a supervisory signal upon removal of the housing cover, and shall be equipped with a silicone rubber gasket to assure positive water seal and a dustproof cover and gasket to seal the mechanism from dirt and moisture.

2.8.2 Valve Supervisory (Tamper) Switch

Switch shall be suitable for mounting to the type of control valve to be supervised open. The switch shall be tamper resistant and contain one set of SPDT (Form C) contacts arranged to transfer upon removal of either the housing cover or closure of the valve of more than two rotations of the valve stem. All system control valves shall be provided with supervisory switches.

2.9 FIRE DEPARTMENT CONNECTION

Fire department connection shall be wall mounted type with cast brass body and escutcheon lettered "Auto Spkr" with a polished brass finish. The connection shall be a 5 inch Storz connection turned down to a 30 degree angle with cap and chain. Fire department connection (FDC) shall not serve the HEF system.

2.10 SPRINKLERS

Sprinklers with internal O-rings shall not be used. Sprinklers shall be used in accordance with their listed coverage limitations. Temperature classification shall be 175 degrees F rated in the Hangar Bay and 165 degrees F in all other areas, unless indicated otherwise or required by NFPA 13, as indicated. Sprinklers in high heat areas including attic spaces or in close proximity to unit heaters shall have temperature classification in accordance with NFPA 13. Extended coverage sprinklers shall not be used. All heads placed in ceiling tiles shall be recessed and

SECTION 21 13 13.00 10 Page 11 located a minimum of 6 inches from ceiling grid. Sprinklers placed below grating shall be shielded from discharge of overhead sprinklers.

2.10.1 Recessed Sprinkler

Recessed sprinkler shall be chrome-plated quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.

2.10.2 Pendent Sprinkler

Pendent sprinkler shall be of the fusible strut or glass bulb type, recessed, quick-response type with nominal 1/2 inchor 17/32 inch or orifice. Pendent sprinklers shall have a polished chrome or white polyester finish.

2.10.3 Upright Sprinkler

Upright sprinkler shall be brass, chrome-plated or white polyester, quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.

2.10.4 Sidewall Sprinkler

Sidewall sprinkler shall have a nominal 1/2 inch orifice. Sidewall sprinkler shall have a brass, polished chrome or white polyester finish.

Sidewall sprinkler shall be the quick-response type.

2.11 ACCESSORIES

2.11.1 Sprinkler Cabinet

Spare sprinklers shall be provided in accordance with NFPA 13 and shall be packed in a suitable metal or plastic cabinet. Spare sprinklers shall be representative of, and in proportion to, the number of each type and temperature rating of the sprinklers installed. At least one wrench of each type required shall be provided.

2.11.2 Pendent Sprinkler Escutcheon

Escutcheon shall be one-piece metallic type with a depth of less than 3/4 inch and suitable for installation on pendent sprinklers. The escutcheon shall have a factory finish that matches the pendent sprinkler heads.

2.11.3 Pipe Escutcheon

Escutcheon shall be polished chromium-plated zinc alloy, or polished chromium-plated copper alloy. Escutcheons shall be either one-piece or split-pattern, held in place by internal spring tension or set screw.

2.11.4 Sprinkler Guard

Guard shall be a steel wire cage designed to encase the sprinkler and protect it from mechanical damage. Guards shall be provided on sprinklers located as indicated, and in elevator pits and equipment rooms, and at locations 7 feet or less above finished floor.

2.11.5 Identification Sign

Valve identification sign shall be minimum 6 inches wide by 2 inches high with enamel baked finish on minimum 18 gauge steel or 0.024 inch aluminum

SECTION 21 13 13.00 10 Page 12 with red letters on a white background or white letters on red background.

Wording of sign shall include, but not be limited to "main drain," "auxiliary drain," "inspector's test," "alarm test," "alarm line," and similar wording as required to identify operational components.

2.12 EXPANSION TANK

Expansion tank shall be FM approved or UL listed for use with the fire protection systems. Submit calculation performed by the equipment manufacturer supporting tank selection. Identify charge pressure.

PART 3 EXECUTION

3.1 FIELD MEASUREMENTS

After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.

3.2 INSTALLATION REQUIREMENTS

The installation shall be in accordance with the applicable provisions of UFC 3-600-01, NFPA 13, NFPA 24 and publications referenced therein.

3.3 INSPECTION BY FIRE PROTECTION SPECIALIST

Prior to ceiling installation and concurrent with the Final Acceptance Test Report, certification by the Fire Protection Specialist that the sprinkler system is installed in accordance with the contract requirements, including signed approval of the Preliminary and Final Acceptance Test Reports. The Fire Protection Specialist shall: 1) inspect the sprinkler system periodically during the installation to assure that the sprinkler system is being provided and installed in accordance with the contract requirements, including an above-the-ceiling inspection, 2) witness the preliminary and final acceptance tests, and sign the test results, 3) after completion of the system inspections and a successful final test, certify in writing that the system has been installed in accordance with the contract requirements. Any discrepancy shall be brought to the attention of the Contracting Officer in writing, no later than three working days after the discrepancy is discovered.

