Solicitation Amendment - W911SG27BA0020002.pdf

PDF 6 MB Posted

Attached to
New Fort Bliss Paving IDIQ Contract
Solicitation number
W911SG27BA002
Issued by

About this file

This is a Solicitation Amendment document for an Invitation for Bids (IFB) for construction paving services at Fort Bliss, Texas and surrounding areas. The Mission and Installation Contracting Command (MICC) Fort Bliss seeks contract services for paving and related construction work across Fort Bliss installation and training ranges in Texas and New Mexico, including areas in Dona Ana and Otero counties. The solicitation is structured as a single-award Indefinite Delivery/Indefinite Quantity (IDIQ) contract with firm fixed pricing, consisting of a 12-month base year plus four optional 1-year periods, with potential extension up to six months under FAR Clause 52.217-8. Individual task orders will be issued on a firm fixed-price basis with pricing derived from pre-established contract line item numbers (CLINs), with minimum order amounts of $2,000 and maximum of $3,000,000 per task order. If no task orders are issued during the first base year, the contractor receives a minimum guaranteed contract amount of $25,000.

This solicitation is set-aside 100% for 8(a) certified small businesses whose business plans are serviced by either the SBA El Paso District Office or SBA New Mexico District Office, under NAICS code 237310. Sealed bids are due by September 24, 2026 at 9:00 AM MDT at MICC-Fort Bliss, Building 111, Room 220, Fort Bliss, Texas. Bid submission includes electronic submission for Tabs A-E (cover sheet, SF 1442, total contract price, bonding letter, and bid bond guarantee), with hard copies required, and email submission for Tabs F-H (key personnel resumes, subcontractor list, and representations/certifications). A bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less, is required. The applicable wage determinations are NM20260035 (Dona Ana and San Juan Highway), NM20260036 (Multiple NM Highway), and TX20260293 (El Paso Highway), effective May 18, 2026. Contractors must be registered in the System for Award Management (SAM) and submit complete representations and certifications. Questions must be submitted by August 21, 2026 at 2:00 PM MDT.

View the file

Other files

File Type Posted
Solicitation Amendment W911SG27BA0020003 SF 30.pdf PDF
Solicitation Amendment - W911SG27BA0020003.pdf PDF
Solicitation Amendment W911SG27BA0020002 SF 30.pdf PDF
W911SG27BA002 Instructions to Bidders 3 September 2026.pdf PDF
W911SG27BA002 Solicitation RFI Questions and Answers.pdf PDF
Bid Schedule_PAVE_FE 10011 0J_Paving IDIQ.xlsx XLSX spreadsheet
Solicitation Amendment W911SG27BA002 0001 SF 30.pdf PDF
W911SG27BA002 Instructions to Bidders (Revised).pdf PDF
Solicitation Amendment - W911SG27BA002 0001.pdf PDF
Bid Schedule_PAVE_FE 10011 0J_PavingNM.pdf PDF
GSA Categories of Labor.pdf PDF
Attachment A - The Army Radiation Permit ARP.pdf PDF
Attachment D - Contractor Requirements Document.pdf PDF
Attachment K - Site Clearance and Line Marking Permit.pdf PDF
Attachment L - NMDOT Spec.pdf PDF
Attachment L - TXDOT Spec.pdf PDF
Attachment N - UFGS 03 30 00 Cast-in-Place Concrete.pdf PDF
Attachment N - UFGS 05 52 00 Metal Railings.pdf PDF
Attachment N - UFGS 31 11 00 Clearing and Grubbing.pdf PDF
Attachment N - UFGS 32 17 23 Pavement Markings.pdf PDF
Wage Determination TX20260293 (El Paso Highway).pdf PDF
Attachment C - Construction and Demolition Sample Report.pdf PDF
Attachment F - DPW-RFI Template Blank Form.pdf PDF
Attachment H - Fire Prevention Construction Guide 2025.pdf PDF
Attachment N - UFGS 02 41 00 Demolition.pdf PDF
Attachment N - UFGS 32 01 11.51 Rubber and Paint Removal -Airfield.pdf PDF
Attachment N - UFGS 32 01 16.71 Cold Milling Asphalt Paving.pdf PDF
Attachment N - UFGS 32 01 16.75 Heater Scarifying of Asphalt Paving.pdf PDF
Attachment N - UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving.pdf PDF
Attachment N - UFGS 32 12 13 Bituminous Tack and Prime Coats.pdf PDF
Attachment N - UFGS 32 12 16 Hot-Mix Asphalt HMA for Roads.pdf PDF
Attachment N - UFGS 32 84 23 Underground Sprinkler Systems.pdf PDF
Attachment N - UFGS 32 93 00 Exterior Improvements Plants (1).pdf PDF
Attachment N - UFGS 34 71 13.16 Vehicle Crash Barriers.pdf PDF
W911SG27BA002 Instructions to Bidders.pdf PDF
eCRAFT Professional Categories List.pdf PDF
Wage Determination NM20260036 (Multiple NM Highway).pdf PDF
Attachment G - DPW SUBMITTAL FORM V.1.pdf PDF
Attachment N - UFGS 03 45 33 Precast Structural Concrete.pdf PDF
Attachment N - UFGS 26 00 00 Electrical.pdf PDF
Attachment N - UFGS 31 00 00 Earthwork.pdf PDF
Attachment N - UFGS 32 11 20 Base Course.pdf PDF
Attachment N - UFGS 32 11 33.13 Cement Stabilized Soil (1).pdf PDF
Attachment N - UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads.pdf PDF
Attachment N - UFGS 32 31 13 Chain Link Fences and gates.pdf PDF
Solicitation - W911SG27BA002.pdf PDF
W911SG27BA002 Statement of Work.pdf PDF
Wage Determination NM20260035 (Dona Ana and San Juan Highway).pdf PDF
Attachment B - As-built Requirements.pdf PDF
Attachment E - DD1354 Form.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR

INFORMATION CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

INVITATION FOR BID

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF PAGES

AWARD (To be completed by Government)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES

CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Patrick.Ferguson Line

Patrick.Ferguson Line

Identifier Document Name

Document Description

Reference Identifier

Date Line Item

Page Numbers

Document Type

Provided Under Separate Cover

0001 W911SG27BA

002 Statem ent of Wor k

Statement of Work 28 Jul

52 Attachment No

0002 W911SG27BA

002 Instru ctions to Bidders 3 September

Instructions to Bidders

Sep

6 Attachment No

0003 Wage Deter mination N M20260035 (Dona Ana and San Ju an Highway ) Eff.

May 18 2026

Wage Determination

Jul

4 Attachment No

0004 Wage Deter mination N M20260036 (Multiple NM Highway ) Eff.

May 18 2026

Wage Determination

Jul

5 Attachment No

0005 Wage Deter mination T X20260293 (El Paso H ighway) Ef f.

May 18 2026

Wage Determination

Jul

4 Attachment No

0006 eCRAFT Pro fessional Categories List eCRAFT Professional Categories

Jul

59 Attachment No

0007 Bid Schedu le_PAVE_FE 10011 0J_ Paving IDI Q

Bid Schedule Excel Sheet

Aug

Attachment No

0008 Bid Schedu New Mexico Bid 03 5 Attachment No

W911SG27BA0020002

le_PAVE_FE 10011 0J_ PavingNM

Schedule Aug

0009 Bid Schedu le_PAVE_FE 10011 0J_ PavingTX

Texas Bid Schedule

Aug

5 Attachment No

0010 W911SG27BA

002 Solici tation RFI Questions and Answe rs

RFI Questions and Answers

Sep

6 Attachment No

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

Additional Information/Notes

Item Supplies/Service Quanti ty

Unit Unit Price Amount

0001 Texas Requirements Base Year

Product Service Code: Z2LB

North American Industry Classification System (NAICS):

237310

Pricing Arrangement: Firm Fixed Price

1 null

0002 New Mexico Requirements Base Year

Product Service Code: Z2LB

North American Industry Classification System (NAICS):

237310

Pricing Arrangement: Firm Fixed Price

1 null

1001 Texas Requirements OY1

Product Service Code: Z2LB

North American Industry Classification System (NAICS):

237310

Pricing Arrangement: Firm Fixed Price

1 null

1002 New Mexico Requirements OY1

Product Service Code: Z2LB

North American Industry Classification System (NAICS):

237310

Pricing Arrangement: Firm Fixed Price

1 null

2001 Texas Requirements OY2

Product Service Code: Z2LB

North American Industry Classification System (NAICS):

237310

Pricing Arrangement: Firm Fixed Price

1 null

2002 New Mexico Requirements OY2

Product Service Code: Z2LB

North American Industry Classification System (NAICS):

