This document establishes Construction and Demolition (C&D) Monthly Diversion Report requirements and instructions for a federal sustainability initiative at Fort Bliss. Under Executive Order 13693 and the Planning for Federal Sustainability in the Next Decade mandate, contractors must divert a minimum of 60 percent of C&D materials and debris from landfills. If contractors cannot meet this diversion goal, they must submit written justification to the Environmental Division through the Contract Officer Representative (COR).
The contractor must submit monthly C&D Diversion Reports by the 10th of each month documenting all materials resold, recycled, reused, or landfilled, with copies sent to the Solid Waste Program Manager (cynthia.m.hernandez38.civ@army.mil) and the COR. Acceptable diversion items include salvaged materials, scrap metal, masonry products, gravel, asphalt, concrete, rock, and topsoil, while earth fill is specifically excluded. Suitable concrete and asphalt materials may be crushed and stockpiled at Fort Bliss on a temporary basis, and all recycled materials must be removed by project completion. The report form requires submission of commodity-specific data including tons diverted, diversion costs, tons landfilled, landfill costs, and supporting weight tickets for verification. Attachment B provides a comprehensive list of El Paso Area C&D recyclers categorized by material type and recycling capability.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
./00 12' 3'+4/**'5 (66$3(2* 0,)56/007 �8'-1*/9' "+5'+ ?0,))/)@ 6(+ A'5'+,0 !12*,/),B/0/*C #'8* �'-,5'> +'D1/+'2 ,00 6'5'+,0 6,-/0/*/'2 5/9'+* 4/)/414 (6
<EF
(6 -()2*+1-*/() ,)5 5'4(0/*/() G���H 4,*'+/,02 ,)5 5'B+/2 6+(4 0,)56/0027 �6 &,2 9,0/5 +',2() 6(+ B'/)@ ,B0' 4''* *&/2 5/9'+2/() @(,0> )''52 3+'2')* +',2()/)@ �?I$ �)9/+()4')*,0 �/9/2/()7
23'-/6/-,*/()2 ./00 /)-015' 21B4/22/()
JK
L
MJNOPLMOJPQR
4()*&0C �/9'+2/() '3(+* (6 ,00 4,*'+/,02 +'2(05> +'-C-0'5> +'12'5> 0,)56/00'5 ./00 B' +'3(+*'5
BC
:E*& (6 4()*&
GS**,-&4')*
SH
�)9/+()4')*,0 �/9/2/()> !(0/5 I,2*' ?+(@+,4 T,),@'+> -C)*&/,747&'+),)5'U;V7-/9W,+4C74/0 -(3C "66/-'+ '3+'2')*,*/9' G�" H7
�*'42 B' 12'5 /)-+',2' 5/9'+2/() +,*'2 /)-015' 2,09,@'5 /*'42 G4,C B' +'12'5 ,2 3,+* (6
BC
(*&'+2H> 2-+,3 4'*,0> 4,2()+C 3+(51-*2> @+,9'0> ,23&,0*> +(-X> *(32(/0 G',+*& 6/00 /2 23'-/6/-,00C '8-015'5H7 ,**,-&'5 0/2* (6 0(-,0 +'-C-0'+2
GS**,-&4')*
YH7
!1/*,B0' 4,*'+/,02 4''* 2*,)5,+52 6(+ +'-C-0'Z+'12' 4,C 5/+'-*0C +'-C-0/)@ 6,-/0/*C7 S00 21/*,B0' -()-+'*'Z,23&,0*/- 4,*'+/,02 4,C B' -+12&'5> +'-C-0'5> 2*(-X3/0'5
5'2/@),*'5
2/*'
A(+*
Y0/22
*'43(+,+C B,2/27 S00 +'-C-0'5Z+'12'5 -()-+'*'Z,23&,0* 4,*'+/,02 412* B' +'4(9'5 6+(4 A(+* Y0/22
BC
')5 (6 3+(['-* 2-&'510'7 \2' (6 4,*'+/,0 3+(-'22'5 6(+ 6/00> -()2*/*1*'5 ,23&,0*/- 3,9'4')* -()2*/*1*'2 +'-C-0/)@7
\3() 5/9'+2/() (6 +'-C-0'5Z+'12'5 4,*'+/,02> 2&,00 21B4/* 3+((6 (6 +'-C-0/)@Z5/9'+2/() 4()*&0C I,2*' T,),@'4')* '3(+*2 5'*,/0/)@ (6 5/9'+*'5 4,*'+/,0 ,)5 .'/@&*2 (6 5'B+/2 0,)56/00'57
./00 +'9/'.
