8107_mi11v8.pdf

PDF 130 KB Posted

Attached to
Renovation of Builiding 1701
Solicitation number
W911S717B0003
Issued by

About this file

8107_mi11v8, 26 of 27

View the file

Other files

File Type Posted
Bid_Abstract,_W911S7-17-B-0003.pdf PDF
Additional_Questions_W9111S7-17-B-0003.pdf PDF
W9111S7-17-B-0003,_Repair_and_Renovation_of_Bldg_1701,_Amendment_0002.pdf PDF
Revised,_8107_mi7v8.pdf PDF
Questions_and_Answers_W911S7-17-B-0003.pdf PDF
Revised,_8107_mi6v8.pdf PDF
W911S7-17-B-0003,_Repair_Renovation_of_Bldg_1701,_Admendment_0001.pdf PDF
Revised,_8107_mi9v8.pdf PDF
Revised,_8107_mi10v8.pdf PDF
Revised,_8107_m3v8.pdf PDF
Site_Visit_Roster.pdf PDF
8107_m7v8.pdf PDF
8107_mi6v8.pdf PDF
Attachment_B,_DBA_Wages_MO170019.pdf PDF
W911S7-17-B-0003_Repair_Renovation_of_Bldg_1701.pdf PDF
8107_m6v8.pdf PDF
8107_m8v8.pdf PDF
8107_e3v8.pdf PDF
8107_a1v8.pdf PDF
8107_m2v8.pdf PDF
8107_mi12v8.pdf PDF
8107_mi10v8.pdf PDF
8107_mi3v8.pdf PDF
8107_mi2v8.pdf PDF
8107_e1v8.pdf PDF
Attachment_A,_Statement_of_Work.pdf PDF
8107_a2v8.pdf PDF
8107_e4v8.pdf PDF
Technical_Exhibit_1,__1701_Asbestos_Report.pdf PDF
8107_mi4v8.pdf PDF
8107_m3v8.pdf PDF
8107_m1v8.pdf PDF
8107_mi1v8.pdf PDF
8107_mi5v8.pdf PDF
8107_mi8v8.pdf PDF
8107_m4v8.pdf PDF
8107_e2v8.pdf PDF
8107_a3v8.pdf PDF
8107_mi9v8.pdf PDF
8107_m5v8.pdf PDF
8107_mi7v8.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L v

O f

A P

P R

D M

A D

E

D I

R E

C T

O R

A T

E

O F

U

B L I

C

W

R K

S

F O

R T

O N

A

D

W

O

M

S S

O U

R I

D E

S C

R I

P T I

O N

R E

V I

S I

O N

S

D A

T E

A P

P R

O V

E D

D A

T E

S U

B M I

T T

E D

C H

E C

K E

D

D R

A W

N

D E

S I

G N

E D

C O

O R

D I

N A

T I

O N

D A

T E

D A

T E

D A

T E

SCALE

DATE

PROJECT NO:

DRAWING NO:

AS SHOWN

E L

L E

R

T

BUILDING LEVEL TP/FT-10 NETWORK

NOTES:

OFF

ON

PROTECTOR

SURGE

COMM RM

PATCH PANEL

NODE NODE

SEE NOTES:

INSTALLED ACORDING TO CEA-709.3

T

EXISTING ENTERPRISE/UMCS WORKSTATION

PATCH PANEL CONNECTION TO NETWORK

AFTER COMM WIRE INSTALL COORDINATE WITH DPW FOR

CAT 6 WIRING SHALL NOT BE IN WIREWAYS OR WIRING TROUGHS

COMMUNICATION ROOM AND INSIDE THE BPOC ENCLOSURE

ON THE PATCH PANEL LOCATED IN THE BUILDING

TWO CAT 6 COMMUNICATION CABLES TERMINATED

PROVIDE DEDICATED 3/4"IN. RACEWAY AND

WINDOWS VISTA ENTERPRISE ARMY GOLD VERSION ON WORKSTAIONS

MOUNT

JACKS SURFACE

MODULAR RJ-45

PROVIDE TWO

BPOC, CPU AND LON NETWORK DIAGRAM

PROVIDE FINAL LNS DATABASE

EES 2.0

LNS SERVER

LONMAKER TURBO

14. PROVIDE NEW USB LON TALK ADAPTER AND THREE METER CABLE ACCESSARY WITH PHONE PLUG.

WITH DPW TEN DAYS IN ADVANCE.

CONTAINER FOR NETWORK SECURITY CONFIGURATION, BPOC HARDWARE SHALL NOT LEAVE FLW. COORDINATE

13. BPOC HARDWARE SHALL BE DELIVERED TO THE DIRECTORATE OF PUBLIC WORKS OPS IN THE ORIGINAL SEALED

12. WEB BINDINGS ARE NOT ALLOWED

11. PROVIDE A DEDICATED ENCLOSURE FOR THE BPOC AS SPECIFIED AND SHOWN.

10. EACH CHANNEL SHALL CONTAIN NO MORE THAN 2/3 THE MAXIMUM NUMBER OF DEVICES PERMITTED BY CEA-709.3

WHEN MORE THAN ONE CHANNEL IS PROVIDED.

CEA-7091B ROUTERS CONNECTED TO IT. DDC HARDWARE SHALL NOT BE CONNECTED TO THE BACKBONE CHANNEL THE CONTROL NETWORK BACKBONE . THE CONTROL NETWORK BACKBONE SHALL HAVE NO DEVICES EXCEPT

9. WHEN THE BUILDING LEVEL CONTROL NETWORK CONSISTS OF MUTIPLE CHANNELS ONE CHANNEL SHALL BE

8. PROVIDE A LICENSED COPY OF THE WEB AUTHORING TOOL ON MANUFACTURE CD. WEB AUTHORING TOOL SHALL MEET AR-25 REQ's.

ON THE BPOC.

AND DATA LOGGER, GRAPHIC'S AND ALARMS CONFIGURED AS SPECIFIED AND SHOWN. GRAPHICS SHALL RESIDE

6. BPOC USE SHALL BE LIMITED TO THE FOLLOWING ITEMS, ENT./UMCS COMMUNICATION, BUILT IN SCHEDULER

TO THE LAN NETWORK COORDINATE WITH DPW.

5. BPOC SHALL HAVE ALL SOFTWARE UPDATES AND PATCHES INSTALLED BEFORE CONNECTION

COMPUTER HARDWARE. COORDINATE WITH DPW 10 DAY'S IN ADVANCE.

4. COORDINATION WITH DPW OPS SECTION WILL BE REQUIRED FOR ACCESS TO

SHOWN.

3. BUILDING LEVEL DDC SYSTEM SHALL COMMUNICATE WITH THE UMCS AS SPECIFIED &

TP/FT-10 (LON NETWORK) IN ACCORDANCE WITH CEA-709.3.

2.PROVIDE DOUBLY TERMINATED BUSS TOPOLOGY FOR BUILDING LEVEL

1. CONTRACTOR TO PROVIDE FACTORY FABRICATED PATCH CABLES FOR BPOC.

G

S T

E N

S T

E

J

L L

A R

D I

SHEETMI11OF12

N E

T W

O

K

N F I

G U

R A

T I

O N

B U I

L D I

V E

L

PROVIDE SOFTWARE TO DPW.

FPM USE IS NOT ALLOWED.

WEB BINDINGS ARE NOT ALLOWED.

BUILT IN SCHEDULER DATALOGGER.

BUILDING LEVEL GRAPHICS

CONFIGURED FOR DHCP

BPOC WITH IP COMMUNICATION

TYPE 4 ENCLOSURE

PROVIDE NEMA 250 CIRCUIT BREAKER OR FUSE

SUPPLY WITH OUTLET AND

ENCLOSED POWER

F

S

M C

R E

P A

B

I

L D I

N G

17 NOV 16

DPW 03383-6J

PROTECTOR

SURGE

J

A

L

S

E D

C8107.27

2017-04-24T12:45:21-0500
BALES.JIMMIE.D.JR.1231309302

File details come from the government source that posted it. Updated .