This is a technical specification for asphalt surface treatment work, Section 32 01 13.62, dated May 2018, used for exterior improvements on federal construction projects.

The specification establishes comprehensive requirements for single and double bituminous surface treatments. Contractors must submit certified waybills and delivery tickets for all aggregate and bituminous materials used, with initial and final outage and temperature measurements required before material removal from tank cars or storage tanks. Mineral aggregates must consist of clean, sound, durable crushed stone, crushed gravel, or crushed slag meeting specified gradations, with three gradation options for single treatments and four options for double treatments. Bituminous materials are limited to rapid-setting emulsified asphalt conforming to ASTM D977 (Grade RS-1 or RS-2) or ASTM D2397/D2397M (Grade CRS-1 or CRS-2), or asphalt cement conforming to ASTM D946/D946M (Penetration Grade 120-150) or ASTM D6373 (Performance Graded PG 64-22); cutback asphalt and solvent products are explicitly prohibited. Application quantities vary by gradation, ranging from 0.10 to 0.45 gallons of bituminous material and 10 to 50 pounds of aggregate per square yard for single treatments, with corresponding ranges for double treatments. All equipment, including bituminous distributors, spreaders, rollers, and related machinery, must be calibrated by an approved laboratory within 12 months prior to work commencement and annually thereafter. Work execution requires surface preparation through power brooming or blowing, application of bituminous material at specified temperatures (90–160°F for emulsions; 325–375°F for cement), immediate aggregate spreading, and rolling and brooming operations until proper compaction and curing are achieved. Environmental restrictions prohibit application when atmospheric temperature is below 50°F or pavement surface is below 70°F, and moisture control is required to ensure proper adhesion and coverage uniformity.

View the file

Other files

File Type Posted
W911SG27BA002 Full Abstract of Offers.pdf PDF
Solicitation Amendment W911SG27BA0020003 SF 30.pdf PDF
Solicitation Amendment - W911SG27BA0020003.pdf PDF
W911SG27BA002 Second List of RFI Questions and Answers.pdf PDF
Solicitation Amendment W911SG27BA0020002 SF 30.pdf PDF
W911SG27BA002 Instructions to Bidders 3 September 2026.pdf PDF
W911SG27BA002 Solicitation RFI Questions and Answers.pdf PDF
Bid Schedule_PAVE_FE 10011 0J_Paving IDIQ.xlsx XLSX spreadsheet
Solicitation Amendment - W911SG27BA0020002.pdf PDF
W911SG27BA002 Instructions to Bidders (Revised).pdf PDF
Bid Schedule_PAVE_FE 10011 0J_PavingNM.pdf PDF
Solicitation Amendment - W911SG27BA002 0001.pdf PDF
Solicitation Amendment W911SG27BA002 0001 SF 30.pdf PDF
Bid Schedule_PAVE_FE 10011 0J_PavingTX.pdf PDF
W911SG27BA002 Statement of Work (2).pdf PDF
Attachment N - UFGS 32 01 16.71 Cold Milling Asphalt Paving.pdf PDF
Attachment N - UFGS 32 01 16.75 Heater Scarifying of Asphalt Paving.pdf PDF
Attachment N - UFGS 32 84 23 Underground Sprinkler Systems.pdf PDF
Attachment N - UFGS 32 17 23 Pavement Markings.pdf PDF
Attachment H - Fire Prevention Construction Guide 2025.pdf PDF
Attachment L - NMDOT Spec.pdf PDF
W911SG27BA002 Statement of Work.pdf PDF
Attachment N - UFGS 26 00 00 Electrical.pdf PDF
W911SG27BA002 Instructions to Bidders.pdf PDF
Attachment N - UFGS 32 11 20 Base Course.pdf PDF
Attachment F - DPW-RFI Template Blank Form.pdf PDF
Attachment N - UFGS 03 45 33 Precast Structural Concrete.pdf PDF
Attachment K - Site Clearance and Line Marking Permit.pdf PDF
Attachment A - The Army Radiation Permit ARP.pdf PDF
Attachment D - Contractor Requirements Document.pdf PDF
GSA Categories of Labor.pdf PDF
Attachment N - UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads.pdf PDF
Attachment N - UFGS 32 11 33.13 Cement Stabilized Soil (1).pdf PDF
Attachment N - UFGS 32 01 11.51 Rubber and Paint Removal -Airfield.pdf PDF
Attachment N - UFGS 32 93 00 Exterior Improvements Plants (1).pdf PDF
Attachment N - UFGS 31 00 00 Earthwork.pdf PDF
Wage Determination TX20260293 (El Paso Highway).pdf PDF
Attachment N - UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving.pdf PDF
Attachment L - TXDOT Spec.pdf PDF
Attachment N - UFGS 03 30 00 Cast-in-Place Concrete.pdf PDF
Attachment N - UFGS 05 52 00 Metal Railings.pdf PDF
Attachment N - UFGS 32 12 13 Bituminous Tack and Prime Coats.pdf PDF
Attachment N - UFGS 32 12 16 Hot-Mix Asphalt HMA for Roads.pdf PDF
Attachment N - UFGS 02 41 00 Demolition.pdf PDF
Attachment N - UFGS 34 71 13.16 Vehicle Crash Barriers.pdf PDF
Wage Determination NM20260036 (Multiple NM Highway).pdf PDF
eCRAFT Professional Categories List.pdf PDF
Attachment G - DPW SUBMITTAL FORM V.1.pdf PDF
Attachment C - Construction and Demolition Sample Report.pdf PDF
Attachment N - UFGS 32 31 13 Chain Link Fences and gates.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 32 01 13.62 Page 1

