8107_m7v8.pdf
PDF 166 KB Posted
- Attached to
- Renovation of Builiding 1701
- Solicitation number
- W911S717B0003
About this file
8107_m7v8, 14 of 27
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L v
O f
A P
P R
D M
A D
E
D I
R E
C T
O R
A T
E
O F
U
B L I
C
W
R K
S
F O
R
O N
A
D
W
O
M
S S
O U
R I
D E
S C
R I
P T I
O N
R E
V I
S I
O N
S
D A
T E
A P
P R
O V
E D
D A
T E
S U
B M I
T T
E D
C H
E C
K E
D
D R
A W
N
D E
S I
G N
E D
C O
O R
D I
N A
T I
O N
D A
T E
D A
T E
D A
T E
SCALE
DATE
PROJECT NO:
DRAWING NO:
OFSHEET
AS SHOWN
E L
L E
E L
L E
E L
L E
R
F
S
M C
R E
P A
B
I
L D I
N G
17 NOV 16
DPW 03383-6J
Y L
O R
N O
R
H
4 2 0 4 8
S C A L E I N F E E T
PLUMBING PLAN - DEMOLITION
N O
R
H
4 2 0 4 8
S C A L E I N F E E T
PLUMBING PLAN - NEW WORK
KEYED NOTES
GENERAL NOTES, DEMOLITION
ITEMS TO BE REMOVED ARE INDICATED AS DOTTED LINES
OF ALL SUPPORTS, BRACKETS, AND/OR HANGERS.
REMOVAL/DEMOLITION OF ANY ITEM (EQUIPMENT, DUCT, PIPING, ETC.) SHALL INCLUDE THE REMOVAL/DEMOLITION 5.
ANY DEBRIS SHALL BE REMOVED FROM WORK AREAS DAILY.
KEEP CLEAN ALL EXISTING SPACES AND PROPERTIES ADJACENT TO DEMOLITION/ CONSTRUCTION AREAS. 4.
PROTECT FROM DAMAGE ALL PORTIONS OF THE EXISTING BUILDING DURING DEMOLITION/ CONSTRUCTION.3.
OF ANY DISCREPANCIES.
VERIFY FIELD CONDITIONS PRIOR TO START OF DEMOLITION/ CONSTRUCTION, AND NOTIFY THE GOVERNMENT 2.
REFER TO ARCHITECTURAL, ELECTRICAL, AND MECHANICAL SHEETS FOR ADDITIONAL INFORMATION.1.
KEYED NOTES
GENERAL NOTES:
1. ALL COLD AND HOT WATER PIPING SHALL BE TYPE-L COPPER AND SLOPED
1/4"/ FT.
2. SEE ARCHITECTUAL, MECHANICAL, CIVIL & ELECTRICAL SHEETS FOR ADDITIONAL
INFO.
3. THE MENTION OF A BRAND NAME IS NOT INTENDED TO LIMIT COMPETITION BUT
IS USED AS A QUALITY STANDARD ONLY.
4. 2012 INTERNATIONAL PLUMGING CODE SHALL APPLY.
5. SUBMITTALS REQUIRED ON ALL MATERIALS.
6. ALL WATER PIPING SHALL HAVE FIBER INSULATION COMPLETELY SEALED
WITH ASJ. INCLUDE PVC JACKET COVERS AT FITTINGS. COLD WATER SHALL HAVE
MOLDED INSULATION UNDER PVC JACKET AT FITTINGS. PROVIDE LABELING AND
DIRECTION ARROWS.
7. WALL PENETRATIONS SHALL INCLUDE CHROME ESCUTCHENS.
8. PIPE HANGERS AND SUPPORTS SHALL BE NONMETALLIC AT CONNECTION TO PIPING
9. MECHANICAL ROOM PENETRATIONS SHALL BE 2-HOUR FIRE SEALED.
WALL
ESCUTCHENS
WALL
BALL VALVE
SUPPLY SHUTOFF
…" COLD WATER
ELECTRIC WATER COOLER
P-TRAP,
1-1/4" WASTE
N.T.S.
M A
X
A F
F
M I N
A F
F
TYPICAL
VALVE
BALL
SHUTOFF
SUPPLY
WATER
AND COLD
3/8" HOT
WITH P-TRAP
1-1/4" WASTE
SUPPLY
WATER
HOT
SUPPLY
WATER
COLD
DETAIL ADA CLEARANCES REQUIRED
LAVATORY FRONT AND SIDE VIEW
WALL
FLOOR
ESCUTCHENS
WALL
FILLER
BOTTLE
N.T.S.
7.7 GPH AT 50 DEGREES F.
FILTER AND BOTTLE FILLER.
ADA APPROVED UNIT INCLUDES LEAD
CL
FROM FINISHED FLOOR TO SEAT.
ADA SEAT HEIGHT REQUIRED. 17"-19"8.
WATER SUPPLY SHALL BE 1".7.
CAPS.
COMPLETE WITH FLOOR BOLTS AND BOLT 6.
GASKET SHALL BE WAX TYPE.5.
PROVIDE CLOSET FLANGE.4.
LESS COVER.
SEAT SHALL BE BLACK, OPEN FRONT 2.
SAVING FLUSHOMETER VALVE.
WATER SAVER TOILET WITH WATER
WATER CLOSET SHALL BE ELONGATED 1.
W.C. OUTLET
N.T.S.ADA WATER CLOSET DETAIL
REMOVE DRINKING WATER FOUNTAIN COMPLETE AND PREPARE WALL AND PLUMBING FOR NEW FOUNTAIN.4.
SHALL BE CAPPED OR PLUGGED INSIDE WALL. REPAIR WALL TO MATCH ADJACENT.
REMOVE URINAL COMPLETE TO INCLUDE ALL PLUMBING. DOMESTIC WATER PIPING SHALL BE CAPPED AT THE MAIN. WASTE 3.
REMOVE WATER CLOSET COMPLETE TO INCLUDE EXPOSED WATER PIPING AND STOP VALVE.2.
REMOVE LAVATORY COMPLETE TO INCLUDING ALL EXPOSED PLUMBING PIPING AND STOP VALVES.1.
PROVIDE ADA DRINKING WATER COOLER.3.
PROVIDE ADA WATER CLOSET COMPLETE TO INCLUDE PIPING AND FLUSH VALVE.2.
PIPING AND ADA PIPING INSULATION.
PROVIDE ADA LAVATORY COMPLETE WITH STOP VALVES, HOT & COLD SUPPLY LINES, DRAIN 1.
PROVIDE CARRIER PER SPECIFICATION.6.
LOCATED AND INSULATED PER ADA.
UNDER SINK PIPING SHALL BE BRASS WITH CHROME FINISH5.
CHROME WALL ESCUTCHEN FOR ALL WALL PIPE PENATRATIONS.4.
FAUCET/VALVE FLEXIBLE STAINLESS CONNECTORS.3.
PROVIDE LAVATORY STOP VALVES. 2.
BLADE HANDLES, CHROME TUBING TAILPIECE, AND STRAINER.
ADA LAVATORIES INCLUDE ADA GOOSE NECK FAUCET AND WRIST 1.
T A I
L S
P L
U M
B I
N G
A N
M7 8
J
B
L
S
C
E D
B
C8107.27
RESTROOM RESTROOM
STORAGE
JANITOR
MOP
EWC
OF SHELVES
FIVE ROWS
| 2017-04-24T12:31:25-0500 | |
| BALES.JIMMIE.D.JR.1231309302 |
File details come from the government source that posted it. Updated .