SECTION 32 01 16.71 - COLD MILLING ASPHALT PAVING

This is a technical specification section for cold milling asphalt paving work, classified under Division 32 (Exterior Improvements). The specification establishes requirements for milling existing pavement surfaces to specified depths and grades prior to resurfacing operations.

Quality Standards and Equipment Requirements:

The contractor must mill pavement to achieve a finished surface conforming to established plan grades and cross sections, with maximum allowable deviations of 1/4 inch from the plan grade line and elevation. Surface smoothness must not deviate more than 6 mm (1/4 inch) from the testing edge in transverse or longitudinal directions. The contractor must provide a self-propelled cold-milling machine capable of controlling depth, smoothness, grade, and transverse slope, with dust suppression capabilities including water application. The contractor must furnish one 12-foot aluminum straightedge per milling machine for surface testing and maintain cleaning equipment to remove loose material from milled surfaces.

Operational Requirements and Material Handling:

A minimum of seven days' notice is required before work commences for the Contracting Officer to coordinate with other site activities. Milling must proceed in depth increments to prevent damage to pavement layers below the designated finished grade. If scabbing occurs, the contractor must modify the process and correct any damaged items including manholes, valve boxes, and utility lines. Grade conformance testing requires running level lines at 25-foot intervals longitudinally and transversely; surface smoothness testing uses a straightedge after final milling. Low areas must be corrected by complete removal and replacement with at least 1 inch of asphalt concrete—skin patching is not permitted. The contractor becomes the property owner of all milled material and is responsible for removing it from the site. Milling operations cannot proceed when snow or ice accumulates on pavement surfaces.

View the file

Other files

File Type Posted
W911SG27BA002 Full Abstract of Offers.pdf PDF
Solicitation Amendment W911SG27BA0020003 SF 30.pdf PDF
Solicitation Amendment - W911SG27BA0020003.pdf PDF
W911SG27BA002 Second List of RFI Questions and Answers.pdf PDF
Solicitation Amendment W911SG27BA0020002 SF 30.pdf PDF
W911SG27BA002 Instructions to Bidders 3 September 2026.pdf PDF
W911SG27BA002 Solicitation RFI Questions and Answers.pdf PDF
Bid Schedule_PAVE_FE 10011 0J_Paving IDIQ.xlsx XLSX spreadsheet
Solicitation Amendment - W911SG27BA0020002.pdf PDF
W911SG27BA002 Instructions to Bidders (Revised).pdf PDF
Bid Schedule_PAVE_FE 10011 0J_PavingNM.pdf PDF
Solicitation Amendment - W911SG27BA002 0001.pdf PDF
Solicitation Amendment W911SG27BA002 0001 SF 30.pdf PDF
Bid Schedule_PAVE_FE 10011 0J_PavingTX.pdf PDF
W911SG27BA002 Statement of Work (2).pdf PDF
Attachment N - UFGS 32 01 16.75 Heater Scarifying of Asphalt Paving.pdf PDF
Attachment N - UFGS 32 84 23 Underground Sprinkler Systems.pdf PDF
Attachment N - UFGS 32 17 23 Pavement Markings.pdf PDF
Attachment H - Fire Prevention Construction Guide 2025.pdf PDF
Attachment N - UFGS 32 01 13.62 Asphalt Surface Treatment.pdf PDF
Attachment L - NMDOT Spec.pdf PDF
W911SG27BA002 Statement of Work.pdf PDF
Attachment N - UFGS 26 00 00 Electrical.pdf PDF
W911SG27BA002 Instructions to Bidders.pdf PDF
Attachment N - UFGS 32 11 20 Base Course.pdf PDF
Attachment F - DPW-RFI Template Blank Form.pdf PDF
Attachment N - UFGS 03 45 33 Precast Structural Concrete.pdf PDF
Attachment K - Site Clearance and Line Marking Permit.pdf PDF
Attachment A - The Army Radiation Permit ARP.pdf PDF
Attachment D - Contractor Requirements Document.pdf PDF
GSA Categories of Labor.pdf PDF
Attachment N - UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads.pdf PDF
Attachment N - UFGS 32 11 33.13 Cement Stabilized Soil (1).pdf PDF
Attachment N - UFGS 32 01 11.51 Rubber and Paint Removal -Airfield.pdf PDF
Attachment N - UFGS 32 93 00 Exterior Improvements Plants (1).pdf PDF
Attachment N - UFGS 31 00 00 Earthwork.pdf PDF
Wage Determination TX20260293 (El Paso Highway).pdf PDF
Attachment N - UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving.pdf PDF
Attachment L - TXDOT Spec.pdf PDF
Attachment N - UFGS 03 30 00 Cast-in-Place Concrete.pdf PDF
Attachment N - UFGS 05 52 00 Metal Railings.pdf PDF
Attachment N - UFGS 32 12 13 Bituminous Tack and Prime Coats.pdf PDF
Attachment N - UFGS 32 12 16 Hot-Mix Asphalt HMA for Roads.pdf PDF
Attachment N - UFGS 02 41 00 Demolition.pdf PDF
Attachment N - UFGS 34 71 13.16 Vehicle Crash Barriers.pdf PDF
Wage Determination NM20260036 (Multiple NM Highway).pdf PDF
eCRAFT Professional Categories List.pdf PDF
Attachment G - DPW SUBMITTAL FORM V.1.pdf PDF
Attachment C - Construction and Demolition Sample Report.pdf PDF
Attachment N - UFGS 32 31 13 Chain Link Fences and gates.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 32 01 16.71 Page 1

SECTION TABLE OF CONTENTS DIVISION 32 - EXTERIOR IMPROVEMENTS

SECTION 32 01 16.71

COLD MILLING ASPHALT PAVING

02/17

Table of Contents

PART 1 GENERAL

1.1 QUALITY ASSURANCE

1.2 EQUIPMENT, TOOLS, AND MACHINES

1.3 ENVIRONMENTAL REQUIREMENTS

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 MILLING OPERATION

3.2 GRADE AND SURFACE-SMOOTHNESS TESTING

3.3 REMOVAL OF MILLED MATERIAL

SECTION 32 01 16.71 Page 2

SECTION 32 01 16.71

COLD MILLING ASPHALT PAVING

02/17

PART 1 GENERAL.

1.1 QUALITY ASSURANCE.

1.1.1 Grade

Mill pavement such that the finished surface conforms to the lines, grades, and cross sections indicated. The maximum allowable deviation of the finished milled pavement surfaces from the established plan grade line and elevation will be 1/4 inch. The deviations from the plan grade line and elevation will not be permitted in areas of pavements where closer conformance with planned grade and elevation is required for the proper functioning of appurtenant structures involved.

1.1.2 Surface Smoothness

The maximum allowable deviation of the finished surfaces from the testing edge in the transverse or longitudinal direction will be 6 mm 1/4 inch.

1.1.3 Traffic Control

Provide all necessary traffic controls during milling operations.

1.2 EQUIPMENT, TOOLS, AND MACHINES.

Maintain in a satisfactory working condition equipment, tools, and machines used in the performance of the work.

1.2.1 Cold-Milling Machine

Provide a cold-milling machine which is self-propelled, capable of milling the pavement to a specified depth and smoothness and of establishing grade control; with means of controlling transverse slope and dust produced during the pavement milling operation. Machine will have capability of adding water in front of equipment to minimize dust during milling operation. The machine will have the ability to windrow the millings or cuttings or remove the millings or cuttings from the pavement and load them into a truck]. The milling machine will not damage any part of the pavement structure that is not to be removed.

1.2.2 Cleaning Equiment

Provide cleaning equipment suitable for removing and cleaning loose material from the pavement surface.

1.2.3 Straightedge

Furnish and maintain at the site, in good condition, one 12 foot straightedge or other suitable device for each milling machine, for testing the finished surface. Make straightedge available for

SECTION 32 01 16.71 Page 3

Government use. Use straightedges constructed of aluminum or other lightweight metal, with blades of box or box-girder cross section with flat bottom reinforced to insure rigidity and accuracy. Use straightedges with handles to facilitate movement on the pavement.

1.3 ENVIRONMENTAL REQUIREMENTS.

Do not perform milling when there is accumulation of snow or ice on the pavement surface.

PART 2 PRODUCTS.

Not Used

PART 3 EXECUTION.

3.1 MILLING OPERATION.

A minimum of seven days notice is required, prior to start work, for the

Contracting Officer to coordinate the milling operation with other activities at the site. Make sufficient passes so that the designated area is milled to the grades and cross sections indicated. Mill the pavement in depth increments that will not damage the pavement below the designated finished grade. If scabbing occurs, the surface will not meet smoothness requirements. Take steps to modify the process as needed to prevent scabbing from occuring. Repair or replace, as directed, items damaged during milling such as manholes, valve boxes, utility lines, pavement that is torn, cracked, gouged, broken, or undercut.

3.2 GRADE AND SURFACE-SMOOTHNESS TESTING.

3.2.1 Grade-Conformance Tests

Test the finished milled surface of the pavement for conformance with the plan-grade requirements and for acceptance by the

Contracting Officer by running lines of levels at intervals of 25 feet longitudinally and 25 feet transversely to determine the elevation of the completed pavement. Correct variations from the designated grade line and elevation in excess of the plan-grade requirements as directed. Skin patching for correcting low areas will not be permitted. Remove and replace the deficient low area.

Remove sufficient material to allow at least 1 inch of asphalt concrete to be placed.

3.2.2 Surface-Smoothness Tests

Surface-Smoothness Tests. After completion of the final milling, the finished milled surface will be tested by the Government with a straightedge. Other approved devices may be used, provided that when satisfactorily and properly operated, such devices reveal all surface irregularities exceeding the tolerances specified. Correct surface irregularities that depart from the testing edge by more than 1/4 inch. Skin patching for correcting low areas will not be permitted. Remove and replace the deficient low area. Remove sufficient material to allow at least 1 inch of asphalt concrete to be placed.

3.3 REMOVAL OF MILLED MATERIAL.

SECTION 32 01 16.71 Page 4

Material that is removed will become the property of the Contractor and removed from the site.

-- End of Section --