A12__DCAA_SF_1408_Checklist.pdf

Standard Form PDF 32 KB Posted

Attached to
W900KK-18-R-0033 for ACC-Orlando/ PEO STRI, PM STS Special Operations Forces Training, Engineering and Maintenance Support III (SOF TEAMS III)
Solicitation number
W900KK-18-R-0033
Issued by

About this file

Not Listed

View the file

Other versions and copies of SF 1408

File Revision Posted Attached to
B08 - Attachment 0006 - Preaward Survey of Prospective KTR Accounting Sys (SF 1408) - 11SEP2025.pdf Sep 11, 2025 EAGLE Fort Irwin, CA W519TC-25-R-0009
B08 Attachment 0006 Preaward Survey of Prospective KTR Accounting Sys (SF 1408).pdf Revision not stated EAGLE Fort Riley KS W519TC-26-R-A054
Standard Form 1408 - Pre-Award Survey.pdf Revision not stated Next Generation Ammunition & Munitions Equipment (NGAME) for MMHE RFP/Solicitation
Attachment 10-SF1408-14f.pdf Revision not stated Mid-Atlantic Regional Maintenance Center (MARMC) Technical and Professional Services
Attachment 11 - SF1408-14f.pdf Revision not stated Submarine Peculiar Special and Support Equipment (PSSE) Support Services for the Mid-Atlantic Regional Maintenance Center
47QFHA25R0017_T10_08_PRISM MATOC Attachment 4_Modified Preaward Survey (SF 1408).pdf Revision not stated Personnel & Readiness Infrastructure Support Management Services (PRISM) MDoDS Pool Small Business On-Ramp
B08 - Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Picatinny Arsenal, NJ W519TC-25-R-0023
Attachment 7 Pre-Award Survey (SF1408).pdf Revision not stated Joint Safety Health Institutional Facilities Team (JSHIFT) 80LARC25R7001
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Dugway Proving Ground, UT: W519TC-25-R-0008
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Revision not stated EAGLE Ft. Bliss, TX, W519TC-25-R-0007
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Huachuca, AZ W519TC-24-R-0027
1305M325R0002 - Attachment 6 - SF1408-14f.pdf Revision not stated Phased Array Radar (PAR) Test Article
SF1408-14e.pdf Revision not stated PNW Regional Planning Facilitator
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort McCoy, WI - W519TC-23-R-0119
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort Knox, KY W519TC-23-R-0088
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Revision not stated EAGLE Fort Jackson, SC W519TC-24-R-0026
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Cavazos, TX W519TC-23-R-0102
Attach 4a - SF 1408.pdf Revision not stated USSOCOM Intelligence Support Services -- DRAFT RFP (H92402-24-R-0001)
J.1.b.3 - SF1408-14e.pdf Revision not stated NASA Ames Research Center - Request for Proposal - Aerospace Research Technology and Simulations (ARTS)
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Presidio of Monterey, CA, W519TC-23-R-0104
Show all 20

Who attaches SF 1408

Other files

File Type Posted
W900KK-18-R-0033_0003-Conformed.pdf PDF
A7_Cost_Price_Workbook_7-25-18.xlsx XLSX spreadsheet
W900KK-18-R-0033_0003-Executed.pdf PDF
A7_Cost_Price_Workbook.xlsx XLSX spreadsheet
W900KK18-R-0003_0002-_Conformed.pdf PDF
W900KK18-R-0003_0002-_Executed.pdf PDF
A13_Industry_Quest_Answer_23July2018V.1.pdf PDF
A7_Cost_Price_Workbook.xlsx XLSX spreadsheet
W900KK18-R-0003_0002-_Conformed.pdf PDF
W900KK18-R-0003_0002-_Executed.pdf PDF
A13_Industry_Quest_Answer_23July2018V.1.pdf PDF
A15_KEY_PERSONNEL.pdf PDF
A13_Industry_Quest_Answer_18July2018.pdf PDF
A1_PWS_V1.3.pdf PDF
A7_Cost_Price_Workbook.xlsx XLSX spreadsheet
W900KK-18-R-0033_0001-Conformed.pdf PDF
W900KK-18-R-0033_0001-Executed.pdf PDF
A6_SCA__Nondisplacment_of_Qualified_Workers_Fact_Sheet.pdf PDF
A2_QASP.pdf PDF
A5_GFE_GFI_List.pdf PDF
A7_Cost_Price_Worksheet.xlsx XLSX spreadsheet
A10a-f_Wage_Determination.pdf PDF
A14_CBA.pdf PDF
A1_PWS.pdf PDF
A3_DD254.pdf PDF
A8_Service_Agreements.pdf PDF
A11_SF_1444.pdf PDF
EXHIBIT_A-CDRLS.pdf PDF
A9_Clarification_Form.doc DOC document
A13_Industry_Quest_Answer.pdf PDF
A4__TADSS_List.pdf PDF
W900KK-18-R-0033_SOF_TEAMS_III_Final_RFP.PDF PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preaward Survey of Prospective Contractor Accounting System Checklist

Instructions:

1. Please refer to the instructions for filling out this form provided at the bottom of this document.

2. Mark “X” in the appropriate column.

3. On Page 2 provide a narrative describing how the current accounting system supports your response to each item.

Yes No N/A Note

1. Is the accounting system in accord with generally accepted accounting principles?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. Accounting system provides financial information:

a. Required by contract clauses concerning limitation of cost

(FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).

b. Required to support requests for progress payments.

4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) Do you currently have existing contracts with the U.S. Government?

Instruction: Use this section to explain how the current accounting system supports your response to each item. If a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.

Note Narrative

Instructions for Contractor

The acceptability of an accounting system is determined based upon a preaward survey performed by the Defense Contract Audit Agency (DCAA). In order for the Program Executive Office for Simulation, Training and Instrumentation (PEO STRI) to proceed with a request for a DCAA preaward accounting system survey we require that you complete the Preaward Survey of Prospective Contractor Accounting System Checklist included as Attachment 1. This completed form should be submitted to the cognizant PEO STRI Procuring Contracting Officer (PCO), Lovisa D. Parks as soon as possible. The PCO will forward a copy to the cognizant DCAA office along with the request for audit.

Information concerning DCAA may be found at http://www.dcaa.mil. Specific information concerning requirements for an acceptable accounting system may be found under the menu located on the left hand side of the home page entitled "DCAA Publications". The publication listed there is called "Information for Contractors" and Chapter 2 provides details on preaward accounting system surveys.

http://www.dcaa.mil/�

File details come from the government source that posted it.