30,) -((+5/),*/() (6 ?1B0/- I(+X2$ �)9/+()4')*,0 �/9/2/()7
This page intentionally left blank.
������������������������������������������ �!"#�$������%�&!'�#"����#��"���$�("�"���" �)��#�������������*��"��+�����*��",������� "#�$�������)���������"�����-����.��$ ��(�*�.�� ("�*�,�+"#"���*���/"��*� �#�*�,�,"$��"�*�"��0�/-��-���"���##��($" ���������"���",����" �)����"�1�$��(0�2���)�345657*��-"��&!� �+"������(��$����86�,"��"��0�9�"�"�(��""���(�"���#��"��)��������("��("�"���" �)��#�,��:"��������������#,$"����0�;0�<-"��&!�#���-$1� �+"�������",��������"=���" ����,�����)��-"�,��:"��*����������������.#����$��"=���"#"��0�<-"��&!�#���-$1� �+"�������",����)��#�����������-"�)�$$�/��(��"=���" ��",�����(�"$"#"���>�?�<-"�@ABCBDEF�GHIAH�IJF�KBLCMEHNBJ�OIHED�/�$$����������� "�"�#����(�/-"���&!�#���-$1� �+"�������",�������"� �"0�?�<-"�KBJHAIPH�QRLSEA�����-"���#."���-���� "���)�"���-"����������+"-��$"���" �)����-"�,��:"��0�?�<-"�@ABTEPH�QRLSEA�� "���)�"���-"�,��:"��0�?�<-"�UBVEAJLEJH�@ABTEPH�WIJIXEA�Y@WZ��",�"�"�����-"�(�+"��#"�������-"� "��(�*���=����������� ��������������,���"��"���� [����-"�KBJHAIPHNJX�\]]NPEA�̂ECAEDEJHIHNVE�YK\̂ Z�����-"�(�+"��#"���"#,$�1""�"#,�/"�" �.1��-"�����������(�_))��"�����#���("��-"�"̀"��������)��-"�,��:"��0�<-"�ab�����_c���"��"=���" ������.#����-"��&!�#���-$1� �+"�������",��������-"�!adef!���$� �/���"�#���("�0�?�<-"�KBJHAIPHBA�����-"�,��#"������������)����-"��&!�,��:"��0�<-"������������)�"$ ��-��$ ��")$"����-"���#"��)��-"���#,��1�"�(�(" �.1��-"�(�+"��#"���%,��#"'������#,$"�"��-"�,��:"����� ��-���/�$$�("�"���"��-"�/���"0�g)�����.e�����������/�$$��$��#��"$1�"̀"���"�("�"��������)��-"�/���"*��-�����)��#�������-��$ ��$���."���.#���" �����-���)�"$ 0�?�<-"�hIDi�\AFEA�����-"�)���e �(�����#."��/-��-�� "���)�"�������j��� "�%�'��(��������(�+"�����������+"-��$"0�b�$��,$"����j��� "�������."�����(�" ������,��:"��0�?�<-"�kIPNMNHl�QILEmGNHE�nBPIHNBJ�)�"$ ����$� "���-"���#"��)��-"�)���$��1*��-"�����(�" �)���$��1���#."���� ��-"����""��� �"��o�<-"���#"��)��-"�)���$��1��-����-"��&!�#��"���$�/��������,���" ���*�� �� ������$� "������������)��"=���" 0���� 50��&!�#���-$1� �+"�������",����#����."���.#���" �����(��-���)��#0�2)�"����#,$"���(��$$��,,$���.$"��",�����(�.$��j�*�"#��$��-"��",��������1��-��0#0-"���� "pqr0��+s��#10#�$0�������� 2����-#"���2��&!�d���"�b���("#"���a$���c"+��" �5r�3".����1�5657�
Reporting Period: through Proposed Start Date:
(mm/dd/yy) (mm/dd/yy)
Proposed Completion Date:
Contract Number:
Delivery Order No:
Contractor: Task Order No:
Commodity Tons Diverted (T) Cost to Divert ($) Tons Landfilled (T) Cost to Landfill ($)
Concrete
Asphalt
Clean Fill
Gravel
Greenery
Scrap Metal
Wood
Cardboard
Drywall
Other:
Other:
Other:
General Debris
TOTALS
Total Diverted: Notes:
Total Landfilled:
*Percent Diverted:
(=Total ton Diverted divided by Total Diverted + Total Landfilled)
*Please note an error message will pop up for the "Percent Diverted" Box until all totals are complete.
