8107_m2v8.pdf

PDF 180 KB Posted

Attached to
Renovation of Builiding 1701
Solicitation number
W911S717B0003
Issued by

About this file

8107_m2v8, 9 of 27

View the file

Other files

File Type Posted
Bid_Abstract,_W911S7-17-B-0003.pdf PDF
Additional_Questions_W9111S7-17-B-0003.pdf PDF
W9111S7-17-B-0003,_Repair_and_Renovation_of_Bldg_1701,_Amendment_0002.pdf PDF
Revised,_8107_mi7v8.pdf PDF
Questions_and_Answers_W911S7-17-B-0003.pdf PDF
Revised,_8107_mi6v8.pdf PDF
W911S7-17-B-0003,_Repair_Renovation_of_Bldg_1701,_Admendment_0001.pdf PDF
Revised,_8107_mi9v8.pdf PDF
Revised,_8107_mi10v8.pdf PDF
Revised,_8107_m3v8.pdf PDF
Site_Visit_Roster.pdf PDF
8107_m7v8.pdf PDF
8107_mi6v8.pdf PDF
8107_mi11v8.pdf PDF
Attachment_B,_DBA_Wages_MO170019.pdf PDF
W911S7-17-B-0003_Repair_Renovation_of_Bldg_1701.pdf PDF
8107_m6v8.pdf PDF
8107_m8v8.pdf PDF
8107_e3v8.pdf PDF
8107_a1v8.pdf PDF
8107_mi12v8.pdf PDF
8107_mi10v8.pdf PDF
8107_mi3v8.pdf PDF
8107_mi2v8.pdf PDF
8107_e1v8.pdf PDF
Attachment_A,_Statement_of_Work.pdf PDF
8107_a2v8.pdf PDF
8107_e4v8.pdf PDF
Technical_Exhibit_1,__1701_Asbestos_Report.pdf PDF
8107_mi4v8.pdf PDF
8107_m3v8.pdf PDF
8107_m1v8.pdf PDF
8107_mi1v8.pdf PDF
8107_mi5v8.pdf PDF
8107_mi8v8.pdf PDF
8107_m4v8.pdf PDF
8107_e2v8.pdf PDF
8107_a3v8.pdf PDF
8107_mi9v8.pdf PDF
8107_m5v8.pdf PDF
8107_mi7v8.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12 X 12

AHU-A AHU-B AHU-C AHU-D AHU-E

GENERAL NOTES, DEMOLITION

COVER ALL RETURNS IN WORK AREA WITH FILTERS DURING CONSTRUCTION WHERE APPLICABLE.6.

OF ALL SUPPORTS, BRACKETS, AND/OR HANGERS.

REMOVAL/DEMOLITION OF ANY ITEM (EQUIPMENT, DUCT, PIPING, ETC.) SHALL INCLUDE THE REMOVAL/DEMOLITION 5.

ANY DEBRIS SHALL BE REMOVED FROM WORK AREAS DAILY.

KEEP CLEAN ALL EXISTING SPACES AND PROPERTIES ADJACENT TO DEMOLITION/ CONSTRUCTION AREAS. 4.

COVER ALL SMOKE DETECTORS, THERMOSTATS AND AC COILS DURING CONSTRUCTION.

PROTECT FROM DAMAGE ALL PORTIONS OF THE EXISTING BUILDING DURING DEMOLITION/ CONSTRUCTION. 3.

OF ANY DISCREPANCIES.

VERIFY FIELD CONDITIONS PRIOR TO START OF DEMOLITION/ CONSTRUCTION, AND NOTIFY THE GOVERNMENT 2.

REFER TO ARCHITECTURAL, ELECTRICAL, AND MECHANICAL SHEETS FOR ADDITIONAL INFORMATION.1.

N O

R T

H

HVAC FLOOR PLAN - DEMOLITION

ITEMS TO BE REMOVED ARE INDICATED AS DOTTED LINES

1 1

1 1

2 2

2 2

CHW

CHWR

HW

HWR

C H

W

C H

W R

H W

H W

R

CHW

CHW

CHWCHWCHW

CHW

CHWRCHWR

CHWR CHWR CHWR

CHWR

CHWRCHWRCHWR

HW HW HW HW

HWR

HWR

HWRHWRHWR

3 3

4 4

KEYED DEMOLITION NOTES

C W

S

C

R

H T

W S

H T

W R

11 11 11 11

L v

O f

A P

P R

D M

A D

E

D I

R E

C T

O R

A

E

O F

U

B L I

R K

S

F O

R

L

O N

A

D

O

M

S S

O U

R I

D E

S C

R I

P T I

O N

R E

V I

S I

O N

S

D A

T E

A P

P R

O V

E D

D A

T E

S U

B M I

T T

E D

C H

E C

K E

D

D R

A W

N

D E

S I

G N

E D

C O

O R

D I

N A

T I

O N

D A

T E

D A

T E

D A

T E

SCALE

DATE

PROJECT NO:

DRAWING NO:

OFSHEET

AS SHOWN

E L

L E

R

F

M C

R E

P A

B

I

L D I

N G

17 NOV 16

DPW 03383-6J

4 2 0 4 8

S C A L E I N F E E T

S T

E

S T

E

J

L L

A R

D I

M2 8

P L

A N

D E

M O

L I

T I

PLUMBING DEMO AND NEW WORK SEE SHEET M7.12.

AHU-A THRU AHU-E SHALL REMAIN. THE HOT WATER PIPING AND CONTROL VALVES SHALL BE REPLACED.11.

DEMOLITION SHALL BE THE FIRST FLANGE AT ENTRY TO MECHANICAL ROOM FOR HTHW AND FIRST FLANGE ABOVE BYPASS FOR CW.

REMOVE ALL HIGH TEMPERATURE AND CHILLED WATER PIPING IN MECHANICAL ROOM BACK TO POINT OF DEMOLITION. POINT OF 10.

EXISTING WATER HEATER, RETURN PUMP AND PIPING TO REMAIN.9.

REMOVE AIR COMPRESSOR COMPLETE TO INCLUDE ALL PIPING AND CONTROLS.8.

REMOVE UNIT HEATER COMPLETE TO INCLUDE ALL PIPING AND CONTROLS.7.

REMOVE DUAL TEMPERATURE PUMP AND HOT WATER PUMP COMPLETE TO INCLUDE ALL PIPING, VALVES AND CONTROLS.6.

REMOVE REMOVE HOT WATER CONVERTER AND EXPANSION TANK COMPLETE TO INCLUDE ALL PIPING, VALVES AND CONTROLS.5.

REMOVE HOT WATER SUPPPLY (HWS) AND HOT WATER RETURN (HWR) PIPING COMPLETE.4.

REMOVE CHILLED/HOT SUPPLY (CHW) AND CHILLED/HOT RETURN PIPING (CHWR) COMPLETE.3.

REMOVE FAN COIL UNIT COMPLETE. TO INCLUDE ALL CONTROL WIRING, WATER LINES, ELECTRICAL & CONTROL VALVES.2.

DIFFUSERS, GRILLES DAMPERS AND CONTROLS ETC.

REMOVE DUCTWORK COMPLETE. TO INCLUDE ALL SUPPLY, RETURN & VENTILATION DUCTWORK, ASSOCIATED 1.

C8107.27

J

B A

L

E D

B

RESTROOMS

F F

2017-04-24T12:27:20-0500
BALES.JIMMIE.D.JR.1231309302

File details come from the government source that posted it. Updated .