8107_a1v8.pdf

PDF 210 KB Posted

Attached to
Renovation of Builiding 1701
Solicitation number
W911S717B0003
Issued by

About this file

8107_a1v8 , 1 of 27

View the file

Other files

File Type Posted
Bid_Abstract,_W911S7-17-B-0003.pdf PDF
Additional_Questions_W9111S7-17-B-0003.pdf PDF
W9111S7-17-B-0003,_Repair_and_Renovation_of_Bldg_1701,_Amendment_0002.pdf PDF
Revised,_8107_mi7v8.pdf PDF
Questions_and_Answers_W911S7-17-B-0003.pdf PDF
Revised,_8107_mi6v8.pdf PDF
W911S7-17-B-0003,_Repair_Renovation_of_Bldg_1701,_Admendment_0001.pdf PDF
Revised,_8107_mi9v8.pdf PDF
Revised,_8107_mi10v8.pdf PDF
Revised,_8107_m3v8.pdf PDF
Site_Visit_Roster.pdf PDF
8107_m7v8.pdf PDF
8107_mi6v8.pdf PDF
8107_mi11v8.pdf PDF
Attachment_B,_DBA_Wages_MO170019.pdf PDF
W911S7-17-B-0003_Repair_Renovation_of_Bldg_1701.pdf PDF
8107_m6v8.pdf PDF
8107_m8v8.pdf PDF
8107_e3v8.pdf PDF
8107_m2v8.pdf PDF
8107_mi12v8.pdf PDF
8107_mi10v8.pdf PDF
8107_mi3v8.pdf PDF
8107_mi2v8.pdf PDF
8107_e1v8.pdf PDF
Attachment_A,_Statement_of_Work.pdf PDF
8107_a2v8.pdf PDF
8107_e4v8.pdf PDF
Technical_Exhibit_1,__1701_Asbestos_Report.pdf PDF
8107_mi4v8.pdf PDF
8107_m3v8.pdf PDF
8107_m1v8.pdf PDF
8107_mi1v8.pdf PDF
8107_mi5v8.pdf PDF
8107_mi8v8.pdf PDF
8107_m4v8.pdf PDF
8107_e2v8.pdf PDF
8107_a3v8.pdf PDF
8107_mi9v8.pdf PDF
8107_m5v8.pdf PDF
8107_mi7v8.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L v

O f

A P

P R

D M

A D

E

D I

R E

C T

O R

A T

E

O F

U

B L I

C

W

R K

S

F O

R

O N

A

D

W

O

M

S S

O U

R I

D E

S C

R I

P T I

O N

R E

V I

S I

O N

S

D A

T E

A P

P R

O V

E D

D A

T E

S U

B M I

T T

E D

C H

E C

K E

D

D R

A W

N

D E

S I

G N

E D

C O

O R

D I

N A

T I

O N

D A

T E

D A

T E

D A

T E

SCALE

DATE

PROJECT NO:

DRAWING NO:

OFSHEET

AS SHOWN

A1

E L

L E

E L

L E

E L

L E

R

N O

R T

H

FOR ACTUAL NORTH

REFER TO SITE PLAN

PLAN NORTH0

GENERAL NOTES

AND FINISHES

OR CONSTRUCTION - PATCH SHALL MATCH EXISTING CONSTRUCTION

PATCH WALLS, FLOOR, AND CEILING WHERE DAMAGED BY DEMOLITION

FROM MANUFACTURERS STANDARD COLORS

ALL FINISHES TO BE SELECTED BY CONTRACTING OFFICER

MISCELANEOUS ITEMS

PROVIDE SOLID BACKING FOR WALL HUNG EQUIPMENT AND OTHER

UNLESS NOTED OTHERWISE

DIMENSIONS AT GYPSUM BOARD WALLS ARE TO STUDS

R.C.P.

O.C.

DIA.

NOT IN CONTRACT

REFLECTED CEILING PLAN

ON CENTER

DIAMETER

GYP. BD. GYPSUM BOARD

GA.

MAX.

MIN. MINIMUM

ABBREVIATIONS

AFF ABOVE FINISH FLOOR

MAXIMUM

NIC

GAUGE OF METAL

DEMOLITION NOTES

REFER TO MECHANICAL AND ELECTRICAL SHEETS FOR ADDITIONAL

REFER TO CONSTRUCTION DRAWINGS FOR EXTENT OF DEMOLITION

AND FINISHES

OR CONSTRUCTION - PATCH SHALL MATCH EXISTING CONSTRUCTION

PATCH WALLS, FLOOR, AND CEILING WHERE DAMAGED BY DEMOLITION

DEMOLITION NOTES

48 8 16 FT

A N

N

T E

S

F L

O

A N

F

S

M C

R E

P A

B

I

L D I

N G

17 NOV 16

DPW 03383-6J

Y L

O R

RESTROOMS

DEMOLITION PLAN

N O

R T

H

FOR ACTUAL NORTH

REFER TO SITE PLAN

PLAN NORTH012 2 4 FT

ROOF PLAN

ROOFING NOTES

DO NOT REMOVE INSULATION

REMOVE EPDM MEMBRANE, EDGE METAL, BOOTS AND FLASHINGS ONLY

REMOVE WALKWAYS THAT EXIST COMPLETE

REMOVE METAL VENTED SOFFIT SYSTEM

PROVIDE 4" OF CLOSED CELL FOAM INSULATION ON WALL AND STRUCTURE BEHIND FACIA

PROVIDE WELDABLE EDGE METAL AND COPING

REMOVE EXISTING DRAINS AND CLEAN GUTTER PIPE

REMOVE CERAMIC TILE IN EACH RESTROOM FROM THE FLOOR AND THE WALLS COMPLETE

REMOVE ALUMINUM STOREFRONTS COMPLETE IN EACH BAY

REMOVE ALL ALUMINUM WINDOWS COMPLETE IN EACH BAY

REMOVE ALL THE DOORS AND FRAMES COMPLETE IN EACH BAY

REMOVE COUNTERS AND MAKESHIFT CABINETS COMPLETE IN EACH BAY

REMOVE SHELVES IN FOUR STORAGE CLOSETS COMPLETE

REMOVE ASBESTOS TILE IN VESTIBULE AND FRONT OFFICE OF EACH BAY (REFER TO ASBESTOS REPORT)

