Attachment N - UFGS 32 01 16.75 Heater Scarifying of Asphalt Paving.pdf

PDF 413 KB Posted

Attached to
New Fort Bliss Paving IDIQ Contract
Solicitation number
W911SG27BA002
Issued by

About this file

This is a specification section for heater scarifying of asphalt paving work under Division 32 (Exterior Improvements), dated February 2017.

The specification requires contractors to perform heater scarifying operations on existing bituminous pavement surfaces. Key equipment requirements include a self-propelled heater scarifier capable of producing a minimum 3/4-inch depth of uncompacted reclaimed mix without damaging the asphalt binder, a bituminous distributor with pneumatic tires capable of spraying at variable widths up to 12 feet with controlled application rates of 0.02 to 0.5 gallon/square yard (±5% tolerance), and cleaning equipment including power brooms, blowers, and vacuuming units. The contractor must provide emulsified asphalt conforming to ASTM D977 with a negative spot test result per AASHTO T 102. Work may only be performed when pavement is dry and surface temperature exceeds 60 degrees Fahrenheit. Execution requirements include surface preparation (pothole and crack repair), scarifying to a depth of at least 3/4 inch, application of bituminous emulsion at 75-130 degrees Fahrenheit in quantities of 0.05 to 0.30 gallon/square yard, and compaction to achieve less than 8% air voids for surface treatments or less than 7% air voids when thin asphalt overlays are applied. Testing responsibility rests with the contractor using an approved commercial laboratory or contractor-operated facility, with certified test reports submitted prior to material delivery and during construction.

View the file

Other files

File Type Posted
W911SG27BA002 Full Abstract of Offers.pdf PDF
Solicitation Amendment W911SG27BA0020003 SF 30.pdf PDF
Solicitation Amendment - W911SG27BA0020003.pdf PDF
W911SG27BA002 Second List of RFI Questions and Answers.pdf PDF
Solicitation Amendment W911SG27BA0020002 SF 30.pdf PDF
W911SG27BA002 Instructions to Bidders 3 September 2026.pdf PDF
W911SG27BA002 Solicitation RFI Questions and Answers.pdf PDF
Bid Schedule_PAVE_FE 10011 0J_Paving IDIQ.xlsx XLSX spreadsheet
Solicitation Amendment - W911SG27BA0020002.pdf PDF
W911SG27BA002 Instructions to Bidders (Revised).pdf PDF
Bid Schedule_PAVE_FE 10011 0J_PavingNM.pdf PDF
Solicitation Amendment - W911SG27BA002 0001.pdf PDF
Solicitation Amendment W911SG27BA002 0001 SF 30.pdf PDF
Bid Schedule_PAVE_FE 10011 0J_PavingTX.pdf PDF
W911SG27BA002 Statement of Work (2).pdf PDF
Attachment N - UFGS 32 01 16.71 Cold Milling Asphalt Paving.pdf PDF
Attachment N - UFGS 32 84 23 Underground Sprinkler Systems.pdf PDF
Attachment N - UFGS 32 17 23 Pavement Markings.pdf PDF
Attachment H - Fire Prevention Construction Guide 2025.pdf PDF
Attachment N - UFGS 32 01 13.62 Asphalt Surface Treatment.pdf PDF
Attachment L - NMDOT Spec.pdf PDF
W911SG27BA002 Statement of Work.pdf PDF
Attachment N - UFGS 26 00 00 Electrical.pdf PDF
W911SG27BA002 Instructions to Bidders.pdf PDF
Attachment N - UFGS 32 11 20 Base Course.pdf PDF
Attachment F - DPW-RFI Template Blank Form.pdf PDF
Attachment N - UFGS 03 45 33 Precast Structural Concrete.pdf PDF
Attachment K - Site Clearance and Line Marking Permit.pdf PDF
Attachment A - The Army Radiation Permit ARP.pdf PDF
Attachment D - Contractor Requirements Document.pdf PDF
GSA Categories of Labor.pdf PDF
Attachment N - UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads.pdf PDF
Attachment N - UFGS 32 11 33.13 Cement Stabilized Soil (1).pdf PDF
Attachment N - UFGS 32 01 11.51 Rubber and Paint Removal -Airfield.pdf PDF
Attachment N - UFGS 32 93 00 Exterior Improvements Plants (1).pdf PDF
Attachment N - UFGS 31 00 00 Earthwork.pdf PDF
Wage Determination TX20260293 (El Paso Highway).pdf PDF
Attachment N - UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving.pdf PDF
Attachment L - TXDOT Spec.pdf PDF
Attachment N - UFGS 03 30 00 Cast-in-Place Concrete.pdf PDF
Attachment N - UFGS 05 52 00 Metal Railings.pdf PDF
Attachment N - UFGS 32 12 13 Bituminous Tack and Prime Coats.pdf PDF
Attachment N - UFGS 32 12 16 Hot-Mix Asphalt HMA for Roads.pdf PDF
Attachment N - UFGS 02 41 00 Demolition.pdf PDF
Attachment N - UFGS 34 71 13.16 Vehicle Crash Barriers.pdf PDF
Wage Determination NM20260036 (Multiple NM Highway).pdf PDF
eCRAFT Professional Categories List.pdf PDF
Attachment G - DPW SUBMITTAL FORM V.1.pdf PDF
Attachment C - Construction and Demolition Sample Report.pdf PDF
Attachment N - UFGS 32 31 13 Chain Link Fences and gates.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 32 01 16.75 Page 1