3.4 ABOVEGROUND PIPING INSTALLATION

3.4.1 Protection of Piping Against Earthquake Damage

Seismically protect the system piping against damage from earthquakes.

This requirement is not subject to determination under NFPA 13. Install the seismic protection of the system piping in accordance with UFC 3-310-04, NFPA 13 and Annex A. Include the required features identified therein that are applicable to the specific piping system. All C-clamp attachments shall be provided with restraining straps. All equipment over 31 pounds shall be braced per UFC 4-010-01.

3.4.2 Piping in Exposed Areas

Install exposed piping without diminishing exit access widths, corridors or equipment access. Exposed horizontal piping, including drain piping, shall be installed to provide maximum headroom. Provide access to all valves and equipment in fire protection room without climbing over or ducking under

SECTION 21 13 13.00 10 Page 13 piping. All valves 7 feet above finished floor shall be provided with chain operators. All valves 10 feet above finished floor shall be provided with platforms for access.

3.4.3 Piping in Finished Areas

In areas with suspended or dropped ceilings and in areas with concealed spaces above the ceiling, piping shall be concealed above ceilings. Piping shall be inspected, tested and approved before being concealed. Risers and similar vertical runs of piping in finished areas shall be concealed.

Piping shall be provided with identification and flow markings at maximum 26 foot intervals.

3.4.4 Pendent Sprinklers

Drop nipples to pendent sprinklers shall consist of minimum 1 inch pipe with a reducing coupling into which the sprinkler shall be threaded.

Hangers shall be provided on arm-overs to drop nipples supplying pendent sprinklers when the arm-over exceeds 12 inches. Recessed pendent sprinklers shall be installed such that the distance from the sprinkler deflector to the underside of the ceiling shall not exceed the manufacturer's listed range and shall be of uniform depth throughout the finished area. Pendent sprinklers in suspended ceilings shall be a minimum of 6 inches from ceiling grid.

3.4.5 Upright Sprinklers

Riser nipples or "sprigs" to upright sprinklers shall contain no fittings between the branch line tee and the reducing coupling at the sprinkler.

Riser nipples exceeding 30 inches in length shall be individually supported.

3.4.6 Pipe Joints

Pipe joints shall conform to NFPA 13, except as modified herein. Not more than four threads shall show after joint is made up. Welded joints on the headers will be permitted, only if welding operations are performed as required by NFPA 13 at the Contractor's fabrication shop, not at the project construction site. Provide certification for welders. Flanged joints shall be provided where indicated or required by NFPA 13. Grooved pipe and fittings shall be prepared in accordance with the manufacturer's latest published specification according to pipe material, wall thickness and size. Grooved couplings, fittings and grooving tools shall be products of the same manufacturer. The diameter of grooves made in the field shall be measured using a "go/no-go" gauge, vernier or dial caliper, narrow-land micrometer, or other method specifically approved by the coupling manufacturer for the intended application. Groove width and dimension of groove from end of pipe shall be measured and recorded for each change in grooving tool setup to verify compliance with coupling manufacturer's tolerances. Grooved joints shall not be used in concealed locations, such as behind solid walls or ceilings, unless an access panel is installed and shown on the drawings for servicing or adjusting the joint.

3.4.7 Reducers

Reductions in pipe sizes shall be made with one-piece tapered reducing fittings. The use of bushings or, grooved-end or rubber-gasketed reducing couplings will not be permitted.

SECTION 21 13 13.00 10 Page 14

3.4.8 Pipe Penetrations

Cutting structural members for passage of pipes or for pipe-hanger fastenings will not be permitted. Pipes that must penetrate concrete or masonry walls or concrete floors shall be core-drilled and provided with pipe sleeves. Each sleeve shall be Schedule 40 galvanized steel, ductile iron or cast iron pipe and shall extend through its respective wall or floor and be cut flush with each wall surface. Sleeves shall provide required clearance between the pipe and the sleeve per NFPA 13 for earthquake clearances. The space between the sleeve and the pipe shall be firmly packed with mineral wool insulation. Where pipes penetrate fire walls, fire partitions, or floors, pipes shall be fire stopped in accordance with Section 07 84 00 FIRESTOPPING. In penetrations that are not fire-rated or not a floor penetration, the space between the sleeve and the pipe shall be sealed at both ends with plastic waterproof cement that will dry to a firm but pliable mass or with a mechanically adjustable segmented elastomer seal.

3.4.9 Escutcheons

Escutcheons shall be provided for pipe penetration of ceilings and walls.

Escutcheons shall be securely fastened to the pipe at surfaces through which piping passes.

3.4.10 Inspector's Test Connection

Unless otherwise indicated, test connection shall consist of 1 inch pipe connected at the riser as a combination test and drain valve; and a painted metal identification sign affixed to the valve with the words "Inspector's Test." The discharge shall be discharged to drain without splashing.