Note 1: For an electronic workable copy of this form, please contact the Solid Manager at (915) 568-5677; cynthia.m.hernandez38.civ@army.mil
Note 2: Contractor is to attach weight tickets to this form for review by Solid Waste Manager.
Submitted by Print:
Submitted by Signature: Date:
Location/Site Delivered
Fort Bliss Solid Waste Program
Construction and Demolition (C&D) Monthly Diversion Report
Diverted Landfilled
# of Loads
Government Project Manager/Contract
Officer Representative:
Project No:
1638650904.civ Line
��� � ������������������ ���� ������!"� #$#� ������!"�� $#� %�$��&�'� ������!"� (�')�'�*'�)�!"� �+�)�,�-+�-��� ./��'��$�'�+�0����� $#�$�'�+�0����� *�����0����-� $1�+�'��$�'�+�0����� #0�2!)/-�'��-�%�-���3�!!������!-� ,�&�'-����)� ������!"��/�1�'���4'�/+�..3� ��+�-�������-� ���'��(�'!��� 5�6��0���'���-������-�� ������!"�2!��� ��#))'�--� �7898:�;<==>?@AB�CD��7:E8�F@GHG>I<�JI� ��KL::�M@DN<H� 9:89�OP<A>I@�QD<<=R�S@AH@�T<D<G@R�UM�� 7:77�V@WN>AG�X=PI� � 7YL7�S�C@DD>AZHBA�JI�[X��7:\7\�O=@]<I@��Y97�U�U<P<D@̂�JI� � �8:K�CBIZ<�JB@I�� � � E87�_D<I<D>?NG�JI� � �7:E78�;<DG<̀aBA<�CD� � �7Y897�;<==>?@AB�CD� �7898:�;<==>?@AB�CD�� ��1�!�� b79cL9bc�8Lb:� b79c\\bc�YY8K� b79c\\8c�8\8L� b79c9Y8c�9KEY� b79c\\9c�89EK� b79c878c�K:::� b79cL\8c�bLL:� b79c89Lc�b77K� K7Lcb\bc�K7:\�b79cLL7c�7bb7� b79c88\c�b:Y9� b79cE\Lc�7Lb:� b79cE\bc�LEY\� b79c\8Kc�8\LE� b79c98bc�K78L� b79cL8:c�EY\:�b79c8bLc�bb::�b79cL9bc�8Lb:�� #-+1���� � � � � � � � � � � � � � � � � d� �� ('��e� � � � � � � � � � � � � � � � � � �� 3�!�'���� � � � � � � � � � � � � � � � � d� �.�!)�3���'�!"� ,�6'�-� ��e-� � � � � � � � � � � � � � � � � � �$���� � � � � � � � � � � � � � � � � � �f�"������!g�*��6�'� � � � � � � � � � � � � � � � � � �h�1�'� � � � � � � � � � � � � � � � � � �� 0����� #�/��!/�� d� d� d� d� d� d� d� d� d� d� d� d� d� � � � � �3�++�'� d� d� d� d� d� d� d� d� d� d� d� d� d� � � � � �0�i�)�0����� d� d� d� d� d� d� d� d� d� d� d� d� d� � � � � �$����� d� d� d� d� d� d� d� d� d� d� d� d� d� � � � � �h�1�'�0����-� d� d� d� d� d� d� d� d� d� d� d� d� d� d� � � � �
����0���'����
3����!"�*���� � � � � � � � � � � � � � � � � � �3��+�-����!� ���� � � � � � � � � � � � � � � � � � �,��'-� � � � � � � � � � � � � � � � � � �%�!)�j-� � � � � � � � � � � � � � � � � � �$���'-� � � � � � � � � � � � � � � � � � �3�6�!��-� � � � � � � � � � � � � � � � � � �4��--� � � � � � � � � � � � � � � � � � �4�+-/�g����-��'� ����������k� � � � � � � � � � � � � � � � � d�2!-/�����!�� � � � � � � � � � � � � � � � � ���+�'� d� � � d� � � � � � � � � � � � � � ����-���� d� � � d� � � � � � � � � � � � � � �$�)�!"� � � � � � � � � � � � � � � � � � �� %��)� ��!�-1�)� d� � � � � � � � � � � � d� � d� d� � �$�'/��/'��� d� � � � � � � � � � � � d� � d� d� � �*'����)� � � � � � � � � � � � � d� � d� d� � �h�1�'� � � � � � � � � � � � � d� � d� d� � �� �ll��mn ol�p���������� qr� s�tu�v w x� ��tytz�
This page intentionally left blank.