SECTION TABLE OF CONTENTS

DIVISION 32 - EXTERIOR IMPROVEMENTS

SECTION 32 01 16.75

HEATER SCARIFYING OF ASPHALT PAVING

02/17

Table of Contents

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 EQUIPMENT, TOOLS, AND MACHINES

1.4 ENVIRONMENTAL REQUIREMENTS

PART 2 PRODUCTS

2.1 BITUMINOUS MATERIAL

2.2 TESTING

PART 3 EXECUTION

3.1 PREPARATION OF SURFACE

3.2 SCARIFYING OPERATION

3.3 APPLICATION OF BITUMINOUS EMULSION AGENTS

3.4 COMPACTION

3.5 COMPLETION OF PAVEMENT

SECTION 32 01 16.75 Page 2

SECTION 32 01 16.75

HEATER SCARIFYING OF ASPHALT PAVING

02/17

PART 1 GENERAL.

1.1 REFERENCES.

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO T 102 (2009; R 2013) Standard Method of Test for

Spot Test of Asphaltic Materials

ASTM INTERNATIONAL (ASTM)

ASTM D92 (2012a) Standard Test Method for Flash and

Fire Points by Cleveland Open Cup Tester

ASTM D140/D140M (2016) Standard Practice for Sampling

Asphalt Materials

ASTM D244 (2009; R 2017) Standard Test Methods and

Practices for Emulsified Asphalts

ASTM D977 (2019a; E 2019) Standard Specification for

Emulsified Asphalt

ASTM D1250 (2019; E 2020) Standard Guide for Use of the Joint API and ASTM Adjunct for

Temperature and Pressure Volume Correction

Factors for Generalized Crude Oils, Refined Products, and Lubricating Oils:

API MPMS Chapter 11.1

ASTM D2170/D2170M (2018) Standard Test Method for Kinematic

Viscosity of Asphalts (Bitumens)

ASTM D2397/D2397M (2019a) Standard Specification for

Cationic Emulsified Asphalt

1.2 SUBMITTALS.

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the government officer that will review the submittal for the Government.

SD-04 Samples

Materials; G, COR

SECTION 32 01 16.75 Page 3

SD-06 Test Reports

Testing

1.3 EQUIPMENT, TOOLS, AND MACHINES.

Maintain equipment, tools, and machines used in the performance of the work in a satisfactory working condition at all times and conforming to applicable governing regulations for local air pollution controls.

1.3.1 Heater Scarifier

Provide a heater scarifier that is: 1) a self-propelled machine having, in combination, the means of heating and scarifying the existing asphalt concrete surface and spreading the scarified material in a uniform layer.