237310

Pricing Arrangement: Firm Fixed Price

1 null

3001 Texas Requirements, OY3

Product Service Code: Z2LB

North American Industry Classification System (NAICS):

237310

1 null

Pricing Arrangement: Firm Fixed Price

3002 New Mexico Requirements, OY3

Product Service Code: Z2LB

North American Industry Classification System (NAICS):

237310

Pricing Arrangement: Firm Fixed Price

1 null

4001 Texas Requirements, OY4

Product Service Code: Z2LB

North American Industry Classification System (NAICS):

237310

Pricing Arrangement: Firm Fixed Price

1 null

4002 New Mexico Requirements, OY4

Pricing Arrangement: Firm Fixed Price

1 null

Section 00 21 00 - Instructions

FAR Provisions Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.204-7 System for Award Management- Registration. (Deviation)

2026-02

52.214-3 Amendments to Invitations for Bids. (Deviation)

2026-02

52.214-4 False Statements in Bids. 1984-04

52.214-5 Submission of Bids. (Deviation) 2026-02

52.214-6 Explanation to Prospective Bidders.

1984-04

52.214-7 Late Submissions, Modifications, and Withdrawals of Bids.

(Deviation)

2026-02

52.214-12 Preparation of Bids. 1984-04

52.214-34 Submission of Offers in the English Language.

1991-04

52.214-35 Submission of Offers in U.S.

Currency.

1991-04

52.225-10 Notice of Buy American Requirement-Construction Materials.

2014-05

52.237-1 Site Visit. 1984-04

DFARS Provisions Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

252.204-7024 Notice on the Use of the Supplier Performance Risk System.

2023-03

252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors.

2023-01

FAR Provisions Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

52.216-1 Type of Contract. (Deviation) 2026-02

Type of Contract (Feb 2026) (Deviation)

The Government contemplates award of a Indefinite Delivery/Indefinite Quantity with Firm-Fixed contract resulting from this solicitation.Price (FFP) Task Orders

(End of provision)

52.228-1 Bid Guarantee. 1996-09

Bid Guarantee (Sept 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of clause)

52.252-1 Solicitation Provisions Incorporated by Reference.

1998-02

Solicitation Provisions Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/ https://www.acq.osd.mil/dpap/dars/class_deviations.html

52.252-5 Authorized Deviations in Provisions.

2020-11

Authorized Deviations in Provisions (Nov 2020)

The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) (a) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

The use in this solicitation of any (48 CFR (b) Defense Acquisition Regulation Supplement Chapter ) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" 2 after the name of the regulation.

Section 00 21 13 - Instructions to Bidders

INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS

1. Description of the Project:

The Department of Public Works at Fort Bliss, TX has a new requirement that consists of providing contract services for paving and related construction services in Texas and New Mexico, including all Training Ranges on the Fort Bliss Installation

2. Instructions to Bidders:

2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) W911SG-27-B-A002 New Paving IDIQ Contract, at at Ft. Bliss, TX, Bldg. 111 Rm 9AM MDT on 24 September 2026 220.

2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.

2.3. This solicitation is set-aside 100% for 8(a) Small Businesses.

3. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:

3.1. A site visit will not be conducted; contractors are welcome to access the base and conduct However, Contractors may request a site visit if needed, and it will be held at an their own tour.

agreed-upon location between the contractor and the Government. Contractors are highly encouraged to schedule a site visit; however, it is not mandatory.

3.2. The conference/site visit is limited to a maximum of two (2) attendees per company.

Contractor representatives should be prepared to furnish identification if requested.

Email the following attendees to Jakeb James at jakeb.i.james.civ@army.mil

COMPANY NAME

POC Name and position title Telephone Number

Individual or group questions will not be answered during the site visit. Potential bidders may submit written questions in accordance with number 4 (below) of this instructions to bidders section.

3.3. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

3.4. A record of the conference shall be made and furnished to all prospective bidders via posting at https://sam.gov/.

4. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:

Submit all questions in the format below by email to the contracting office address shown below.

Do NOT contact DPW directly. Doing so will only delay your answer. All questions must come through the Contracting Office.

Subject Line: Reference No. SOLICITATION W911SG-27-B-A002 Email: jakeb.i.james.civ@army.

mil

PRE-BID INQUIRY FORMAT

Date of Bid Inquiry:

From: Company Name:

Address:

Phone Number: Fax Number:

Email address:

Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)

4.1. Any explanation desired by bidder regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.

4.2. All questions and requests for information (RFI) must be received NO LATER THAN 2:00PM . BIDDERS ARE STRONGLY ENCOURAGED TO MDT 21 August 2026 SUBMIT QUESTIONS

EARLY IN THIS PROCESS. **After the due date no additional RFI's will be answered**

4.3. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment.

However, any answers that clarify or provide an interpretation to the drawings, specifications, etc.

will NOT be posted via amendment but rather as a response to the RFI on SAM at https://sam.gov/

4.4. Receipt by the bidder must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.

4.5. All technical data related to this solicitation will be distributed using the SAM Contract Opportunities (https://sam.gov/) system. SAM is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with SAM before accessing the system.

4.5.1. Amendments, if/when issued will be posted to https://sam.gov/ for electronic downloading.

This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation.

Websites are occasionally inaccessible due to various reasons.

5. : ELECTRONIC SUBMISSION OF BIDS (TABS A-E), TO INCLUDE E-SUBMISSION OF BIDS

MAIL, AND FACSIMILE TRANSMISSIONS ARE NOT AUTHORIZED. TABS F-H SHALL BE

TO THE ADDRESS LISTED ABOVE IN AN EFFORT TO REDUCE WASTE. IF A EMAILED

HARD COPY IS NOT RECEIVED BY BID OPENING (TABS A-E), THE TABS SUBMITTED BY

EMAIL ( ) WILL BE IGNORED/DELETED.TABS F-H

5.1. The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf as indicated below. Bids shall not be addressed to any specific person. Any bids hand-delivered between 7:30AM and 9:00AM on the due date shall only be delivered to the bid opening room at:

MICC-Fort Bliss, 111 Pershing Rd. Room 220

Fort Bliss, TX 79916

*Note: Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer shall declare the bid "late" in accordance with FAR 14.304.

All bids must be clearly identified with the bidder's name and address; and must be SEALED in an envelope (In an effort to reduce waste, please do not include a binder). To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:

Invitation for Bid No: W911SG-27-B-A002

Due Date of Bids: 24 September 2026

Time by which Bids are due: 9:00 AM MDT

Title of Project: New Paving IDIQ Contract

Bidders submission shall consist of one (1) volume hard copy.

TAB TITLE ORIGINAL (HARD COPY)

A COVER SHEET: 1

B SF 1442/ AMENDMENTS: 1

C TOTAL CONTRACT PRICE: 1

D LETTER FROM BONDING COMPANY: 1

E BID BOND GUARANTEE: 1

F KEY PERSONNEL RESUMES: EMAIL

G SUBCONTRACTOR LIST: EMAIL

H REPS & CERTS: EMAIL

Bids delivered before bid opening must be delivered in person or by mail, including, Federal Express or United Parcel Service to the address as indicated below. The date and time of delivery established by these carriers is not the official time of receipt by the Government. Bidders are responsible for allowing sufficient time for the bid to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of bids. Bids sent by Federal Express and United Parcel Service are required to be sent to:

MICC-Fort Bliss

Attention: Jakeb James, Contract Specialist W911SG27BA002

Bldg. 111 Pershing Road Fort Bliss, TX 79916

Bidders must allow sufficient time to complete security screening to gain admittance to Fort Bliss, TX. The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf. Bidders are responsible for ensuring bids are submitted so as to reach the location designated for receipt of bids.

6. PUBLIC BID OPENING:

The bid opening will occur at the time and date specified in Block 13 of the SF1442: MICC-Fort Bliss, Room 220

111 Pershing Rd Fort Bliss, TX 79916

7. WAGE DETERMINATION:

Construction Wage Rates are applicable to this project Wage Determination; NM20260035, NM20260036, and TX20260293 as shown in Section 00 30 00 and provided as separate attachments.

8. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS:

This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.

9. CLAUSES:

Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

10. SYSTEM FOR AWARD MANAGEMENT (SAM):

Bidder must be registered in the database IAW RFO FAR 52.204-7 in order to be awarded a contract and have the applicable NAICS code listed in RFO FAR 52.219-1(c), Small Business Program Representations, Representations.

11. DISPOSITION OF UNSUCCESSFUL BIDS:

In compliance with RFO FAR Part 4.101, the Government will retain one copy of all unsuccessful bids including the bid bond.

