Technical_Exhibit_1,__1701_Asbestos_Report.pdf
PDF 11 MB Posted
- Attached to
- Renovation of Builiding 1701
- Solicitation number
- W911S717B0003
About this file
Technical Exhibit 1, 1701 Asbestos Report
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
. 1701 JANUARY 2017 2
TABLE OF CONTENTS
Page No.
1.0 EXECUTIVE SUMMARY
2.0 SUMMARY OF ASBESTOS CONTAINING MATERIAL
3.0 THERMAL SYSTEMS
4.0 SURFACING MATERIALS
4.1 Flooring
4.2 Interior Walls/Ceilings
4.3 Exterior Walls
5.0 MISCELLANEOUS
5.1 Roofing
5.2 Windows
5.3 Insulation
6.0 FINDINGS
7.0 RECOMMENDATIONS
ATTACHMENTS
ATTACHMENT A Inspection Log Sheets/analytical results
ATTACHMENT B Missouri Asbestos Inspector License
. 1701 JANUARY 2017 11
4.3 Exterior Walls
Exterior walls were brick. No samples taken
5.0 MISCELLANEOUS
5.1 Roofing was rubber, no samples taken
5.2 Windows
Caulking on older windows and window glazing have been known to contain asbestos.
Windows were metal framed (no caulking)
NO sample taken.
5.3 Insulation
Several types of insulation have been known to contain asbestos.
No insulation was in the structure. No samples taken
6.0 FINDINGS
As noted in the Sections above:
Flooring material (12x12 tile: FRONT OFFICE AREA: B,D,E ) tested positive for asbestos.
ALL FRONT OFFICE TILE FLOORING MATERIAL ARE THEREFORE ASSUMED
TO BE ASBESTOS CONTAINING BUIDLING MATERIAL.
Log sheets in Attachment A contain location, description, and approximate amount of the materials that were encountered and tested. There were no other suspect materials encountered at the time of the inspection.
7.0 RECOMMENDATIONS
There is no Friable Asbestos Containing Material
There is Non Friable Asbestos Containing Material.
Materials inaccessible at the time of the inspection, such as those behind floors, walls and ceiling were not included in this survey. If additional suspect material is encountered during renovation or demolition all work affecting the suspect material must cease. Suspect ACM must be sampled by a Licensed Asbestos Professional. All sampling activities must be coordinated through and recorded by the Department of Public Works Environmental Branch. All ACM must be removed in accordance with Federal, State, Local and Army Regulations. Any notification/permit forms requiring licensed asbestos inspector information should have a copy of this report along with all its attachments, accompanying those notification/permits. This report should only be attached and read in its entirety. Ensure that all materials are disposed of properly. Solid waste must be properly disposed of at an approved landfill or transfer facility in accordance with the Solid Waste
Management Law. All renovation/demolition activities should be conducted following all required Occupational Safety and Health Administration OSHA guidelines.
. 1701 JANUARY 2017 12
ATTACHMENTS
ATTACHMENT A Inspection Diagram/Inspection Sheets/Sampling Results
Laboratory Results/Chain of Custody
. 1701 JANUARY 2017 25
1701 A
. 1701 JANUARY 2017 26
1701B
. 1701 JANUARY 2017 27
. 1701 JANUARY 2017 28
1701 C
. 1701 JANUARY 2017 29
1701D
. 1701 JANUARY 2017 30
1701 E
. 1701 JANUARY 2017 49
File details come from the government source that posted it. Updated .