2) capable of producing a minimum thickness of 3/4 inch of uncompacted reclaimed mix without damaging the asphalt binder or violating pollution standards of the area. 3) capable of working at a rate of speed that allows heating and scarifying the pavement to meet the specified requirements. Provide a machine that heats, scarifys, and spreads material in equal widths.

1.3.2 Bituminous Distributor

Provide a bituminous distributor mounted on pneumatic tires of such size and number to prevent rutting, shoving, or other damage to the base, surface, or other layers in the pavement structure. Design and equip the bituminous distributor to spray the bituminous material in a uniform double or triple lap at the temperature recommended by the manufacturer, at variable widths up to at least 12 feet, and at readily determined and controlled rates from 0.02 to 0.5 gallon/square yard with an allowable variation from the specified rate of not more than plus or minus 5 percent. Include with the distributor equipment a separate power unit for the bitumen pump, full circulation spray bars, tachometer, pressure gauges, volume measuring devices, adequate heaters for heating of materials to the proper application temperature, a thermometer for reading the temperature of tank contents, and a hand hose attachment suitable for applying bituminous material to areas inaccessible to the distributor. Equip the distributor to circulate and agitate the bituminous material during the heating process.

1.3.3 Cleaning Equipment

Use power brooms, power blowers, and power vacuuming equipment suitable for cleaning the surface and cracks in the existing pavement prior to treatment.

1.4 ENVIRONMENTAL REQUIREMENTS.

Perform heater scarifying procedures only when the existing pavement is dry and the pavement surface temperature is above 15 degrees C 60 degrees F.

PART 2 PRODUCTS.

2.1 BITUMINOUS MATERIAL.

Provide an emulsified asphalt, all grades, conforming to ASTM D977. The asphalt from which emulsion is required to have a negative spot when tested in accordance with AASHTO T 102.

SECTION 32 01 16.75 Page 4

2.2 TESTING.

2.2.1 Testing

Testing is the responsibility of the Contractor. Perform testing using an approved commercial testing laboratory or by the Contractor's testing laboratory, subject to the approval of the Contracting Officer. Test the materials to establish compliance with the specified requirements. Before delivery of materials, submit certified copies of the test reports establishing compliance with specifications detailed herein and in referenced publications. Submit test results on materials prior to and during construction.

PART 3 EXECUTION.

3.1 PREPARATION OF SURFACE.

Repair all potholes, defective base areas, utility cuts, and large cracks. Adjust manhole covers, valve boxes, and like structures to the desired grade prior to pavement surface repair operations.

3.2 SCARIFYING OPERATION.

Use a heater scarifier to scarify the existing bituminous surface as shown. The temperature at which the work is performed, the nature and condition of the equipment, and the manner of performing the work should be such that no pavement damage occurs during the heating and scarifying operation. Accomplish heating with a unit or units that uniformly heat the pavement to the depth to be scarified. Uniformly spread the scarified material with the scarifier unit. Scarify the surface to a depth of at least 3/4 inch. Do not heat the pavement while in a loosened, scarified condition.

3.3 APPLICATION OF BITUMINOUS EMULSION AGENTS.

Uniformly apply the bituminous emulsion with a bituminous distributor or other approved equipment at a temperature between 75 and 130 degrees F in quantities of not less than 0.05, nor more than 0.30 gallon/square yard. The exact quantities, which may be varied to suit field conditions, will be determined by the Contracting Officer. Apply the emulsion while the scarified material is hot. The bituminous material or recycling agent should be added after the heating process and before the scarification process.

3.4 COMPACTION.

When a surface treatment is to be added, compact the scarified surface to provide a density that results in less than 8% air voids. When a thin asphalt overlay is to be applied the overlay asphalt material will be added on top of the scarified surface behind the scarifier. This can be placed prior to compaction of the scarified material and all material compacted together or it can be added after the scarified material has been compacted. Compact the entire area including the overlay and scarified material to a density that provides less than 7% air voids.

3.5 COMPLETION OF PAVEMENT.

After application of bituminous emulsion agents complete pavement construction.

-- End of Section --

File details come from the government source that posted it. Updated .