| Reporting Period: |
| through: |
| Proposed Start Date: |
| Contract Number: |
| Delivery Order No: |
| COR: |
| Contractor: |
| Task Order No: |
| of LoadsConcrete: 1 |
| LocationSite DeliveredConcrete: Clint |
| TonsDivertedTConcrete: 2 |
| CosttoDivertConcrete: 5 |
| TonsLandfilledTConcrete: |
| CosttoLandfillConcrete: |
| of LoadsAsphalt: |
| LocationSite DeliveredAsphalt: |
| TonsDivertedTAsphalt: |
| CosttoDivertAsphalt: |
| TonsLandfilledTAsphalt: |
| CosttoLandfillAsphalt: |
| of LoadsClean Fill: |
| LocationSite DeliveredClean Fill: |
| TonsDivertedTClean Fill: |
| CosttoDivertCleanFill: |
| TonsLandfilledTCleanFill: |
| CosttoLandfillCleanFill: |
| of LoadsGravel: |
| LocationSite DeliveredGravel: |
| TonsDivertedTGravel: |
| CosttoDivertGravel: |
| TonsLandfilledTGravel: |
| CosttoLandfillGravel: |
| of LoadsGreenery: |
| LocationSite DeliveredGreenery: |
| TonsDivertedTGreenery: |
| CosttoDivertGreenery: |
| TonsLandfilledTGreenery: |
| CosttoLandfillGreenery: |
| of LoadsScrap Metal: |
| LocationSite DeliveredScrap Metal: |
| TonsDivertedTScrapMetal: |
| CosttoDivertScrapMetal: |
| TonsLandfilledTScrapMetal: |
| CosttoLandfillScrapMetal: |
| of LoadsWood: |
| LocationSite DeliveredWood: |
| TonsDivertedTWood: |
| CosttoDivertWood: |
| TonsLandfilledTWood: |
| CosttoLandfillWood: |
| of LoadsCardboard: |
| LocationSite DeliveredCardboard: |
| TonsDivertedTCardboard: |
| CosttoDivertCardboard: |
| TonsLandfilledTCardboard: |
| CosttoLandfillCardboard: |
| of LoadsDrywall: |
| LocationSite DeliveredDrywall: |
| TonsDivertedTDrywall: |
| CosttoDivertDrywall: |
| TonsLandfilledTDrywall: |
| CosttoLandfillDrywall: |
| of LoadsOther: |
| LocationSite DeliveredOther: |
| TonsDivertedTOther: |
| CosttoDivertOther: |
| TonsLandfilledTOther: |
| CosttoLandfillOther: |
| of LoadsOther_2: |
| LocationSite DeliveredOther_2: |
| TonsDivertedTOther_2: |
| CosttoDivertOther_2: |
| TonsLandfilledTOther_2: |
| CosttoLandfillOther_2: |
| of LoadsOther_3: |
| LocationSite DeliveredOther_3: |
| TonsDivertedTOther_3: |
| CosttoDivertOther_3: |
| TonsLandfilledTOther_3: |
| CosttoLandfillOther_3: |
| of LoadsGeneral Debris: |
| LocationSite DeliveredGeneral Debris: |
| TonsDivertedTGeneral Debris: |
| CosttoDivertGeneralDebris: |
| TonsLandfilledTGeneralDebris: |
| CosttoLandfillGeneralDebris: |
| TotalCosttoDivert: 5 |
| TotalTonsLandfilled: 0 |
| TotalCosttoLandfill: 0 |
| text34: 2 |
| Printed Name: |
| Date: |
| Proposed End Date_af_date: |
| text32: 2 |
| TotalTonsDiverted: 2 |
| Notes: asdfasfdasfddsafasdfasfas |
| text33: 0 |
| text35: 100 |
| Text10: |
| 0: |
| 1: |
| 2: |
Project No: