W =PIPE OD + 2'
M
A X
LAY BACK SIDES TO
STABLE SLOPE
FINAL
BACKFILL
MARKING
TAPE
EXISTING OR
FINISHED GRADE
INITIAL
BACKFILL
PIPE BEDDING
MATERIAL
TRACING WIRE
TRENCH SIDE
IF SHORED &
BRACED
1'-0"
8'-0" PIT DIMENSION
VARIES
VALVE BOX (ADJUSTABLE)
TAPPING SLEEVE
TAPPING VALVE
TAPPING MACHINE
BLOCKING WILL BE REQUIRED BEFORE
TAP IS MADE.
WATER LINE TRENCH DETAIL
PIPE TAPPING DETAIL
FINAL
BACKFILL
TRENCH
SIDE IF
SHORED &
BRACED
EXISTING OR FINISHED
GRADE
LAY BACK
SIDES TO
STABLE SLOPE
PIPE BEDDING
MATERIAL
M
A X
W =PIPE OD +2'
HAUNCH AREA
T c
5'-0"
T c
RAW SUBGRADE SCARIFIED AND COMPACTED TO 95% ASTM
D1557 DENSITY. THICKNESS IN ACCORDANCE WITH
APPROPRIATE PAVEMENT SECTION
DRAINAGE COURSE
PCC PAVEMENT
5'-0"
T b
SEE CIVIL SHEETS
0.02
SLOPE
0.02
SLP
AGGREGATE BASE COURSE COMPACTED TO AT
LEAST 100% MAX DENSITY AS DETERMINED
IN ACCORDANCE WITH THE SPECS.
HOT MIX ASPHALTIC
CONCRETE (HMAC) PVMT
PRIME
COAT
FILL COMPACTED TO AT LEAST 90%
MAX DENSITY AS DETERMINED IN
ACCORDANCE WITH THE SPECS
UNPAVED
SHOULDER
FINISHED GRADE
JUNCTURE OF NEW PCC PAVEMENT
(AIRFIELD) AND SHOULDERS (AIRFIELD)
STORM DRAIN
TRENCH SECTION
SEPARATION COURSE
Tc = CONCRETE PVMT THICKNESS
Tb = ASPHALT PVMT THICKNESS
PLAN
6"
1'-0"
5'-0"
10" 60°
12"
4'-4"
3"
6"
9'-0"
1'-6"
6" TO 2'-0"
1'-6"
1'-6"
3'-2"
8"
4'-6"
8"
337°
SECTION A-A
4'-4" 12"
6"
5"
18"
ELEVATION
6'-0"
10"
6"
12"
2'-8
4"
18" 18"
R
BENDING FOR H
- BARS
BENDING FOR V
- BARS
BENDING FOR V
- BARS
OF PIPE
2-V
3'-8"
H
6'-1" AVG
V
A
A
4-B
C
V
4-B
4-B
2-V
2'-9"
5'-10"
REINFORCING STEEL LENGTHS
A
" Ø
LENGTH
A -
" Ø
LENGTH
B -
" Ø
LENGTH
H
" Ø
LENGTH
V
" Ø
LENGTH
V
" Ø
LENGTH
3'-8" 6'-1" AVG 8'-3" 5'-10" 2'-9" AVG 5'-10"
4-B
2 V
2-18" HEADWALL DETAILS
SAFETY GRATE:
#5 BARS @ 10" OCEW AFFIX
TO FACE OF HEADWALL WITH
BRACKETS
THRUST BLOCK,
RE: 1/C-504
MISMATCHED JOINT
REINFORCEMENT DETAIL
4'-6"
3"
MISMATCHED
JOINT FROM
ADJACENT
SLAB
DISCONTINUE
REINFORCEMENT
AT ALL JOINTS
#4 @ 12"
OCEW
M
NOTES:
REINFORCEMENT SHALL BE PROVIDED IN SLABS MARKED "M"
ON JOINT LAYOUT PLAN AND IN ACCORDANCE WITH THE
SPECIFICATIONS.
T b
D E
S C
R I P
T I O
N M
A R
K A
P P
R
D A
T E
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET OF
L a k e h u r s t
N
A E
S
C E
R D
E C
F l i g h t
A c t i v i t y
F a c i l i t y
F Y
D
2 3
C
4 5
A
B
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
O T
D
A T
E
C O
N T
R A
C T
N
O
A N
S I
D
P L
O T
T E
D
B
Y
U
S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
N E
W
Y
O R
K h t t p w w w n a n u s a c e a r m y m i l
T e l e p h o n e
F a x
B r o a d w a y
E x t
S t e
O k l a h o m a
C i t y
O
K
A r c h i t e c t s
E n g i n e e r s
P l a n n e r s
F S
B
S O
L B
N
U M
B
W F
Y Q
D
SHEET
REFERENCE
NUMBER
US Army Corps of Engineers
New York District
THIS BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
0 1"
J B
M c G u i r e D i x L a k e h u r s t
N e w
J e r s e y
15891
RUSSELL
FRANK
KETNER
C-503
C I V
I L
D
E T
A I L
S
G R
M
J M
S R
F K
D J A
H P
R J
B
I M
C i v i l S h e e t s
C
X X
X d w g
A
M
C
X
X X d w g
A
M
SHEET KEYNOTES
#1 - WATER LINE TRENCH SECTION
1. COMPACT BEDDING MATERIAL TO 95% ASTM
D1557 DENSITY (STANDARD PROCTOR).
COMPACT CAREFULLY WITH SMALL MANUALLY
OPERATED VIBRATORY COMPACTION
EQUIPMENT.
2. INITIAL BACKFILL: FOR ALL AREAS INITIAL
BACKFILL SHALL BE AS SPECIFIED, PLACED TO A
DEPTH OF 12" ABOVE TOP OF BEDDING MATERIAL
AS SHOWN. PLACE IN 6" LIFTS & COMPACT TO
95% STANDARD PROCTOR DENSITY. FOR
DUCTILE IRON PIPE, INITIAL BACKFILL MATERIAL
IS NOT REQUIRED; FINAL BACKFILL MATERIAL
MAY BE USED FOR ALL BACKFILL. FOR CRUSHED
STONE BEDDING MATERIAL CONSTRUCTION,
INSTALL FILTER FABRIC BETWEEN CRUSHED
STONE AND SIDE WALLS AND BOTTOM OF
TRENCH.
3. FINAL BACKFILL: UNDER PAVEMENTS USE
GRANULAR SOILS SUCH AS COARSE SANDS AND
GRAVELS, WITH NOT MORE THAN 15% PASSING
THE #200 SIEVE (FINES). ALL FINES SHALL HAVE A
MAXIMUM PLASTICITY INDEX (PI) OF 12 AND A
LIQUID LIMIT NOT GREATER THAN 25. PLACE
BACKFILL IN LIFTS NOT GREATER THAN 6" LOOSE
THICKNESS FOR COMPACTION WITH MANUALLY
OPERATED VIBRATORY COMPACTORS. COMPACT
EACH LIFT TO 98% STANDARD PROCTOR
DENSITY (ASTM D1557). IN OPEN AREAS NOT TO
BE OCCUPIED BY BUILDINGS OR PAVEMENTS,
FINAL BACKFILL MAY BE MADE WITH EXCAVATED
SOILS, PLACED IN LIFTS AS NOTED ABOVE, AND
COMPACTED TO 95% ASTM D1557 DENSITY.
4. HEIGHT OF VERTICAL TRENCH SIDES FOR
UNSHORED TRENCH SHALL BE GOVERNED BY
CURRENT OSHA REGULATIONS AND EM 385-1-1
REGULATIONS AND SLOPE STABILITY
RECOMMENDATIONS OF THE GEOTECHNICAL
ENGINEER. HEIGHT SHALL NOT EXCEED 4 FEET,
IN ANY CASE, UNLESS TRENCH IS SHORED AND
BRACED FROM TOP TO BOTTOM.
5. SIDES OF TRENCH ABOVE 4 FEET IN HEIGHT
MUST BE LAID BACK ON STABLE SLOPES FOR
EXISTING SOILS, AS DETERMINED BY A
PROFESSIONAL GEOTECHNICAL ENGINEER AND
MUST BE IN ACCORDANCE WITH CURRENT OSHA
REGULATIONS.
6. WATER LINE PIPE: AS SPECIFIED.
7. REMOVE ANY UNSTABLE MATERIAL FROM THE
TRENCH BOTTOM AND REPLACE WITH SELECT
GRANULAR MATERIAL AS SPECIFIED.
8. REFER TO 11/C-506 FOR TRENCH CONSTRUCTION
UNDER EXISTING PAVEMENTS. FOR NEW
CONSTRUCTION SURFACES, TOP OF TRENCH IS
BOTTOM SURFACE OF REQUIRED DETAIL.
#4 - STORM DRAIN TRENCH SECTION
1. BEDDING MATERIAL: COMPOSED OF
WELL-GRADED, CRUSHED STONE, 100%
PASSING A 2-INCH SIEVE, AT LEAST 98%
PASSING A 1
-INCH SIEVE AND AT LEAST
90% PASSING A
-INCH SIEVE,
COMPACTED TO 98% ASTM D1557
DENSITY WITH SMALL MANUALLY
OPERATED VIBRATORY COMPACTORS,
UNDER, AROUND AND ON TOP OF PIPE.
PIPE MUST BE COMPLETELY
SURROUNDED WITH GRANULAR
MATERIAL.
2. FINAL BACKFILL: SAND PLACED IN 8"
LIFTS AND COMPACTED TO 95% ASTM
D1557 DENSITY TO BOTTOM OF
SUBGRADE UNDER PAVEMENTS OR
BOTTOM OF TOPSOIL.
3. HEIGHT OF VERTICAL TRENCH SIDES FOR
UNSHORED TRENCH SHALL BE
GOVERNED BY OSHA AND EM 385-1-1
REGULATIONS AND SLOPE STABILITY
RECOMMENDATIONS OF THE
GEOTECHNICAL ENGINEER. HEIGHT
SHALL NOT EXCEED 4 FEET, IN ANY CASE,
UNLESS TRENCH IS SHORED AND
BRACED FROM TOP TO BOTTOM.
4. SIDES OF TRENCH ABOVE 4 FEET IN
HEIGHT MUST BE LAID BACK ON STABLE
SLOPES FOR EXISTING SOILS, AS
DETERMINED BY THE LICENSED
GEOTECHNICAL ENGINEER AND MUST BE
IN ACCORDANCE WITH CURRENT OSHA
REGULATIONS.
5. COMPACT BEDDING MATERIAL UNDER
HAUNCH AREAS WITH VIBRATORY
COMPACTORS. FOR ARCH PIPE
INSTALLATION, SHAPE PIPE BEDDING
MATERIAL TO A FLAT BOTTOM ARC TO
APPROXIMATELY MATCH THE PIPE
SHAPE.
6. REINFORCED CONCRETE STORM DRAIN
PIPE: ASTM C76, OR ASTM C506 (FOR
ARCH PIPE).
7. REMOVE ANY UNSTABLE MATERIAL FROM
THE TRENCH BOTTOM AND REPLACE
WITH BEDDING MATERIAL.
8. UNDER PAVEMENTS, GRADE ON THE
TRENCH BACKFILL SECTION REFERS TO
THE BOTTOM OF LOWEST BASE COURSE
SHOWN ON THE PAVEMENT SECTIONS.
9. WHERE TWO PIPES ARE TO BE RUN
PARALLEL, SEPARATION BETWEEN THE
PIPES SHALL BE 8" FROM OUTSIDE TO
OUTSIDE, DISREGARDING BELL
THICKNESS.