8107_m8v8.pdf

PDF 237 KB Posted

Attached to
Renovation of Builiding 1701
Solicitation number
W911S717B0003
Issued by

About this file

8107_m8v8, 15 of 27

View the file

Other files

File Type Posted
Bid_Abstract,_W911S7-17-B-0003.pdf PDF
Additional_Questions_W9111S7-17-B-0003.pdf PDF
W9111S7-17-B-0003,_Repair_and_Renovation_of_Bldg_1701,_Amendment_0002.pdf PDF
Revised,_8107_mi7v8.pdf PDF
Questions_and_Answers_W911S7-17-B-0003.pdf PDF
Revised,_8107_mi6v8.pdf PDF
W911S7-17-B-0003,_Repair_Renovation_of_Bldg_1701,_Admendment_0001.pdf PDF
Revised,_8107_mi9v8.pdf PDF
Revised,_8107_mi10v8.pdf PDF
Revised,_8107_m3v8.pdf PDF
Site_Visit_Roster.pdf PDF
8107_m7v8.pdf PDF
8107_mi6v8.pdf PDF
8107_mi11v8.pdf PDF
Attachment_B,_DBA_Wages_MO170019.pdf PDF
W911S7-17-B-0003_Repair_Renovation_of_Bldg_1701.pdf PDF
8107_m6v8.pdf PDF
8107_e3v8.pdf PDF
8107_a1v8.pdf PDF
8107_m2v8.pdf PDF
8107_mi12v8.pdf PDF
8107_mi10v8.pdf PDF
8107_mi3v8.pdf PDF
8107_mi2v8.pdf PDF
8107_e1v8.pdf PDF
Attachment_A,_Statement_of_Work.pdf PDF
8107_a2v8.pdf PDF
8107_e4v8.pdf PDF
Technical_Exhibit_1,__1701_Asbestos_Report.pdf PDF
8107_mi4v8.pdf PDF
8107_m3v8.pdf PDF
8107_m1v8.pdf PDF
8107_mi1v8.pdf PDF
8107_mi5v8.pdf PDF
8107_mi8v8.pdf PDF
8107_m4v8.pdf PDF
8107_e2v8.pdf PDF
8107_a3v8.pdf PDF
8107_mi9v8.pdf PDF
8107_m5v8.pdf PDF
8107_mi7v8.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L v

O f

A P

P R

D M

A D

E

D I

R E

C T

O R

A T

E

O F

P U

B L I

C

W

R K

S

F O

R

L

O N

A

D

W

O

M

S S

O U

R I

D E

S C

R I

P T I

O N

R E

V I

S I

O N

S

D A

T E

A P

P R

O V

E D

D A

T E

S U

B M I

T T

E D

C H

E C

K E

D

D R

A W

N

D E

S I

G N

E D

C O

O R

D I

N A

T I

O N

D A

T E

D A

T E

D A

T E

SCALE

DATE

PROJECT NO:

DRAWING NO:

OFSHEET

AS SHOWN

E L

L E

E L

L E

E L

L E

R

F

S

M C

R E

P A

B

I

L D I

N G

17 NOV 16

DPW 03383-6J

A

Y L

O R

PLAN UNIT UNIT BASIS OF DESIGN

SUPPLY MARK TYPE ARRANGEMENT MODEL

(CFM)

SUPPLY FAN DATA

HP

NUMBER*

QTY

MCQUAY

(IN. H20)

ESP

FAN COIL UNIT SCHEDULE

FCU-1(A-E) 5 DUCTED HORIZONTAL FCHH202 186 0.1 1/30

SIZE

UNIT

02 5272

(BTU/HR)

TOTAL

(MBH)

SENSIBLE

4386 75/63 53/53

(°F)

WATER IN

(°F)

WATER OUT

45 55

(GPM)

FLOW

(FT H20)

DROP

PRESSURE

1.1 0.5

(°F)

WATER IN

(°F)

WATER OUT

(GPM)

FLOW

(FT H20)

DROP

PRESSURE

0.5 0.7

(BTU/HR)

TOTAL

(°F)

AIR IN

(DB/WB)°F

AIR OUT

(DB/WB)°F

AIR IN

(°F)

AIR OUT

180 150

CHILLED WATER COIL FILTER

MERV 4

1"

TYPE

VOLTAGE

V/HZ/PH

115/60/1 0.8 1.4

(AMPS)

MCA

(AMPS)

MROPD

MCQUAYFCU-2(A-E) 5 DUCTED HORIZONTAL FCHH202 164 0.1 1/3002 4395 3665 75/63 55/54 45 55 0.9 0.3 0.5 0.86750 70 103 180 150 115/60/1 0.8 1.4

MERV 4

1"

MCQUAYFCU-3(A-E) 5 DUCTED HORIZONTAL FCHH202 164 0.1 1/3002 4395 3665 75/63 55/54 45 55 0.9 0.3 0.5 0.86750 70 103 180 150 115/60/1 0.8 1.4

MERV 4

1"

MCQUAYFCU-4(A-E) 5 DUCTED HORIZONTAL FCHH202 0.1 1/3002

MCQUAYFCU-5(A-E) 5 DUCTED HORIZONTAL FCHH208 575 0.1 1/1208 75/63 53/53 45 55 3.4 6.4 2.270 118 180 150 115/60/1 1.8 3.2

MERV 4

1"

108 5272 4386 75/63 53/53 45 55 1.1 0.5 0.5 0.77394 70 180 150 115/60/1 0.8 1.4

MERV 4

1"

103 17104 13594 30327

NOTES

180 163

QTY

HEAT EXCHANGER SCHEDULE

MARK

HX-1

EWT(°F)

SHELL

EWT(°F)

TUBE

LWT(°F)

TUBE

LWT(°F)

SHELL

295 221 140

FLOW (GPM)

SHELL SIDE

WET (LBS)

WEIGHT

EXHAUST FAN SCHEDULE

MARK CFM H.P.STATIC VOLTS NOTESMOUNTING MODELLOCATION MAKE*

LATRINES 300 1/6 120 ROOF LOREN COOK

MECH RM 265 0.15

0.375 ACE-B 80

EF-102 ROOF---- ---- ---- ----

FAN IS EXISTING TO REMAIN. 7.

PROVIDE BACKDRAFT DAMPER.6.

CENTRIFUGAL BACKWARD INCLINED ALUMINUM WHEEL.5.

CONTINUOUSLY WELDED CURB CAP.4.

PROVIDE PERMANENTLY SEALED BEARINGS W/ L50 LIFE EXCEEDING 200,000 HRS.3.

SPUN ALUMINUM, BELT DRIVEN, DOWNBLAST.2.

UL LISTED CURB MOUNTED HEAVY DUTY EXHAUST FAN.1.

1-6

HOT WATER COIL (REHEAT TYPE)(35% PROPYLENE GLYCOL)

25.0

PLAN BASIS OF DESIGN

SUPPLY MARK

MODEL

(CFM)

SUPPLY FAN DATA

HP

QTY

MCQUAY

(IN. H20)

ESP

1 1000 1.0

(BTU/HR)

TOTAL

(MBH)

SENSIBLE

95/78 54/54

(°F)

WATER IN

(°F)

WATER OUT

45 55

(GPM)

FLOW

(FT H20)

DROP

PRESSURE

16.7 3.7

(°F)

WATER IN

(°F)

WATER OUT

(GPM)

FLOW

(FT H20)

DROP

PRESSURE

3.3 0.3

(BTU/HR)

TOTAL

(°F)

AIR IN

(DB/WB)°F

AIR OUT

(DB/WB)°F

AIR IN

(°F)

AIR OUT

180 158

CHILLED WATER COIL

MERV 8

2"

TYPE

VOLTAGE

V/HZ/PH

208/60/3

HOT WATER COIL (REHEAT TYPE)(35% PROPYLENE GLYCOL)