12. BID CONTENT/BIDDERS QUALIFICATIONS:

IFB DOCUMENTS. Contract shall be awarded to the responsive/responsible prospective contractor considering only price. Before award, to be determined responsive, a prospective contractor must furnish the following information with their bid:

a. Coversheet shall be on company letterhead and must contain your UEI TAB A: Cover Sheet.

number, CAGE code, Tax ID, and authorized representative(s) who can obligate your company contractually, sign the bid, and sign, other contract actions; include telephone number with area code and complete email address for each authorized representative.

b. . The SF1442 shall be TAB B: Signed and completed SF 1442 along with any amendments submitted fully completed. The Contractor shall acknowledge any amendments to the IFB in accordance with the instructions on the SF1442. All bidders are cautioned to complete blocks 20a- 20c with an original signature in block 20b. Failure to provide all of the above requirements shall render your bid nonresponsive.

c. The Bidders shall provide page 3 and 4 of the TAB C: CLIN Price and Total Contract Amount.

solicitation pricing each CLIN individually and include the OVERALL contract price. (There is no box for this, please annotate sum below CLIN prices). Bidders shall submit a complete Bid Schedule. A unit price shall be inserted for each line item for each location for each option period.

Line item unit prices shall include appropriate and applicable New Mexico Gross Receipt Tax(es).

Total sums for the completed Bid Schedule shall match Line Items in the SF1442. Failure to submit a price for each subline item could render your bid as non-responsive.

d. . Letter must indicate the bidder's ability to obtain TAB D: Letter from Bonding Company performance and payment bonds in the amount of their bid. Failure to provide this letter shall render your bid as nonresponsive.

e. . Per FAR 52.228-1; TAB E: Bid Bond Guarantee Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

f. . Bidders shall submit a list of Key Personnel TAB F: Key Personnel Resumes (EMAIL) resumes as an attachment to their bid. Key Personnel include the Program Manager (PM), Superintendent, Site Safety Health Officer (SSHO), and Quality Control Manager (QCM). These

.positions are distinct and shall not be combined or filled by the same individual

g. . Bidders shall submit a list of proposed subcontractors as TAB G: Subcontractor List (EMAIL) an attachment to their bid. If bidder does not intend on utilizing subcontractors (self- perform), Bidder shall state so in their bid.

h. . The bidder shall ensure that TAB H: REPRESENTATIONS, CERTIFICATIONS (EMAIL) their business has completed an online Representations and Certifications at the System and Awards Management (SAM) website, which may be found at https://www.sam.gov/portal/public/SAM//. It is the bidder's responsibility to ensure that the information provided in each representation and certification is completed truthfully and completely. A bidder's failure to complete the online representations and certifications prior to the close of the Solicitation (to include listing of the applicable NAICS code and applicable size standards) will result in their bid being deemed non-responsive and eliminated from further consideration. Bidders shall submit the representations and certifications listed in Section 00 45 00 or provide a printed version of the documents from their corporate SAM profile. Bidder must be registered in the database IAW RFO FAR Part 52.204-7 in order to be awarded a contract and have the applicable NAICS code listed in RFO FAR Part 52.219-1(c), Small Business Program Representations, Representations.

*** END OF NARRATIVE ***

Section 00 22 00 - Supplementary Instructions

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.217-5 Evaluation of Options. (Deviation) 2026-02

Section 00 30 00 - Available Information

Ordering Guide:

1. This is a single-award Indefinite Delivery Indefinite Quantity (IDIQ) contract. As such, all task orders will be issued directly to the awardee in accordance with the procedures outlined below.

2. Authority to Place Orders: MICC Fort Bliss has the authority to award and administer task orders under this IDIQ

3. The ordering period for the contract consists of a twelve (12) month Base Period, with four (4) 1-year option ordering periods, and FAR Clause 52.217-8, Option to Extended Services up to six (6) months. Task orders may be issued from date of contract award until the last day of the contract period. However, task orders issued during the contract period may be completed in accordance with the terms of the task order after the contract period has expired. It is the Government's intent to issue task orders on an annual basis with estimated quantities. However, there may be occasions where task orders may be for less than annual such as quarterly, or as needed.

4. All task orders will be issued on a Firm-Fixed-Price (FFP) basis. The price of each task order will be derived from the pre-established pricing in the contract's Schedule of Supplies/Services (Contract Line-Item Numbers - CLINs).

5. Funds for the services provided will be obligated at the task order level as they become available. Task Orders may be incrementally funded throughout their period of performance, subject to the availability of funds.

6. The Contractor shall confirm compliance with Limitation of Subcontracting, FAR 52.219-14 (deviation 2021-O008) by returning a completed Attachment A02 to the Contracting Officer by the end of the base term of the contract and then again by the end of each subsequent option period.

"General Decision Number: NM20260035 05/18/2026

State: New Mexico

Construction Types: Highway

Counties: New Mexico Counties of Dona Ana and San Juan

Modification Number Publication Date

0 01/02/2026 1 05/18/2026

ELEC0611-003 07/01/2014

Rates Fringes

ELECTRICIAN (BOOM OPERATOR).........................$ 29.79 12.74

SUNM2011-003 08/25/2011

Rates Fringes

TRUCK DRIVER: WATER TRUCK...........................$ 13.51 1.51

TRUCK DRIVER: PICKUP TRUCK (SAN JUAN)...............$ 12.95 0.26

TRUCK DRIVER: PICKUP TRUCK (DONA ANA)...............$ 12.14 0.26

TRUCK DRIVER: DUMP TRUCK (DONA ANA).................$ 15.04 0.26

TRUCK DRIVER (FLATBED TRUCK)........................$ 13.30 0.26

POWER EQUIPMENT OPERATOR: TRENCHER (SAN JUAN).......$ 15.93 0.26

POWER EQUIPMENT OPERATOR: TRENCHER (DONA ANA).......$ 15.22 0.26

POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT)

(SAN JUAN)..........................................$ 12.91 1.60

POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT)

(DONA ANA)..........................................$ 16.27 1.51

POWER EQUIPMENT OPERATOR: OILER.....................$ 22.08 8.72

POWER EQUIPMENT OPERATOR: MECHANIC..................$ 23.24 1.51

POWER EQUIPMENT OPERATOR: GRADER/BLADE..............$ 17.64 1.51

POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER........$ 14.56 0.26

POWER EQUIPMENT OPERATOR:

BACKHOE/EXCAVATOR/TRACKHOE (SAN JUAN)...............$ 16.27 1.51

POWER EQUIPMENT OPERATOR:

BACKHOE/EXCAVATOR/TRACKHOE (DONA ANA)...............$ 17.74 0.26

POWER EQUIPMENT OPERATOR: (PILEDRIVER)..............$ 16.26 0.26

POWER EQUIPMENT OPERATOR: (LOADER(FRONT END)).......$ 16.53 0.26

POWER EQUIPMENT OPERATOR: (BROOM SWEEPER)...........$ 16.67 1.57

LABORER: PIPELAYER..................................$ 17.13 5.04

LABORER: MASON TENDER-CEMENT/CONCRETE...............$ 10.25 0.35

LABORER: COMMON OR GENERAL (SAN JUAN)...............$ 11.48 0.35

LABORER, COMMON OR GENERAL (DONA ANA)...............$ 11.95 0.35

LABORER (FLAGGER/CONE SETTER).......................$ 14.27 0.35

IRONWORKER, REINFORCING (SAN JUAN)..................$ 16.41 5.85

IRONWORKER, REINFORCING (DONA ANA)..................$ 22.61 6.03

HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY

LINE/PARKING LOT LINE STRIPING AND LINE STRIPING

TRUCK DRIVER (SAN JUAN).............................$ 14.39 0.35

HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY

LINE/PARKING LOT LINE STRIPING AND LINE STRIPING

TRUCK DRIVER (DONA ANA).............................$ 15.44 0.35

ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION AND

INSTALLATION (SAN JUAN).............................$ 24.46 8.56

ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION AND

INSTALLATION (DONA ANA).............................$ 25.91 9.45

CEMENT MASON/CONCRETE FINISHER......................$ 13.65 0.26

CARPENTER, INCLUDES FORM WORK (SAN JUAN)............$ 13.42 0.44

CARPENTER, INCLUDES FORM WORK (DONA ANA)............$ 14.15 0.44

TEAM0492-003 04/01/2025

Rates Fringes

TRUCK DRIVER: DUMP (SAN JUAN).......................$ 21.70 9.65

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than SU, UAVG, SA, or SC denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The SU identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

SU wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The SA identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the SA identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION

"General Decision Number: NM20260036 05/18/2026

State: New Mexico

Construction Types: Highway

Counties: New Mexico Counties of Catron, Chaves, Curry, De Baca, Eddy, Grant, Hidalgo, Lea, Lincoln, Luna, Otero, Roosevelt, Sierra and Socorro

Modification Number Publication Date 0 01/02/2026 1 05/18/2026

SUNM2011-004 08/26/2011

Rates Fringes

TRUCK DRIVER: WATER TRUCK (LEA).....................$ 15.07 0.26

TRUCK DRIVER: WATER TRUCK (CATRON, CHAVES, CURRY,

DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO,

ROOSEVELT, SIERRA, SOCORRO).........................$ 14.39 0.26

TRUCK DRIVER: PICKUP AND PILOT CAR (LEA)............$ 12.84 0.26

TRUCK DRIVER: PICKUP AND PILOT CAR (EDDY)...........$ 12.60 0.26

TRUCK DRIVER: PICKUP AND PILOT CAR (CATRON, CHAVES,

CURRY, DEBACA, GRANT, HIDALGO, LINCOLN, LUNA,

OTERO, ROOSEVELT, SIERRA, SOCORRO)..................$ 12.70 0.26

TRUCK DRIVER: FLATBED TRUCK (ROOSEVELT).............$ 13.26 0.26

TRUCK DRIVER: FLATBED TRUCK (LEA)...................$ 13.05 0.26

TRUCK DRIVER: FLATBED TRUCK (EDDY)..................$ 12.71 0.26

TRUCK DRIVER: FLATBED TRUCK (CATRON, CHAVES, CURRY,

DEBACA, GRANT, HIDALGO, LINCOLN, LUNA, OTERO,

SIERRA, SOCORRO)....................................$ 12.96 0.26

TRUCK DRIVER: DUMP TRUCK (LEA)......................$ 14.61 0.26

TRUCK DRIVER: DUMP TRUCK (CATRON, CHAVES, CURRY,

DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO,

ROOSEVELT, SIERRA, SOCORRO).........................$ 14.60 0.26

TRUCK DRIVER: DISTRIBUTOR (EDDY)....................$ 13.70 0.26

TRUCK DRIVER: DISTRIBUTOR (CATRON, CHAVES, CURRY,

DEBACA, GRANT, HIDALGO, LEA, LINCOLN, LUNA, OTERO,

ROOSEVELT, SIERRA, SOCORRO).........................$ 13.81 0.26

TRUCK DRIVER (TRACTOR HAUL TRUCK)...................$ 14.00 0.00

TRUCK DRIVER (SEMI-TRAILER TRUCK)...................$ 16.58 0.26

POWER EQUIPMENT OPERATOR: TRACTOR...................$ 15.40 0.26

POWER EQUIPMENT OPERATOR: SCREED....................$ 15.70 0.26

POWER EQUIPMENT OPERATOR: SCRAPER...................$ 15.91 0.26

POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT, DIRT,

AND SHEEPSFOOT) (LEA)...............................$ 17.41 0.26

POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT, DIRT,

AND SHEEPSFOOT) (DEBACA)............................$ 14.19 0.75

POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT, DIRT,

AND SHEEPSFOOT) (CATRON, CHAVES, CURRY, EDDY,

GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT,

SIERRA, SOCORRO)....................................$ 15.86 0.26

POWER EQUIPMENT OPERATOR: OILER.....................$ 15.79 0.26

POWER EQUIPMENT OPERATOR: MECHANIC (LEA)............$ 20.69 0.26

POWER EQUIPMENT OPERATOR: MECHANIC (CATRON, CHAVES,

CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, LUNA,

OTERO, ROOSEVELT, SIERRA, SOCORRO)..................$ 19.44 0.26

POWER EQUIPMENT OPERATOR: LOADER (FRONT END)........$ 16.12 0.26

POWER EQUIPMENT OPERATOR: GRADER/BLADE..............$ 18.02 0.26

POWER EQUIPMENT OPERATOR: FORKLIFT..................$ 17.16 0.26

POWER EQUIPMENT OPERATOR: BULLDOZER.................$ 16.25 0.26

POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER........$ 18.06 0.26

POWER EQUIPMENT OPERATOR:

BACKHOE/EXCAVATOR/TRACKHOE (LEA)....................$ 16.88 0.26

POWER EQUIPMENT OPERATOR:

BACKHOE/EXCAVATOR/TRACKHOE (EDDY)...................$ 14.87 0.26

POWER EQUIPMENT OPERATOR:

BACKHOE/EXCAVATOR/TRACKHOE (CATRON, CHAVES, CURRY,

DEBACA, GRANT, HIDALGO, LINCOLN, LUNA, OTERO,

ROOSEVELT, SIERRA, SOCORRO).........................$ 19.92 0.26

POWER EQUIPMENT OPERATOR: (TRENCHER)................$ 16.31 0.26

POWER EQUIPMENT OPERATOR: (PILEDRIVER)..............$ 17.82 0.26

POWER EQUIPMENT OPERATOR: (MILLING MACHINE).........$ 16.59 0.26

POWER EQUIPMENT OPERATOR: (DISTRIBUTOR).............$ 14.50 0.26

POWER EQUIPMENT OPERATOR: (CRUSHER).................$ 16.53 0.26

POWER EQUIPMENT OPERATOR: (BROOM)...................$ 15.48 0.26

POWER EQUIPMENT OPERATOR: (ASPHALT/CONCRETE PAVER,

LAYDOWN MACHINE, AND PLANT).........................$ 15.42 0.26

PAINTER (BRUSH, ROLLER, AND SPRAY)..................$ 15.41 0.44

LABORER, COMMON OR GENERAL (OTERO)..................$ 12.73 0.35

LABORER, COMMON OR GENERAL (LUNA, ROOSEVELT)........$ 12.56 0.35

LABORER, COMMON OR GENERAL (LEA)....................$ 11.61 0.35

LABORER, COMMON OR GENERAL (GRANT)..................$ 10.62 0.35

LABORER, COMMON OR GENERAL (EDDY)...................$ 11.78 0.35

LABORER, COMMON OR GENERAL (DEBACA).................$ 11.33 0.35

LABORER, COMMON OR GENERAL (CATRON, CHAVES, CURRY,

HIDALGO, LINCOLN, SIERRA, SOCORRO)..................$ 11.67 0.35

LABORER (POWER/AIR TOOL OPERATOR, INCLUDES JACK

HAMMER).............................................$ 13.91 0.86

LABORER (PIPELAYER).................................$ 19.28 0.00

LABORER (MASON TENDER-BRICK/CEMENT/CONCRETE)........$ 11.39 0.79

LABORER (GRADE CHECKER).............................$ 16.18 1.60

LABORER (FLAGGER/CONE SETTER).......................$ 12.56 0.35

LABORER (ASPHALT RAKER).............................$ 13.00 0.35

IRONWORKER, STRUCTURAL..............................$ 21.77 6.03

IRONWORKER, REINFORCING (LEA).......................$ 21.77 6.03

IRONWORKER, REINFORCING (CATRON, CHAVES, CURRY,

DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO,

ROOSEVELT, SIERRA, SOCORRO).........................$ 21.66 6.03

INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (LEA).$ 14.62 0.30

INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS)

(CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT,

HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA,

SOCORRO)............................................$ 13.58 0.35

HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY

LINE/PARKING LOT LINE STRIPING AND LINE STRIPING

TRUCK DRIVER........................................$ 15.93 0.35

ELECTRICIAN, INCLUDING TRAFFIC SIGNALIZATION (LEA)..$ 24.90 8.56

ELECTRICIAN, INCLUDING TRAFFIC SIGNALIZATION

(CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT,

HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA,

SOCORRO)............................................$ 26.21 9.35

CEMENT MASON/CONCRETE FINISHER (LEA)................$ 13.74 0.68

CEMENT MASON/CONCRETE FINISHER (CATRON, CHAVES,

CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN,

OTERO, ROOSEVELT, SIERRA, SOCORRO)..................$ 14.17 0.55

CARPENTER, INCLUDES FORM WORK (LUNA)................$ 13.11 0.44

CARPENTER, INCLUDES FORM WORK (LEA).................$ 13.30 0.44

CARPENTER, INCLUDES FORM WORK (CATRON, CHAVES,

CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN,

OTERO, ROOSEVELT, SIERRA, SOCORRO)..................$ 13.93 0.44

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than SU, UAVG, SA, or SC denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The SU identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

SU wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The SA identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the SA identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .