12 X 12
AHU-A AHU-B AHU-C AHU-D AHU-E
GENERAL NOTES, DEMOLITION
COVER ALL RETURNS IN WORK AREA WITH FILTERS DURING CONSTRUCTION WHERE APPLICABLE.6.
OF ALL SUPPORTS, BRACKETS, AND/OR HANGERS.
REMOVAL/DEMOLITION OF ANY ITEM (EQUIPMENT, DUCT, PIPING, ETC.) SHALL INCLUDE THE REMOVAL/DEMOLITION 5.
ANY DEBRIS SHALL BE REMOVED FROM WORK AREAS DAILY.
KEEP CLEAN ALL EXISTING SPACES AND PROPERTIES ADJACENT TO DEMOLITION/ CONSTRUCTION AREAS. 4.
COVER ALL SMOKE DETECTORS, THERMOSTATS AND AC COILS DURING CONSTRUCTION.
PROTECT FROM DAMAGE ALL PORTIONS OF THE EXISTING BUILDING DURING DEMOLITION/ CONSTRUCTION. 3.
OF ANY DISCREPANCIES.
VERIFY FIELD CONDITIONS PRIOR TO START OF DEMOLITION/ CONSTRUCTION, AND NOTIFY THE GOVERNMENT 2.
REFER TO ARCHITECTURAL, ELECTRICAL, AND MECHANICAL SHEETS FOR ADDITIONAL INFORMATION.1.
N O
R T
H
HVAC FLOOR PLAN - DEMOLITION
ITEMS TO BE REMOVED ARE INDICATED AS DOTTED LINES
1 1
1 1
2 2
2 2
CHW
CHWR
HW
HWR
C H
W
C H
W R
H W
H W
R
CHW
CHW
CHWCHWCHW
CHW
CHWRCHWR
CHWR CHWR CHWR
CHWR
CHWRCHWRCHWR
HW HW HW HW
HWR
HWR
HWRHWRHWR
3 3
4 4
KEYED DEMOLITION NOTES
C W
S
C
R
H T
W S
H T
W R
11 11 11 11
L v
O f
A P
P R
D M
A D
E
D I
R E
C T
O R
A
E
O F
U
B L I
R K
S
F O
R
L
O N
A
D
O
M
S S
O U
R I
D E
S C
R I
P T I
O N
R E
V I
S I
O N
S
D A
T E
A P
P R
O V
E D
D A
T E
S U
B M I
T T
E D
C H
E C
K E
D
D R
A W
N
D E
S I
G N
E D
C O
O R
D I
N A
T I
O N
D A
T E
D A
T E
D A
T E
SCALE
DATE
PROJECT NO:
DRAWING NO:
OFSHEET
AS SHOWN
E L
L E
R
F
M C
R E
P A
B
I
L D I
N G
17 NOV 16
DPW 03383-6J
4 2 0 4 8
S C A L E I N F E E T
S T
E
S T
E
J
L L
A R
D I
M2 8
P L
A N
D E
M O
L I
T I
PLUMBING DEMO AND NEW WORK SEE SHEET M7.12.
AHU-A THRU AHU-E SHALL REMAIN. THE HOT WATER PIPING AND CONTROL VALVES SHALL BE REPLACED.11.
DEMOLITION SHALL BE THE FIRST FLANGE AT ENTRY TO MECHANICAL ROOM FOR HTHW AND FIRST FLANGE ABOVE BYPASS FOR CW.
REMOVE ALL HIGH TEMPERATURE AND CHILLED WATER PIPING IN MECHANICAL ROOM BACK TO POINT OF DEMOLITION. POINT OF 10.
EXISTING WATER HEATER, RETURN PUMP AND PIPING TO REMAIN.9.
REMOVE AIR COMPRESSOR COMPLETE TO INCLUDE ALL PIPING AND CONTROLS.8.
REMOVE UNIT HEATER COMPLETE TO INCLUDE ALL PIPING AND CONTROLS.7.
REMOVE DUAL TEMPERATURE PUMP AND HOT WATER PUMP COMPLETE TO INCLUDE ALL PIPING, VALVES AND CONTROLS.6.
REMOVE REMOVE HOT WATER CONVERTER AND EXPANSION TANK COMPLETE TO INCLUDE ALL PIPING, VALVES AND CONTROLS.5.
REMOVE HOT WATER SUPPPLY (HWS) AND HOT WATER RETURN (HWR) PIPING COMPLETE.4.
REMOVE CHILLED/HOT SUPPLY (CHW) AND CHILLED/HOT RETURN PIPING (CHWR) COMPLETE.3.
REMOVE FAN COIL UNIT COMPLETE. TO INCLUDE ALL CONTROL WIRING, WATER LINES, ELECTRICAL & CONTROL VALVES.2.
DIFFUSERS, GRILLES DAMPERS AND CONTROLS ETC.
REMOVE DUCTWORK COMPLETE. TO INCLUDE ALL SUPPLY, RETURN & VENTILATION DUCTWORK, ASSOCIATED 1.
C8107.27
J
B A
L
E D
B
RESTROOMS
F F