- Renovation of Builiding 1701
- Solicitation number
- W911S717B0003
About this file
8107_m6v8, 13 of 27
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L v
O f
A P
P R
D M
A D
E
D I
R E
C T
O R
A T
E
O F
P U
B L I
C
W
R K
S
F O
R
L
O N
A
D
W
O
M
S S
O U
R I
D E
S C
R I
P T I
O N
R E
V I
S I
O N
S
D A
T E
A P
P R
O V
E D
D A
T E
S U
B M I
T T
E D
C H
E C
K E
D
D R
A W
N
D E
S I
G N
E D
C O
O R
D I
N A
T I
O N
D A
T E
D A
T E
D A
T E
SCALE
DATE
PROJECT NO:
DRAWING NO:
OFSHEET
AS SHOWN
E L
L E
E L
L E
E L
L E
R
F
S
M C
R E
P A
B
I
L D I
N G
17 NOV 16
DPW 03383-6J
Y L
O R
PI PI
NO SCALE
HTWR
HTWS
PRESSURE SWITCH
HX DIFFERENTIAL
PIPE OUTLET TO FLOOR
TO CONTROLS
TEMPERATURE SENSOR
MAKE-UP WATER LINE
PUMP
FAILSAFE POSITION IS CLOSED(NC)
AUTOMATIC CONTROL VALVE
NC
NO
CWS CWR
SYSTEM PUMP
HOSE END DRAIN VALVE
CHEMICAL POT FEEDER
GATE OR BALL VALVE
FILL FUNNEL
TO SYSTEM
FROM SYSTEM
GATE VALVE (TYP)
NO SCALE
DETAIL
NEW END SUCTION PUMP
SYSTEM HEADER SEE
CONNECT PIPING TO
FROM FLOOR
WALL OR SUPPORT
HANG UNIT TO
AIR VENT
MANUAL
NEW CHEMICAL BYPASS FEEDER DETAIL
DIELECTRIC UNIONS AT ALL DISSIMILAR METALS.
INSULATE ALL NEW PIPING/FITTINGS AND PROVIDE
INSTALL NEW CHEM FDR-1 TO HOT WATER SYSTEM.
NO SCALE
MANUAL AIR VENT
UNION OR FLANGE (TYPICAL)
PRESSURE/TEMPERATURE PLUG
(TYPICAL)
AUTOMATIC 2 WAY CONTROL VALVE
REDUCER
BALANCING VALVE
HWR
HWS
BLOWDOWN WITH CAPPED END
STRAINER WITH HOSE END VALVE
W/CAP (TYP.)
HOSE END DRAIN
HOT WATER REHEAT COIL
AIR
FLOW
NOTE:
INSTALL PIPING TO ALLOW COIL REMOVAL CLERANCE WITHOUT CUTTING ANY
PIPING.
HOT WATER REHEAT COIL
MANUAL AIR VENT
UNION OR FLANGE (TYPICAL)
PRESSURE/TEMPERATURE PLUG (TYPICAL)
REDUCER (TYPICAL)
BALANCING VALVE
3 WAY AUTOMATIC CONTROL VALVE
HWR
HWS
PIPING.
INSTALL PIPING TO ALLOW COIL REMOVAL CLERANCE WITHOUT CUTTING ANY
NOTE:
BLOWDOWN WITH CAPPED END
STRAINER WITH HOSE END VALVE
W/CAP (TYP.)
HOSE END DRAIN
FLOW
AIR
NO SCALE
FULL PORT BALL
VALVE (TYPICAL)
FULL PORT BALL
VALVE (TYPICAL)
NO SCALE
BYPASS VALVES TO REMAIN
EXISTING ISOLATION &
MECHANICAL ROOM FLOOR
TH
TH
MECHANICAL ROOM FLOOR
(TYPICAL)
THERMOMETER
(TYPICAL)
PRESSURE GAUGE
STRAINER
RETURN PIPING FROM PLANT
CHILLED WATER SUPPLY AND
(TYPICAL)
DRAIN VALVE
FLOW
AIR
(TYPICAL)
PRESSURE/TEMPERATURE PLUG
UNION OR FLANGE (TYPICAL)
BALANCING VALVE
HWR
2 POSITION CONTROL VALVE
MANUAL AIR VENT
HWS
NO SCALE
UNIT HEATER
FROM CHEMICAL FEEDER
HW
AIR DIRT SEPARATOR
M6 8
D E
T A I
L
TYPICAL COIL PIPING (3-WAY VALVE) TYPICAL COIL PIPING (2-WAY VALVE)
PIPE HANGER W/VIBRATION
REFER TO PLAN FOR
SIZES OF MAINS
BAS SENSOR WELL(TYP.)