SECTION TABLE OF CONTENTS

DIVISION 32 - EXTERIOR IMPROVEMENTS

SECTION 32 01 13.62

ASPHALT SURFACE TREATMENT

05/18

Table of Contents

PART 1 GENERAL

1.2 REFERENCES

1.3 SUBMITTALS

1.4 QUALITY CONTROL

1.5 DELIVERY, STORAGE, AND HANDLING

1.6 EQUIPMENT, TOOLS AND MACHINES

1.7 ENVIRONMENTAL REQUIREMENTS

PART 2 PRODUCTS

2.1 MINERAL AGGREGATE

2.2 BITUMINOUS MATERIALS

PART 3 EXECUTION

3.1 SURFACE PREPARATION

3.2 APPLICATION OF FIRST COURSE

3.3 APPLICATION OF SECOND COURSE

3.4 APPLICATION TEMPERATURE OF MATERIALS

3.5 PROTECTION

SECTION 32 01 13.62 Page 2

SECTION 32 01 13.62

ASPHALT SURFACE TREATMENT

05/18

PART 1 GENERAL.

1.1 Payment.

1.1.1 Waybills and Delivery Tickets

Submit copies of waybills and delivery tickets during progress of the work. Before the final statement is allowed, file with the Contracting

Officer certified waybills and delivery tickets for aggregate and bituminous material used in the bituminous surface treatment. Do not remove bituminous material from the tank car or storage tank until initial outage and temperature measurements have been taken. Do not release the car or tank until final outage has been taken.

1.2 REFERENCES.

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C29/C29M (2017a) Standard Test Method for Bulk

Density ("Unit Weight") and Voids in

Aggregate

ASTM C88 (2018) Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or

Magnesium Sulfate

ASTM C131/C131M (2020) Standard Test Method for Resistance to Degradation of Small-Size Coarse

Aggregate by Abrasion and Impact in the

Los Angeles Machine

ASTM C136/C136M (2019) Standard Test Method for Sieve

Analysis of Fine and Coarse Aggregates

ASTM D75/D75M (2019) Standard Practice for Sampling

Aggregates

ASTM D140/D140M (2016) Standard Practice for Sampling

Asphalt Materials

ASTM D946/D946M (2020) Standard Specification for

Penetration-Graded Asphalt Cement for Use in Pavement Construction

ASTM D977 (2019a; E 2019) Standard Specification for

Emulsified Asphalt

SECTION 32 01 13.62 Page 3

ASTM D1139/D1139M (2015) Aggregate for Single or Multiple

Bituminous Surface Treatments

ASTM D1250 (2019; E 2020) Standard Guide for Use of the Joint API and ASTM Adjunct for

Temperature and Pressure Volume Correction

Factors for Generalized Crude Oils, Refined Products, and Lubricating Oils:

API MPMS Chapter 11.1

ASTM D2028/D2028M (2015) Cutback Asphalt (Rapid-Curing Type)

ASTM D2397/D2397M (2019a) Standard Specification for

Cationic Emulsified Asphalt

ASTM D2995 (1999; R 2009) Determining Application

Rate of Bituminous Distributors

ASTM D3625/D3625M (2012) Standard Practice for Effect of

Water on Bituminous-Coated Aggregate Using

Boiling Water

ASTM D6373 (2016) Standard Specification for

Performance Graded Asphalt Binder

1.3 SUBMITTALS.

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the government officer that will review the submittal for the Government.

SD-03 Product Data

Waybills and Delivery Tickets

Emulsified Asphalt

Asphalt Cement

SD-06 Test Reports

1.4 QUALITY CONTROL.

1.4.1 Safety Precautions

Smoking or open flames will not be permitted within 25 feet of heating, distributing, or transferring operations of bituminous materials other than bituminous emulsions.

1.5 DELIVERY, STORAGE, AND HANDLING.

Inspect the materials delivered to the site for contamination and damage.

Unload and store the materials with a minimum of handling. Store aggregates preventing segregation and contamination.

1.6 EQUIPMENT, TOOLS AND MACHINES.

Provide equipment dependable and adequate for the purpose intended and properly maintained in satisfactory and safe operating condition at all times. Discontinue the use of equipment which fails to produce satisfactory work and replace with satisfactory equipment. Equipment such

SECTION 32 01 13.62 Page 4 as asphalt distributors, scales, batching equipment, spreaders and similar equipment, must have been calibrated by an approved calibration laboratory within 12 months prior to commencing work and every 12 months thereafter, by such laboratory from the date of last calibration, during the term of the contract.

1.6.1 Bituminous Distributors

Provide a self-propelled distributor with pneumatic tires of such size and number to prevent rutting, shoving or otherwise damaging the surface being sprayed. Calibrate the distributer in accordance with ASTM D2995. Design and equip the distributor to spray the bituminous material in a uniform coverage at the specified temperature, at readily determined and controlled total liquid rates from 0.03 to 1.0 gallons per square yard, with a pressure range of 25 to 75 psi and with an allowable variation from the specified rate of not more than plus or minus 5 percent, and at variable widths. Include with the distributor equipment a separate power unit for the bitumen pump, full-circulation spray bars, tachometer, pressure gauges, volume-measuring devices, adequate heaters for heating of materials to the proper application temperature, a thermometer for reading the temperature of tank contents, and a hand hose attachment suitable for applying bituminous material manually to areas inaccessible to the distributor. The distributor will be capable of circulating and agitating the bituminous material during the heating process.

1.6.2 Single-Pass, Surface-Treatment Machines

Use only machines capable of spraying bituminous material and spreading aggregate in one pass. Use only bituminous spraying equipment conforming to the requirements given above for a bituminous distributor. Use only machines capable of spreading aggregates at controlled amounts per square yard as specified. In addition, only use single-pass, surface-treatment machines capable of placing a surface treatment adjacent to an existing surface treatment, forming a joint of the same thickness and uniformity as other portions of the surface treatment. Ridges or blank spaces will not be permitted. Form joints in the second application at least 1 foot from those formed in the first application.

1.6.3 Heating Equipment for Storage Tanks

Use equipment consisting of coils and equipment for producing steam or hot oil and designed to prevent the introduction of steam or hot oil into the material. Affix an armored thermometer with a range of 100 to 400 degrees

F to the tank so the temperature of the bituminous material may be determined at all times.

1.6.4 Power Rollers

Use only steel-wheeled or pneumatic-tired type power rollers conforming to the following requirements:

a. Use only steel-wheeled rollers having at least one steel drum and weigh a minimum of 5 tons. Equip steel wheels of the rollers with adjustable scrapers.

b. Use only self-propelled pneumatic-tired rollers having wheels mounted on two axles in such manner that the rear tires will not follow in the tracks of the forward group. Maintain uniform tire inflation to not less than 60 psi nor more than 80 psi pressure.

Equip pneumatic-tired rollers with boxes or platforms for ballast loading. Load rollers so that the tire print width of each wheel

SECTION 32 01 13.62 Page 5 is not less than the clear distance between tire prints.

1.6.5 Mechanical Spreaders

Use only adjustable spreaders capable of spreading aggregate at controlled amounts per square yard, as specified.

1.6.6 Brooms and Blowers

Use only power type brooms and blowers capable of cleaning surfaces to be treated.

1.7 ENVIRONMENTAL REQUIREMENTS.

Apply bituminous surface treatment only when the existing surface or base course is dry or contains moisture not in excess of the amount that will permit uniform distribution of the asphalt material and provide the desired adhesion between the asphalt material and the materials underneath and above. Do not apply bituminous surface treatment when either the atmospheric temperature, in the shade, is below 50 degrees F or the pavement surface to be treated is below 70 degrees F unless otherwise directed.

PART 2 PRODUCTS.

Use mineral aggregate and bituminous material of the following types, gradations, grades, and consistencies that meet the requirements.

2.1 MINERAL AGGREGATE.

Provide aggregate consisting of crushed stone, crushed gravel, or crushed slag of such nature that thorough coating of bituminous material, used in the work, will not strip off upon contact with water. Maintain aggregate moisture content so that the aggregate will be readily coated with the bituminous material. Drying may be required, as directed. Use aggregate conforming to the gradation shown below. Determine gradation of the aggregates by ASTM /C136M.

AGGREGATE GRADATION SINGLE BITUMINOUS SURFACE TREATMENT

(PERCENT BY WEIGHT PASSING)

Sieve Designation No. 1 No. 2 No. 3

1 inch 100 -- --

3/4 inch 90-100 100 --

1/2 inch 20-55 90-100 100

3/8 inch 0-15 40-70 85-100

No. 4 0-5 0-15 10-30

No. 8 -- 0-5 0-10

SECTION 32 01 13.62 Page 6

No. 16 -- -- 0-5

AGGREGATE GRADATION DOUBLE BITUMINOUS SURFACE TREATMENT

(PERCENT BY WEIGHT PASSING)

Sieve Designation No. 1 No. 2 No. 3 No. 4

1 inch 100 -- -- --

3/4 inch 90-100 -- 100 --

1/2 inch 20-55 100 90-100 --

3/8 inch 0-15 85-100 40-70 100

No. 4 0-5 10-30 0-15 85-100

No. 8 -- 0-10 0-5 10-40

No. 16 -- 0-5 -- 0-10

No. 50 -- -- -- 0-5

2.1.1 Crushed Stone

Provide crushed stone consisting of clean, sound, durable particles, free of soft or disintegrated pieces, dust, or foreign matter.

2.1.2 Crushed Gravel

Provide crushed gravel consisting of clean, sound, durable particles, free of soft or disintegrated pieces or foreign matter. At least 90 percent by weight of the particles must have at least two fractured faces.

2.1.3 Crushed Slag

Provide crushed slag which is an air-cooled blast-furnace product having a dry weight of not less than 70 pcf, and consists of angular particles uniform in density and quality and free of dust and foreign matter.

Determine the weight of a cubic foot of slag aggregate by ASTM

C29/C29M.

2.1.4 Aggregate Quantities

Spread the bituminous material and aggregate within the quantity limits shown below. The individual quantities of bituminous material and aggregate may be varied to meet specific field conditions at all times during progress of the work, as directed, without adjustments to contract unit prices. Aggregate weights shown are for aggregates having a specific gravity of 2.65. Adjust the number of pounds required if the specific gravity of the aggregate used is other than 2.65 in order to ensure a constant volume of aggregate per square yard of treatment.

QUANTITIES (PER SQUARE YARD) FOR

SINGLE SURFACE TREATMENT

Gradation No. Bituminous Material

(Gallons)

Aggregate (Pounds)

SECTION 32 01 13.62 Page 7

1 0.30-0.45 35-50

2 0.15-0.30 20-35

3 0.10-0.20 15-25

QUANTITIES (PER SQUARE YARD) FOR

DOUBLE SURFACE TREATMENT

Gradation No. Bituminous

Material

(Gallons) First

Application

Aggregate

(Pounds) First

Spreading

Bituminous

Material)

(Gallons)

Second

Application

Aggregate

(Pounds) Second

Spreading

1 0.20-0.30 28-34 -- --

2 -- -- 0.20-0.30 20-25

3 0.15-0.20 20-25 -- --

4 -- -- 0.15-0.20 10-15

2.2 BITUMINOUS MATERIALS.

2.2.1 Cutback Asphalt

Cutback Asphalt or solvent (jet fuel) products shall not be used by

Contractor.

2.2.2 Emulsified Asphalt

Emulsified Asphalt. Use rapid-setting emulsified asphalt conforming to ASTM

D977, Grade RS-1 or RS-2 or ASTM D2397/D2397M, Grade CRS-1 or CRS-2.

2.2.3 Asphalt Cement

Asphalt Cement. Use asphalt cement conforming to ASTM D946/D946M, Penetration Grade 120-150 or ASTM D6373, Performance Graded Asphalt Binder

PG 64-22. Submit temperature-viscosity relationship of asphalt cement.

PART 3 EXECUTION.

3.1 SURFACE PREPARATION.

Immediately before applying the first course of bituminous material, clean the surface of loose material with power brooms or power blowers. Take care to remove all dirt, clay, and other loose or foreign matter. Flush the surface with water, when necessary to achieve a clean surface, only when directed by the Contracting Officer; allow the surface to dry after flushing.

SECTION 32 01 13.62 Page 8

3.2 APPLICATION OF FIRST COURSE.

3.2.1 Bituminous Material

Apply bituminous material by means of a bituminous distributor at the temperature specified in paragraph APPLICATION TEMPERATURE OF MATERIALS, below or as directed; and within the limits specified in paragraph

QUANTITY LIMITS in PART 1. Apply bituminous material in such a manner that uniform distribution is obtained over all surfaces treated. Unless the distributor is equipped to obtain a satisfactory result at the junction of previous and subsequent applications, spread building paper on the surface for a sufficient distance back from the ends of each application so that flow through the sprays may be started and stopped on the paper in order that all sprays will operate at full force on the surface treated. Immediately after application, remove and destroy the building paper. Properly treat areas inaccessible to the distributor with bituminous material using the hose attachment. Protect adjacent buildings, structures, and trees to prevent their being spattered or marred.

3.2.2 Spreading of Aggregate

Immediately following application of bituminous material, spread aggregate uniformly over the surface within the limits of the quantities specified in paragraph QUANTITY LIMITS in PART 1 using mechanical spreaders. Spread aggregate evenly by hand on all areas missed by the mechanical spreader.

Operate equipment spreading aggregate so that the bituminous material will be covered ahead of the truck wheels. When hand spreading is employed on inaccessible areas, spread aggregate directly from trucks. Spread additional aggregate by hand over areas having insufficient cover.

Continue spreading during these operations when necessary.

3.2.3 Brooming and Rolling

Roll the surface with a pneumatic-tired and a steel-wheeled roller after sufficient aggregate is spread. Continue rolling until no more aggregate can be worked into the treated surface. The use of the steel-wheeled roller will be discontinued, or a lighter weight steel wheel roller substituted, as directed, if the roller being used causes excessive crushing and shattering of the aggregate. If the aggregate is not distributed properly, broom the surface as soon as possible after the first coverage by the roller, but not until the surface has set sufficiently to prevent excessive marking. Continue brooming, rolling, and supplemental spreading of aggregate until the surface is cured and rolled sufficiently to key and set the aggregate. In places not accessible to rollers, compact the aggregate with pneumatic tampers.

Remove aggregate that has become contaminated with foreign matter and replace with clean aggregate and reroll as directed. Maintain and protect the treated areas by use of barricades until properly cured.

3.3 APPLICATION OF SECOND COURSE.

3.3.1 Bituminous Treatment

Apply the bituminous material for the second course within 48 hours after construction of the first course, weather permitting. Remove excess aggregate prior to the second application of bituminous material. If the treated surface is excessively moistened by rain, allow the surface to dry for such time as deemed necessary. Perform the second application of bituminous material in the manner specified in paragraph APPLICATION OF

FIRST COURSE, including temperature and QUANTITY LIMITS.

SECTION 32 01 13.62 Page 9

3.3.2 Aggregate

Immediately following the second application of bitumen, spread aggregate conforming to the gradation and limits specified in paragraph QUANTITY

LIMITS uniformly over the bituminous material and process in the manner specified for the first course.

3.3.3 Brooming and Rolling Second Course

Roll and broom the surface in the manner specified for the first course until a thoroughly bonded, smooth, even-textured surface is produced.

Sweep off the surface surplus aggregate and remove it prior to final acceptance.

3.4 APPLICATION TEMPERATURE OF MATERIALS.

3.4.1 Cutback Asphalt

Cutback Asphalt or solvent (jet fuel) products shall not be used by

Contractor.

3.4.2 Emulsified Asphalt

Apply asphalt emulsions in the range of 90 to 160 degrees F.

3.4.3 Asphalt Cement

Apply asphalt cement in the range of 325 to 375 degrees F.

3.5 PROTECTION.

Keep all traffic off surfaces freshly treated with bituminous material.

Provide sufficient warning signs and barricades so that traffic will not travel over freshly treated surfaces. Protect the treated areas from traffic for at least 24 hours after final application of bituminous material and aggregate, or for such time as necessary to prevent picking

up. Immediately prior to opening to traffic, roll the entire treated area with a self-propelled pneumatic-tired roller.

-- End of Section --