8107_m3v8.pdf
PDF 218 KB Posted
- Attached to
- Renovation of Builiding 1701
- Solicitation number
- W911S717B0003
About this file
8107_m3v8, 10 of 27
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
T
L v
O f
A P
P R
D M
A D
E
D I
R E
C T
O R
A
E
O F
U
B L I
C
W
R K
S
F O
R
O N
A
D
O
M
S S
O U
R I
D E
S C
R I
P T I
O N
R E
V I
S I
O N
S
D A
T E
A P
P R
O V
E D
D A
T E
S U
B M I
T T
E D
C H
E C
K E
D
D R
A W
N
D E
S I
G N
E D
C O
O R
D I
N A
T I
O N
D A
T E
D A
T E
D A
T E
SCALE
DATE
PROJECT NO:
DRAWING NO:
OFSHEET
AS SHOWN
E L
L E
R
F
S
M C
R E
P A
B
I
L D I
N G
17 NOV 16
DPW 03383-6J
N O
R T
H
S C A L E I N F E E T
16848
HVAC FLOOR PLAN - NEW WORK
12 X 12
12 X 12
AHU-A CU-A AHU-B CU-B
CU-C
AHU-C CU-D
CU-E
AHU-EAHU-D
T
T
0 16848
T
T
T
T
T
6"
6"
6"
6"6"
6"6"
6"6" 6"
6"
4"
4"
4"
8"6"
8"
8"
8"
8"
8"
10"10"
8"X8"
8"X8" 8"X8"
8"X8"
8"X8"8"X8"
X
X
GENERAL NOTES APPLY TO ALL DRAWINGS.
8"X8"
10"X10" 12"X10" 10"X10" 8"X8"
FCU-1(A)
FCU-2(A)
FCU-3(A)
FCU-4(A) FCU-5(A)
FCU-1(B)
FCU-4(B)
FCU-5(B)
FCU-3(B)
FCU-2(B)
FCU-1(C)
FCU-4(C)
FCU-5(C)
FCU-3(C)
FCU-2(C)
FCU-2(D)
FCU-3(D)
FCU-1(D)
FCU-4(D)
FCU-5(D)
FCU-1(E)
FCU-4(E)
FCU-5(E)
FCU-3(E)
FCU-2(E)
FCU-1(A)
FCU-4(A) FCU-5(A)
FCU-2(A)
FCU-3(A)
C W
R
H T
W S
H T
W R
C
MAU-1
DOWN FROM
T
T
T
T
T
T
T
GS-1
TG-1
0 16848
FCU-2(C)
FCU-3(C)
FCU-1(C)
FCU-5(C)
FCU-4(C)
12"X10"10"X10"
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
PROVIDE NEW GRILLES AT EACH LOCATION
EXISTING EXHAUST DUCT TO REMAIN
IN WALL.
DUCT WITH 10"X10" GRILLE
PROVIDE NEW 6" EXHAUST
CFM
UP TO EF-101 ON ROOF
SEE "HVAC FLOOR PLAN - BAY A" THIS SHEET SEE "HVAC FLOOR PLAN - BAY C" THIS SHEET
BAY 'A' BAY 'B' BAY 'C' BAY 'D' BAY 'E'
G
S T
E N
S T
E N
J
L L
A R
D I
M3 8
F L
O
A N
H V
-SEE SHEET M4 FOR HOT AND CHILLED WATER PIPING.
CEILING PLAN FOR DIFFUSER LOCATION IN EACH BAY.
SPRINKLER HEAD LOCATOINS. SEE ARCHITECTURAL
-DIFFUSER LOCATIONS MAY VARY SLIGHTLY DUE TO
-SIMILAR INSTALLATION FOR MODULES A, B & D.
0 4 8
WH
UH-1
ET-1 ET-2
HX-1
HWP-1 CWP-1
S-1
CF-1
H W
S
H W
R
C W
S
C W
R
H T
W S
F R
A N
T
H T
W R
H
A N
T
C W
S
F R
A N
T
C W
R
A N
T
MECHANICAL ROOM PLAN
SEE "MECHANICAL ROOM PLAN" THIS SHEET
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
CFM
HVAC FLOOR PLAN - BAY A,B,D HVAC FLOOR PLAN - BAY C,E
-SEE ARCHITECTURAL CEILING PLAN FOR DIFFUSER LOCATIONS.
COMMUNICATIONS CLOSET.
EXHAUST VENTILATION AND TRANSFER GRILLES FOR THE
-NOTE THAT BAY C IS THE ONLY BAY WITH ADDITIONAL
-SIMILAR INSTALLATION FOR BAY C & E.
HOT WATER PIPING, FITTINGS AND VALVES SHALL BE DESIGNED FOR 150 PSI W.P. AND 220-DEGREES F DESIGN TEMPERATURE.14.
AND 600 PSI MAXIMUM PRESSURE AND 400-DEGREES F.
HIGH TEMPERATURE HOT WATER PIPING, FITTINGS AND VALVES SHALL BE DESIGNED FOR OPERATING PRESSURE OF 300 PSI13.
LABEL INSULATED PIPING AND PROVIDE DIRECTION ARROWS. 12.
PROTECT FROM DAMAGE ALL PORTIONS OF THE EXISTING BUILDING DURING DEMOLITION/ CONSTRUCTION. 11.
DISCREPANCIES.
VERIFY FIELD CONDITIONS PRIOR TO START OF DEMOLITION/CONSTRUCTION AND NOTIFY THE GOVERNMENT OF ANY 10.
PAINT COATED.
PROVIDE PIPE SUPPORTS AND HANGERS. PIPE SUPPORTS AND HANGERS SHALL BE CLEANED, PRIMED AND DOUBLE EPOXY 9.
SUBMITTALS ARE REQUIRED ON ALL NEW MATERIALS AND EQUIPMENT.8.
STANDARD ONLY.
*THE MENTION OF A BRAND NAME OR SUPPLIER IS NOT INTENDED TO LIMIT COMPETITION BUT IS USED AS A QUALITY 7.
UNDER INSULATED PIPE TO PREVENT CRUSHING OF INSULATION AT ALL HANGERS AND SUPPORTS.
INSULATION SHALL BE MINERAL FIBER AND COVERED WITH ALL-SERVICE-JACKET WITH VAPOR BARRIER. PROVIDE SHIELDS
ALL HOT WATER PIPING SHALL BE CLEANED, FLUSHED TESTED, FILLED, BLED OF ALL AIR, THEN INSULATED. PIPE 6.
NEW EQUIPMENT SHALL BE FACTORY INSULATED.5.
AND DIMENSIONS.
AS ILLUSTRATED. EQUIPMENT SHALL BE AS INDICATED OR APPROVED EQUAL. SUBMITTALS SHALL SHOW EQUIPMENT ASSEMBLY
ALL NECESSARY WORK INCLUDING, BUT NOT LIMITED TO, BUILDING PENETRATIONS AND PIPING TO INSTALL ALL EQUIPMENT
INSTALLATION OF ALL NEW EQUIPMENT SHALL BE COMPLETED BY THE CONTRACTOR. THE CONTRACTOR SHALL COMPLETE 4.
INSTALL INSULATION ON ALL WATER PIPING. 3.
UNIONS, VENTS, SWITCHES AND AS ILLUSTRATED.
UNLESS OTHERWISE STATED PIPING SHALL REPRESENT PIPE, FITTINGS, VALVES, THERMOMETERS, STRAINERS, GAUGES, 2.
SEE ALL MECHANICAL SHEETS FOR ADDITIONAL INFORMATION.1.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OPEN
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OPEN
8"
C8107.27
J
L
E
| 2017-04-24T12:28:17-0500 | |
| BALES.JIMMIE.D.JR.1231309302 |
File details come from the government source that posted it. Updated .