83MAU-1 OAH004GBGM

TYPE

THRU

BLOW-

MAKE*

(°F)

WATER IN

(°F)

WATER OUT

(GPM)

FLOW

(FT H20)

DROP

PRESSURE

6.2 0.7

(BTU/HR)

TOTAL

(°F)

AIR IN

(°F)

AIR OUT

160 14055

HOT WATER COIL (PREHEAT)(35% PROPYLENE GLYCOL)

59700 0.0 84730 44701 31773

FILTERS

MAKE-UP AIR UNIT SCHEDULE (ROOF MOUNTED)

MODEL

(GAL)

TOTAL VOLUME

EXPANSION TANK SCHEDULE : ET

11.3 21.7

MAKE*

VOLUME

MIN. ACCEPTANCE

B&G D-40

-PRECHARGED EXPANSION TANK

-125 PSIG MAX WORKING PRESSURE

-240°F MAX OPERATING TEMP

-ASME SECT VIII DIV. 1

PROVIDE LONMARK CERTIFIED SPACE HUMIDITY SENSOR. 9.

PROVIDE LONMARK CERTIFIED SPACE TEMPERATURE SENSOR WITH 2 HR OCCUPANT OVERRIDE.8.

ETL & AHRI RATED AND CERTIFIED.7.

CONDENSATE OVERFLOW SWITCH.6.

DISCONNECT SWITCH INCLUDED,5.

INSULATED HIDEAWAY CABINET WITH FILTER.4.

PROVIDE ALL EQUIPMENT AND CONTROLS COMPLETE TO FULLFILL SEQUENCE OF OPERATION AND SPECIFICATIONS.3.

START-UP OF EQUIPMENT SHALL BE PROVIDED BY A FACTORY AUTHORIZED REPRESENTATIVE.2.

LONMARK CERTIFIED. SEE CONTROL DRAWINGS AND SPECIFICATIONS FOR SEQUENCE OF OPERATION.1.

PUMP SCHEDULE

CWP-1

MARK GPM HEAD (FT) CONTROL HP SERIESPHVOLT

15103

3 1510 BASE

BASE

TYPE

QTY

MAKE

B&G

ITT

B&G

ITT

55 50 VFD

70 76 VFD

-- 1

FLUID

WATER

CHILLED

2. HOT WATER PUMPS TO INCLUDE GLYCOL SEAL.

1. MOTORS TO BE OPEN DRIP PROOF.

HOT WATER SHALL BE 35% PROPYLENE GLYCOL MIX.**

START-UP OF EQUIPMENT SHALL BE PROVIDED BY A FACTORY AUTHORIZED REPRESENATIVE.

MARK

S-1

MODELFLOW(GPM)

SPIROTHERM

AIR/DIRT SEPERATOR SCHEDULE

HUBBELL MECHANICAL SUPPLY CO 1-800-725-4217 OAE.

HEAD AS INDICATED. SEPARATOR AVAILABLE FROM

SEPARATORS WITH PIPE FLANGES AND REMOVABLE

1. INSTALL SPIROTHERM SPIROVENT AIR/DIRT

70 VDN250FL

COMM CLOSET 300

MARK LOCATION CFM STATIC MODEL NOTES

TG-1

W X H MAKE*

22 GAUGE MINIMUM GALVANIZED STEEL OUTER CASING.2.

COMPRESSION TO ELIMINATE VOIDES DUE TO VIBRATION AND SETTLING.

MATERIAL OF SUFFICIENT DENSITY AND PACKED UNDER AT LEAST 5%

AND FILLED WITH INORGANIC MINERAL WOOL TYPE GLASS FIBER ABSORBANT

INTERNAL BAFFLES TO BE 24 GAUGE MINIMUM GALVANIZED PERFORATED STEEL3.

250 2000

OCTAVE BAND MID-FREQUENCIES

OCTAVE BAND

ATTENUATION (dB)

1 2 3 4 5 6 7 8

63 125 500 1000 4000 8000

3 14 15 1 29 27 22 20

GRILLE SILENCER ATTENUATION

AS LISTED IN THE FOLLOWING TABLE.

GRILLE SILENCER SHALL HAVE MINIMUM ATTENUATION PROPERTIES4.

BUT IS USED AS BASIS OF DESIGN ONLY.

THE MENTION OF A BRAND NAME IS NOT INTENDED TO LIMIT COMPETITION*

TRANSFER GRILLES & SILENCER

COMM CLOSET 300GS-1 0.12 14" X 14"

ACOUSTICS

COMMERCIAL

TS-4 2-4

16"X16" 1--- --- ---

ABOVE FINISHED FLOOR.

MOUNTED IN WALL BETWEEN THE TWO GRILLES. LOCATE BOTTOM OF GRILLES 8"

PROVIDE TWO 16"X16" TRANSFER GRILLES (TG-1) WITH GRILLE SILENCER (GS-1) 1.

(A,B,D,E)

EF-101

EF-101(C) LATRINES 350 0.375 1/6 120 ROOF LOREN COOK ACE-B 80 1-6

11.3 21.7 B&G D-40

ET-1

HWP-1

MARK

ET-2

MARK GPM PHVOLT QTY

FLUID

UNIT HEATER SCHEDULE

UH-1 35% GLYCOL 3.2

MBH

MODINE

MODEL

HC 47 115 1

S C

H E

D U

L E

S

M8 8

SERVED

AREA

106/107

MAKE*

(CFM)

AIR

OUTSIDE

ETL & AHRI RATED AND CERTIFIED.8.

PROVIDE CONDENSATE SAFETY SWITCH.7.

PROVIDE DISCONNECT AND 120V SERVICE OUTLET.6.

PROVIDE INSULATED MOUNTING CURB.5.

PAINTED GALVANZED STEEL OUTER PANEL AND LINER WITH R-13 INJECTED FOAM INSULATION.4.

PROVIDE ALL EQUIPMENT AND CONTROLS COMPLETE TO FULLFILL SEQUENCE OF OPERATION AND SPECIFICATIONS.3.

START-UP OF EQUIPMENT SHALL BE PROVIDED BY A FACTORY AUTHORIZED REPRESENTATIVE.2.

LONMARK CERTIFIED. SEE CONTROL DRAWINGS AND SPECIFICATIONS FOR SEQUENCE OF OPERATION.1.

WATER**

HOT

MAKE*

RELIEF VALVE ON HEATED WATER SIDE TO PROTECT HEAT EXCHANGER.

400 PSI AND SHELL SIDE 150 PSI. 400°F DESIGN TEMPERATURE (SHELL AND TUBE). PROVIDE

SUBMITTAL REQUIRED. MEETS ASME BOILER AND PRESSURE CODE AND STAMPED FOR TUBESIDE

HEAT LOAD 1,471,216 BTU/HR. SURFACE AREA REQUIRED 18.4 SQFT. SPIRAL WOUND GASKETS.

GAUGE. PRESSURE DROP TUBE SIDE 3.9 FT H2O AND SHELL SIDE 6.25 FT H20.

90/10 COPPER/NICKEL TUBES (3/4" O. D., TUBE WALL THICKNESS 0.049", 18.0 B.W.G. TUBE

WITH HIGH TEMPERATURE, HIGH PRESSURE TUBE SIDE DESIGN, CAST DUCTILE IRON BONNET HEAD, ITT BELL & GOSSETT*, SHELL AND TUBE HEAT EXCHANGER, SERIES HTWU, MODEL QHTWU 104-42, 1.

MAKE*

J

B A

L

S

C

E D

B

C8107.27

8107_m1v8.dgn Default 4/24/2017 12:37:12 PM

2017-04-24T12:37:55-0500
BALES.JIMMIE.D.JR.1231309302

File details come from the government source that posted it. Updated .