Provide a sign at the Hangar sprinkler test valve stating that the foam system will discharge upon operation of valve. Remove handle and store in cabinet in the fire protection room.

3.4.11 Drains

Main drain piping shall be provided to discharge to a splash block on the building exterior. Sprinkler piping shall be fully accessible with drain valves no higher than 7 feet AFF. Drain valves shall be used where drain plugs are allowed by NFPA 13. Auxiliary drains shall be provided as required by NFPA 13. Provide a sign at Hangar Bay drain valves stating that the foam system will discharge upon operation of the valve and show on posted O&M Instructions. Remove handle and store in cabinet in the FP Room.

3.4.12 Installation of Fire Department Connection

Connection shall be wall-mounted type, outside of the fire protection room.

The piping between the connection and the check valve shall be provided with an automatic drip in accordance with NFPA 13 and arranged to drain to the outside.

3.4.13 Identification Signs

Signs shall be affixed to each control valve, inspector test valve, main drain, auxiliary drain, test valve, and similar valves as appropriate or as required by NFPA 13. Hydraulic design data nameplates shall be permanently affixed to each sprinkler riser as specified in NFPA 13.

SECTION 21 13 13.00 10 Page 15

3.5 UNDERGROUND PIPING INSTALLATION

Refer to Section 21 13 39 HIGH EXPANSION FOAM (HEF) FIRE PROTECTION SYSTEM.

3.6 ELECTRICAL WORK

Except as modified herein, electric equipment and wiring shall be in accordance with Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Alarm signal wiring connected to the building fire alarm control system shall be in accordance with Section 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM. All wiring for supervisory and alarm circuits shall be #14 AWG solid copper installed in metallic tubing (EMT) or conduit.

Wiring color code shall remain uniform throughout the system.

3.7 PIPE COLOR CODE MARKING

Color code marking of piping shall be as specified in Section 09 90 00 PAINTS AND COATINGS. Piping in fire protection rooms and mechanical rooms shall be cleaned and painted red. Finish paint piping in exposed areas per Section 09 90 00 PAINTS AND COATINGS, in facility coordinated color and provide with plastic wraparound identification and flow markings conforming to ANSI A13.1 at maximum 26 foot intervals. Legends include Fire Protection Water and Fire Sprinkler. Labels are not required on sprinkler system branch lines or piping smaller than 2 inch. Do not paint over equipment nameplates.

3.8 PRELIMINARY TESTS

The system, including the underground water mains, and the aboveground piping and system components, shall be tested to assure that equipment and components function as intended. The underground and aboveground interior piping systems and attached appurtenances subjected to system working pressure shall be tested in accordance with NFPA 13 and NFPA 24. Specific flushing and testing requirements for the underground piping system are specified in Section 21 13 39 HIGH EXPANSION FOAM (HEF) FIRE PROTECTION SYSTEM. Upon completion of specified tests, complete certificates and other items as specified in paragraph SUBMITTALS. In addition to written confirmation of all test results, all preliminary tests shall be video recorded to show the methods and equipment employed to conduct the tests and shall be delivered in DVD format. Testing shall be coordinated with the requirements of Section 28 31 76 FIRE ALARM AND MASS NOTIFICATION SYSTEM and Section 21 13 39 HIGH EXPANSION FOAM (HEF) FIRE PROTECTION

SYSTEM.

3.8.1 Underground Piping

3.8.1.1 Hydrostatic Testing

New underground piping shall be hydrostatically tested in accordance with NFPA 24. The allowable leakage shall be measured at the specified test pressure by pumping from a calibrated container. The amount of leakage at the joints shall not exceed 2 quarts per hour per 100 gaskets or joints, regardless of pipe diameter.

3.8.2 Aboveground Piping

3.8.2.1 Hydrostatic Testing

Aboveground piping shall be hydrostatically tested in accordance with

SECTION 21 13 13.00 10 Page 16

NFPA 13 at not less than 225 psi or 50 psi in excess of maximum system operating pressure over 175 psi and shall maintain that pressure without loss for 2 hours. There shall be no drop in gauge pressure or visible leakage when the system is subjected to the hydrostatic test. The test pressure shall be read from a gauge located at the high elevation point of the system or portion being tested.

3.8.3 Testing of Alarm Devices

Each alarm switch shall be tested by flowing water through the inspector's test connection. Each water-operated alarm device shall be tested to verify proper operation.

3.8.4 Main Drain Flow Test

Following flushing of the underground piping, a main drain test shall be made to verify the adequacy of the water supply. Static and residual pressures shall be recorded on the certificate specified in paragraph SUBMITTALS. In addition, a main drain test shall be conducted each time a main control valve is shut and opened.

3.9 FINAL ACCEPTANCE TEST

Begin the Final Acceptance Test only when the Preliminary Test Report has been approved. Testing shall be coordinated with the requirements of Section 28 31 76 FIRE ALARM AND MASS NOTIFICATION SYSTEM, Section 21 30 00 FIRE PUMPS,…