This is a specification section for precast structural concrete work as part of Division 03 (Concrete) construction specifications. The section establishes comprehensive requirements for the design, manufacturing, quality control, delivery, and installation of precast concrete members.
Manufacturing and Design Requirements: Precast members must be produced by manufacturers specializing in precast concrete work and designed in accordance with ACI 318 and PCI MNL-120 standards. Design calculations and shop drawings must be prepared by registered professional engineers experienced in precast concrete design and submitted for Contracting Officer approval prior to fabrication. Members must be designed for dead loads, live loads, lateral loads (wind and earthquake), and construction loads including handling and erection stresses. Minimum concrete compressive strength is 5000 psi at 28 days unless otherwise specified. Air-entraining admixtures must produce 4-6 percent air by volume. Concrete mix designs must be submitted 15 days prior to placement with complete material documentation, mill test reports, and trial batch data. Shop drawings must detail member piece marks, openings, connections, lifting devices, estimated camber, prestressing schedules, surface finishes, and all applicable loads.
Materials, Quality Control, and Installation: Reinforcing steel must comply with ASTM standards (A615, A706, or A996 Grade 60), with options for epoxy-coated or galvanized bars when specified. Portland cement must meet ASTM C150/C150M Type I or II (Type III for high early strength). Water must comply with ASTM C1602/C1602M. Tolerances must meet PCI MNL-135 product and position tolerances for cast-in items. Minor defects (less than 36 square inches) must be repaired; major defects result in member rejection. Hairline cracks visible and less than 0.01 inches in width are acceptable except cracks larger than 0.005 inches on weather-exposed surfaces must be repaired. Cracks exceeding 0.01 inch warrant rejection. Installation requires members to be erected after specified compressive strength is attained, placed level and plumb within 1:500 tolerance, and supported on flat, properly sized bearing surfaces using nonshrink grout where irregularities exist. Precast units must be inspected by a QC representative prior to transport and available for Contracting Officer inspection with 7 days' notice.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 03 45 33 Page 1
SECTION TABLE OF CONTENTS
DIVISION 03 - CONCRETE
SECTION 03 45 33
PRECAST STRUCTURAL CONCRETE
05/16
Table of Contents
PART 1 GENERAL
1.1 REFERENCES
1.2 MODIFICATION TO REFERENCE
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.5 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 MATERIALS
2.3 PRODUCTION QUALITY CONTROL PROCEDURES
2.4 TESTS, INSPECTIONS, AND VERIFICATIONS
PART 3 EXECUTION
3.1 EXAMINATION
3.2 ERECTION
3.3 BEARING SURFACES
3.4 ANCHORAGE
3.6 OPENINGS
3.7 GALVANIZING REPAIR
3.8 GROUTING
3.9 SEALANTS
3.10 PROTECTION AND CLEANING
SECTION 03 45 33 Page 2
SECTION 03 45 33
PRECAST CONCRETE
05/16
PART 1 GENERAL.
1.1 REFERENCES.
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO LRFDCONS (3rd Edition; 2010, 2011, 2012, 2014, 2015, and 2016 Int) Bridge Construction
Specifications
AASHTO M 251 (2006; R 2011) Standard Specification for
Plain and Laminated Elastomeric Bridge
Bearings
AASHTO T 259 (2002; R 2017) Standard Method of Test for
Resistance of Concrete to Chloride Ion
Penetration
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 318 (2014; Errata 1-2 2014; Errata 3-5 2015;
Errata 6 2016; Errata 7-9 2017) Building
Code Requirements for Structural Concrete
(ACI 318-14) and Commentary (ACI 318R-14)
ACI 318M (2014; ERTA 2015) Building Code
Requirements for Structural Concrete &
Commentary
AMERICAN HARDBOARD ASSOCIATION (AHA)
AHA A135.4 (1995; R 2004) Basic Hardboard
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2020) Structural Welding Code - Steel
AWS D1.4/D1.4M (2011) Structural Welding Code -
Reinforcing Steel
ASTM INTERNATIONAL (ASTM)
ASTM A27/A27M (2020) Standard Specification for Steel
Castings, Carbon, for General Application
ASTM A36/A36M (2019) Standard Specification for Carbon
Structural Steel
SECTION 03 45 33 Page 3
ASTM A47/A47M (1999; R 2018; E 2018) Standard
Specification for Ferritic Malleable Iron
Castings
ASTM A123/A123M (2017) Standard Specification for Zinc
(Hot-Dip Galvanized) Coatings on Iron and
Steel Products
ASTM A153/A153M (2016a) Standard Specification for Zinc
Coating (Hot-Dip) on Iron and Steel
Hardware
ASTM A307 (2014; E 2017) Standard Specification for
Carbon Steel Bolts, Studs, and Threaded
Rod 60 000 PSI Tensile Strength
ASTM A325 (2014) Standard Specification for
Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength
ASTM A325M (2014) Standard Specification for
Structural Bolts, Steel, Heat Treated, 830
MPa Minimum Tensile Strength (Metric)
ASTM A416/A416M (2018) Standard Specification for
Low-Relaxation, Seven-Wire for
Prestressed Concrete
ASTM A421/A421M (2015) Standard Specification for Uncoated
Stress-Relieved Steel Wire for Prestressed
Concrete
ASTM A563 (2015) Standard Specification for Carbon and Alloy Steel Nuts
ASTM A563M (2007; R 2013) Standard Specification for
Carbon and Alloy Steel Nuts (Metric)
ASTM A615/A615M (2020) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete
Reinforcement
ASTM A706/A706M (2016) Standard Specification for
Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement
ASTM A722/A722M (2015) Standard Specification for Uncoated
High-Strength Steel Bar for Prestressing
ASTM A767/A767M (2016) Standard Specification for
Zinc-Coated (Galvanized) Steel Bars for
Concrete Reinforcement
ASTM A775/A775M (2017) Standard Specification for
Epoxy-Coated Steel Reinforcing Bars
ASTM A780/A780M (2009; R 2015) Standard Practice for
Repair of Damaged and Uncoated Areas of
SECTION 03 45 33 Page 4
Hot-Dip Galvanized Coatings
ASTM A934/A934M (2016) Standard Specification for
Epoxy-Coated Prefabricated Steel
Reinforcing Bars
ASTM A996/A996M (2016) Standard Specification for
Rail-Steel and Axle-Steel Deformed Bars for Concrete Reinforcement
ASTM A1064/A1064M (2017) Standard Specification for
Carbon-Steel Wire and Welded Wire
Reinforcement, Plain and Deformed, for
ASTM C33/C33M (2018) Standard Specification for Concrete
Aggregates
ASTM C94/C94M (2020) Standard Specification for
Ready-Mixed Concrete
ASTM C150/C150M (2020) Standard Specification for Portland
Cement
ASTM C260/C260M (2010a; R 2016) Standard Specification for
Air-Entraining Admixtures for Concrete
ASTM C295/C295M (2019) Standard Guide for Petrographic
Examination of Aggregates for Concrete
ASTM C311/C311M (2018) Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use in Portland-Cement Concrete
ASTM C330/C330M (2017a) Standard Specification for
Lightweight Aggregates for Structural
ASTM C494/C494M (2019) Standard Specification for Chemical
Admixtures for Concrete
ASTM C618 (2019) Standard Specification for Coal Fly
Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
ASTM C989/C989M (2018a) Standard Specification for Slag
Cement for Use in Concrete and Mortars
ASTM C1107/C1107M (2020) Standard Specification for Packaged
Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C1202 (2019) Standard Test Method for Electrical
Indication of Concrete's Ability to Resist
Chloride Ion Penetration
ASTM C1218/C1218M (2017) Standard Test Method for
Water-Soluble Chloride in Mortar and
Concrete
ASTM C1240 (2020) Standard Specification for Silica
Fume Used in Cementitious Mixtures
SECTION 03 45 33 Page 5
ASTM C1260 (2014) Standard Test Method for Potential
Alkali Reactivity of Aggregates
(Mortar-Bar Method)
ASTM C1567 (2013) Standard Test Method for Potential
Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate
(Accelerated Mortar-Bar Method)
ASTM C1602/C1602M (2018) Standard Specification for Mixing
Water Used in Production of Hydraulic
Cement Concrete
ASTM D2240 (2015; E 2017) Standard Test Method for
Rubber Property - Durometer Hardness
ASTM D5759 (2012; R 2020) Characterization of Coal
Fly Ash and Clean Coal Combustion Fly Ash for Potential Uses
ASTM F436 (2011) Hardened Steel Washers
ASTM F436M (2011) Hardened Steel Washers (Metric)
ASTM F844 (2007a; R 2013) Washers, Steel, Plain
(Flat), Unhardened for General Use
PRECAST CONCRETE INSTITUTE (PCI)
PCI MNL-116 (1999) Manual for Quality Control for
Plants and Production of Structural
Precast Concrete Products, 4th Edition
PCI MNL-120 (2010) PCI Design Handbook - Precast and
Prestressed Concrete, 6th Edition
PCI MNL-124 (2011) Design for Fire Resistance of
Precast Prestressed Concrete, Third Edition
PCI MNL-135 (2000) Tolerance Manual for Precast and
Prestressed Concrete Consturction
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-C-882 (1989; Rev E) Cloth, Duck, Cotton or
Cotton-Polyester Blend, Synthetic Rubber, Impregnated, and Laminated, Oil Resistant
UNDERWRITERS LABORATORIES (UL)
UL Fire Resistance (2014) Fire Resistance Directory
1.2 MODIFICATION TO REFERENCE.
In the ACI publications, reference to the "Building Official," the
"Structural Engineer" and the "Architect/Engineer" must be interpreted to mean the Contracting Officer.
1.3 SUBMITTALS.
SECTION 03 45 33 Page 6
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the government officer that will review the submittal for the Government.
SD-01 Shop Drawings
Drawings of Precast Members; G, COR
SD-02 Closeout Submittals
Concrete Batch Ticket Information
Recycled Content for Silica Fume
1.4 QUALITY ASSURANCE.
1.4.1 Concrete Mix Design
ACI 318MACI 318. The minimum compressive strength of concrete at 28 days must be 5000 psi, unless otherwise indicated. Add air-entraining admixtures at the mixer to produce between 4 and 6 percent air by volume. 15 days minimum prior to concrete placement, submit a mix design for each strength and type of concrete. Submit a complete list of materials including type; brand; source and amount of cement, complementary cementitious materials, and admixtures; and applicable reference specifications. Submit mill test and all other test for cement, complementary cementitious materials, aggregates, and admixtures. Provide documentation of maximum nominal aggregate size, gradation analysis, percentage retained and passing sieve, and a graph of percentage retained verses sieve size. Provide mix proportion data using at least three different water-cementitious material ratios for each type of mixture, which produce a range of strength encompassing those required for each type of concrete required. If source material changes, resubmit mix proportion data using revised source material.
Provide only materials that have been proven by trial mix studies to meet the requirements of this specification, unless otherwise approved in writing by the Contracting Officer. Indicate clearly in the submittal where each mix design is used when more than one mix design is submitted. Resubmit data on concrete components if the qualities or source of components changes. For previously approved concrete mix designs used within the past twelve months, the previous mix design may be re-submitted without further trial batch testing if accompanied by material test data conducted within the last six months. Obtain mix design approval from the contracting officer prior to concrete placement.
1.4.2 Certificates: Record Requirement
ASTM C94/C94M. Submit mandatory batch ticket information for each load of ready-mixed concrete.
1.5 DELIVERY, STORAGE, AND HANDLING.
1.5.1 Transportation
1.5.1.1 Transporting Members
Transport members in a manner to avoid excessive stresses that could cause
SECTION 03 45 33 Page 7 cracking or other damage.
1.5.1.2 Lateral Deflection or Vibration
Any noticeable indication of lateral deflection or vibration during transportation must be corrected by rigid bracing between members or by means of lateral trussing.
1.5.2 Storage
1.5.2.1 Storage Areas
Storage areas for precast members must be stabilized, and suitable foundations must be provided, so differential settlement or twisting of members will not occur.
1.5.2.2 Stacked Members
Stack members with adequate dunnage and bracing to control cracking, distortion, warping or other physical damage. Stack members such that lifting devices will be accessible and undamaged.
1.5.3 Handling of Members
The location of pickup points for handling of the members and details of the pickup devices must be shown in shop drawings. Members must be handled only by means of approved devices at designated locations.
Members must be maintained in an upright position at all times and picked up and supported as shown in approved shop drawings.
PART 2 PRODUCTS.
2.1 SYSTEM DESCRIPTION.
Precast members must be the product of a manufacturer specializing in the production of precast concrete members.
2.1.1 Design Requirements
Design Requirements for Changes to Original Design. If design changes from that provided, design precast members in accordance with ACI 318M ACI 318 and the PCI MNL-120. Design precast members (including connections) for the design load conditions and spans indicated, and handling and erection stresses, and for additional loads imposed by openings and supports of the work of other trades. Design precast members for handling without cracking in accordance with the PCI MNL-120.
2.1.1.1 Loads
Loadings for members and connections must include all dead load, live load, applicable lateral loads such as wind and earthquake, applicable construction loads such as handling, erection loads, and other applicable loads.
2.1.1.2 Drawing and Design Calculation Information
SECTION 03 45 33 Page 8
Drawing and Design Calculation Information. Submit drawings and design calculations indicating complete information for the fabrication, handling, and erection of the precast member. Include a cover page with the design calculations, signed and sealed by the registered design professional who prepared the design. Drawings must not be reproductions of contract drawings. Design calculations, drawings of precast members, and (including connections) must be made by a registered professional engineer experienced in the design of precast concrete members, and submitted for approval prior to fabrication. The drawings must indicate, as a minimum, the following information:
a. Plans, elevations and other drawing views showing the following:
(1) Member piece marks locating and defining products furnished by the manufacturer.
(2) Headers for openings.
(3) Location and size of openings
(4) Relationships to adjacent material.
(5) Joints and openings between members and between members and other construction.
(6) Location of field installed anchors.
(7) Erection sequences and handling requirements
(8) Areas receiving toppings and magnitude of topping thickness.
Identify areas where topping is an integral part of the structural capacity of the precast members.
(9) Lifting and erection inserts
b. Elevations, sections and other details for each member showing the following:
(1) Connections between members and connections between members and other construction.
(2) Connections for work of other trades and cast-in items and their relation to other trades.
(3) Dimensioned size and shape for each member with quantities, position and other details of reinforcing steel, anchors, inserts and other embedded items.
(4) Lifting, erection and other handling devices and inserts.
(5) Surface finishes of each member.
(6) Estimated cambers
e. Magnitude, schedule and sequence of tensioning and detensioning prestressing strands.
f. Strength properties for concrete, steel and other materials.
SECTION 03 45 33 Page 9
g. Methods for storage and transportation.
h. Description of loose, cast-in and field hardware.
i. All dead, live, handling, erection and other applicable loads used in the design.
j. Signature and seal of the registered design professional who prepared the design.
2.2 MATERIALS.
2.2.1 Cementitious Materials
2.2.1.1 Portland Cement
Unless otherwise specified, provide cement that conforms to ASTM
C150/C150M Type I or II and meets low alkali content Requirements.
Contractor shall use ASTM C150/C150M Type III where high early strength is required.
2.2.2 Water
Water must comply with the requirements of ASTM C1602/C1602M. Minimize the amount of water in the mix. Improve workability by adjusting the grading rather than by adding water. Water must be potable free from injurious amounts of oils, acids, alkalis, salts, organic materials, or other substances deleterious to concrete. Submit test report showing water complies with ASTM C1602/C1602M.
2.2.3 Aggregates
ASTM C33/C33M, except as modified herein. Furnish aggregates for exposed concrete surfaces from one source. Provide aggregates that do not contain any substance which may be deleteriously reactive with the alkalies in the cement. Submit test report showing compliance with ASTM C33/C33M.
2.2.4 Grout
2.2.5.1 Nonshrink Grout
ASTM C1107/C1107M.
2.2.5.2 Cementitious Grout
Must be a mixture of portland cement, sand, and water. Proportion one part cement to approximately 2.5 parts sand, with the amount of water based on placement method.
2.2.6 Admixtures
2.2.6.1 Air-Entraining
ASTM C260/C260M.
SECTION 03 45 33 Page 10
2.2.6.2 Accelerating
ASTM C494/C494M, Type C or E.
2.2.6.3 Water Reducing
ASTM C494/C494M, Type A, E, or F.
2.2.7 Reinforcement
2.2.7.1 Reinforcing Bars
ASTM A615/A615M, Grade 60; ASTM A706/A706M, Grade 60; or ASTM A996/A996M, Grade 60.
Epoxy-coated steel bars must comply with the requirements of ASTM A775/A775M or ASTM A934/A934M, including written certifications for coating material and coated bars, sample of coating material, and 0.5 pounds of patching material.Submit written certification with the delivery of the bars.
Zinc-coated (galvanized) bars must comply with the requirements of
ASTM A767/A767M, Class II coating, galvanized after fabrication.
2.2.7.2 Wire
ASTM A1064/A1064M.
2.2.7.3 Welded Wire Reinforcement
ASTM A1064/A1064M.
2.2.7.4 Supports for Concrete Reinforcement
Include bolsters, chairs, spacers, and other devices necessary for proper spacing, supporting, and fastening reinforcement bars and wire in place.
Ensure legs of supports in contact with formwork for sections that will be exposed to weather are hot-dip galvanized after fabrication, plastic coated, or corrosion-resistant steel bar supports.
2.3 PRODUCTION QUALITY CONTROL PROCEDURES.
2.3.1 Forms
Brace forms to prevent deformation. Forms must produce a smooth, dense surface. Use forms and form-facing materials that are nonreactive with concrete such as wood, metal, plastic, or other approved materials.
Conform to the shapes, lines, and dimensions indicated and are within the limits of the specified fabrication tolerances. Chamfer exposed edges of columns and beams 3/4 inch, unless otherwise indicated. Provide threaded or snap-off type form ties.
2.3.2 Tolerances
Fabricate structural precast concrete members of shapes, lines and dimensions indicated, so each finished member complies with PCI MNL-135 product tolerances as well as position tolerances for cast-in items.
SECTION 03 45 33 Page 11
2.3.3 Reinforcement Placement
ACI 318MACI 318 and PCI MNL-116 for placement and splicing. Place and secure steel bars, welded-wire reinforcement, and other reinforcement by means of metal bar supports and spacers. Reinforcement may be preassembled before placement in forms. Provide exposed connecting bars, or other approved connection methods, between precast and cast-in-place construction. Remove any excess mortar that adheres to the exposed connections
2.3.4 Inserts
When the ends of the prestressed member will be exposed, recess the prestressing stands using inserts. After detensioning, remove inserts and fill the recess with nonshrink grout.
2.3.5 Built-In Anchorage Devices
Position, anchor, and locate anchorage devices where they do not affect the position of the main reinforcement or placing concrete. Bearing plates; set level, aligned properly, and anchored in the exact location indicated.
2.3.6 Lifting Devices
Provide lifting devices designed for 100-percent impact, and of materials sufficiently ductile to ensure visible deformation before fracture.
2.3.7 Blockouts
Provide blockouts as indicated.
2.3.8 Identification Markings
Clearly mark each structural section in a permanent manner to indicate its location and orientation in the building and the pickup points.
Ensure each structural section has the date of casting plainly indented in the unexposed face of the concrete.
2.3.9 Concrete
2.3.9.1 Concrete Mixing
ASTM C94/C94M. Mixing operations must produce batch-to-batch uniformity of strength, consistency, and appearance.
2.3.9.2 Concrete Placing
PCI MNL-116.
2.3.9.3 Concrete Curing
PCI MNL-116.
2.3.10 Surface Finish
Repairs located in a bearing area must be approved by the Contracting
Officer prior to repairs. Defects must be repaired or rejected as
SECTION 03 45 33 Page 12 specified in paragraph ACCEPTANCE/REJECTION OF DEFECTS.
2.3.11 Acceptance/Rejection of Defects
2.3.11.1 Minor Defects
All honeycombed areas, chipped corners, air pockets over 1/4 inch in diameter, and other minor defects involve less than 36 square inches of concrete must be repaired. Form offsets of fins over 1/8 inch must be ground smooth. All unsound concrete must be removed from defective areas prior to repairing. All surfaces permanently exposed to view must be repaired by a blend of portland cement and white cement properly proportioned so that the final color when cured will be the same as adjacent concrete. Precast members containing hairline cracks which are visible and are less than 0.01 inches in width, may be accepted, except that cracks larger than 0.005 inches in width for surfaces exposed to the weather must be repaired.
2.3.11.2 Major Defects
Major defects are those which involve more than 36 square inches of concrete or expose stressing tendons or reinforcing steel. If one or more major defects appear in a member, it will be rejected. Cracks of a width of more than 0.25 mm 0.01 inch will be cause for rejection of the member.
2.4 TESTS, INSPECTIONS, AND VERIFICATIONS.
At the option of the Contracting Officer, precast units may be inspected by the Contracting Officer. Precast units must be inspected by the QC
Representative prior to being transported to the job site. The Contractor must give notice 7 days prior to the time the units will be available for inspection. Neither the exercise nor waiver of inspection will affect the
Government's right to enforce contractual provisions after units are installed.
PART 3 EXECUTION.
3.1 EXAMINATION.
Prior to erection, and again after installation, precast members must be checked for damage, such as cracking, spalling, and honeycombing.
As directed by the Contracting Officer, precast members that do not meet the surface finish requirements specified in paragraph SURFACE
FINISH must be repaired, or removed and replaced with new precast members.
3.2 ERECTION.
Precast members must be erected after the concrete has attained the specified compressive strength, unless otherwise approved by the precast manufacturer. Erect in accordance with the approved shop drawings. PCI
MNL-135 for tolerances. Provide a 1:500 tolerance, if no tolerance is specified. Brace precast members, unless design calculations submitted with the shop drawings indicate bracing is not required. Follow the manufacturer's recommendations for maximum construction loads. Place precast members level, plumb, square, and true within tolerances. Align member ends.
3.3 BEARING SURFACES.
SECTION 03 45 33 Page 13
Must be flat, free of irregularities, and properly sized. Size bearing surfaces to provide for the indicated clearances between the precast member and adjacent precast members or adjoining field placed surfaces.
Correct bearing surface irregularities with nonshrink grout. Provide bearing pads where indicated or required. Do not use hardboard bearing pads in exterior locations. Place precast members at right angles to the bearing surface, unless indicated otherwise, and draw-up tight without forcing or distortion, with sides plumb.
3.4 ANCHORAGE.
Provide anchorage for fastening work in place. Conceal fasteners where practicable. Make threaded connections up tight and nick threads to prevent loosening.
3.5 WELDING
AWS D1.1/D1.1M, AWS D1.4/D1.4M for welding connections and reinforcing splices. Welding of epoxy-coated reinforcing is not allowed.
3.6 OPENINGS.
Holes or cuts requiring reinforcing to be cut, which are not indicated on the approved shop drawing, must only be made with the approval of the
Contracting Officer and the precast manufacturer. Drill holes less than
12 inches in diameter with a diamond tipped core drill. Ensure cuts are straight and at 90 degrees to the surfaces without breaking or spalling the edges.
3.7 GALVANIZING REPAIR.
Repair damage to galvanized coatings using ASTM A780/A780M zinc rich paint for galvanized surfaces damaged by handling, transporting, cutting, welding, bolting, or acid washing. Do not heat surfaces to which repair paint has been applied.
3.8 GROUTING.
Clean and fill keyways between precast members, and other indicated areas, solidly with nonshrink grout or cementitious grout. Provide reinforcing where indicated. Remove excess grout before hardening.
3.9 SEALANTS.
Provide as indicated and as specified in Section 07 92 00 JOINT SEALANTS.
3.10 PROTECTION AND CLEANING.
Protect exposed-to-view surfaces against staining and other damage until completion of the work.
Upon completion of installation, swept clean and leave ready slab surfaces to receive concrete floor topping, roofing, or other covering.
-- End of Section --