ROOF DRAINS ROOF DRAINS

WITH SECURITY SCREEN

ROOF LADDER

REMOVE SUSPENDED CEILING SYSTEM COMPLETE THROUGHOUT ALL BAYS

WALLS TO REMAIN AT WATER SERVICE ENTRANCE

REMOVE GYPSUM BOARD ON WOOD STUD PARTITIONS IN THE BACK STORAGE AREAS AS SHOWN

REMOVE VINYL TILE IN THE ROOMS TO CONCRETE IN THE BACK STORAGE AREAS COMPLETE

RAISE EXISTING CURBS TO A MINIMUM OF 8" ABOVE MEMBRANE

OVER •" GLASS MAT GYPSUM ROOF BOARD AND R-20 OF RIGID INSULATION

PROVIDE NEW FULLY-ADHERED THERMOPLASTIC POLYOLEFIN (TPO) ROOF SYSTEM

PROVIDE WALKWAYS ON TPO ROOF TO EXHAUST VENTS AND UNITS, PROVIDE LAYOUT FOR APPROVAL

FENCO TYPE COUPLING WITH STAINLESS STEEL CLAMPS OR EQUAL

PROVIDE NEW ROOF DRAINS SAME SIZE AND CAPABILITIES AS EXISTING

PROVIDE ROOF LADDER WITH SECURITY SCREEN, REFER TO SPECIFICATION 07545

REMOVE EXISTING METAL AND PLYWOOD/AGGREGATE FACIA SYSTEM

AND VENTED SOFFIT SYSTEM TO MATCH EXISTING INCLUDING SUPPORT CLIPS

PROVIDE NEW METAL FACIA OF INVERTED STANDING SEAM ROOFING WITH ƒ" SHEATHING BOARD AND SUPPORT SYSTEM

REPLACE EXISTING LIGHT FIXTURES IN THE SOFFITS WITH LED DOWN LIGHTS, REFER TO ELECTRICAL DRAWINGS

CONSTRUCTION NOTES

REFER TO MECHANICAL AND ELECTRICAL SHEETS FOR ADDITIONAL

MINIMUM LENGTH TO BE 24" - BEVEL INSIDE CORNERS

PROVIDE „" X 4" HIGH VINYL BASE AT ALL INTERIOR WALLS

IN OFFICES 104 - 108 WITH „" X 4" VINYL BASE EXCEPT AS NOTED

AND PILE FIBER OF NYLON 6 CONTINUOUS HOLLOW FILAMENT

PROVIDE NEW CARPET TILES OF MINIMUM 21 OUNCES PER SQUARE YARD PILE WEIGHT

IN RESTROOMS, OPEN OFFICE 103, CORRIDOR AND VESTIBULES

PROVIDE „" VINYL COMPOSITION TILE FLOORING WITH „" X 4" VINYL BASE

PROVIDE 2 X 2 SUSPENDED CEILING SYSTEM IN BAYS WHERE REMOVED IN DEMOLITION

WITH A PREFINISHED EDGE IN JANITOR ROOM AT 5'6" AFF

PROVIDE ONE 9" X 2'0" SHELVE OF PARTICLE BOARD

BAY 'A' BAY 'B' BAY 'C' BAY 'D' BAY 'E'

SEE TYPICAL COMPANY BAY SHEET A3

PRIOR TO APPLICATION OF CONCRETE SEALERS

SLAB SHALL BE CLEAN AND CLEAR OF OILS AND OTHER DELETERIOUS MATERIALS

OR APPROVED EQUAL ON CONCRETE FLOOR IN STORAGE ROOMS AND JANITOR

SUCH AS CRYSTAL SEAL OTC BY DAYTON SUPERIOR WITH NONSLIP SURFACE

PROVIDE 2 COATS OF A NON-YELLOWING ACRYLIC SEALER

REMOVE SUSPENDED GYPSUM BOARD CEILINGS IN VESTIBULE, JANITOR, AND RESTROOMS

PAINT CONCRETE WALLS AND CEILING IN STORAGE ROOM WITH THREE COAT SYSTEM

F F

MOUNT PER MANUFACTURER'S RECOMMENDATIONS

CONTRACTOR TO FIELD VARIFY SIZE OF WINDOWS

ON STANDARD ANODIZED ALUMINUM TRACK WITH SIDE DRAW ALL WINDOWS TO OFFICES (15)

PROVIDE 1" WIDE 0.030 THICK CURVED VINYL HORIZONTAL BLINDS

NEW HVAC UNIT

FIVE EXISTING HVAC UNITS

FIVE AIR PENTHOUSES

FIVE RELIEF VENTILATORS

FIVE EXHUAST FANS

FOUR RELIEF VENTILATORS

VENTILATOR

REMOVED RELIEF

PAINTED WITH THREE COAT SYSTEM

ON 1" X 2" POPLAR FRAME IN SMALL STORAGE ROOM WITH EQUAL SPACING

PROVIDE FIVE ROWS OF 16" SHELVES OF PARTICLE BOARD WITH A PREFINISHED EDGE

REMOVE EXPANDED STEEL CAGES AND GATES COMPLETE IN BACK STORAGE AREAS AS SHOWN

REMOVE GYPSUM BOARD ON EXPANDED STEEL CAGES IN THE BAY AREA AS SHOWN AS WELL AS GAGES

PAINT ALL WALLS NEW AND EXISTING UNLESS NOTED OTHERWISE, TWO COATS LATEX SEMIGLOSS

PROVIDE TAPERED VINYL OR RUBBER MOLDING AT TRANSITION OF FLOORING MATERIALS

IN OFFICE AREA AS SHOWN AND IN THE BACK STORAGE NEXT TO THE DOUBLE DOORS

WITH GLASS DOORS AND 10# ABC FIRE EXTINGUISHER (FE) PER NFPA 10

PROVIDE SEMI-RECESSED MOUNTED STAINLESS STEEL FIRE EXTINGUISHER CABINET

J

L

S

C

E D

C8107.27

2017-04-24T11:26:09-0500
BALES.JIMMIE.D.JR.1231309302