This document is a Request for Information Report (RFI) template used by the District of Columbia Department of Public Works (DPW) for federal contracting purposes. The form serves as a structured mechanism for contractors and stakeholders to request clarification or propose solutions regarding contract execution issues during project performance.

The RFI template captures essential administrative information including contract title, number, RFI number, date, prime contractor identification, and the requesting party. Contractors must identify the specific Statement of Work (SOW) paragraph number and feature of work related to their inquiry, then describe the problem or issue requiring resolution. The form includes a checkbox section to indicate the nature of impact: potential cost impact, schedule impact, other impacts, or no cost change. Contractors propose solutions in a designated section and provide their signature and date. The form establishes a mandatory response deadline. The COR (Contracting Officer's Representative) section includes approval checkboxes from Safety, NEC, Fire Department, Master Planning, and Environmental stakeholders. The COR must indicate whether the proposed solution is accepted, rejected, or requires recommendation, with signature and date required for authorization. This template facilitates systematic documentation and multi-disciplinary review of contractor requests during contract performance with DPW.

View the file

Other files

File Type Posted
Solicitation Amendment W911SG27BA0020003 SF 30.pdf PDF
W911SG27BA002 Second List of RFI Questions and Answers.pdf PDF
Solicitation Amendment W911SG27BA0020002 SF 30.pdf PDF
W911SG27BA002 Instructions to Bidders 3 September 2026.pdf PDF
Solicitation Amendment - W911SG27BA0020002.pdf PDF
Solicitation Amendment - W911SG27BA002 0001.pdf PDF
Bid Schedule_PAVE_FE 10011 0J_PavingNM.pdf PDF
Solicitation Amendment W911SG27BA002 0001 SF 30.pdf PDF
W911SG27BA002 Instructions to Bidders (Revised).pdf PDF
Bid Schedule_PAVE_FE 10011 0J_PavingTX.pdf PDF
W911SG27BA002 Statement of Work (2).pdf PDF
Wage Determination TX20260293 (El Paso Highway).pdf PDF
Attachment C - Construction and Demolition Sample Report.pdf PDF
Attachment H - Fire Prevention Construction Guide 2025.pdf PDF
Attachment N - UFGS 02 41 00 Demolition.pdf PDF
Attachment N - UFGS 32 01 11.51 Rubber and Paint Removal -Airfield.pdf PDF
Attachment N - UFGS 32 01 16.71 Cold Milling Asphalt Paving.pdf PDF
Attachment N - UFGS 32 01 16.75 Heater Scarifying of Asphalt Paving.pdf PDF
Attachment N - UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving.pdf PDF
Attachment N - UFGS 32 12 13 Bituminous Tack and Prime Coats.pdf PDF
Attachment N - UFGS 32 12 16 Hot-Mix Asphalt HMA for Roads.pdf PDF
Attachment N - UFGS 32 84 23 Underground Sprinkler Systems.pdf PDF
Attachment N - UFGS 32 93 00 Exterior Improvements Plants (1).pdf PDF
Attachment N - UFGS 34 71 13.16 Vehicle Crash Barriers.pdf PDF
GSA Categories of Labor.pdf PDF
Attachment A - The Army Radiation Permit ARP.pdf PDF
Attachment D - Contractor Requirements Document.pdf PDF
Attachment K - Site Clearance and Line Marking Permit.pdf PDF
Attachment L - NMDOT Spec.pdf PDF
Attachment L - TXDOT Spec.pdf PDF
Attachment N - UFGS 03 30 00 Cast-in-Place Concrete.pdf PDF
Attachment N - UFGS 05 52 00 Metal Railings.pdf PDF
Attachment N - UFGS 31 11 00 Clearing and Grubbing.pdf PDF
Attachment N - UFGS 32 17 23 Pavement Markings.pdf PDF
Solicitation - W911SG27BA002.pdf PDF
W911SG27BA002 Statement of Work.pdf PDF
Wage Determination NM20260035 (Dona Ana and San Juan Highway).pdf PDF
Attachment B - As-built Requirements.pdf PDF
Attachment E - DD1354 Form.pdf PDF
Attachment I - iWATCH Training for Contractors.pdf PDF
Attachment J - SF 1413 Statement and Acknowledgement for Subcontractors.pdf PDF
Attachment N - UFGS 10 14 53 Traffic Signage.pdf PDF
Attachment N - UFGS 32 01 13.62 Asphalt Surface Treatment.pdf PDF
Attachment N - UFGS 32 01 19.61 Sealing Cracks in Asphalt Paving.pdf PDF
Attachment N - UFGS 32 12 15.13 Asphalt Paving for Airfields.pdf PDF
Attachment N - UFGS 32 16 19 Concrete Curbs Gutters and Sidewalks.pdf PDF
Attachment N - UFGS 33 40 00 Storm Drainage Utilities.pdf PDF
W911SG27BA002 Instructions to Bidders.pdf PDF
eCRAFT Professional Categories List.pdf PDF
Wage Determination NM20260036 (Multiple NM Highway).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI No.

Date

Contract Title:

Contract No.

RFI Subject:

Prime Contractor: Requested by:

Feature of work

Date

Date

RFI requires answer no later than this date:

Contractor (stakeholder) Signature

COR Signature

Contractor (Stakeholder) Proposed Solution:

REQUEST FOR INFORMATION – REPORT (RFI)

Potentional cost Impact Schedule Impact Other No Cost change

Information Requested by Contractor (Stakeholder):

COR Accepts contractor proposed solution.

COR recommendation below

COR Rejects contractor proposed solution.

COR response to Contractor questions.

______________ Safety accepts proposed solution

______________ NEC accepts proposed solution

______________ Fire Department accepts proposed solution

______________ Master Planning accepts proposed solution

______________ Environmental accepts proposed solution

Contract Title:
RFI No:
Contract No 1:
Contract No 2:
undefined:
Feature of work:
Date1_af_date:
Text3: Describe problem/Issue here
Text9:
Date10_af_date:
Date11_af_date:
Check Box16: Off
Check Box17: Off
Check Box18: Off
Date19_af_date:
Text1:
Text4:
Button5:
Dropdown1: [SOW Paragragh No.]
Text2:
Check Box2: Off
Text12:
Text13: Other accepts proposed solution
Text8:
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off

File details come from the government source that posted it. Updated .