BALL VALVE (TYP.)
BUTTERFLY VALVE (TYP.)
STRAINER WITH
BLOWDOWN VALVE, SEE NOTE 1,2
NEOPRENE FLEX CONNECTIONS
W/ CONTROL CABLES (TYPICAL)
PIPE SUPPORT LEG
HOSE END DRAIN VALVE WITH CAP
3/4" PUMP BASIN DRAIN
PIPE TO FLOOR DRAIN
ANCHOR BOLT (TYPICAL)
PUMP AND SUCTION ELBOW
AS REQUIRED TO SUPPORT
PUMP BASE LENGTH AND WIDTH
FINISH FLOOR
5" CONCRETE PAD
ISOLATOR (TYP.)
SPRING VIBRATION
FOR ABOVE GRADE FLOORS
PUMP INERTIA BASE
SYSTEM IS FILLED
PIPE INSTALLATION AND
GROUT PUMP BASE AFTER
COUPLING GUARD
CHECK VALVE
BALANCING VALVE
NO SCALE
END SUCTION PUMP
HEATING WATER AND HEAT EXCHANGER CONNECTIONS
CHILLED WATER
PI PI
HTWR HTWS
NO SCALE
MECHANICAL ROOM FLOOR
TH
TH
(TYPICAL)
THERMOMETER
(TYPICAL)
PRESSURE GAUGE
STRAINER
(TYPICAL)
DRAIN VALVE
RETURN PIPING FROM PLANT
HIGH TEMP WATER SUPPLY AND
HIGH TEMP WATER
ISOLATOR (TYP)
CONNECTION
POINT OF
VALVES
ISOLATION
FULL PORT
CONNECTION
POINT OF
METAL REINFORCED FOR ALL FLANGES.
SCH 80XS STEEL. FLANGES AND FITTINGS SHALL BE 600 CLASS STEEL. GASKETS TO BE FLEXITALLIC
SERRATED FACE FLANGE CONNECTED. UNIONS NOT ALLOWED. PIPPING AND FITTINGS TO BE SEAMLESS
ALL HIGH TEMP PIPING POINTS OF DISASSEMBLY TO ALLOW FOR TUBE BUNDLE REMOVAL SHALL BE RAISED9.
CONFIGURE PIPING TO ALLOW MAINTENANCE ACCESS8.
ALL HIGH TEMPERATURE HOT WATER PIPING SHALL BE EXTRA HEAVY.7.
ALL HEATING WATER, CHILLED WATER AND CONDENSATE PIPING SHALL BE SCH 40.6.
ONCE NEW EQUIPMENT IS INSTALL CONTRACTOR SHALL VERIFY PROPER OPERATION TO GOV INSPECTOR.5.
INSULATE ALL HEATING WATER, HIGH TEMPERATURE HOT WATER, CHILLED WATER AND CONDENSATE PIPING.4.
CLEAN AND TEST NEW PIPING AS DEFINED IN SPECIFICATIONS. 3.
PROVIDE PIPING LABELS.2.
CONTRACTOR TO INSTALL ALL VALVES, FITTINGS AND EQUIPMENT. 1.
BALANCING.
STRAINER SCREEN SHALL BE CLEANED PRIOR TO WATER 1.
NOTES:
AUTOMATIC AIR VENT
EXPANSION TANK
BLADDER TYPE
CEILING SUSPENDED
PROVIDE NEW
HWS
J
L
C
E D
C8107.27